DEALER SERVICE BULLETIN

Similar documents
M2 Series Startup Form

Service Step by Step Trouble-Shooting Check-List

48PGD/E/F/L/M/N PG20-28

SA Series Start up Report

Service and Maintenance Instructions

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

Controls, Start-Up, Operation, Service and Troubleshooting Instructions

KITS COMMON TO HEATING AND COOLING EQUIPMENT 504,652M 03/04. Supersedes 503,249M

INSTALLATION INSTRUCTIONS R 410A Single Package Gas Heating / Electric Cooling

SUBMITTAL. Project. CLU Swenson Center. Date 01/07/2010. Mechanical Contractor. West Coast Air Conditioning. Mechanical Engineer

Series 9. Commissioning Checklist. MISSION CRITICAL Air Conditioning Systems. ClimateWorx International Inc.

THE RIGHT SPEC. RIGHT NOW.

M2 Series Startup Form

40 RM/RMS Packaged Air-Handling Units

SECTION 7 AIR CONDITIONING (COOLING) UNIT 41 TROUBLESHOOTING

Field Start-Up Sheet Direct Fired Gas Equipment

LGH/LCH WARNING. CAUTION Danger of sharp metallic edges. Can cause injury. Take care when servicing unit to avoid accidental contact with sharp edges.

48TF GAS HEATING/ ELECTRIC COOLING UNITS

50TC Single Package Rooftop Cooling Only Horizontal Air Flow Unit with Puronr (R---410A) Refrigerant 15, 17.5, 20, 25 Tons --- (Sizes 18, 21, 25, 29)

HVAC Service Technicians Training Center

START UP FORM PACKET

HVAC REPAIR/REPLACEMENT 07/18/12 SECTION HVAC - MAJOR EQUIPMENT

Weathermaster Series 48HJ004, 005, 006, 007, 008, 009, 012 & 014 COMBINATION GAS HEATING/ ELECTRIC COOLING UNITS

62DA,DB,DC,DD,DE,DF07-38

OPERATION AND SERVICE for

INSTALLATION INSTRUCTIONS

Installation Instructions

48TM GAS HEATING/ELECTRIC COOLING UNITS

4TTB3060D1000B 208/230/1/60 35 SCROLL /230/1/ /8

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Installation, Start-Up and Service Instructions

START UP FORM PACKET

INSTALLATION INSTRUCTIONS 036, 042, 048, 060, & 072 LGA/LCA/LGC/LCC

7/8 NO NO NO PROPELLER DIRECT / /230/1/ SPINE FIN /8 8 LBS., 0 OZ. YES 7/8 3/8

INSTALLATION INSTRUCTIONS

Service Facts. Split System Cooling 3.0 Ton 4A7A6036J-SF-1B-EN. January A7A6036J1000A

INSTALLATION MANUAL R-22/R-407C OUTDOOR SPLIT-SYSTEM AIR CONDITIONING MODELS: GCGA SERIES 1.5 TO 6.3 TONS 1 & 3 PHASE LIST OF SECTIONS LIST OF FIGURES

Mortex INSTALLATION INSTRUCTIONS AIR CONDITIONING & HEAT PUMP INDOOR COILS

XC13. IMPORTANT Operating pressures of this R 410A unit are higher than pressures in R 22 units. Always use service equipment rated for R410A.

INSTALLATION INSTRUCTION

Submittal Data PERFORMANCE DATA CERTIFIED DIMENSION PRINTS CERTIFIED ROOF CURB DIMENSION PRINTS

EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST TEL NO: ORDER NO: CONTRACT NO:

INSTALLATION INSTRUCTIONS TXV Horizontal Slab Coils WLSH

User s Information Manual

HEATING & COOLING SUBMITTAL The DuraPac Series Unit 559F/579F180, 216, 240, , 18, 20, and 25 NOMINAL TONS

Table of Contents. Service Procedures. Service Procedures. Measuring Superheat (4) Measuring Subcooling (5) Airflow Calculation (6-8)

Checking the Charge on a Heat Pump in the Winter

Preventative Maintenance Tables

Calhoon MEBA Engineering School. Study Guide for Proficiency Testing Refrigeration

D-PAC. Digital Precise Air Control System. Functionality Factory Testing Ease of Installation Ease of Maintenance Energy Efficiency

Service Facts. WARNING: HAZARDOUS VOLTAGE - DISCONNECT POWER and DISCHARGE 4TTB6-SF-3. Split System Cooling 4TTB6048A1000A, 4TTB6049A1000A CAUTION

Submittal Data PERFORMANCE DATA CERTIFIED DIMENSION PRINTS CERTIFIED ROOF CURB DIMENSION PRINTS SERVICE OPTION DIMENSION PRINTS

Corp L9 Revised HS27 SERIES UNITS SPECIFICATIONS. Model No. HS HS HS HS27-042

50TC Single Package Rooftop Cooling Only Vertical Air Flow Unit with Puron

SA Series Startup Form

HP13 WARNING WARNING. Service Literature HP13 SERIES UNITS

Service Facts. WARNING: HAZARDOUS VOLTAGE - DISCONNECT POWER and DISCHARGE 4TTR6024-SF-1B. Split System Cooling 4TTR6024A1000B CAUTION CAUTION WARNING

User s Information and Installation Instructions

MODEL YVAA EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST CUSTOMER: LOCATION: ADDRESS: CUSTOMER ORDER NO: PHONE: JCI CONTRACT NO: JOB NAME:

FALCON Rooftop Units ACPSE 50/60Hz Cooling Capacity : 36 to 1388 MBH (11 to 407 kw) Heating Capacity : 40 to 1298 MBH (12 to 380 kw)

50HJQ004, 005, 006, 007, 008 & 012 SINGLE-PACKAGE HIGH-EFFICIENCY HEAT PUMP UNITS WITH FIELD-INSTALLED ELECTRIC HEAT

4TTR6036B1000A 208/230/1/ CLIMATUFF - SCROLL 3/4 3/4 3/4 3/4 3/4 208/230/1/ NO YES NO PROPELLER DIRECT

Product Data. 48TC Gas Heat/Electric Cooling Packaged Rooftop Vertical Models Nominal Tons 15, 17.5, 20, 25, 27.5 Model Sizes 17, 20, 24, 28, 30

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS TXV Coils for Manufactured Housing EMA

RHGN-H: COMMERCIAL AIR HANDLER WITH VARIABLE FREQUENCY DRIVE (VFD) NOMINAL 10 TONS R-410A REFRIGERANT 2-STAGE AIR-FLOW

User's Infomation Manual

Vehicle Level Heating and Air Conditioning Description and Operation A/C System - Manual. A/C System - Manual

Residential Piping and Long Line Guideline

FILTERS MANIFOLD CABINET REFRIGERANT CONNECTION LOCATION

4TTB3030D1000B 208/230/1/60 4TTB3036D1000B 208/230/1/ RECIP /230/1/ RECIP YES YES

Input Cap. (Btuh) Stage 2

A/C-HEATER SYSTEM - MANUAL

Installation Owner Diagnostics

30GT FLOTRONIC AIR-COOLED CHILLERS

F1 Series. Installation, Operation & Maintenance. Indoor Air Handing Units WARNING WARNING WARNING NOTICE QUALIFIED INSTALLER

208/230/1/ CLIMATUFF /230/1/ YES NO NO PROPELLER 23-1 DIRECT / /230/1/ SPINE FIN

Instructors: Contact information. Don Reynolds Doug McGee Factory Tech Support

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

Liebert Small System MCD and PFH Condensers (1-5 Ton) Warranty Inspection Check Sheet

SERVICE MANUAL FOR 6636A & 6636B SERIES TWO TON HIGH EFFICIENCY PACKAGED AIR CONDITIONERS

INSTALLATION MANUAL SPLIT-SYSTEM CONDENSING UNITS (AIR COOLED) HB Ton HB Ton HB Ton NOTES, CAUTIONS AND WARNINGS

4A6H5042G1000A 208/230/1/ DURATION - SCROLL 3/4 208/230/1/ NO (Use BAYKSKT263) YES YES PROPELLER DIRECT

BARD MANUFACTURING COMPANY, INC. W24G-W60G Gas Heat/Electric Cooling Engineering Specification Guide

Service Facts. WARNING: HAZARDOUS VOLTAGE - DISCONNECT POWER and DISCHARGE 4TTR6048-SF-1A. Split System Cooling 4TTR6048A1000A CAUTION CAUTION WARNING

CAUTION. Check Equipment and Job Site. Clearance Requirements. Unpack Unit

48KC Gas Heat/Electric Cooling Single Packaged Rooftop 14 SEER 3to5NominalTons. Product Data C08613

Advance Release September 2009

User s Information Manual

TGA WARNING CAUTION ROOFTOP UNITS. Service Literature. Table of Contents

Package Rooftop Units. Installation, Operation and Maintenance Instructions

Indirect gas-fired air heater

Installer's Guide. WARNING: HAZARDOUS VOLTAGE - DISCONNECT POWER and DISCHARGE YCC-IG EB23D1-12

INSTALLATION AND OPERATIONAL MAINTENANCE MANUAL

AIR-COOLED CONDENSING UNIT UNITS PRODUCED AFTER JANUARY, 1996 INDEX SCHEMATIC DIAGRAM FIG. NO.

CONDENSING UNITS SPLIT-SYSTEM COOLING 1.5 TO 5 TONS INSTALLATION INSTRUCTION MODELS H*DE018 THRU H*DE060 NOMENCLATURE GENERAL LIMITATIONS INSPECTION

Installation Instructions

Condensing Unit Installation and Operating Instructions

Product Data. Features/Benefits. OMNIZONE 50BV Remote Air-Cooled and Water-Cooled Indoor Self-Contained Systems and Water Source Heat Pumps

Transcription:

DEALER SERVICE BULLETIN Number: DSB 13-0025 Issued: 10/25/2013 Title: Schrader Valve Core Removal on Humidi-Mizer SRT Units PRODUCT CATEGORY: SRT with Humidi-Mizer System MODELS AFFECTED: Carrier: 48/50 TC04, 05, 06, 07 Serial Number(s): 3511C77243 to 3613C99999 SITUATION: Several small rooftop units with the optional Humidi-Mizer system have been found to contain a Schrader valve core in the equalizer line for the reheat TXV. On small rooftop, electro-mechanical units, there is a connection between the reheat coil TXV equalizer line and the compressor suction line where the equalizer line flare nut screws on a ¼ inch Schrader valve port of the suction line. This flare nut does not have a Schrader depressor, so the ¼ inch Schrader valve port should not have a core installed. During production, the Schrader valve core may have been installed in the port under thetxv equalizer line. This may cause inadequate dehumidification during the reheat mode. When this occurs, there may be a noticeable frosting of the evaporator coil. SOLUTION: Verify proper operation of the reheat TXV (attached is the Unit Start-up Checklist for Humidi-Mizer systems). To prevent this potential restriction of the equalizer line, the Schrader core must be removed from the Schrader valve port under the TXV equalizer flare nut. For units in the field, the Schrader core must be removed. Follow the steps below for field instructions: 1. Perform unit lockout/tagout. 2. Evacuate the refrigerant charge. 3. Unscrew the TXV equalizer line flare nut and inspect for a Schrader core. 4. Using a core removal tool, remove the Schrader core. 6. Screw the equalizer line flare nut back on to the ¼ port without a core. 7. Perform proper charging procedures. 8. Restore power and verify proper operation.

DSB 13-0025 2 Field Action: Verify proper operation of the reheat TXV (attached is the Unit Start-up Checklist for Humidi-Mizer systems). If a core is found, correct units per instructions above. Attachment: Humidi-Mizer Unit Start-up Checklist. Warning: Do not perform any of the servicing instructions provided in this Service Bulletin unless you are a trained and qualified technician. Observe all precautions in the instructions, equipment tags, labels, and observe all other safety precautions that may apply. Failure to follow this warning could result in property damage, personal injury or death.

DSB 13-0025 3 UNIT START-UP CHECKLIST MODEL NO: SERIAL NO: I. PRE_START-UP: VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT VERIFY INSTALLATION OF OUTDOOR AIR HOOD VERIFY INSTALLATION OF FLUE EXHAUST AND INLET HOOD VERIFY THAT CONDENSATE CONNECTIONS IS INSTALLED PER INSTRUCTIONS VERIFY THAT ALL ELECTRICAL CONNECTIONS AND TERMINALS ARE TIGHT VERIFY GAS PRESSURE TO UNIT GAS VALVE IS WITHIN SPECIFIED RANGE CHECK GAS PIPING FOR LEAKS CHECK THAT INDOOR-AIR FILTERS ARE CLEAN AND IN PLACE CHECK THAT OUTDOOR AIR INLET SCREENS ARE IN PLACE VERIFY THAT UNIT IS LEVEL CHECK FAN WHEEL AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE, AND VERIFY SETSCREW IS TIGHT VERIFY THAT FAN SHEAVES ARE ALIGNED AND BELTS ARE PROPERLY TENSIONED VERIFY THAT SCROLL COMPRESSORS ARE ROTATING IN THE CORRECT DIRECTION VERIFY INSTALLATION OF THERMOSTAT VERIFY THAT CRANKCASE HEATERS HAVE BEEN ENERGIZED FOR 24 HOURS. II. START-UP CHECK AND VERIFY ALL THAT APPLY: ELECTRICAL SUPPLY VOLTAGE L1-L2 L2-L3 L3-L1 COMPRESSOR AMPS 1. L1 L2 L3 COMPRESSOR AMPS 2. L1 L2 L3 SUPPLY FAN AMPS L1 L2 L3 TEMPERATURES OUTDOOR-AIR TEMPERATURE F DB (DRY BULB) RETURN-AIR TEMPERATURE F DB F WB(WET BULB) COOLING SUPPLY AIR TEMPERATURE F GAS HEAT SUPPLY AIR F PRESSURES GAS INLET PRESSURE IN. WG GAS MANIFOLD PRESSURE STAGE1 IN. WG STAGE2 IN. WG REFRIGERANT SUCTION CIRCUIT A PSIG CIRCUIT B PSIG

DSB 13-0025 4 REFRIGERANT DISCHARGE CIRCUIT A PSIG CIRCUIT B PSIG VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS GENERAL ECONOMIZER MINIMUM VENT AND CHANGEOVER SETTINGS TO JOB REQUIREMENTS WITH ECONOMIZIER / FA CLOSED: RETURN AIR STATIC PRESSURE SUPPLY AIR STATIC PRESSURE IN. WC IN. WC BLOWER WHEEL RPM RPM VERIFY SMOKE DETECTOR PROVIDES UNIT SHUTDOWN UTILIZING MAGNET TEST IV.UNITS WITH HUMIDIMIZER START-UP STEP 1. CHECK CTB FOR JUMPER 5, 6, 7 JUMPER 5, 6, 7 MUST BE CUT AND OPEN 2. OPEN HUMIDISTAT CONTACTS 3. START UNIT IN COOLING (CLOSE Y1) OBSERVE AND RECODE A SUCTION PRESSURE PSIG B DISCHARGE PRESSURE PSIG C ENTERING AIR TEMPERATURE F D LIQUID LINE TEMPERATURE AT OUTLET OF REHEAT COIL F E CONFIRM CORRECT ROTATION FOR COMPRESSOR CHECK FOR CORRECT RAMP-UP OF OUTDOOR FAN MOTOR AS CONDENSER COIL F WARMS 4. CHECK UNIT CHARGE PER CHARGING CHART JUMPER 32LT MOTOR MASTER TEMPERATURE SENSOR DURING THIS CHECK. REMOVE JUMPER WHEN COMPLETE 5. SWITCH UNIT TO HIGH-LATENT MODE (SUBCOOLER) BY CLOSING HUMIDISTAT WITH Y1 CLOSED OBSERVE A. REDUCTION IN SUCTION PRESSURE (5 TO 7 PSI EXPECTED) B. DISCHARGE PRESSURE UNCHANGED C. LIQUID TEMPERATURE DROPS TO 50 TO 55 F RANGE D. LSV SOLENOID ENERGIZED (VALVE CLOSES) 6. SWITCH UNIT TO DEHUMID (REHEAT) BY OPENING Y1 A. SUCTION PRESSURE INCREASES TO NORMAL COOLING LEVEL B. DISCHARGE PRESSURE DECREASES (35 TO 50 PSI) (LIMITED BY MOTORMASTER) C. LIQUID TEMPERTURE RETURNS TO NORMAL COOLING LEVEL

DSB 13-0025 5 D. LSV SOLENOID ENERGIZED (VALVE CLOSES) E. DSV SOLENOID ENERGIZED, VALVE OPENS 7. WITH UNIT IN DEHUMID MODE CLOSE W1 COMPRESSOR AND OUTDOOR FAN STOP LSV AND DSV SOLENOIDS DE-ENERGIZED 8. OPEN W1 RESTORE UNIT TO DEHUMID MODE 9. OPEN HUMIDISTAT INPUT COMPRESSOR AND OUTDOOR FAN STOP LSV AND DSV SOLENOIDS DE-ENERGIZED 10. RESTORE SETPOINTS FOR THERMOSTAT AND HUMIDISTAT