Building & Fire Code Academy. Building Better With Our Greatest Resource Education. Welcome!

Similar documents
January 1, 2014 Mandatory Effective Date

BUILDING CODE OF THE CITY OF NEW YORK. New York City Department of Buildings 4 June 2007

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

Richard B. Alpert, P.E. Senior FPE, Clark Nexsen

BOABC Level III Exams 7, 8, 9 and 10 Beginning April 1, 2015

For the Florida Building Commission And the Fire Code Advisory Council

PROJECT: CIVIC ADDRESS:... PERMIT APPLICATION NO.: DATE:... CRP:. Certified Professional:.

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content

2012 B.C. Building Code Compliance Review (Division B Part 3)

CHAPTER 7 ALTERATIONS LEVEL

Agency for Health Care Administration

COMPLIANCE ALTERNATIVES

COMPLIANCE ALTERNATIVES

PERFORMANCE COMPLIANCE METHODS

PERFORMANCE COMPLIANCE METHODS

2012 International Fire Code Significant Changes. IFC Background. Purpose IBC and 2012 NFPA 101 Significant Means of Egress Changes

American Fire Sprinkler Association. An Introduction to the IBC and IFC

FIRE INSPECTORS GUIDELINES FOR PLAN REVIEWS AND INSPECTIONS OF NEW CONSTRUCTION / ADDITIONS AND CHANGE OF OCCUPANCY

PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE

NFPA 101 Code Update from 2012 Edition to the 2015 Edition

IBC Committee Responsibility Matrix January 2017

Agency for Health Care Administration

Agency for Health Care Administration

PERFORMANCE COMPLIANCE METHODS

Summary of BBS Proposed Ohio Mechanical Code Rule Changes October 2016

Presented by: Bill Lauzon, PE Lauzon Life Safety Consulting, LLC Web: Lauzon-LSC.com

Preview of the MA Building Code (780 CMR) 9 th edition

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

Agency for Health Care Administration

Report on First Revisions with Statement June 2014 NFPA 101

Agency for Health Care Administration

Date: February 22, 2005 Kimbalton DUSEL, Pre-S-2 Submittal CNA0402 PRELIMINARY CODE REVIEW. International Plumbing Code Edition

Rental Housing Initial Inspection Checklist Community Development Department 208 NW 1 st Ave., Faribault, MN

AHC Meeting #7 July 12-13, Occupancy WG Report

Common Building Code Misinterpretations

By: Russell Bainbridge March 18th, 2016 FPE 596

Chapter Nursing Homes

City of South Salt Lake Fire Code Training Exiting, Egress Systems and Egress Control

COURSE SYLLABUS HVAC AND MECHANICAL CONSIDERATIONS FOR PART 3 BUILDINGS CORRESPONDENCE COURSE

Wausau Fire Department Inspection Violation Code Listing (Modified) All Applicable Records

BCBC 2012 CHANGES TO PART 3

Laboratories and Hazardous Materials. Company Overview

The project scope work is 90% new construction and 10% remodel in Esslinger Hall.

Life Safety - Means of Egress/Exits NFPA 101

Open to Below: A Discussion of Allowed Floor Openings. Jay A. Ierardi, Ph.D., P.E., LEED AP. Kevin S. Hastings, P.E., LEED AP

Agency for Health Care Administration

LABELING OF FIRE-RATED GLAZING STUDY GROUP REPORT TO CTC MEETING CHICAGO, IL - OCTOBER 13-14, 2011 CODE CHANGES

Agency for Health Care Administration

2018 International Fire Code. Add new text as follows:

BC Building Code Checklist Part 3 Planning and Development Department

WHITE PLAINS SMOKE CONTROL CODE PART 1. GENERAL REQUIREMENTS

FIRE AND SAFETY PROJECT REVIEW REPORT

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge.

WORKSHEET 2-1 THE MANITOBA RESIDENTIAL OCCUPANCY FIRE RISK INDEX FIRE SAFETY PARAMETER VALUES

Fire and Life Safety Committee

BUILDING/FIRE CODE REFERENCES 2006 EDITION

Fire Protection Coffee Break Training May 2016

DUCT SYSTEMS CHAPTER 6

NFPA 101, 2012 EDITION IMPACT ON NEW AND EXISTING HEALTH CARE FACILITIES

Module 9: Ontario Building Code Fire Fighting Provisions

Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region

APPENDIX A International Building Code Amendments

SCHEDULE. Essential Safety Measures taken from Schedule 9 of the Building Regulations PART 1 BUILDING FIRE INTEGRITY

SAFETY. USE OF SAFETY CHECK LISTS A safety check for compliance with current regulations should be performed yearly.

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

Following are code change proposals submitted through Adhoc Health from General study group and related changes. General. Position.

First Aspen Federal Regulation Set: K LSC 2000 Health Existing

EPCOT BUILDING CODES 2017 Supplement to the 2015 Edition Effective Date March 1, 2017

Taming the Health Care Building Codes NFPA vs. The International and Chicago Building Codes JENSEN & HALSTEAD LTD.

Ch. 54 GROUP B EDUCATIONAL 34 CHAPTER 54. GROUP B EDUCATIONAL OCCUPANCY GROUP

M E M O R A N D U M. Diane Matthews, Administrator, Technical Projects. NFPA 101 First Draft Letter Ballot (A2014)

Defend In Place 2012 IFC Overview of Institutional Occupancies

Balloting Version First Draft NFPA 101 Life Safety Code Proposed 2015 Edition

Culminating Project U.S. Federal Courthouse FPE Spring 2013

Notable Changes in the Mechanical Codes

Report on First Revisions with Statement June 2014 NFPA 101

DUCT SYSTEMS CHAPTER 6

2015 Recommended Building Code with Amendments. The Executive Committee of the Central Iowa Code Consortium does ordain as follows:

FIRE/SMOKE BARRIER FUNDAMENTALS

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

DUCT SYSTEMS CHAPTER 6

FIRE PROTECTION AND SAFETY ANALYSIS FOR AN OFFICE HIGH RISE BUILDING. Fabio Mazza June 2016

Nirmal Chandra Sinha. Supposed to complete(dd/ MM/YYYY) Comments after Physical Inspection

Fire Protection Analysis DCI Data Center Building

Module 7. Control of Smoke & Highlights of Code Requirements

PLAN REVIEW SUBMITTAL GUIDE

3/6/2018. Design Tips For Fire and Smoke Barriers. Professional Development Hours (PDH) Certificates. Copyright Materials

Agency for Health Care Administration

MWL Consulting Company

Fire and Life Safety Review Form

Objectives. To review updated IBC and fire test requirements when designing for life safety.

FIRE SAFETY INSPECTION REPORT

Life Safety Damper Installation ASHRAE St Louis Chapter Feb. 9,2015. Peter McDonnell, PE, LEED AP BD+C McClure Engineering

SCHULTE & ASSOCIATES Building Code Consultants 880D Forest Avenue Evanston, IL fpeschulte.

FIRE PROTECTION SYSTEMS

FIRE SAFETY INSPECTION REPORT

Transcription:

Building & Fire Code Academy Building Better With Our Greatest Resource Education Welcome!

Understanding the Sprinkler System Design Alternatives in the 2015 International

Why inspect, test and maintain? Insure proper system operation Insure hazard has not changed Maintain ability to occupy the building

Why is proper system operation important? Consider the myriad of design alternatives tradeoffs that the model building and fire codes allow when fire sprinkler systems are installed.

Building Code Indicates where sprinklers are required or Provides design alternatives which utilize sprinklers

Sprinklers systems are required to be indicated on the Certificate of Occupancy This makes the sprinkler systems a mandatory requirement for occupancy Sprinklers can be required by a code section or be a design choice by the owner and/or design team In either case they are required for occupancy Remember - Chapters 8, 9 and 10 of the IBC and the IFC are almost identical

Fire Code Section 901.6.1 Indicates sprinklers shall be maintained in an operative condition at all times sprinklers

Existing Building Code When existing building with sprinklers are changed, altered, modified Maintenance per the International Fire Code is required

Lets clarify in the IBC and IFC 903.3.1.1 NFPA 13 qualifies for all design alternatives 903.3.1.2 NFPA 13R qualifies for many design alternatives 903.3.1.3 NFPA 13D qualifies for a few design alternatives

Assembly Occupancy Specific Sprinkler Advantages Sprinklers permit unlimited areas in one-story A-4 buildings. 507.4 Sprinklers permit unlimited areas in one-story A-3 buildings. 507.6 Sprinklers permit unlimited areas for Motion Picture theaters of 1 story and type II construction. 507.12 Multiple manual pull stations not required when sprinklers are present in A occupancies. 907.2.1 Sprinklers permit an increase from 200 ft to 250 ft in assembly buildings. 1029.7

Business Occupancy Specific Sprinkler Advantages Sprinklers permit unlimited areas in one story group B, F, M, or S buildings 507.4 Sprinklers permit unlimited areas in two-story group B, F, M, or S buildings. 507.5 Sprinklers eliminate smoke dampers at shafts in groups B and R buildings, when meeting criteria. 717.5.3#2 Multiple manual pull stations not required when sprinklers are present in B occupancies. 907.2.2 exception Sprinklers allow 100 ft of common path of egress travel in occupancies B, F, S. 1006.2.1

Educational Occupancy Specific Sprinkler Advantages Sprinklers permit unlimited areas in one story E building of type II, IIIA, or IV. 507.11 Multiple manual pull stations not required when sprinklers are present in E occupancies. 907.2.3

Factory Occupancy Specific Sprinkler Advantages Sprinklers permit unlimited areas in one story group B,F,M, or S buildings 507.4 Sprinklers permit unlimited areas in two-story group B, F, M, or S buildings. 507.5 Multiple manual pull stations not required when sprinklers are present in F occupancies. 907.2.4 exception Sprinklers allow 100 ft of common path of egress travel in occupancies B,F,S. 1006.2.1 Sprinklers allow up to 400 ft of travel distance in groups F-1 and S-1. 1017.2.2

Institutional Occupancy Specific Sprinkler Advantages In group I-2, quick response sprinklers allow waiting rooms constructed as corridors open to the corridors. 407.2.1 Sprinklers eliminate the need for smoke detectors in habitable areas in group s I-1 and I-3. 907.2.6.1 and 907.2.6.3.3

Mercantile Occupancy Specific Sprinkler Advantages Sprinklers permit unlimited areas in one-story M buildings. 507.4 Sprinklers permit unlimited areas in two-story M buildings. 507.5 Sprinklers permit unlimited or increase of 100% in groups M and S control areas (non-flammable liquids, non-combustible solids). Table 414.2.5(1) sub (b) Sprinklers permit increase in control areas of group M per Table 414.2.5(2) (flammable & combustible liquids) Multiple manual pull stations not required when sprinklers are present in M occupancies. 907.2.7

Residential Occupancy Specific Sprinkler Advantages Sprinklers reduce the fire resistance rating of fire partitions between dwelling/sleeping units to ½ hour. 708.3 Sprinklers reduce the fire resistance rating of horizontal assemblies between dwelling/sleeping units to ½ hour. 711.2.4.3 Sprinklers eliminate smoke dampers at shafts in group R buildings. 717.5.3 (2) Sprinklers eliminate draftstopping in floors of all R groups. 718.3.2 Sprinklers eliminate draftstopping in attics of groups R-1 and R-2. 718.4.2 Multiple manual pull stations not required when sprinklers are present in R-1 and R-2 occupancies. 907.2.8.1 and 907.2.9 Sprinklers increase common path of travel in R-2 to 125 ft. 1006.3.2(1) Sprinklers allow R-2 occupancies up to 3 stories with one exit. Table 1006.3.2(1)

Storage Occupancy Specific Sprinkler Advantages Indoor and Outdoor Control Areas Sprinklers permit unlimited or increase of 100% in groups M and S control areas. Table 414.2.5 (1) sub (b) and (i) (Non-flammable liquids, Non-combustible Solids) Sprinklers permit unlimited areas in one-story S buildings. 507.4 Sprinklers permit unlimited areas in two story S buildings. 507.5 Sprinklers allow additional building height of open parking garages with mechanical access. Table 406.5.4 Where ESFR (early suppression fast response) sprinklers are provided, smoke and heat vents are not required. 910.1 Sprinklers allow 100 ft of common path of egress travel in occupancies B, F, S. 1006.3.2.1 Sprinklers allow up to 400 ft of travel distance in groups F-1 and S-1. 1017.2.2 Quantities can be increased in a control area 100% when sprinkled (physical hazard). Table 307.1(1) note d Quantities can be increased in a control area 100% when sprinkled (health hazard). Table 307.1(2) note d Sprinklers eliminate control area floor fire rating in type II-A, III-A, and V-A. 414.2.4

High-Rise Buildings Sprinklers permit the fire resistance rating reductions for high-rise buildings that have sprinkler control valves equipped with supervisory initiating devices and water flow initiating devices for each floor. 403.2.1 Sprinklers permit the required fire resistance rating of the fire barrier walls enclosing vertical shafts, other than exit enclosures and elevator hoistway enclosures, to be reduced to 1-hour where automatic sprinklers are installed within the shafts at the top and at alternate floor levels. 403.2.1.2 Atrium Floor Areas Sprinklers permit the atrium floor area to be used for any approved use where the individual space is provided with an automatic sprinkler system. 404.2 Atriums Sprinklers permit a glass wall forming a smoke partition where automatic sprinklers are provided along both sides of the separation wall. 404.6

Stages Sprinklers installed in the space below the stage eliminate the requirement for a fire resistance rated floor type IIA, IIA, VA. 410.3.1 (2) Proscenium wall water curtains may be used in lieu of fire curtains for proscenium openings. 410.3.5 Sprinklers allow 1 ½ hose connections instead of 2 ½ hose connections installed near stages. 905.3.4 Attics and Crawl Spaces Sprinklers delete the 1-hour fire resistance rating for attics and under-floor concealed spaces used for storage of combustible materials. 413.2 Mezzanines Sprinklers increase mezzanine area up to one half of the floor area in construction types I and II. 505.2 Sprinkled mezzanines in 2 story buildings, other than H and I uses, having two or more means of egress are not required to be open into the area of the mezzanine 505.4 (5)

Area Increase Sprinklers add 300% for one story and 200% for multiple stories in building area. Table 506.23 Height Increases Sprinklers permit a height increase of 20 ft and one story. Table 504.3 Unlimited Areas Sprinklers permit unlimited areas in one and two-story group B, F, M, or S buildings. 507.4 & 507.5 Furnace Rooms Sprinklers eliminate the 1-hour wall requirement around furnace rooms having equipment with over 400,000 BTU per hour input. Table 509 Boiler Rooms Sprinklers eliminate the 1-hour wall requirement around boiler rooms having boilers over 15 psi and 10 horsepower. Table 509

Refrigerant Machinery Sprinklers eliminate the 1-hour wall requirement around refrigerant machinery rooms. Table 5095 Occupancy Separations Sprinklers permit up to a 1-hour reduction in the fire resistance rating of fire separation walls. Table 508.4 Exterior Wall Opening Sprinkled maximum allowable area of unprotected opening to be the same as for protected opening. Table 705.8 Sprinklers eliminate the requirements for flame barriers protecting window separations, separated by five feet or less. 705.8.5 Sprinklers delete the protection requirements of openings in an exterior wall where buildings are equipped with sprinklers and water curtains are installed on the exterior. 705.8.2

Fire Walls Sprinklers permit openings in firewalls to exceed the 156 sq ft limit where both buildings are sprinklered. 706.8 Sprinklers allow the firewall to terminate to the inside surface of the non-combustible exterior wall. 706.5 (3) Fire Barriers Sprinklers permit openings in fire barriers to exceed the 156 sq ft. where both fire areas are sprinkled. 707.6 Shaft Enclosure The bottom of a shaft is not required to be closed off provided it terminates in room protected by sprinklers. 713.11

Sprinkler Penetration The annular space created by the membrane penetration fire sprinkler covered by a metal escutcheon plate requires no additional firestopping. 714.3.2 Draftstopping Sprinklers eliminate the requirement for draftstopping at 1,000 sq ft in floor ceiling assembly.718.3.2 Sprinklers eliminate the requirement for draftstopping in attics and concealed spaces at 3,000 sq ft. 718.3.3 Exit Enclosure Doors Sprinklers delete the maximum transmitted temperature end point for door assemblies in exit enclosures. 716.5.5 Fire Dampers Sprinklers eliminate the required fire dampers in ducts for HVAC systems, fire barrier walls that have a required fire resistance rating of 1-hour or less. 717.5.2

Set Out Construction Sprinklers permit a reduction in the class finish requirements for walls or ceilings that are set out or dropped. 803.13.2 Interior Wall and Ceiling Finishes Sprinklers reduce the wall and ceiling finishes to a lower category. Table 803.11 Textile Wall Covering Sprinklers eliminate the requirement of materials to pass ASTM E-84 requirements for class A materials. 803.1.4 Combustible Decorative Materials Sprinklers increase the amount of combustible decorations up to 75% (versus 10%) in assembly occupancies. 806.3 Interior Floor Finish Sprinklers reduce the requirements for floor finish materials in vertical exits and exit passageways and exit access corridors. 804.4.2

Standpipes Sprinklers allow Class I standpipes where Class III standpipes are required. 905.3.1 Sprinklers allow Class I standpipes to have 50 more travel. 905.4 Sprinklers allow the risers and laterals of standpipes not to be covered by fire resistive material. 905.4.1 Fire Alarms Heat detectors are not required when sprinklers are present. 907.4.3.1 Sprinklers eliminate smoke detection in R-4 occupancies. 907.2.10.2 Multiple manual pull stations not required when sprinklers are present in A, B, E, F, M, R-1, R-2 occupancies. 907.2.1 thru 907.2.4, 907.2.7, 907.2.8.1, 907.2.9

Elevators Elevators are not required to serve as the means of egress as required by ADA in sprinkled buildings 1009.2.1 Accessibility Stairs Sprinklers delete the accessibility requirement for 48 egress stairs and for areas of refuge(except Illinois). 1009.3 Revolving Doors Sprinklers permit the use of revolving doors for other than a means of egress. 1008.1.4.1.2 Automatic Locking Sprinklers permit the use of access controls egress doors. 1010.1.9.7 Travel Distance Sprinklers increase the travel distances for all occupancies. Table 1017.2 Egress Separations Sprinklers reduced the required egress separation distance to 1/3 the diagonal of the building or space. 1007.1.1 exception

Corridor Rating Sprinklers delete the corridor fire resistance rating A,B,E,F, M, S, U. Table 1018.1 Dead End Corridors Sprinklers allow dead end corridors up to 50 ft. in the following occupancies: B, E, F, I-1, M, R- 1, R-2, R-4, S and U. 1018.4 Sprinklers allow the space between the corridor ceiling and the floor or roof structure above corridors to serve as return air. 1018.5.1 Exit Discharge Sprinklers eliminate the fire separation requirement for exterior exit ramps and stairs. 1027.6(3) Sprinklers permit of maximum of 50 percent of the occupants to exit through exit enclosures. 1028.1 Balcony Fire Ratings Sprinklers permit balconies and similar appendages on buildings of types III, IV and V to be of type V construction without a fire resistance rating. 1406.3 (3) Sprinklers eliminate the aggregate width requirement of balconies. 1406.3 (4)

Foam Plastic Insulation Sprinklers allow foam plastic insulation to increase from 4 to 10 in thickness. 2603.3 exception Light Diffusing Systems Sprinklers permit the use of light-diffusing systems with an occupant load of 1,000 or more, theaters with the stage and proscenium opening and an occupant load of 700 or more, group I-2, group I-3 exit stairways and exit passageways. 2606.7 Areas of light diffusing systems that are protected with fire sprinkler systems shall not be limited. 2606.7.4 Sprinklers permit a 100 percent increase in the maximum percentage area for light transmitting plastic wall panels. 2607.5 Plastic Glazing Sprinklers permit the allowable area of glazing to 50 percent of the wall face. 2608.2 (1) exception

Light Transmitting Roof Panels Sprinklers permit unlimited height for light transmitting plastics. 2608.2 (3) Sprinklers eliminate flame barriers for adjacent stories. 2608.2 (2) Sprinklers permit light transmitting plastic roof panels in buildings required to be of fire rated construction without complying with the roof covering requirements. 2609.1 Sprinklers permit a 100 percent increase in an aggregate area of plastic roof panels.2609.4 (1) Sprinklers eliminate the 4 ft minimum separation requirement between individual plastic roof panels. 2609.2 (1) Skylight Separations Sprinklers eliminate the minimum separation distance of 4 ft between skylights. 2610.6 Plastic Skylights Sprinklers eliminate the 100 sq ft maximum area for skylights. 2610.4

Pedestrian Walkways Sprinklers eliminate the requirement for fire barriers between pedestrian walkways and buildings. 3104.5 Sprinklers permit increased height and stories for pedestrian walkways and buildings. 3104.5 Sprinklers permit an increase from 200 ft to 250 ft for exit access travel distance in pedestrian walkways. 3104.9 Sprinklers allow any increase from 200 ft to 400 ft of exit access travel systems in a pedestrian walkway constructed with both sides at least 50 percent open. 3104.9

So. Obviously the benefits of fire sprinklers are widely recognized & adopted by the code makers WHAT IF THE SYSTEM FAILS? - NOW WHAT ARE YOU UP AGAINST??? And, if the system is not being maintained, should the building still have a certificate of occupancy? Can you count on the system performing properly? What if the occupancy changes is the system design still code compliant? IF THERE S A LOSS WILL INSURANCE PAY??

Thank You For Your Time www.bfcacademy.com Email bfca@bfcacademy.com Building Better With Our Greatest Resource Education Voice (800) 488-7057 (847) 428-2951 Fax (847) 428-2911