New York City, 19 th c.

Similar documents
New York City, 17 th c.

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

NYC Parks by the Numbers

Kevin M. Rampe, President -- Lower Manhattan Development Corporation

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

2013 Summer Recap. Rockaway Beach

Restoring Water Ecosystems in NYC Parks

Introducing Green Infrastructure for Coastal Resilience

Rhode Island Shoreline Change Special Area Management Plan

NYC Green Infrastructure Program

PORT OF SAN FRANCISCO

Sustainable Waterfront Redevelopment Case Study: Seattle, Washington. By Nicole Faghin, LEED AP

East Midtown Greenway

Monday, October 5, THE LIGHTHOUSE, PIER 61 at CHELSEA PIERS, HUDSON RIVER PARK, NEW YORK CITY SPONSORSHIP DECK

Preparing Hudson River Waterfronts for an Era of Rapid Sea Level Rise

Well-Planned Growth:

1. Seattle Central Waterfront Park

Libby Zemaitis October 18, 2017 Climate Outreach Specialist, NYS DEC Hudson River Estuary Program

Natural & Nature-Based Solutions for Risk Reduction & Resilience

Supporting Hudson Riverfront Communities as Climate-Adaptive Leaders. Libby Zemaitis November 17, 2017 NYS DEC Hudson River Estuary Program

LANDSCAPE ARCHITECTURE AMERICAN SOCIETY OF LANDSCAPE ARCHITECTURE NEW YORK CHAPTER

Improving quality of life in. New York City ARCADIS NEW YORK CITY

Local rain-driven flooding (surface and ground water) Upstream rain-driven flooding (rivers) Tidal or storm surge-driven flooding (coast)

NYC Green Infrastructure Program

Introduction. Integrating Ecological Restoration of Estuarine Shorelines with Urban Community Revitalization Efforts. Ed Morgereth Biohabitats, Inc.

Project. Project Type:

Coastal Planning in Texas. Tony Williams Senior Director of Planning Coastal Resources Division Texas General Land Office

Pinellas County Greenways

Green or Grey Solutions? Why not both? Lessons from the Mid-Atlantic on Hybrid Living Shorelines

Detroit Stormwater Rules and Drainage Fee Updates

Case studies. B1.1 Lloyds Crossing, Portland (USA)

Green Infrastructure. NYS Department of Environmental Conservation

Key Environmental Issues in U.S. EPA Region 2 Panel 4 Water Issues

G. RECREATION AND OPEN SPACE ELEMENT. The following summarizes the Recreation and Open Space Element:

An Integrated Approach for Water Management Examples from The Netherlands. Addressing Climate Change and Sea Level Rise

RESILIENCY, ADAPTATION, & SUSTAINABILITY AT THE CITY OF ST. AUGUSTINE

Making the Land Use, Transportation, Air Quality Connection

10.0 Open Space and Public Realm

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director, Planning and Capital Projects

Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016

Appendix E: Illustrative Green Infrastructure Examples

Green Roofs and CSO Mitigation:

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018

CLIMATE STEWARDSHIP INITIATIVE AND GREEN INFRASTRUCTURE. City of Hartford Office of Sustainability

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement

HAZARD MITIGATION GOALS AND OBJECTIVES

Bristol Marsh Heritage Conservancy

the future of existing conditions A Multidisciplinary Approach to Resilient Coastal Design

Splendor Test Tour TEST TOUR SPLENDOR - 08/02/17

Virginia Beach and Sea Level Rise: Where Do We Go From Here?

IDENTIFICATION TO IMPLEMENTATION THE JOURNEY OF CITY RESILIENCE

Waterfront Redevelopment. City Council Briefing May 15, 2006

Appendix to Amicus Curiae Brief: Selected Provisions of the South Carolina Beachfront Management Act

1.1 WATERFRONT SEATTLE

Baylands Segment J. Bay between the Golden Gate and Segment J. Coyote Point. of For managed ponds. included habitat enhancement.

DRAFT FOR PUBLIC REVIEW. Game Plan for a Healthy City

NORTH KINGSTOWN PILOT PROJECT May 9, 2016 North Kingstown Town Council

MP Program Summary: A resiliency study for Bridgeport, Connecticut and the Long Island Sound.

Bridgeport Comprehensive Waterfront Plan 2 nd Launch Neighborhood Meeting 3/9/16

HUDSON RIVER WATERFRONT. Hudson River Waterfront Walkway

Climate Smart Communities Green Infrastructure Case Studies

Hunts Point Landing, Bronx, New York

PUBLIC SPACE/AMENITY PROJECTS

Zoning and Development Considerations in the Boothbay Harbor Maritime/Water Dependent District

Fulfilling the Promise of Parks to People in a Changing Environment: The Gateway National Recreation Area Experience

CHAPTER 8 ISSUES, CONCERNS, CONSTRAINTS AND OPPORTUNITIES

RECREATION, OPEN SPACE AND GREENWAYS ELEMENT GOALS, OBJECTIVES, AND POLICIES

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK

Comprehensive Plan & Station Area Zoning

The Benefits and Challenges Associated with Green Infrastructure Practices

FRI-A05: INFRASTRUCTURE, RESILIENCE, and PUBLIC SPACE. E450B, Level 4 Friday, November 6, am-10am

Fort Washington & Upper Riverside Parks PlaNYC Survey Results

COASTAL MANAGEMENT ELEMENT. Last amended December 6, 2016 as part of the 2016 EAR

Planning for Higher Education Journal V44N1 October December William Kenworthey

Empowering Local Action for Coastal Resilience in Massachusetts. Bruce K. Carlisle MA Office of Coastal Zone Management

Improvement of the Atlantic Coast of New York City,

New York City s Neighborhood Grocery Store and Supermarket Shortage New York City Department of City Planning

VACANT TO VIBRANT : GREEN INFRASTRUCTURE & URBAN REVITALIZATION

But What About the People? The Role of Urban Planning and Green Infrastructure

CHAPTER 1 Introduction

Green Infrastructure Policy and Ordinances: Local Planning Tools for Green Infrastructure

Figure 1 SSIP Watersheds (Source: SFPUC) North Shore Watershed

Port of Camas-Washougal Waterfront Trail Master Plan

Support the implementation of Cape Coral's Comprehensive Plan. Protect and utilize the unique natural resources in the City.

CHATHAM COUNTY S PATH TO SUSTAINABILITY - THE NATURAL RESOURCES SIDE

A CONCEPTUAL PROPOSAL BY THE UMDLOTI FORUM Representing the Umdloti Ratepayers and Residents Association and the emdloti UIP

900 Innes & India Basin Shoreline Park

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

Green Infrastructure for Stormwater Management in Syracuse, New York. Atlantic States Legal Foundation, Inc.

Brooklyn Bridge Park: Storm Resilience through Design

False Creek South Sustainability

Route 1 Corridor Study

Manchester. Vision for Manchester

Task Force Meeting November 5th, www. IBwaterfrontparks.com

DC Clean Rivers Project Green Infrastructure Program

Municipal Action Teams

GREENING. Caucasian Wing Nut Tree, The Brooklyn Botanic Garden

Learning Objectives. Thinking about Tomorrow s Waterfront Parks Lessons from Hurricane Sandy and Beyond. Hurricane Sandy

A Vision For Miami s Twenty-first Century Parks And Public Spaces

Transcription:

New York City, 19 th c.

Lower Manhattan, circa 1930s

Westside Highway, Manhattan, circa 1940s

Greenpoint Terminal Market, Brooklyn

TRANSFORMATIONS ON THE WATERFRONT Harlem River Park, Manhattan BEFORE AFTER

TRANSFORMATIONS ON THE WATERFRONT Manhattan, Hudson River Waterfront, Pier 66 BEFORE AFTER

TRANSFORMATIONS ON THE WATERFRONT Brooklyn Bridge Park, East River Waterfront BEFORE AFTER

TRANSFORMATIONS ON THE WATERFRONT Concrete Plant Park, the Bronx BEFORE AFTER

THE OPPORTUNITY At 520 miles, New York City s waterfront is longest and most diverse of any city. It s longer than Chicago, Seattle, San Francisco, and Portland combined. Reclaim New York City s position as an international harbor city. Reestablish strong relationship with the water make the water part of New Yorker s daily experience.

VISION 2020 PROCESS Phase 1: Identify Goals and Issues, Spring 2010 Citywide Public Meeting, April 8 Phase 2: Identify Opportunities and Priorities, Summer 2010 The Bronx Workshop, May 12 Brooklyn, May 17 Queens, June 2 Manhattan Workshop, June 8 Staten Island, June 28 The Blue Network, June 24 and July 19 Phase 3: Identify Recommendations, Fall 2010 Draft Recommendations Issued, September 7 Citywide Public Meeting, October 12 VISION 2020: NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN

VISION 2020 PROCESS VISION 2020: NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN

Franklin D. Roosevelt Boardwalk and Beach on the Atlantic Ocean Staten Island GOAL 1 Expand public access to the waterfront and waterways on public and private property for all New Yorkers and visitors alike. VISION 2020: NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN Daniel Avila, NYC Department of Parks & Recreation

ACTION AGENDA PROJECTS 1. Expand and improve existing waterfront parks by investing more than $200 million. GOAL 1: EXPAND PUBLIC ACCESS 2. Develop or acquire over 50 acres of new waterfront parks by investing $40 million 3. Develop waterfront Greenways and esplanades by investing over $120 million Pier 1, Brooklyn Bridge Park Julienne Schaer Rendering of Freshkills Park South Bronx Greenway Plan NYCEDC

Walkway at Northside Pier in Williamsburg, Brooklyn GOAL 2 Enliven the waterfront with a range of attractive uses integrated with adjacent upland communities. VISION 2020: NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN

ACTION AGENDA PROJECTS 1. Catalyze over $150M in waterfront development projects. GOAL 2: ENLIVEN THE WATERFRONT 2. Promote historic maritime resources for educational and economic development 3. Promote water dependent uses on the waterfront Rendering of Hunters Point South SHoP Architects VISION 2020: NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN

Crew of the Thomas J. Brown pulling in slack line from a barge. GOAL 3 Support economic development activity on the working waterfront. VISION 2020: NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN Carolina Salguero

ACTION AGENDA PROJECTS 1. Encourage the expansion of container shipping. GOAL 3: SUPPORT THE WORKING WATERFRONT 2. Sustain economic development activity on the working waterfront by investing over $170 million 3. Improve environmental sustainability of working waterfront New York Container Terminal, Staten Island Bethlehem Steel Site, Staten Island Carolina Salguero Red Hook Container Terminal, Brooklyn

Oysters from the Bay Ridge Flats Restoration Project.. GOAL 4 Improve water quality through measures that benefit natural habitats, support public recreation, and enhance waterfront and upland communities. VISION 2020: NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN

ACTION AGENDA PROJECTS 1. Continue major upgrades at wastewater treatment plants by investing $1.6 billion GOAL 4: IMPROVE WATER QUALITY 2. Implement $180 million of green infrastructure projects that capture stormwater runoff and reduce combined sewer overflows (CSOs) 3. Invest $650 million to build cost-effective gray infrastructure that captures and manages combined sewer overflows 4. Enhance and improve drainage by acquiring new areas for Bluebelts and improving storm sewers in waterfront neighborhoods; an investment of $140 million. Staten Island Bluebelt VISION 2020: NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN

American Oystercatchers in Jamaica Bay. GOAL 5 Restore degraded natural waterfront areas, and protect wetlands and shorefront habitats. VISION 2020: NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN Dan Riepe

ACTION AGENDA PROJECTS GOAL 5: RESTORE THE NATURAL WATERFRONT 1. Implement over $50 million in waterfront ecological restoration projects. 2. Increase protection of wetlands and shoreline habitat Freshkills Park Pelham Bay Lagoon Daniel Avila, NYC Department of Parks & Recreation VISION 2020: NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN

On the Hudson River near the George Washington Bridge. GOAL 6 Enhance the public experience of the waterways that surround New York our Blue Network. VISION 2020: NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN Daniel Avila, NYC Department of Parks & Recreation

GOAL 6: ENHANCE THE BULE NETWORK VISION 2020: NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN

Construction of the new WNYC Transmitter Park on the East River, Brooklyn GOAL 7 Improve government regulation, coordination, and oversight of the waterfront and waterways. VISION 2020: NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN

ACTION AGENDA PROJECTS GOAL 7: IMPROVE GOVERNMENT OVERSIGHT 1. Establish In-Water Permitting Task Force to focus on developing permitting guidance documents, written mitigation policies and standards, one-stop-shop for in-water permitting, and training program for applicants. 2. Establish In-Water Design Guidelines Task Force to focus on design and construction practices and develop guidelines that minimize environmental impact, ensure structural resiliency of in-water structures, and accommodate vessel tieup. 3. Develop wetlands mitigation bank and/or in-lieu fee program to promote more effective mitigation projects. VISION 2020: NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN

The seawall at Battery Park City, Manhattan GOAL 8 Identify and pursue strategies to increase the city s resilience to climate change and sea level rise. VISION 2020: NEW YORK CITY COMPREHENSIVE WATERFRONT PLAN

COASTAL CLIMATE RESILIENCE The coastal zone is large and diverse. Different areas face different risks and will require different strategies.

COASTAL CLIMATE RESILIENCE Surge Barriers Floodproofing Wave Attenuation Shoreline Armoring 38

East River Esplanade

East River Esplanade

East River Esplanade

Waterfront zoning regulations