FIRE SAFETY POLICY. This policy document replaces any previously published documents and comes into effect September 2018.

Similar documents
FIRE SAFETY & EMERGENCY EVACUATION STRATEGY AND POLICY

Fire Safety, Procedures and Risk Assessment Policy

KING S HOUSE SCHOOL FIRE RISK MANAGEMENT POLICY & PROCEDURES

Millfield Schools Fire Risk Prevention Policy

Fire Safety Procedures & Risk Assessment Policy

Fire. This policy applies to all members of our school community, including those within the EYFS setting.

FIRE PREVENTION, PROCEDURES AND RISK ASSESSMENT POLICY

HEALTH AND SAFETY FIRE SAFETY POLICY Putnoe Primary School

FIRE SAFETY POLICY & EMERGENCY EVACUATION POLICY

EMLC Academy Trust. Fire Safety Policy 2017/19. Every child deserves to be the best they can be

GREAT DENHAM PRIMARY SCHOOL FIRE SAFETY POLICY September 2017

Fire Safety Policy 29/09/2017. Holme Grange School Whole School Policy Including EYFS. Fire Safety Policy

Fire Safety Policy 2018/19

Management Standard: Fire Safety

FIRE PROCEDURES 1. APPOINTMENTS

b. Fire Alarm System operating notes

Fire Safety Policy. (The Regulatory Reform (Fire Safety) Order 2005) Last Reviewed: January Next Review: January 2019

FIRE SAFETY POLICY. This policy refers to both Wellington Senior School and Wellington Prep School

Fire Safety Policy. Billy Hanafin H & S and Operations Officer. Fife Cultural Trust. Version 1.0 October 2013 Page 1

Health and Safety Policy. Version Author Revisions Made Date 1 Colin Campbell First Draft March 2014

Fire safety procedure

LEICESTER GRAMMAR SCHOOL TRUST FIRE SAFETY POLICY

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE EMERGENCY PLAN

Arbour House. Fire Policy and Procedures

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE EMERGENCY PLAN

FIRE AND EMERGENCY EVACUATION PROCEDURES STARCROSS PRIMARY SCHOOL

Fire Safety Protocol

Wellsprings Primary School. Fire Emergency Evacuation Plan

Health, Safety and Wellbeing Management Arrangements. Core I Consider I Complex. Fire Safety. Health, Safety and Wellbeing Service

Peponi House Preparatory School Nairobi, Kenya. Peponi House Fire Risk Prevention Policy

FIRE & FIRE PREVENTION POLICY AND PROCEDURE

THE HABERDASHERS ASKE S BOYS SCHOOL FIRE SAFETY, PROCEDURES AND RISK ASSESSMENT POLICY

FIRE EMERGENCY PLAN AND FIRE RISK (PREVENTATION) POLICY

Annemount School Fire Safety Policy This Policy is for the whole school including the EYFS

St Edward s Oxford FIRE SAFETY POLICY

FIRE SAFETY POLICY Revised March 2013

FIRE SAFETY, PROCEDURES AND RISK ASSESSMENT POLICY PART 1: FIRE SAFETY

Fire Safety Policy. Investing in success. Dukes Centre Dukes Avenue Kingston KT2 5QY 1. Policy

Joint Responsibility for Health and Safety Internal Guidance for Members and other occupiers of the Scottish Parliament Campus.

Fire Policy and Procedures St Helen s School

Local Rules: Fire Safety

Fire Risk Management Policy. UK September 2017

H&S Forum. Fire Safety Policy Glascote Academy

Fire Safety, Fire Procedures and Fire Risk Assessment Policy. Three Schools Policy

Tuition, Medical and Behaviour Support Service

Fire Risk Assessment Safety Checklist

Fire Policy and Procedures. Cañada Blanch Spanish School

REGULATORY REFORM (FIRE SAFETY) ORDER 2005 FIRE EMERGENCY PLAN

GENERAL - Regulatory. Fire Policy, Risk Assessment and Prevention (ISI 12a) Fire Procedures (ISI 12b)

Fire Evacuation Policy

Fire Safety Management Policy. This plan should be read in conjunction with the Health and Safety Policy.

FIRE SAFETY POLICY and FIRE SAFETY ARRANGMENTS

Fire risk management plan. MH/05/Revised/06/17

FIRE SAFETY POLICY LEEDS METHODIST MISSION. Oxford Place Centre

FIRE RISK ASSESSMENT Self Assessment

Visitor & Intruder Security Policy

FIRE POLICY STATEMENT

Project: Location: Date Prepared: Last Reviewed:

Fire Risk Assessment 2017

Fire Risk Assessment Borough High Street

Contents HEALTH AND SAFETY MANAGEMENT SYSTEMS FIRE PREVENTION AND EVACUATION PROCEDURE. 1. Introduction. 2. Warning in the event of fire

PREMISES FIRE SAFETY LOGBOOK

Peninsula Dental Social Enterprise (PDSE)

FIRE SAFETY AWARENESS

Fire Policy. Fire Safety Order (2005) Dangerous Substances and Explosive Atmospheres Regulations (2002)

Fire Risk Assessment - HMO (including accommodation with integrated fire systems)

Fire and Emergency Plan: Evacuation & Invacuation. Fire and Emergency Plan: Evacuation & Invacuation

Glenmere Primary School Fire Safety Policy FIRE SAFETY POLICY. Revised on April Sam Conlon. Created by S.Conlon 1

FIRE SAFETY RISK ASSESSMENT AUDIT - CENTRE. Identification of hazards

KRISHNAMURTI FOUNDATION TRUST FIRE SAFETY POLICY. Last Review Date 30 June Next review date 30 August Health and Safety Officer

Fire Safety Policy. Document Author: Director of Estates, Fleet & Facilities Management

LYHA Fire Safety Policy

Fire Prevention and Procedures Policy

DEF Fire Evacuation and Emergency Planning Criteria

Evacuation Procedure and Fire Safety Policy

FIRE PRECAUTIONS AND EMERGENCY EVACUATION PROCEDURES

To seek Cabinet approval of the Council s Fire Safety Policy. It is proposed that Cabinet approves the Fire Safety Policy.

GHS 8-4 Fire Policy and Procedures

STATEMENT OF THE HEALTH AND SAFETY STRATEGY FOR THE SYDNEY RUSSELL SCHOOL

Fire Safety Procedures and Associated Training

Fire Safety Policy. Signed Date September on behalf of the Management Committee. on behalf of The Woodlands

NOT PROTECTIVELY MARKED. Fire Legislation

WILTSHIRE POLICE FORCE PROCEDURE. Fire Safety Management

June 2017 (Updated 18 January 2018) Fire Safety Policy. Peter Webb, Project Manager Compliance First Choice Homes Oldham Limited

Sandwell Valley School and Sandwell Community Care Trust Training. 150 Birmingham Road, West Bromwich, B70 6QT

Byker Various post codes. Your Homes Newcastle Health and Safety (fire) Officer Date of Fire Risk Assessment 18 th February nd October 2014

Fire Risk Assessment Guidance

5 Key Stages to Risk Assessment

UNIVERSITY OF OXFORD FIRE RISK ASSESSMENT

To: All SAAS Accredited Certification Bodies Subject: Clarification to Emergency and Health & Safety Requirements in the SA8000 Standard

HEATHLAND SCHOOL Fire Policy and Risk Assessment

Health & Safety Policy

FIRE SAFETY MANAGEMENT PLAN

Fire Safety Policy. Reviewer: Senior Deputy Headmaster Last Reviewed: September Version 1

EVACUATION POLICY 1. General

FIRE AND EMERGENCY EVACUATION POLICY AND PROCEDURES

AFEC FIRE ENGINEERING TEMPLATE FOR CLIENTS INTERNALLY COMPLETED RISK ASSESMENT

Fire safety management issues identified by fire risk assessments

Fire Safety Policy. Adopted by Governing Body: Reviewed by Governing Body: Next review: July Statutory Policy: No

EMERGENCY MANAGEMENT PLAN For Lambton High School. Date of last review: April, Review date: April, 2018

Transcription:

FIRE SAFETY POLICY This policy document replaces any previously published documents and comes into effect September 2018. 1.0 Fire Safety: The priority of Shrewsbury School is to minimise the risk to life and to reduce injury by maintaining the fire safety integrity of all school premises. 1.1 The fire safety policy, fire evacuation procedures and risk assessments at Shrewsbury School have been designed in such a manner as to help all members of the school community, and our visitors, to respond calmly and effectively in the event that a fire occurs. 2.0 Role of the School Fire Officer: The Property Surveyor is the designated School Fire Officer who has overall responsibility for ensuring that: 2.1 This Fire Safety Policy is kept under regular review by the Governors and the Senior Leadership Team. 2.2 The information contained within the Fire Safety policy is made available to all members of the School community. 2.3 Clear, written instructions on the course of action to take in the event of an emergency are displayed in all areas of the school, with additional information being given when large numbers of visitors are on site, ie for concerts, play performances etc 2.4 Clear, written instructions are freely available for all visitors to the school and these instructions contain full information on the course of action to be taken in the event of an emergency. 2.5 Contractors working for the school will be given written documentation detailing the procedures that they should follow whilst working on the school campus, and also informing them of the school s procedures in an emergency situation. 2.6 Basic fire training is given to all employees at least annually and the School s H.R. Department include Fire Training in the induction sessions given to all new employees upon commencing work at the school. 2.7 Emergency evacuations and fire practices are carried out. 1

2.8 The Shrewsbury School Fire Risk Assessment and assessments undertaken for individual buildings are regularly reviewed incorporating any alterations to the layout, systems installed or operational use of the premises. 2.9 The integrity of all fire prevention systems and equipment in place is maintained in good working order. 3.0 Emergency In case of Fire notice: In case of fire notices, adapted specifically for each building and backed up by compliant fire signage will be used to facilitate the safe evacuation of all buildings. 3.1 The In case of fire notice will be displayed in prominent positions throughout buildings and will follow the following format: The actions to be taken upon discovery of a fire. The actions to be taken to reach the assembly point safely with special regard to the needs of any disabled person(s). The actions to be taken upon reaching the assembly point. 4.0 Briefing of new members of staff and pupils, contractors and visitors to the school: Shrewsbury School recognises the importance of making sure all those on the school premises are aware of how they should respond in an emergency situation. 4.1 All new members of staff (teaching and support alike) and all new pupils will be given a briefing on the school s emergency procedures on their first day at Shrewsbury School. This briefing will include: The importance of ensuring that individuals are familiar with the routes of escape and emergency exits in the buildings in which they will work/live. Familiarisation with the systems in place, ie how to operate a Break Glass point, location of the defined assembly point. The importance of adhering to the evacuation procedures and how the safe evacuation of everyone is the first priority and that protecting property comes second. The importance of good housekeeping in all buildings and the systems in place to draw to the attention of the School Fire Officer any issue that may be of concern. 4.2 All visitors to the school should be made aware of, and given a copy of, the school s Visitor Safety Leaflet by their host. This leaflet will be prominently displayed in public buildings and will be readily available from Reception, the Bursary etc. 4.3 For Open Days, concerts, plays etc when there will be a large number of visitors to the school the organiser of the function will undertake to ensure that a brief safety announcement is made prior to the start of any performance, detailing the location of emergency exits and the action to be taken in the event of an alarm sounding. Where deemed necessary, the organiser of the event will 2

need to arrange for stewards to be on duty for the duration of the performance. Stewards may be required for events which take place in the hours of darkness, or are likely to involve significant numbers of older or young visitors who may require additional support. (Guidance on this matter must be sought from the School Fire Officer, if the organiser has any doubts on the level of provision required.) 4.4 Contractors working at the school will be given detailed Health & Safety documentation upon being awarded the contract and this will include specific information on the course of action to be taken by their operatives in the event of an emergency situation developing whilst they are on site. Contractors will also be required to ensure that their work processes do not compromise any aspect of any fire safety system in place. 4.5 Groups or other organisations making use of the school s facilities (ie summer holiday lettings, sports courses, training evenings etc) are provided with detailed information with regards to the school s fire safety systems. A Site Warden, or other competent member of staff is on duty for events such as weddings, Leavers Ball etc that operate late at night, or out of normal working hours in holiday periods. On such occasions the individual on duty must not be involved with any other aspect of the event. 4.6 Residential groups are required to provide Shrewsbury School with their proposed fire procedures that will be in place during their stay, ensuring that these do not compromise the systems already in place. Groups bringing foreign students to stay at the school will need to ensure that all fire procedures are explained to these individuals in a language they fully comprehend. 4.7 Disabled staff, pupils and visitors (even if only temporarily disabled) should be given one to one instruction on the school s fire safety procedures by their host, and adjustments agreed with all parties. 5.0 Training: 5.1 All employees of the school receive will receive basic fire training annually. Due to the proximity of the school to the Fire & Rescue Services Headquarters this will emphasise the importance of fire prevention and the safe evacuation of a building rather than on how to actually fight a fire. 5.2 Specific employees, ie Works Department, Grounds, Science Technicians, will be given additional training in basic fire fighting techniques. Additional training of individuals will be given as necessary and as determined by risk assessment. 5.3 In residential accommodation there will be a minimum of at least one fire practice and evacuation each term. Housemasters are required to undertake fire practices within the first six weeks of the term commencing, and lessons learnt will be acted upon. 5.4 Housemasters and Faculty Heads are the designated Building Managers of their respective premises and should liaise closely with the School Fire Officer to ensure the actions/operations of their House/Faculty does not, at any time or in any way compromise the integrity of the fire safety of the building they occupy. 6.0 Fire Prevention Measures: The following fire prevention measures are in place at Shrewsbury School: 6.1 Escape routes in all school buildings are kept clear and unobstructed. 3

6.2 Fire evacuation notices and compliant signage are prominently displayed throughout all buildings. 6.3 Fire extinguishers are located in all school buildings and are maintained in a good working condition by a professional company contracted by the school. The location of such equipment is as defined by visiting Fire Officers from Shropshire Fire & Rescue, from our professional advisors or by Building Regulations. 6.4 Automatic fire detection systems are in place in all residential accommodation to an L1 standard and the majority of other buildings have systems installed. In recent new build and refurbished buildings the systems can include beacons as well as sounders. A few, low risk buildings are without any permanent automatic fire detection system and the installation of a system where necessary be determined by risk assessment. A competent contractor services all installed systems every six months. Service records are maintained in the Estates Office. 6.5 All installed fire detection systems trigger sounders located throughout the building and in some areas visual beacons are also activated. 6.6 All magnetic holdback devices to corridor and fire escape route doors that are held open during normal day time activities are linked to the fire control panel in the building and close when the system is activated. 6.7 Emergency lighting systems are installed to all emergency exits and escape routes and these are regularly tested. 6.8 All installed fire systems are tested weekly by the Estates Department and logged in individual log books held in each building. 6.9 The Property Surveyor undertakes periodic room by room walk abouts in all school buildings to monitor any defects in any systems and all employees can submit a work request to the Estates Department if they notice anything of concern. The maintenance of the fire safety integrity of a building is given priority over other works that may be in progress. 6.10 Comprehensive information is kept by the Estates Department with regards to the location of emergency gas & electric shut off points, hydrants etc. The individual fire risk assessments undertaken for the main school buildings contain detailed information of services and utilities. 6.11 The School is an accredited conforming body under NICEIC and all remedial or installation work undertaken by the school electricians is to the current IEE Regulations. The electrical team is inspected annually by NICEIC to ensure that the work undertaken is to standard. 6.12 Minor Works Certificates and/or Electrical Installation Certificates are required for all electrical work undertaken by outside contractors. 6.13 The school undertakes fixed electrical installation tests to all buildings on a rolling programme. 6.14 The school undertakes all portable appliance testing in house. Appliances brought on site by pupils are visually inspected at least once a term by the trained Estates staff. The Property Surveyor has issued guidance notes on the safe use of portable appliances to all Housemasters. 6.15 The installation of lightning protection systems is ongoing and all testing and a specialist contractor undertakes the servicing of the systems. 4

6.16 The School is an accredited conforming body under Gas Safe (Registration 58198) and employs a full time plumbing team. All remedial or installation work undertaken by them is to current regulations. The plumbing department is liable to inspection by Gas Safe at any time to ensure that the work undertaken is to standard. 6.17 All gas installations are serviced in house and all necessary records are kept. Specialist contractors can be contracted in as and when necessary. 6.18 All plant rooms, laboratories, main kitchens & laundry have Emergency gas shut off valves located in prominent positions in case of emergency. 6.19 Pressurised gas cylinders kept on site are stored in specific locations. Solvent cupboards have been provided for areas that hold small amounts of solvents (ie painters stores) whilst a purpose built flammable store has been fitted out for the Science Faculty. 6.20 The storage of bulk quantities of oil around site has been eliminated with all CH & HW systems now being gas operated. 6.21 The CCF has storage facilities to current MoD standards for weapons, stores and ammunitions. 6.22 Flammable rubbish is not allowed to accumulate in buildings and the central processing of the general waste and storage of recycled goods is away from buildings. 6.23 The Works Team operates a 24/7 emergency call out for emergency situations. 6.24 The Property Surveyor works directly with Shropshire Fire & Rescue to ensure that all information available to the emergency services on their 7(2)d Risk Information Data (held on their appliances) is up to date and accurate. 7.0 Fire Risk Assessments: A generic Fire Risk Assessment has been undertaken for the whole school site as well as more detailed assessments for individual buildings. Assessments will be reviewed by the Property Surveyor as and when any alteration (structural or operational) is made. All employees have a duty to inform the Property Surveyor, as the designated Fire Officer, of any such intended changes in their House, Faculty or Department before implementing them. In the normal course of events, Fire Risk Assessments for individual buildings will be reviewed at least annually on a rolling programme. All Fire Risk Assessments are held by the Estates Office. All Housemasters and Faculty/Departmental Heads should read those that apply to them and any comments on how to improve them are always welcome. 8.0 Record keeping: All records relating the Fire Safety are retained in the Estates Office and are available to view during normal office hours. Records retained include those in relation to: 5

Gas safety, Landlord Certificates etc Portable appliance testing Fire system testing Fire fighting appliances service records Electrical installation testing, inc Minor Works Certificates Lift installations service records Fire practices Lightning conductor testing Training records July 2018 (RSB) To be reviewed January 2019 6