1U ULTRA Compact System

Similar documents
5U Compact System. Installation Manual V1.0. Manufactured by Enatel Ltd. 321 Tuam Street PO Box Christchurch New Zealand

RE-PR3-E-27 3-Phase Panel Mount 27kW

4100U City and Relay Cards Installation Instructions

AC/DC Power Supply and Battery Charger Installation and Maintenance

15R HARDWARE INSTALLATION GUIDE

ACCURATE ELECTRONICS INC PO BOX SW HALL BLVD BEAVERTON OR USA FAX

La Marche Manufacturing Company Option 16 Series. Digital Combined Accessory Package. Installation and Operation Manual

HOKKIM INTEGRATED AMF CONTROL BOARD MANUAL FOR MODELS: HAMF-8 AND HAMF-4

User s Manual. For the SHORE POWER CONNECTION MONITOR MODEL 9151

FUSE PANEL Technical Practice N N/L9 10/10 GMT NEBS Level 3 Certified

SMARTELEC 2 ENERGY SAVING CONTROL INSTALLATION AND OPERATING MANUAL

ACCURATE ELECTRONICS INC

Fratech Multipath-IP

Galaxy Pulsar Plus Digital Battery Plant Controller

Cautions and Warnings. Introduction 4009 NAC POWER EXTENDER

La Marche Manufacturing Company Option 46 Series. Digital Combined Accessory Package. Installation and Operation Manual

Galaxy Pulsar Plus Controller Family Troubleshooting Table with SMNP Traps

1 INCA INCA MODEL FPC FIRE PUMP CONTROL PANEL. (Star Delta/D.O.L) USER MANUAL Inca Reference FPC Revision 1.0

ABOUT THIS DOCUMENT AND THE DOCUMENT STRUCTURE WE USE

Added password for IP setup page : Password must be in IP format!

Installing the Cisco ONS FAP-4 Fuse Alarm Panel

Installation and user manual for the BiWire / Conventional Repeater Panel

MODBUS MESSAGING to the S5 BATTERY VALIDATION SYSTEM

EZY SWITCH. SMS-IRR-4 System Monitor Installation Manual

/9308 External Battery Chargers Installation Instructions

Installation and Operation Manual Low Power (LP) DC Power System

Any additional devices linked to the system ET08 (computer, sensors, relays etc.) must be approved by LST EN standard.

FUSE PANEL. Technical Practice N N/L33 10/10 GMT Front Access NEBS Level 3 Certified

LORAIN CIP 4890/48120 DC Power System

How to use the BTRM in Remote Enclosures

Analox 1000 Series. User Manual. Analox Sensor Technology Ltd. 15 Ellerbeck Court, Stokesley Business Park North Yorkshire, TS9 5PT, UK

ELECTRIC FIRE PUMP CONTROLLER

LORAIN CSP DC Power System

Noran Tel. FUSE PANEL Technical Practice N NCY 2/2 KLM and 4/4 GMT NEBS Level 3 Certified

A77 Series. Microprocessor Controlled SCR Filtered/Battery Eliminator Filtered Charger. Installation and Operation Manual

Model 5100A, 5200A, and 5100ALBV Owner s Manual

RMS-I-DE-01 Smoke Detector

The Vanguard System TM VM-2900 Air Seeder Monitor. Operator s Manual

Battery Fail Monitoring System

Gas Safety Products. Installation, operating and maintenance 23/08/2016. Merlin 1000BH Gas Proving/Gas Detection System

LC1 & 2. Fire Alarm Panel 6\VWHPLQVWDOODWLRQRSHUDWLQJ PDLQWHQDQFH LQVWUXFWLRQV

Power Supply / Battery Charger Units, incorporating load switching relays for Smoke Dispersal, Bell Booster or other uses

PTE0705 Electric Fence Monitor

PAC1500Xi PORTABLE APPLIANCE CHECKER

rev3 INSTALLATION & OPERATION MANUAL OIL CIRCULATING HEATING SYSTEM MODEL OSM

Introduction... 1 System Overview... 1 System Diagram... 2

BC-4000 Bilge Monitor/Controller Installation Manual

Multi-Output Access Control Power Supply Charger VDC or 24VDC VDC or 3 24VDC.

Table of Content LT 5165-UL

Public Safety DAS Annunciator Panel

Operations Manual DS 220. Docking Station for Micro IV

APC BC300 Series 40kW 208/450/480V User Guide

Flostop TS D7E and A8E. Operation Manual

LEAKSTOPPER MULTIZONE WATER LEAK DETECTION ALARM PANEL INSTALLATION AND OPERATION MANUAL

www. ElectricalPartManuals. com GADP Ground Fault Indication System Instruction Manual Ground Fault Protection

Installation Guide for AL300ULM. Multi-Output Access Control Power Supply Charger

SITESTAR CABINET DESCRIPTION

TECHNICAL INFORMATION Touchtronic Clothes Dryers

CAN bus-based I/O module, CIO relays Mounting Terminals and wiring Commissioning, using the utility software

TraceTek Sensing Module Installation, Operation and Maintenance Instructions DESCRIPTION SPECIFICATIONS APPROVALS TYPE NM

KPHE32 SERIES WATER-TO-AIR HEAT EXCHANGER

USER MANUAL FOR OPERATING SYSTEM

Centaur TM II Cube Slave Alarm Signalling Equipment INSTALLATION GUIDE

www. ElectricalPartManuals. com GADD MKIII Ground Fault Indication System Instruction Manual Ground Fault Protection

Gas Safety Products. Installation, operating and maintenance 09/05/2016. Merlin CT1650+ Gas Interlock System. S&S Northern Ltd 1

THERMOMAX COLTREC RCX 100 MICROPROCESSOR REFRIGERATION CONTROL SYSTEM ENGLISH.

AQUARIUS 45 MARINE SERVICE MANUAL

PRODUCT MANUAL. TT-MTM2 Hard-Wired Controller with Remote

Water Leak Detector - Four Zone with open/short-circuit detection. Product overview

Rectifier RC-series. Manual RC-series English MA doc. Manual Wall and 19 English

ANALOX 5001 Carbon Dioxide Monitor. User Manual ANALOX Analox 5001 Carbon Dioxide Monitor User Manual

Pakton Technologies Pty Ltd ABN Ferrier Road, Narangba Qld 4504

LC2200 Level Controller Installation and Maintenance Instructions

Gas Safety Products. Installation, operating and maintenance 11/18/2015. Merlin 1000S+ Gas Utility & Electrical Isolation Controller

Please read and digest ALL the instructions before you commence installation.

PowerWizard. Level 1.0 & Level 2.0 Control Systems Training

Models NFPA 1221-A, NFPA 1221-B Public Safety DAS Annunciator Panel. Revision E 61117

Installation Guide for models:

Bulletin 1608N MiniDySC Dynamic Sag Corrector

Independent Zone Control (I.Z.C.)

ENGINE MONITOR VOTT MODEL: YEAR WARRANTY

1200-HCM DIN RAIL MOUNTING FIRE SYSTEM MODULE Fire Detection & Extinguishant Control A R T PATOL LIMITED SUPPLY FAULT SOUNDER

FIRE ALARM CONTROL EQUIPMENT. Addendum October 2006 Instructions for new style EN54-4 Power supply unit module

P4200W2 Series Air Dryer

C-Bus Four Channel Analogue Output Unit Installation Instructions

Instruction Manual WARNINGS

Universal Clamp Meter

Class A and Expansion NAC Modules Installation Instructions

KPHE24 SERIES WATER-TO-AIR HEAT EXCHANGER

Lightning Warning System: LWS MK-II. User's Guide. KOREA EMI Technologies Co.,Ltd , Jangam-ri, Majang-myeon, Icheon-si, Gyeonggi-do, Korea

Installation Guide for AL600ULM. Multi-Output Access Control Power Supply Charger. Rev

SM Field Installed Electric Heat Kit

Multi-Output Access Control Power Supply Chargers VDC or 24VDC VDC or 4 24VDC.

Model OEM-2 INSTRUCTIONS FOR USE

STA16 SELECTRONIC ALARM ANNUNCIATORS DESIGN, INSTALLATION AND OPERATING MANUAL STA16

KNHE30 SERIES WATER-TO-AIR HEAT EXCHANGER

Dough Retarder Prover. Service Manual

Powerohm Resistors Digital HRG System

ITC 2000 HEATING CONTROL CABINET. Installation & Operation Manual

LEAKMONITOR MULTIZONE WATER LEAK DETECTION ALARM PANEL INSTALLATION AND USER OPERATION MANUAL

Transcription:

en atel Supervisory Module SM32 Load 60 00 A IE C60947-2 G B140 4 8.2 CHNT NB1-63 C32 23 0/40 0 V e NaT el OK enatel RM 1848 enatel RM 1848 Battery 60 00A IE C60947-2 G B1 4 04 8.2 CHNT NB 1-63 C32 23 0/4 00 V 1U ULTRA Compact System Installation Manual V1.2 Manufactured by Enatel Ltd. 321 Tuam Street PO Box 22-333 Christchurch New Zealand Phone +64-3-366-4550 Fax +64-3-366-0884 Email sales@enatel.net www.enatel.net Copyright Enatel Ltd. 2007-2008 Enatel DC System Manual Page 1 of 14

TABLE OF CONTENTS Scope... 4 System Overview... 4 Installation... 6 Unpacking & Installing in Frame... 6 AC & DC Cabling... 6 DC Cabling... 7 Alarm/Ancillary Cabling... 7 Alarm Mapping to Volts-free Relays... 9 Circuit Breaker Fail Monitoring... 9 LVD Operation... 9 Commissioning... 10 Appendix 1 - System Wiring Diagram... 12 Appendix 2 - Model Specifications... 14 Enatel DC System Manual Page 2 of 14

Receiving Instructions CAUTION: For your protection, the following information and the product manual should be read and thoroughly understood before unpacking, installing and using the equipment. We present all equipment to the delivering carrier securely packed and in perfect condition. Upon acceptance of the package from us, the delivering carrier assumes responsibility for its safe arrival to you. Once you receive the equipment, it is your responsibility to document any damage the carrier may have inflicted, and to file your claim promptly and accurately. Package Inspection Examine the shipping crate or carton for any visible damage: punctures, dents and any other signs of possible internal damage. Describe any damage or shortage on the receiving documents and have the carrier sign their full name. Equipment Inspection Within fifteen days, open crate or carton and inspect the contents for damages. While unpacking, be careful not to discard any equipment, parts or manuals. If any damage is detected, call the delivering carrier to determine the appropriate action. They may require an inspection. Save all the shipping materials for the inspector to see! After the inspection has been made and you have found damage, call us. We will determine if the equipment should be returned to our plant for repair or if some other method would be more expeditious. If it is determined that the equipment should be returned to us, ask the delivering carrier to send the packages back at the delivering carrier s expense. If repair is necessary, we will invoice you for the repair so that you may submit the bill to the delivering carrier with your claim forms. It is your responsibility to file a claim with the delivering carrier. Failure to properly file a claim for shipping damages may void warranty service for any physical damages later reported for repair. Handling Handle the equipment with care. Do not drop or lean on front panel or connectors. Keep away from moisture. Identification Labels Model numbers are clearly marked on all equipment. Please refer to these numbers in all correspondence with Enatel. Enatel DC System Manual Page 3 of 14

SCOPE This manual covers essential information for the installation and commissioning of the 1U ULTRA Compact Enatel Compact DC Power System (see Appendix for individual model specifications). System set-up for the rectifiers, alarms etc., are provided in separate manuals for the SM3x supervisory module and RM2048 rectifier. All installation and maintenance must be carried out by suitably qualified personnel. Note: The 1U ULTRA Compact system is available with positive earthing (-48VDC, -60VDC) or negative earthing (+24VDC). The installation manual covers both earthing varieties, the standard system is assumed to be positive earthing. Where parameters and settings differ between systems, the negative earthed system parameters will be specified within parenthesis i.e.( ). SYSTEM OVERVIEW The 1U ULTRA Compact DC Power System has a maximum power output of 4.0kW (+24V rated to 2.0kW), producing a maximum current output of 83A at -54Vdc (83A at +27Vdc). The system is intended to be a complete power system in a box, so no connections need to be made internally. All the AC, DC (Load and Battery) connections are made at the rear of the unit. Alarm connections are assessable from the front. The system is designed to be extremely simple to install and set up. The following is a summary of the system: - Overall size is 483mm wide (19 standard mounting) x 44.5mm high (1U) x 350mm deep - Up to 2 RM18xx series rectifiers or 2 RM20xx rectifiers - may be packaged separately - SM31 or SM32 supervisory module (fully integrated in the system) - Battery Low Voltage Disconnect fitted as standard (80A rating). - 1x 63A Battery Circuit Breaker, this may be specified as different values (from 2A to 63A) at time of order. - 1x 63A Load Circuit Breaker, this may be specified as different values (from 2A to 63A) at time of order. Enatel DC System Manual Page 4 of 14

- System weight is approximately 5kg without rectifiers, and 7.6kg with two rectifiers fitted. - Single set of 1-phase input terminals (phase, neutral and earth) Note: This system is supplied with the AC and DC earths connected. The standard system (+ve earth system) output has the DC Common in the positive side of the circuit (-ve earth system output has the DC Common in the negative side of the circuit). The earth link can be removed from the system to isolate earths. Please see the relevant section. Enatel DC System Manual Page 5 of 14

INSTALLATION Unpacking & Installing in Frame Upon unpacking, check that the unit is not damaged, and that you have the required number of rectifiers. The unit fits into a standard 19 mounting frame. The mounting screws should be M6, however M5 may be used with washers. Be sure to mount the unit in the 19 frame squarely if M5 screws are used. To fit the cover, remove the screws securing the top of the system and place on. Secure the cover to the chassis by replacing the screws. The rack will be able to securely hold the 1U system with just the bottom two screws fitted. Brace cabinet mounting if necessary. Please note the complete system weight is 7.6Kg. Ensure the 19 mounting rails are able to withstand mounting of the system. AC & DC Cabling The AC terminals are clearly marked at the rear of the system (see Fig 1). The terminals can accept up to 10mm 2 cables. Line 1 Neutral Earth Com (-ve) Com (-ve) Batt (+ve) Load (+ve) Line 1 Neutral Earth Com (+ve) Com (+ve) Batt (-ve) Load (-ve) Fig. 1 System AC and DC Connection The AC earth is internally bonded to the system chassis. DC Common (+ve or ve depending on specification - see appendix for model numbers) is connected to the AC earth by a removable cable (green/yellow), but can be removed if DC output is required to be isolated from AC earth. DC Earth Fig. 2 System DC Earth connection Enatel DC System Manual Page 6 of 14

DC Cabling CAUTION: Use extreme care when fitting batteries & their connections. Remove all jewellery and rings from oneself prior to commencing the installation. Always use insulated tools when fitting batteries and take extreme care not to short terminals when working on them. All live DC cables terminate on the connectors at the rear of the unit as shown in Figure 1. These terminals are all 10mm 2. The internal battery cabling goes directly to the circuit breaker, then via a Low Voltage Disconnect relay and current shunt to the internal live bus. This can be seen on the wiring diagram as the rear of this manual. Common (+ve or ve depending on specification) connections for both load and battery connections are made to the common connector at the rear of the system also shown in Fig 1. Ensure cables are strain relieved by utilising the cable tie slots provided (see Fig 2). Once cables are connected, ensure cable connector cover is fitted and secured. Live Cables Common Cables AC Cables Fig 3. AC and DC cable strain relief Alarm/Ancillary Cabling Alarm and communication cables terminate directly into the rear of the Supervisory Module, SM31 or SM32, which terminals are assessable by pulling the monitor forward to expose connections (see Fig 3 & 4). When routing the cables, ensure they are kept away from the AC and DC power cables when possible. Enatel DC System Manual Page 7 of 14

Fig 4. For removal, unlock SM3x by lifting green locking tab. Fig 5. SM3x cable access The relay states labelled Normally Open or Normally Closed are for their de-energised state. If an alarm is programmed for the relay to be normally energised (as may be possible in the case of a low voltage alarm where loss of power will put the alarm into its active state), then be sure to connect the remote wiring appropriately. For full SM31/32 functionality and operation information, refer to the SM31/32 Manual. Uncoil the battery temperature sensor and place in the middle of the middle battery string. If the lead is not long enough, ordinary 2-core copper (approx. 0.75mm 2 ) wire can be used as an extension. The purpose of the battery temperature sensor is to monitor the ambient temperature of the batteries over long periods of time and adjust the rectifier output (float) voltage accordingly. As a result, it is not necessary to have the temperature sensor touching the batteries. If the Battery Temperature Sensor is removed a battery temp fault alarm is generated. Enatel DC System Manual Page 8 of 14

For remote communications and direct computer connection to the Compact System, refer to the SM31/32 Manual. These connections can be made via the mini-usb port on the front panel of the monitor (computer connection to the SM31 or SM32), and the Ethernet port (SM32 webbased communications only). Alarm Mapping to Volts-free Relays Note that on all systems, Relay 1 is pre-configured as the Monitor Fail alarm. This alarm activates is the monitor has a hardware fault or if software becomes corrupted. All other relays can be mapped to different alarm conditions. The SM31/32 Manual details how these may be changed. On the standard Compact Systems alarms are preconfigured as follows: Relay 2: Summary Non-urgent alarm Relay 3: Summary Urgent alarm As mentioned, if these mappings are not appropriate, they can be changed in the field to suit customer requirements. Circuit Breaker Fail Monitoring The load circuit breaker is monitored electronically by a general purpose input on the SM31/32. The digital input will trigger an alarm when it is pulled to the system common (+ve or ve depending on specification) rail. This means that to operate the load must be connected. In this way, false alarms are avoided when no load is connected and the load circuit breaker is in the off position. Note: This means that a residual voltage will be measured at the load terminal even when the circuit breaker is turned off. This is high impedance and does not present a hazard to the user The battery circuit breakers however, use voltage sense to detect tripping or whether they are turned off. This is because when a battery breaker is tripped, there may be very little voltage difference, making electronic fail detection problematic. Hence, if no battery is connected, the breaker must be on to clear the Battery Breaker Fail alarm. LVD OPERATION This system is configured with a single Low Voltage Disconnect contactor in the battery side of the circuit (see wiring diagram at rear of this manual). The SM31/32 supervisory and monitor unit is powered from both the rectifier side of the LVD contactor and battery source. Therefore when the low voltage threshold is reached and the LVD disconnects the battery, the SM3x will loose voltage sense (as voltage sense is measuring rectifier bus voltage) but still maintains operation for monitoring system. The LVD contactor will not re-engage until the rectifier power is restored (i.e., until the DC bus voltage is restored). Enatel DC System Manual Page 9 of 14

COMMISSIONING Use the following set of instructions as a guide, unless different procedures are recommended by local authorities. Pre-check: 1. System installation is completed. 2. Battery and load circuit breakers are turned off, and upstream AC has been turned off (i.e., system is completely de-powered). 3. Rectifier modules have been placed into their shelf positions, and pulled forward enough to disconnect them from the system. 4. Check that the protective AC Earth is connected as per local regulations, and check that the DC Earth has been strapped to the AC Earth at a point physically close to the DC Power System (unless specifically requested otherwise). There must only be one AC to DC earth strap. Note: This system is available in either negative earthing (-48VDC, -60VDC) or positive earthing (+24VDC) configurations. Before connecting batteries or rectifiers ensure that the correct system has been specified and earthing is correct for your application. 5. Turn on AC upstream and check that voltages from phase to neutral are as expected. Rectifier Start-up 1. Turn the upstream AC circuits on. 2. Fully insert first rectifier, wait for the rectifier to start and its power on LED to remain green. 3. Check the SM3x powers up, and indicates the system default float voltage on its display. If the audible alarm activates, press any button to silence it. 4. If a different system float voltage has been specified, set this at this time using the procedure specified in the SM3x Manual (either from the front panel or connected computer). 5. Fully insert the rest of the rectifiers ensuring they power up with only their green power on LED illuminated. 6. Check that the load and battery currents on the SM3x are 0 amps (+/- 1 or 2 amps). 7. Check that all SM3x configuration settings are correct (as per customer specification) with respect to: - Voltage levels - Alarm settings - Alarm mappings to the volts-free relays (refer to the SM3x manual for information on how to check these via the front panel or locally connected computer). Battery Start-up Note: It is important that battery circuit breaker connections should be made when the rectifiers are turned on and the system is live. This is because the system voltage and battery voltages will be similar, thus minimising any arcing during connection. This also prevents high current arcing due to the charging of the rectifier output capacitors. 1. Power up only one rectifier initially (to limit any damage if any connections are incorrect). 2. Measure the voltage across each battery string at the terminals of the Compact System. Ensure that the reading from the DC Common bus to the Battery Live Terminals is -48V (or - 60V, +24V as per system specification). 3. Turn on each battery circuit breaker in succession while measuring the battery voltage and ensure that the voltage increases slightly to the system Float Voltage (typically the voltage will increase from 2-3V below float to float voltage. At this point the batteries will be drawing some current to bring them to a full state of charge. Enatel DC System Manual Page 10 of 14

Load Start-up 1. Ensure downstream load connections have been made and there are no loose/floating cables. 2. Turn on load circuit breaker, ensuring that the downstream equipment is being powered up as expected. 3. Ensure the system float voltage on the SM3x is at the level previously noted. 4. Ensure the load current is at a level expected (could be zero if loads downstream have not been connected). Note: Prior to leaving the system after it has been commissioned, ensure all AC, DC and battery circuits are off. If it is required that the system is to be left on (to power load equipment, ensure rectifiers are left in their powered up state, and batteries are in circuit. This will prevent anyone leaving the batteries only powering the load (in which case the batteries would go flat). Enatel DC System Manual Page 11 of 14

APPENDIX 1 - SYSTEM WIRING DIAGRAM 1U ULTRA Compact system, -48V or -60V (+ve earth) Enatel DC System Manual Page 12 of 14

1U ULTRA Compact system, +24V (-ve earth) Enatel DC System Manual Page 13 of 14

APPENDIX 2 - MODEL SPECIFICATIONS Part number Description Voltage Earth Monitor I/O PCB PSC02020110-200 1U ULTRA Compact System +24VDC -ve SM31 PSC02020111-200 1U ULTRA Compact System +24VDC -ve SM31 PSC02020120-200 1U ULTRA Compact System +24VDC -ve SM32 PSC02020121-200 1U ULTRA Compact System +24VDC -ve SM32 PSC04020110-000 1U ULTRA Compact System -48VDC +ve SM31 PSC04020111-000 1U ULTRA Compact System -48VDC +ve SM31 PSC04020120-000 1U ULTRA Compact System -48VDC +ve SM32 PSC04020121-000 1U ULTRA Compact System -48VDC +ve SM32 Enatel DC System Manual Page 14 of 14