CONTENT. I. Product Description.2. II. Application Areas of Pain Spraying/Baking Booth.2. III. Equipment Constituents..2. V. Operating Principle.

Similar documents
INSTALLATION CHART Guangli Spray booth Model: GL1

FLAME115 INFRARED HEATER SERVICE MANUAL INDEX FIRE 115 WARNING

USER'S MANUAL PGE Single Package Rooftop

DF400/DF600. Construction Heaters. Installation and Maintenance Manual

Tel: Fax: Website:

user s information manual

1. GENERAL SAFETY RULES

TM NOVEMBER 1986 HEATER, SPACE, MULTIFUEL WITH BLOWER, 60,000 BTU/HR, 120 V UH-68G ( )

USER S INFORMATION MANUAL

INTRODUCTION THIS MANUAL INCLUDES IMPORTANT SAFETY INFORMATION

Italy Riello Brand, G20 Diesel Burner, Kcal/h, 10N Damp Motor. SUS304 Stainless Steel heat exchanger, argon arc welding;

ACORE Filtration Co.,Ltd provides engineering,

OPERATING MANUAL. AIR CONDITIONER Duct Type. Indoor Unit ARTG36LH ARTG45LH ARTG54LH ARTG60LH PART NO KEEP THIS MANUAL FOR FUTURE REFERENCE

A-8-01 Typical questions and answers on the boiler specifications on tender and boiler contract documents

Evaporation The process in which a liquid dissipates or emits vapor, fumes, or invisible minute particles.

OPERATING & MAINTENANCE MANUAL INDUSTRIAL DIRECT FIRED DIESEL/KEROSENE HEATERS IC 25

Thermo 230 / 231 / 300 / 301 / Troubleshooting

Heating, Air Conditioning, Ventilation. Отопление-Кондиционеры-Вентиляция. MTM 8-30 kw UNIVERSAL OIL HEATER OPERATING MANUAL

Inverter Swimming Pool Heat Pump

Operation Manual. Airbrush Airbrush-Spray Booth Compressor Suction Unit Paint E420

HEAT & COOL MODEL (REVERSE CYCLE)

Fujitsu OPERATING MANUAL Air Conditioner DUCT TYPE

FLOOR CONSOLE/ UNDER CEILING DUAL TYPE. ABT Series FUJITSU GENERAL LIMITED AIR CONDITIONER OPERATING MANUAL P/N

TQ Series. Electronic Control Pump Instruction Manual. 50Hz. ISO 9001 Certified Walrus Pump Co., Ltd.

Installation & Maintenance Manual

SECTION AUXILIARY HEATER

Each heater has slightly different operational characteristics

OPERATING MANUAL AIR CONDITIONER DUCT TYPE. ART Series KEEP THIS MANUAL FOR FUTURE REFERENCE FUJITSU GENERAL LIMITED P/N

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 FEATURES B-0703

R410A. AIR CONDITIONER DUCT TYPE / ART Series OPERATING MANUAL. REFRIGERANT This Air Conditioner contains and operates with refrigerant R410A.

USER S INFORMATION MANUAL

RL/1 SERIES. One Stage Light Oil Burners FIRING RATES LIGHT OIL RL 34/1 MZ kw

UV Flame Supervision System

FJH-3 5B1/(2) Fuel Fired Air Heater Manual of Installation Operation and Maintenance

DH-Direct Fired Poultry Farm Diesel Heater

G71MPP WARNING. WARNING Sharp edges. Be careful when servicing unit to avoid sharp edges which may result in personal injury. Service Literature

USERS MANUAL FOR GAS BOILERS

Presentation On Industrial Boiler Operation And Maintenance

CAST IRON ATMOSPHERIC BOILERS

en Direct oil-fired space heaters HD... Operator's manual

4-2 Climate control. Ventilator control. & Center and side ventilators

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-400 INDIRECT FIRED SPACE HEATERS

C Note! LGI16... Burner Controls. Building Technologies

DIESEL SPACE HEATER, DIESEL TYPE 30KW CT2142. Instruction & Assembly SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE

PVE SERIES POWER VENTER SYSTEM MANUAL

Flame relay units are necessary in most industrial combustion systems. These flame relay models are capable of meeting most application needs.

MV Hydro 5. MV Hydro 5-S Diesel Powered Water Heater Instruction Manual Ed MV Heating UK Ltd

CODE MODEL TYPE PRESS 60 N 616 T PRESS 60 N 616 T80

Dexter Commercial Vended Stack Washer Dryer. Dryer Troubleshooting, Fault Codes, And Schematics. Starting serial number (12/13)

TWO STAGE HEAVY OIL BURNERS

Topic: Mechanical Ventilation Refresher Reference #: DG Level of Instruction: In service personnel Time Required: 3 hours

WINDOW TYPE COOLING MODEL AKT7F AKT9F REVERSE CYCLE MODEL AKT7U AKT9U FUJITSU GENERAL LIMITED

Field Start-Up Sheet Direct Fired Gas Equipment

USER S, MAINTENANCE and SERVICE INFORMATION MANUAL

CONTENTS SAFETY PRECAUTIONS. En-1 DANGER! CAUTION!

AUTOMOTIVE AIR CONDITIONER REFRIGERANT HANDLING SYSTEM

1. The structure and its description

IMPORTANT SAFETY INSTRUCTIONS

FagronLab NP-1 UV. Negative pressure workbench. User Manual

Title: Fire Protection Effective Date: 7/1/2013 Control Number: THG_0039 Revision Number: 1 Date: 10/23/2015 Annual Review Completed: 5/13/2015

Operating instructions

DKO 974/976 DKO 974 N/976 N. Oil Burner Safety Control

OPERATING MANUAL AIR CONDITIONER CASSETTE TYPE. AUT Series KEEP THIS MANUAL FOR FUTURE REFERENCE FUJITSU GENERAL LIMITED P/N

YUHUA PRE-HEATER ALWAYS THE RIGHT ANSWER

LGB Gas fired boiler

PU-5 CONTROL PANEL - OPERATING MANUAL FOR PLANAR AIR HEATERS

Auto Open Cap Heat Press Manual and Parts Book Model No.: KX-CAP-2X

DIVISION WALL-HUNG STAINLESS STEEL HEATING BOILERS

BIX B-One 100 kw INSTALLATION GUIDE

ML180UH SERIES GAS FURNACE WARNING WARNING

Fume Hood Safety TYPES OF FUME HOODS

WHU WATER HEATING UNITS. GENERAL MANUAL MODEL KEY. June 2007 WHU WATER HEATING UNITS

SELF-PRIMING JET PUMPS

DAIKIN ROOM AIR CONDITIONER. Operation Manual

Multi-Elec COMPACTE BOILER

Operating Instructions

Are Your Kitchen Hood Filters Compliant?

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!!

USER S INFORMATION MANUAL

User s Information Manual

Light oil / kerosene burner

Oil Mist Separator Unit LGA 600 FUW

THC 85N / 175N INDUSTRIAL / COMMERCIAL SPACE HEATER

BG2000S PRE-MIX GAS BURNER

INSTALLATION INSTRUCTIONS # BURNER ASSEMBLY REPLACEMENT

Bench-Top Vacuum Oven with 28 segments programmable controller

Providing sustainable energy solutions worldwide. Installation- and maintenance instruction B 30 A

INSTALLATION AND MANINTENANCE INSTRUCTIONS

Dexter Industrial On Premise Dryer. Troubleshooting, Fault Codes, And Schematics. Starting serial number Part # /13

Oil burners Brûleurs fioul Stookoliebranders

Parts Available from

USER S INFORMATION MANUAL

TECHNICAL MANUAL OPERATOR'S, ORGANIZATIONAL, DIRECT AND GENERAL SUPPORT MAINTENANCE MANUAL

Automatic Sublimation Transfer Machine Manual Model. No.: ASTM-40/48/64

MICROTEC. Auto Open Heat Press Manual Model No.: SWH-2 CONTENTS

User's Infomation Manual

INSTRUCTIONS FOR USE OF COMBINED BOILER INTENDED FOR COMBUSTION OF BOTH PELLETS AND SOLID FUEL ABC COMBO

POWDER GUIDE. Trouble shooting tips to maximise the benefits of Apcoshield Powder Coatings

ORT6WXA ORT9WXA Slide-out Rangehoods

Dehumidifier User Manual. (For the series of DP40~DP70)

Transcription:

CONTENT I. Product Description.2 II. Application Areas of Pain Spraying/Baking Booth.2 III. Equipment Constituents..2 IV. Precautions for Use of Paint Spraying/Baking Booth..2 V. Operating Principle.3 VI. Technical Parameters of Baking Booth...5 VII. Functional Descriptions about Switches and Instruments of Microcomputer Control Box 6 VIII. Wiring Connection Diagram of Paint Spraying/Baking Booth..8 IX. Circuit Diagram...9 X. Common Failures and Maintenance...9 1

I. Product Description: Automobile paint spraying/baking booth is used for air purification during auto paint coating operation and drying operation after painting spray. Paint spraying and drying are performed in the same booth. This paint spraying/baking booth is typical of paint spraying and baking functions, provided with automatic thermostat paint spraying, ventilation, air purification, paint mist treatment, and winter hot-air supply functions during paint spraying, and automatic heating, thermostat timing, and timed shutdown function during paint baking. The equipment is reliable in running, simple for operation, and easy for maintenance. II. Application Areas for Paint Spraying/Baking Booth: Industrial Paint Coating III. Equipment Constituents: The equipment of this paint spraying/baking booth is composed of booth structure system, illumination System, air supply system, circulation system, air purification system, paint mist treatment system, pressure control devices, and electrical control system, etc. IV. Precautions for Use of Paint Spraying/Baking Booth: 1. Check for the normality of air pressure for paint spraying and coating, and ensure that the filtration system is clean, before spraying and coating start. 2. Check the air compressor and the oil/water/fine dust separator, and keep clean the paint spraying hose. 3. Spray gun, paint spraying hose, and mixing paint can be stored in clean places. 4. Except for use of air blow gun and dust sticking cloth for dedusting, all the other working procedures before painting spray shall be completed outside the paint baking 2

D A N G E R H az a rd o u s V oltag e. s ta y c le a r o f th e a rea follow lockout procedurres before s e rv ic in g eq uipm ent G u a n g D o n g Jing Zhong Jing In d u s tria l P a in tin g Eq u ip m e n t Co.L td. S ize mm B ao Zh on g B ao Auto Paint S p ra y in g /B a k in g B o o th Model BZB-S er ie s No Po w er kw V oltage Da te A dd : N o.20 63 Lia ngs ha H ighway, Baiyun District, G ua ngz hou, G uan gdo ng,c hina H ttp: //w w w.gz-btb.com T el:+86-2 0-3741 0496-8 12 booth. 5. Only paint spraying and baking working procedures can be performed in the paint baking booth, and the door of the baking booth can only be opened when vehicles are moving in and out. The air circulation system must be started during spraying and coating when the door is opened, to generate positive pressure and to ensure that the dust outside the house cannot enter into the room. 6. Wear the designated paint spraying protective site clothing and safety appliances to enter the paint baking booth for operation. 7. The inflammable articles inside the baking booth must be taken out during the baking operation. 8. It is not allowed for unnecessary personnel to enter the pain baking booth. V. Operating Principle: Inside CE Operation position indication JZJ-01-001 JZJ21 Auto paint spraying/baking booth is composed of the paint baking room, hot-air generator, microcomputer program sensor electrical control cabinet, illumination System, During paint spraying, two set of main blower fan (1) and the two sets of blowers in the air chamber of top light boxes (3) suck the fresh air from the air inlet. At this point the upper air door will open automatically and vertically and the internal circulating air door (9) will close automatically, to initially pass through the first 3

course of dust filter screen (2) and to filtrate off the dusts in large particle size in the air. Then the air enters into the air chamber on the top of the paint baking booth and flows through the top filter cotton fiber and exhaust cabinet (optional) be discharged out of the spray booth, meanwhile the air pressure inside is always higher than outside so the dust is prevented validly from outside getting in. During paint baking, by making use of the burner with micro electromagnetic automatic control for ignition and heating, the cold airflow sucked in by 2 set of main blower fan (1) passes the heat exchanger for heat exchange to heat up the air. At this point the upper air door will close automatically in a horizontal way and the air door for internal circulation (9) will automatically open, to form an internal circulating status of hot blast air. The heated airflow inside the house structure will once again be sucked in through circulating air door, to pass the heat exchanger for heat exchange. The 4

temperature is incessantly and rapidly raised through such circulations and reciprocations. The blower fan and the heater will start up automatically, for the temperature inside the paint baking booth to keep constant and to hold the set temperature until the set operating time is finished to complete the operation VI. Technical Parameters for Paint Baking Booth: 1. Outside dimensions of paint spraying booth (L x W x H) mm: 7000 5560 3430 2. Inside dimensions of paint spraying and baking booth (L x W x H) mm: 6900 4000 2800 3. Large Door Size (W x H)mm: 3000 2700 4. Capacity of Blower 12000 m 3 /h/unit 2 unit 5. Inside air speed:m/s:0.35 5

6. Air exchange volumn 次 /h:280 7. Top temperature 80 8. Heating time(20 80 )/min:5-6 9. Lighting volume: 900 10. Noisy: 80dB 11. TSP: mg/m3: 1.4 12. Fuel consumption:4-6 kg/vehicle 13. Power:10.5kW VII. Manual of electric control switch and instrument: 1.Spray-paint switch Equipped with 2 buttons one pressed will keep normal temperature the other keep constant temperature. When the normal temperature button is on 2 wind generators are working and the burner is ignited when the spraying paint the constant temperature button should be adjust to on state 2.Lighting switch Equipped with 2 lighting switches one is on the left the other is on the right When need light turn on the 2 switches 3.Bake-paint switch After setting well the temperature and baking time Please press the normal temperature button to ignite the burner 1.5 to 3 minutes later the exhaust fan will stop automatically 4.Timer Timer is used to set the bake-paint time when the planned time is over the system will power off automatically. Operate method: turn the switch between M and s then turn the dial at the time u 6

need For example if you turn the dial on 4538 means the bake-paint time planned is 45 minutes and 38 seconds 5.Temperature controller For temperature control when the temperature reaches planned temperature the system will power off automatically. Operate method: turn the dial to set the temperature for example if you set the it 060 means the set time is 60 degree when the temperature reach 60 degree the system will power off automatically when the temperature is lower constant temperature the burner will be ignited automatically to heating Notice : please check the temperature set precise or not and insure the temperature set at or below 80 degree 6.Time accumulator: for record how long time of using the spray booth 7.Electric power indicator lamp When the electric control case is connect with electric power the lamp will on 8.Ignite indicator lamp When the burner is ignited the lamp will on 9.Fault indicator lamp When failed to ignite the lamp will on After turning on the ignite switch 15-20 seconds the burner will be ignited and the electric valve will be open and the fuel fog sprayed from the fuel spigot will be ignited will spray 5 seconds later the flame will reach limitation and begin to burn if after 5 seconds still not ignited successfully the system will power off automatically meanwhile the fault indicator lamp will on If need re-ignite please await 30 seconds then press the red reset button 7

Notice: During the process of normal combustion of the burner, don t fill oil into the oil tank, as massive steam bubbles will be generated in the oiling process, and these steam bubbles will be sucked into the oil pump through oil pipe, which will give rise to burning-out due to sudden stop of fuel supply. On this account, the burner shall be refueled when it is not burning. Notice: The fuel used by the burner is diesel oil and it is prohibited to use gasoline and other oils. VIII. Connection Diagram for Paint Spraying/Baking Booth 1 2 3 4 5 6 A A B U12 V12 W12 U22 V22 W22 U32 V32 W32 L N U42 N 17 1 2 3 N 01 08 N 18 N 19 B 抽风机 进风机 进风机 燃烧机 执行器 左照明 右照明 C C Rev. Approved Date Rev. DRAWN CHECKED D DESIGNED APPROVED SCALE TITLE D DRAWING NO. 1 2 3 4 5 6 IX. Circuit Diagram: ISSUDE DATE 8

4U4U1 2 3 4 5 6 380V50HZQL QF1 3*10mm2L13P63A L234P60AL60(A)NPE10mm210mm2V1 V2 3*2.5mm23*2.5mm23*2.5mm23*1.5mm22*1.5mm2A 进风机 A B KM1 U1 FR1 W1 U12 V12 W12 KM2 U2 FR2 W2 U22 V22 W22 KM3 U3 V3 W3 FR3 U32 V32 W32 QF2 1P20A 2KM4 N U4 18 SA4 N 19 U4 SA5 N B C M1 抽风机 YDFW5.0A 5.5KW900R/MIN M2 进风机 YDFW4.5L 4KW900R/MIN M3 YDFW4.5L 4KW900R/MIN 燃烧器 RG5S 0.15KW 左照明 0.5KW 右照明 0.5KW C Rev. Approved Date Rev. DRAWN CHECKED D DESIGNED APPROVED SCALE TITLE D DRAWING NO. ISSUDE DATE 1 2 3 4 5 6 X. Common Failures and Maintenance of Paint Baking Booth Failure Possible Cause Maintenance Method The indicator lamp for failure of burner turns on after the burner has been started for 15 seconds. 4. Dismantle the electrical control box to towel off 1. No more oil in oil tank 2. Air leak at the joint of oil pipe 3. Too dirty filter screen on oil inlet4. Too dirty magic eye Too small openness of air door at the air suction inlet of 1. Fill up the oil tank with oil. 2. Re-connect the oil pipe properly. 3. Clean the filter screen. 4. Dismantle the electrical control box to towel off the magic eye. To widen the air door until no black fume emits. 9

the magic eye. the burner The motor of burner fails to rotate. The air inlet is fairly small during paint spraying. Heating is slow during paint baking. The main blower fan fails to start 1. 1. The set time for time meter is up. 2. The temperature shown on the thermometer has reached the set temperature. 3. The oil pump is blocked 1. The 1 st course of filter cotton fiber is blocked. 2. The air valve is in the open status 1. The air valve is not opened. 1. The fuse is blown out. 2. The thermal relay is displaced. 3. The motor is in short circuit. 1. Re-set the time Re-set the temperature. 2. Check whether or not the rotating shaft of oil pump is blocked with any contaminant or oil dreg. 1. Clean the 1 st course of filter cotton fiber. 2. Check for the action of air valve. 1. Check for the action of the air valve. 1. Replace the fuse. 2. Press the reset button. 3. Replace the motor. 10