Preliminaries Item Description Supplier Price Qty Material Cost Labour Cost TOTAL General Site Preperations Scaffolding and Tin Hat Waste Removal Deliveries and Parking Temporary Water Supply Temporary Electricity Supply Perm Water Supply Perm Electricity Supply Perm Gas Supply Site Cleaning Pavement Cleaning Site Telephone Health and Safety Signage Hoarding Craneage Site Office Lighting Plant Miscelaneous
Service Connections Item Description Supplier Price Qty Sub - Contracted Material Cost Labour Cost TOTAL WATER CONNECTION THAMES 4 - NEW WATER MAIN THAMES 4 - Connection to existing Main THAMES WATER meters THAMES 4 GAS CONNECTION TRANSCO 4 - NEW GAS MAIN TRANSCO - Connection to existing Main TRANSCO 4 GAS meters British GAS 4 ELECTRICAL CONNECTION N. GRID 4 - NEW ELECTRICAL MAIN N. GRID - Connection to existing Main N. GRID 4 ELECTRICAL meters British GAS 4
General Items Floor Item Description Supplier Price Qty Material Cost Labour Cost TOTAL GROUND Cycle parking Tidy up parking spaces New staircase added onto exisiting 25 new steps Re-bar for increasing both staircases by 1 level landscaping ELEVATIONS Tidy Up Cableing and remove unnessessary Cables Front Cladding Subbed out to Sub Contractor eg 50k THIRD/FOURTH Sound Insulation between levels - Build to robust details Internal access to flat roof above new loft
Demolition Item Description Supplier QTY Material Cost Labour Cost TOTAL Removal of existing Roofing tiles Labour for safe removal Removal of existing Roofing timbers Labour for safe removal Removal of existing Roofing insulation Labour for safe removal
Steel Item Description Supplier Length (cm) Material Cost Labour Cost TOTAL B1 305x165x54.UB - S355 Creighton and Sons 701 B1 305x165x54.UB - S356 Creighton and Sons 698 B2 305x165x54.UB - S357 Creighton and Sons 216 B3 254x146x37.UB - S355 Creighton and Sons 710 B3 254x146x37.UB - S356 Creighton and Sons 710 B4 254x146x37.UB - S357 Creighton and Sons 778 B4 254x146x37.UB - S358 Creighton and Sons 778 B5 254x146x37.UB - S359 Creighton and Sons 877 B5 254x146x37.UB - S360 Creighton and Sons 877 B6 254x146x37.UB - S361 Creighton and Sons 818 3400+VAT Re-bar for increasing both st QUOTATION AVAILABLE ON REQUEST
Timber Item Description Supplier AVG - Price Length Qty Material Cost Labour Cost TOTAL 1" x 1" Sawn and untreated Builders Depot 2.89 2.4m 2" x 1" Sawn and untreated Builders Depot 3.69 3m 2" x 2" Sawn and untreated Builders Depot 4.44 3.6m 3" x 2" Sawn and untreated Builders Depot 6.20 3.6m 4" x 2" Sawn and untreated Builders Depot 8.26 4.2m 5" x 2" Sawn and untreated Builders Depot 12.96 4.2m 6" x 2" Sawn and untreated Builders Depot 14.42 4.2m 7" x 2" Sawn and untreated Builders Depot 12.58 2.4m 8" x 2" Sawn and untreated Builders Depot 15.19 3.6m 12x1220x2440 WPB 22.97 1220mm x 2440mm Architrave 2.96 1m Skirting 6.28 1m Door Beading/stopper 1.50 1m
Doors & Windows Structural opening Floor Ref. No Type Iron Mongery Fire Rating Width (cm) Height (cm) W1 110 245 Qty Material Cost Labour Cost TOTAL FOURTH W2 180 118 W3 116 215 W4 157 246 W5 88 245 J1 116 215 J2 116 215 J3 116 215 J4 116 215 J5 116 215 J6 189 215 J7 116 215 FOURTH J8 116 215 J9 189 215 J10 182 215 J11 237 215 J12 118 215 J13 118 215 J14 178 215 J15 178 215 J16 237 215 FOURTH JW1 116 215 JW2 116 215 JW3 116 215
FOURTH S1 80 80 S2 80 80 S3 80 80 D1 80 200 D2 80 200 D3 80 200 D4 80 200 D5 80 200 D6 80 200 D7 80 200 D8 80 200 D9 80 200 D10 80 200 D11 80 200 D12 80 200 FOURTH D13 80 200 D14 80 200 D15 80 200 D16 80 200 D17 80 200 D18 80 200 D19 80 200 D20 80 200 D21 80 200 D22 80 200 D23 80 200 D24 80 200 D25 80 200 D26 80 200
Sanitary Item Description Supplier Qty Material Cost Labour Cost TOTAL WC close coupled Toilet to go Screwfix 139.99 4 559.96 BATH victorian style freestanding http://www.bigbathroomshop.co.uk/ 370 4 1,480.00 Bath waste chain waste with metal plug and overflow Screwfix 16.64 4 66.56 Matching bath mixer (victorian style) Screwfix 58.49 4 233.96 BASIN Washbasin white colour 60cm x 55 cm Screwfix 65 4 260 Basin Waste Chain waste with metal plug and overflo Screwfix 12.99 4 51.96 Pedestal Screwfix 4 included Basin Fixing set Screwfix 5.03 4 20.12 Alto single lever basin mixer Screwfix 39.40 4 157.60 SHOWER corner shower enclosure Screwfix 239 4 956.00 waste Screwfix 6.49 4 25.96 Thermostatic shower mixer bar Screwfix 59.99 4 239.96 shower hose and head not fixed Screwfix 29.99 4 119.96 shower tray Screwfix 139 4 556.00 4,728.04
Kitchens Item Description Supplier Price Qty Material Cost Labour Cost TOTAL Fridge / Freezer Hotpoint Currys 269.00 4 1,076.00 Electric oven Hotpoint Currys 209.00 4 836.00 Hob Hotpoint Currys 120.00 4 480.00 Extractor Bosch Currys 142.00 4 568.00 Kitchen Double Bowl Sink Screwfix 59.99 4 239.96 Kitchen Tap Chef pull out Screwfix 39.49 4 157.96 Kitchen Drawers Units 20 0.00 Kitchen Wall Units 32 0.00 Splashback Tiling 8 m2 0.00 Kitchen Unit Doors White Gloss Panels 32 0.00 Kitchen Base Units 32 0.00 KickBoard and Architrave Skirting 0.00 Kitchen Work Top black Granite / marble 400m2 0.00 3,357.92
Electrical Item Description Supplier Price Qty Material Cost Labour Cost TOTAL LED spotlights in communal hallway Improve stairway lighting 20 smoke detectors Hallway and L/Room in each flat linked to heat detector LED spotlights throughout 4 new flats Locations to be decided by Site Owner 80 Heat Detector In Kitchens linked to internal smoke alarms Shaver sockets shaver sockets 4 twin socket outlet MK White 60 emergency lighting On Stairwells time operated switch On Stairwells Extension to Intercom Please allow for addition of 4 units to existing system Wylex Consumer Unit- RCD 8 Breaker Conumser Unit 1g 1 way lighting plate MK white 20 2g 2way lighting plate MK white 3 core 3 way lighting plate MK white Telephone point Cable of being used as a router Satelites Installation of 4 sky satelites and cabling, twin LNB for Sky HD 4
Plumbing Item Description Supplier Price Qty Material Cost Labour Cost TOTAL 22mm Copper Tube 0.00 15mm Copper Tube 0.00 Poly Tube 0.00 22mm Copper Gas Supply 0.00 Mains Supply Tube (25mm) 0.00 Soil and Waste Pipe 4 0.00 Waste Fitting 4 0.00 Soldering Fittings 0.00 Poly Fittings ONLY CRIMP FITTINGS - NO PUSH FIT FITTINGS 0.00 Compression Fittings 0.00 Radiators 1200x600 Screwfix 79.99 24 1,919.76 TRV+return Drayton RT212 Screwfix 17.09 24 410.16 Combi upto 30kw combi boiler inc. flu kit & Stat Intergas - Combi Compact ECO RF 30 1,100.00 4 4,400
Flooring Floor Item Description Supplier Price Qty Material Cost Labour Cost TOTAL FOURTH Communal Hardwaring Carpet - Allowance 10 per m2 + 8 per m2 Underlay 20 Stairs Hardwaring Carpet - Allowance 10 per m2 + 8 per m2 Underlay 5 Bathroom Tiling 24 Other internal 3mm Engineered wood - Allowance 21 per m2 + 6 per m2 Underlay 232 OTHER FLOORS Stairs Hardwaring Carpet - Allowance 10 per m2 + 8 per m2 Underlay 40
Masonary Item Description Supplier Price Qty Material Cost Labour Cost TOTAL Wall Construction New Brickwork Rebuild External Wall Communal Staircase Blockwork Rebuild Load Bearing Internal Wall Brick Piers Padstones Lintels Brick Outer, Block inner Match Existing Match Existing 3.6NM Blockwork Fleton Brickwork Engineering Brick, IP2 Off Shelf Off Shelf
Decoration FLOOR Item Description Supplier Price Qty Material Cost Labour Cost TOTAL Walls Throughout Magnolia Matt Dulux/Crown Woodwork - Doors, Arch, Skirting White Eggshell Dulux/Crown Ceilings White Matt Dulux/Crown FOURTH FRONT and REAR Elevation Paint Repairs and Tidying Up
Roofing Item Description Supplier Price Qty Material Cost Labour Cost TOTAL Dormers Lead / Guttering Roofing underlay Roofing Insulation Roofing Felt Roofing tiles PLEASE REFER TO GN01 & GN02 FOR Roofing Detail
Builder Labour Materials TOTAL Preliminaries Service Connections General Demolition Steel Timber Windows and Doors Sanitary Kitchen Electrical Plumbing Flooring Masonary Decoration Roofing CONTINGENCY VAT TOTAL