Planned Washington Boulevard Bus Stop Improvements

Similar documents
Lubber Run Retrofits Ranking Summary (Arranged by Rank) Site ID Site Description Practice Score Rank

Appendix I ARLINGTON COUNTY SECTOR PLANS SUMMARY RECOMMENDATIONS RELATED TO PUBLIC SPACES

General Land Use Plan (GLUP) Amendments 2001 Present*

DESIGN SERVICES FOR BALLSTON- MU METRO STATION AREA IMPROVEMENTS 90% PLAN PRESENTATION: DECEMBER 2015

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 19, 2015

SPRC PRESENTATION MAY 13, 2015

Rosslyn-Ballston Corridor Streetscape Standards

SITE PLAN REVIEW COMMITTEE MEETING AGENDA. NRECA Conference Center 4301 Wilson Blvd. Arlington, VA 22201

2040 Long Range Transportation Plan

The American Legion Post 139 Development Project

ARLINGTON COUNTY, VIRGINIA

WASHINGTON/KIRKWOOD SPECIAL GLUP STUDY PLUS MAY 1, 2017 OPEN HOUSE

ARLINGTON COUNTY, VIRGINIA

Envision Courthouse Square. Cultural Resources, Circulation, Open Space, & Buildings

The American Legion Post 139 Development Project

ATTACHMENT. To the west, north, and east of the block, primarily singlefamily detached residential patterns, with some townhouses, predominate.

Rosslyn Sector Plan Implementation

An SITE PLAN REVIEW COMMITTEE MEETING AGENDA. Washington-Lee High School 1301 N. Stafford St. Arlington, VA 22201

Mary Hills Nature Area. Roadway Lighting. The Minneapolis Clinic of Neurology Courage Kenny Rehabilitation Institute

Three Decades of Smart Growth: Arlington s Urban Village

From: Sent: To: Subject: Zoning: Landscaping:

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of June 16, 2018

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

PLANNING IN ARLINGTON. Briefing to Katie Cristol

Courthouse Square Planning & Urban Design Study. Courthouse Square Working Group #13 October 15, 2014

POPS Advisory Committee Meeting May 31, 2018

Williamsburg Boulevard Green Streets Project. April 27, 2011 Williamsburg Middle School

UNIVERSITY CITY AREA PLAN. Volume Two: Implementation Plan

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 23, 2019

Public Meeting March 10 th 2011

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Washington Boulevard & Kirkwood Road SPECIAL GLUP STUDY PLUS and CONCEPT PLAN NOVEMBER 2017

Neighborhood Conservation (NC) Program CONCEPT DESIGN REVIEW MEETING NOTES

The Lincoln Neighborhood Corridor Plan. The LiNC

Status Report: MD 355 Project

General Land Use Plan

Monroe Street Reconstruction. Business Roundtable March 29, 2017

Ashland BRT Environmental Assessment: logos of CTA, CDOT, Chicago Department of Housing and Economic Development

Clairtrell Area Context Plan

Fire Station Location Study

Proposed Comprehensive Plan Strategies DRAFT for discussion June 28, 2017

Olde Towne Vision Plan

Public input has been an important part of the plan development process.

Tyvola & Archdale Transit Station Area Plan. June 5, 2008

ARLINGTON COUNTY, VIRGINIA

DOWNTOWN JACKSONVILLE MASTER PLAN S T R E E T H I E R A R C H Y

Multi-family Residential: 164, ,000 Sq. Ft. (approx. 172 Units) Single-family Residential 21 Units

DRAFT. October Wheaton. Design Guidelines

Burlington Enhancement Plan

Access Management: An Overview

#8) T-1409 CENTENNIAL & LAMB TENTATIVE MAP

I-70/71 Innerbelt Project

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

The University District envisions, in its neighborhood

Planning Stage. Mosaic Park. Long Term Project. Restoration of 4 Mile Run. Planning Stage. Herndon and 13 th. Project Underway. Clarendon Central Park

Highway 15 Project - Hutchinson

City of Cedar Rapids Public Works Tentative Bid Schedule Issued December 4, 2017 *Subject to Change*

March 1, PWG Meeting #4

VOLUME II DISTRICT DESIGN GUIDELINES BAILEYS CROSSROADS SEVEN CORNERS

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA

Completing the Vision:

VEHICULAR AND PEDESTRIAN CIRCULATION

DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division. Arlington County Planning Commission

SITE PLAN REVIEW COMMITTEE MEETING AGENDA

DRAFT. Urban Development Areas Fairfax County. UDA Needs Profile: Tysons Corner 13% Location Characteristics. Socio-Economic Characteristics

ARLINGTON COUNTY, VIRGINIA

ESTABLISH AN EFFICIENT TOWN CENTER

East Whiteland Township Current Land Development Projects

Courthouse Square Planning & Urban Design Study

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

Downingtown Station Relocation Plan Site Selection Memo June 12, 2012

Shell Beach Road Streetscape Frequently asked Questions

SITE PLAN REVIEW COMMITTEE MEETING AGENDA. Courthouse Plaza 2100 Clarendon Boulevard Cherry and Dogwood Rooms (C&D) Arlington, VA 22201

METRO Gold Line BRT CBAC Meeting. August 23, 2018

Granada Hills-Knollwood New Community Plan Program Focus Group Land use Related Issues Summary*

Washington Boulevard & Kirkwood Road SPECIAL GENERAL LAND U SE PLAN STU DY PLU S DRAFT JULY 21, 2017

Prince William Street Project (Grant Avenue to Wellington Road)

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT

August 2016 COTTAGE GROVE STATION AREA PLANNING REPORT

The transportation system in a community is an

I Street, Sacramento, CA

Princess Anne Road. Phase VII (CIP 2-195) Citizens Information Meeting

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

Community Engagement Committee Meeting #1 December 10, :30pm-8:30pm

Design Guidelines for the Route 30 Corridor Master Plan: Subdivision and Land Development Elements

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017 SUPPLEMENTAL REPORT-2

Coatesville Station Area Planning Work in Progress Meeting, August 19, 2010 STATION AREA PLANNING WORK IN PROGRESS PRESENTATION

ARLINGTON COUNTY, VIRGINIA HISTORICAL AFFAIRS AND LANDMARK REVIEW BOARD APPLICATION FOR CERTIFICATE OF APPROPRIATENESS

4.1 AESTHETICS. A. Regulatory Framework

4.500 Preston Road Overlay District

BRYN MAWR. Tier 2 Characteristics: Location: Lancaster Avenue from Old Lancaster Road on the east to Norwood Avenue on the west

Establish a network of streetscaped vehicle and pedestrian routes that connect within and outside the Plan area.

Introductions Project overview Scope of work Schedule. Agenda. Community/Stakeholder Input Process Discussion Summary/Next Steps

Ballston Station Multimodal Study. Stakeholder Meeting October 5, 2010

Sustainable Development Call for Projects

W&OD PARK MASTER PLAN. The City s Greenest Street. DRAFT W&OD Trail Master Plan v4.docx Page 1

Wayfinding. North Gateway: Integrate a vertical gateway marker on the west side of Ward Street at the south corner of Vernon Street.

Transcription:

Planned Washington Boulevard Bus Stop Improvements Last Revised on April 25 th 2018 Guide Summary: The following document details the bus stop improvement recommendations on Washington Boulevard as part of Arlington County s Lee Highway and Washington Boulevard Bus Stop Consolidation and Accessibility Improvements Project. The document lists bus stops that fall within or near the boundaries of each civic association along the Washington Boulevard corridor. Bus stops are often listed in multiple civic association tables. Tables include bus stop regional ID numbers, the closest intersection on Washington Boulevard to each stop, and information detailing Arlington County s improvement recommendations. Civic association tables are listed from east, at the front of the document, to west, at the end. Related Terms: 1) Americans with Disabilities Act (ADA) compliance: A bus boarding area must have dimensions of 5 feet by 8 feet (5x8), with a clear and level surface, to be considered compliant with ADA standards. The most frequent ADA upgrade in this project is expanding the sidewalk at the boarding/exiting area to a 5x8 foot area. Other ADA upgrades include: clearing the boarding/exiting area; replacing cracked or damaged sidewalks; and leveling the boarding/exiting area. 2) Removal: Several stops are planned for removal due to their close proximity to other stops, low ridership, or due to safety concerns with their location. Removing stops will help to increase the efficiency of bus service and in some cases improve pedestrian and traffic safety. 3) Relocation: Several stops are planned for relocation to improve bus stop spacing, reduce safety issues, and to create opportunities to bring all bus stops into ADA compliance. Most relocations involve moving bus stops less than 200 feet away (i.e. less than a block) from their current locations. Note: Some of the planned improvements require easements from private landholders that need to be obtained by the County before the recommendations can be implemented. Easements are often needed for the expansion of bus boarding/exiting areas, the relocation of bus stops, and the addition of new amenities. If changes are made to the proposed recommendations because the County was not able to obtain an easement, this document will be updated. All revisions since the release of this document (on April 24 th 2018) are listed on Page 8. 1

Lyon Park 6000441 N. Wayne St. Add trash can and recycle bin 6000427 Arlington Blvd. 6000450 N. Barton St. Upgrade for ADA compliance 6000453 N. Brookside Dr. 6000465 3 rd St. N. Remove this stop 6000487 N. Bryan St. 6000510 N. Pershing Dr. Reconstruct corner at Bryan and Washington Blvd. to shorten crossing. Add shelter and bench Add trash can and recycle bin Relocate to north side of N. Pershing Dr. Add lean bar (pending space available) 6000473 3 rd St. N. 6000516 N. Pershing Dr. 6000533 9 th St. N. N/A 6000539 9 th St. N. N/A 6000564 10 th St. N. N/A 6000558 10 th St. N. Relocate 170 feet to south side of N. Pershing Dr. Clarendon - Courthouse 6000564 10 th St. N. N/A 6000558 10 th St. N. As part of future redevelopment of the As part of future redevelopment of the 6000600 13 th intersection, bus stop will be relocated 250 feet St. N. 6000590 N. Kirkwood Rd. intersection, the bus stop will be upgraded for west, upgraded for ADA compliance with a ADA compliance and provided a bench. bench. 2

Planned Washington Boulevard Bus Stop Improvements Lyon Village 6000600 13 th St. N. As part of future redevelopment of the intersection, bus stop will be relocated 250 feet west and upgraded for ADA compliance with a bench. Ballston - Virginia Square 6000590 N. Kirkwood Rd. As part of future redevelopment of the intersection, the bus stop will be upgraded for ADA compliance and provided a bench. 6000600 13 th St. N. 6000599 N. Lincoln St. 6000601 N. Nelson St. 6000598 N. Quincy St. As part of future redevelopment of the intersection, the bus stop will be relocated 250 feet west and upgraded for ADA compliance with a bench. Remove shelter Relocate stop 200 feet east (in front of American Legion building), add bench, and replace trash can Washington Blvd. right turn lane onto N. Nelson will be removed Relocate 150 feet to west side of N. Quincy St. 6000590 N. Kirkwood As part of future redevelopment of the intersection, the bus stop will be upgraded for ADA compliance and provided a bench. 6000593 N. Lincoln St. Replace trash can and add recycle bin 6000595 N. Nelson St. Sidewalk will be expanded to narrow the adjacent, over-sized traffic lane 6000591 N. Quincy St. Replace trash can and add recycle bin 6000588 N. Stafford N/A 6000583 N. Stafford St. St. 6000586 N. Stuart St. This stop will be removed 6000581 N. Stuart St. This stop will be removed 6000582 N. Utah St. This stop will be removed 6000579 N. Utah St. This stop will be removed 6000578 N. Vernon St. 6000580 N. Glebe Rd. Relocate stop 220 feet east to west side of N. Vermont St. and recycle bin 6000575 N. Vernon St. Relocate stop 300 feet east to N. Vermont St. Add a bench, trash can, and recycle bin 3

Bluemont 6000578 N. Vernon St. Relocate stop 220 feet east to west side of N. Vermont St. 6000575 N. Vernon St. Relocate stop 300 feet east to N. Vermont St. Add a bench, trash can, and recycle bin 6000580 N. Glebe Rd. and recycle bin 6000574 N. Buchanan St. 6000576 N. Buchanan St. 6000573 N. Evergreen St. 6000572 N. Evergreen St. Relocate stop 110 feet to east side of Evergreen St. and add bench 6000568 N. Frederick St. This stop will be removed 6000569 N. Frederick St. This stop will be removed 6000556 N. Harrison St. Relocate stop 100 feet to west side of N. Harrison St. (using 6000555 N. Harrison St. additional space from parking lane) 6000554 N. Inglewood St. This stop will be removed 6000553 N. Inglewood St. This stop will be removed 6000548 N. Jefferson St. Relocate stop 160 feet to west side of N. Jefferson St. 6000547 Waycroft - Woodlawn N. Kensington St. Replace bench for ADA compliance Replace trash can 6000580 N. Glebe Rd. and recycle bin 6000574 N. Buchanan St. 6000576 N. Buchanan St. 6000573 N. Evergreen St. 6000572 N. Evergreen St. Relocate stop 110 feet to east side of Evergreen St. 4

Tara Leeway Heights 6000568 N. Frederick St. This stop will be removed 6000569 N. Frederick St. This stop will be removed 6000556 N. Harrison St. Relocate stop 100 feet to west side of N. Harrison St. (Using 6000555 N. Harrison St. additional space from parking lane) 6000554 N. Inglewood St. This stop will be removed 6000553 N. Inglewood St. This stop will be removed Relocate stop 160 feet to west side of 6000548 N. Jefferson St. N. Jefferson St. Replace bench for ADA compliance 6000547 N. Kensington St. Replace trash can Bench addition This stop will be removed and 6000545 N. Kenilworth St. This stop will be removed 6000542 N. Kentucky St. amenities moved to the Patrick Henry 6000546 Patrick Henry Dr. 6000559 N. Longfellow St. Relocate stop 130 feet to west side of Patrick Henry Dr. Relocate stop 140 feet to west side of N. Longfellow St. Washington Blvd. entrance to Italian store parking will be closed off 6000924 Patrick Henry Dr. 6000567 N. Longfellow St. Dr. stop Add shelter and bench (from Kentucky St. stop) Add recycle bin and trash can (from Kentucky St. stop) STILL IN PLANNING PROCESS. DETAILS NOT YET AVAILABLE. 5

Westover Village 6000548 N. Jefferson St. Relocate stop 160 feet to west side of N. Jefferson St. Bench addition 6000547 N. Kensington St. 6000545 N. Kenilworth St. This stop will be removed 6000542 N. Kentucky St. 6000546 Patrick Henry Dr. 6000559 N. Longfellow St. Relocate stop 120 feet to west side of Patrick Henry Dr. Relocate stop 140 feet to west side of Longfellow St. Washington Blvd. entrance to Italian store parking will be closed off 6000924 Patrick Henry Dr. 6000567 N. Longfellow St. 6000592 McKinley Rd. 6000587 McKinley Rd. Replace bench for ADA compliance Replace trash can This stop will be removed and amenities moved to the Patrick Henry Dr. stop Add shelter and bench (from Kentucky St. stop) Add recycle bin and trash can (from Kentucky St. stop) STILL IN PLANNING PROCESS. DETAILS NOT YET AVAILABLE. STILL IN PLANNING PROCESS. DETAILS NOT YET AVAILABLE. 6

Highland Park Overlee Knolls 6000592 McKinley Rd. 6000587 McKinley Rd. STILL IN PLANNING PROCESS. DETAILS NOT YET AVAILABLE. 6000605 N. Nottingham St. This stop will be removed 6000602 18 th St. N. Relocate 225 feet to east side of N. Nicolas St. 6000615 Ohio St. Add lean bar 6000612 Ohio St. 6000618 N. Quantico St. 6000616 N. Quantico St. Arlington - East Falls Church 6000618 N. Quantico St. 6000616 N. Quantico St. 6000622 N. Roosevelt St. 6000619 N. Quintana St. Relocate stop 80 feet east 7

Changes since initial publication: 1. As of 04/25/2018 a. stop 6000601 (N. Nelson St.) will not be relocated. The existing stop will be upgraded for ADA compliance. 8