Stormwater and Ecological Management Opportunities May 2008

Similar documents
West Virginia Stormwater Management Manual: Methods.

Green Infrastructure & Low Impact Development

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

A LOW IMPACT DEVELOPMENT MANUAL FOR COASTAL SOUTH CAROLINA TABLE OF CONTENTS

Green Infrastructure and Low-Impact Development Technologies

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

4. CONCEPT PLAN DEVELOPMENT

Standards Manual. RIDOT Workshop. Design Strategies: How to Meet Minimum Standard No. 1 July 13, 2011

Urban Stormwater Retrofit Program Highlights

Rhode Island Stormwater Design and Installation Standards Manual

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Green Infrastructure Overview

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Urban Water Management and Soils (ESRM 311 & SEFS 507)

APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield

Tennessee Stormwater Management Program. Stormwater Management Site Assessment and Inventory Checklist. Quick Check o Vicinity Map within Watershed

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type

Appendix E: Illustrative Green Infrastructure Examples

Session 1E Non-Structural BMPs. Chesapeake Bay Stormwater Training Partnership 1

SUNY Green Infrastructure Summit. April 17, 2014

Appendix D - Technical Design Criteria for BMPs

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

Horsley Witten Group Sustainable Environmental Solutions. Rich Claytor, P.E. Janet Bernardo, P.E. horsleywitten.com

Integrating Innovative Stormwater Management Technology Into A Mixed Use Community

Executive Summary. iii

ACTION PLAN FOR RETROFITTING THE EXISTING MS4 WITH STRUCTURAL BMPS

SECONDARY BENEFITS OF STORMWATER BMPS. Growing Sustainable Communities, October 2017

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

How to Update a Storm Water Management Program (SWMP) to Incorporate Total Maximum Daily Load (TMDL) BMPs

Low Impact Development. Charlene LeBleu Auburn University Landscape Architecture (334)

APPENDIX G: TOWN ORDINANCE REVIEW

HUDSON VALLEY REGIONAL COUNCIL 3 Washington Center, Newburgh NY

Low Impact Development Ideas and Effects in the Built Environment

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

New Development Stormwater Guidelines

Green Infrastructure on Brownfields

Impervious Cover Assessment and Reduction Action Plan for Woodstown, New Jersey

Charles County, MD Low Impact Development (LID)/ Environmental Site Design (ESD) Ordinance & Design Manual

Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 2

Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE

Sustainable Stormwater Management through Green Infrastructure. Jersey City Public School #5

Innovative Stormwater Management in Urban Environments

J. Paul Guyer, P.E., R.A.

From and

Types and Basic Design of Post-Construction BMPs

The Benefits and Challenges Associated with Green Infrastructure Practices

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

Kearney Post-Construction Stormwater Program

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Managing Stormwater Runoff with Green Infrastructure "Enhancing Community Resiliency to the Changing Climate"

Objective: To provide practitioners and reviewers with information and design guidelines related to innovations in urban stormwater management.

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

Map Reading 201: Where Does the Water Go?? Map Reading Map Reading 201. Interconnected Systems

Going Green with the NYS Stormwater Design Standards

Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey

E. Middle Indian Creek Candidate Restoration Projects

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith

Ramsey Center area - potential BMP sites

Can Urban Redevelopment Restore Aquatic Resources

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013

Stormwater Low Impact Development - A Natural Solution

FACT SHEET: Pervious Pavement with Infiltration

Site Design for Protecting Water Quality 2013 Award Winning Projects

Homeowners Guide to Stormwater BMP Maintenance

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Structural Stormwater Best Management Practices

Fairfax County s Stormwater Learning Experiences

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Ben Powell, Clemson Extension

Post Construction BMPs

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

Third Ave CSO Integrated Green Infrastructure

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey

Storm Water Managament at the University of Michigan

Case Study: Dallas Green Infrastructure for Stormwater

Use of Best Management Practices

HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL

Draft Rhode Island Stormwater Design and Installation Standards Manual

State Water Board s Post Construction Stormwater Calculator. Instructions for El Centro

319 Grant: Baker Creek & Centenary Creek Restoration Initiative

Green Innovation Grant Program

A Review of Green Infrastructure Projects Implemented in the Grand Traverse Region

Impervious Cover Reduction Action Plan for Hampton Township, Sussex County, New Jersey

GREEN INFRASTRUCTURE FEASIBILITY STUDY HARRISON

Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 3

Des Plaines River Watershed: Opportunity Areas North Community Cluster 1:80,000. Miles. Public Parks or Preserve. Wetland Area

The Restoration of Reading Creek & Model Stream Buffer Ordinances/ Zoning Regulations for Alabama Streams

Controlling Urban Stormwater at the University of Wisconsin - Madison

Post-Construction BMPs

Urban Watershed Mentors

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

Urban Stormwater Management

Transcription:

Stormwater and Ecological Management Opportunities May 2008

University of Delaware Newark Campus

Stormwater and Ecological Observations Unique geologic setting on fall line (divide between Piedmont and Coastal Plain) Two major watersheds (White Clay Creek and Christina River) Opportunities to reestablish and improve north/south green corridor Opportunities to develop integrated stormwater management to both improve existing conditions and address future growth Approximate Fall Line Stormwater and Ecological Analysis Overview

White Clay Creek / Laird and Main Campuses Stormwater and Ecological Analysis Overview

White Clay Creek / Laird Campus Significant erosional features due to uncontrolled or inadequately controlled runoff Large student parking lot is source of many impacts which need to be addressed New dorms have missed several landscape opportunities to provide integrated stormwater management Existing best management practices are mix of good bad and ugly Stormwater management has challenges with steeper Piedmont setting Stormwater and Ecological Analysis Overview

Christina River / South Campus Stormwater and Ecological Analysis Overview

South Campus Several existing BMPs in place but abundant other stormwater management opportunities Coastal Plain setting provides opportunities to infiltrate. Flatter slopes means areas may stay wetter longer. Research forest somewhat impacted due to uncontrolled runoff Opportunities to work with neighbors to east to create vegetated buffer Create buffers along streams and wetland areas Make pathway and ecological corridor connections to main campus Look to daylight conveyances and incorporate more vegetated swales and depressional areas for water quality treatment and recharge Stormwater and Ecological Analysis Overview

Ecological Areas of Interest Preliminary Findings From GIS base maps analyses were performed Streams and floodplains were mapped and forest patches >25 ac were identified Stormwater and Ecological Analysis Overview

Ecological Areas of Interest Preliminary Findings Forested areas were visited Qualitative plot data was taken (see points) Scores were tallied Using the scores, areas were statistically ranked based on ecological value: Red = high value, Yellow = medium value, Green = low value Stormwater and Ecological Analysis Overview

Ecological Areas of Interest Preliminary Findings Green areas, with low scores, are more suitable for development. Yellow areas are more intact and valuable areas, where development should be carefully considered Red areas are more ecologically valuable and less suitable for development Stormwater and Ecological Analysis Overview

Ecological Areas of Interest Preliminary Findings Areas 1 and 2 support the most ecologically intact forest investigated Area 1 Area 2 Stormwater and Ecological Analysis Overview

Ecological Areas of Interest Preliminary Findings Areas 3 and 4 contain Fairfield Run and Blue Hen Creek. Both streams are heavily impacted by stormwater. These areas directly affect water quality in White Clay Creek. Area 3 Area 4 Stormwater and Ecological Analysis Overview

Ecological Areas of Interest Preliminary Findings Area 5 is a relatively isolated fragment of forest, the channel of the stream which flows through it is deeply incised and eroded. Stormwater and Ecological Analysis Overview

Ecological Areas of Interest Preliminary Findings Areas 6 and 7 have qualities which enhance their ecological value such as older forest canopy trees and wetland areas. Area 6 Area 7 Stormwater and Ecological Analysis Overview

Stormwater Management Zones Laird Campus Zone Central Campus Zone Athletics Zone Agriculture Zone Facilities and Biotech Park Zone

Laird Campus Laird Campus Zone

Green Infrastructure Opportunities Streets Rooftops Parking lots Turf areas Quads Laird Campus Zone

Stormwater curb extensions Streets Stormwater tree pits Permeable pavers Infiltration Filter Strips Grass swales Laird Campus Zone

Existing Conditions Laird Campus Zone

Proposed Conditions Curb Extension Stormwater Planter Laird Campus Zone

Existing Conditions Laird Campus Zone

Proposed Conditions Curb Extension Stormwater Tree Pit Laird Campus Zone

Existing Conditions There are examples across campus of good management and runoff control/treatment practices. At the Dickinson Complex curb cuts allow runoff to enter a rain garden/bioretention area. Laird Campus Zone

Bioretention/Rain Garden Rooftops Stormwater planters Detention Infiltration Trench Cisterns Grass channel/ Filter Strip Regenerative Stormwater Conveyance Laird Campus Zone

Existing Conditions Proposed Conditions Laird Campus Zone

Linear bioretention/ Bioswale Parking Regenerative Stormwater Conveyance Grass channel/ filter strip Bioretention islands Infiltration Permeable pavers Reforestation/ impervious cover removal Laird Campus Zone

Existing Conditions Laird Campus Zone

Proposed Conditions Permeable Pavers Perimeter Sand Filter Laird Campus Zone

Existing and Proposed Conditions Retrofitted curb cuts have been implemented, offering some benefit. However, in some cases they are not well designed or maintained for optimum treatment. Laird Campus Zone

Proposed Conditions Linear Bioretention Laird Campus Zone

Existing Conditions Laird Campus Zone

Proposed Conditions Linear Bioretention Laird Campus Zone

Existing Conditions Laird Campus Zone

Proposed Conditions Laird Campus Zone Regenerative Stormwater Conveyance

Preliminary Opportunities Stormwater Retrofits (LR) Stream/Outfall Repair (LS) Invasive Plant Removal (LI) Laird Campus Zone

Preliminary Opportunities Laird Campus (Laird, Dickinson, Rodney) Stormwater Retrofits (LR-X) Site ID General Location Representative Opportunity Relative Cost LR-1 Sorority Parking Dry Pond Wetland Creation/Enhancement $$ LR-2 Laird Campus Resident Lot Linear Bioretention/ Permeable Paver $$ - $$$ LR-3 Laird Campus Resident Lot Linear Bioretention/ Permeable Paver $$ - $$$ LR-4 Hollowell Drive Outfall Stormwater Wetland $$$ LR-5 Dallam Road Curb Extension - Stormwater Tree Pit $ LR-6 Forest Lane Curb Extension - Stormwater Planter $ Laird Campus (Laird, Dickinson, Rodney) Stream/Outfall Repair (LS-X) Site ID General Location Representative Opportunity Relative Cost LS-1 Laird Campus Resident Lot Regenerative Stormwater Conveyance $$-$$$ LS-2 Christiana Towers Outfall Regenerative Stormwater Conveyance $$ LS-3 Christiana Towers Outfall Regenerative Stormwater Conveyance $$ LS-4 George Read Outfall Regenerative Stormwater Conveyance $$ Laird Campus (Laird, Dickinson, Rodney) Invasive Management (LI-X) Site ID General Location Representative Opportunity Relative Cost LI-1 Blue Hen Creek at Hollowell Drive Outfall Invasive Eradication (multi-flora rose and privet) $ $ < $30K $30K < $$ < $100K $$$ > $100K Laird Campus Zone

Central Campus Central Campus Zone

Green Infrastructure Opportunities Streets Rooftops Parking lots Turf areas Quads Central Campus Zone

Streets Stormwater curb extensions Stormwater tree pits Permeable pavers Infiltration Filter Strips Grass swales Central Campus Zone

Existing Conditions Central Campus Zone

Proposed Conditions Central Campus Zone Infiltration, Bioretention & Stormwater Tree Pits

Existing Conditions Central Campus Zone

Proposed Conditions Curb Extension Stormwater Planter Central Campus Zone

Rooftop Bioretention/Rain Garden Stormwater planters Detention Infiltration Trench Cisterns Grass channel/ Filter Strip Central Campus Zone

Existing Conditions Central Campus Zone

Proposed Conditions Downspout Disconnect to Rainbarrel Central Campus Zone

Existing Conditions Central Campus Zone

Proposed Conditions Central Campus Zone Downspout Disconnection to Rain Garden

Existing Conditions Central Campus Zone

Proposed Conditions Green Roof Central Campus Zone

Linear bioretention/ Bioswale Parking Perimeter bioretention Grass channel/ filter strip Bioretention islands Infiltration Permeable pavers Reforestation/ impervious cover removal Central Campus Zone

Existing Conditions Central Campus Zone

Existing and Proposed Conditions Parking lot behind the Center for the Arts - another example of good management and runoff control/treatment practices. Central Campus Zone

Proposed Conditions Central Campus Zone

Turf Bioretention Grass channels Reforestation Native vegetation Central Campus Zone

Existing Conditions Central Campus Zone

Proposed Conditions Downspout Disconnection to Rain Garden Central Campus Zone

Existing Conditions Central Campus Zone

Proposed Conditions Stream Buffer Planting Central Campus Zone

Quads Detention/ rainwater harvest Pervious concrete Permeable Pavers Stormwater planters/bioswales Central Campus Zone

Existing Conditions Central Campus Zone

Proposed Conditions Central Campus Zone Landscape Conversion: Native Vegetation

Existing Conditions Central Campus Zone

Proposed Conditions Landscape Conversion: Designed Public Use & Rain Garden Central Campus Zone

Preliminary Opportunities Stormwater Retrofits (CR) Buffers (CB) Central Campus Zone

Preliminary Opportunities Central Campus Stormwater Retrofits (CR-X) Site ID General Location Representative Opportunity Relative Cost CR-1a Gilbert Complex Downspout Disconnection to Rain Garden $ CR-1b Gilbert Complex Downspout Disconnection to Rain Garden $ CR-1c Gilbert Complex Downspout Disconnection to Rain Garden $ CR-2a Cannon Hall Downspout Disconnection to Rain Garden $ CR-2b New Castle Hall Downspout Disconnection to Rain Garden $ CR-2c Sussex Hall Downspout Disconnection to Rain Garden $ CR-2d Robinson Hall Downspout Disconnection to Rain Garden $ CR-2e Warner Hall Downspout Disconnection to Rain Garden $ CR-3 Russell Complex Landscape Conversion $ CR-4 Gilbert Complex Green Roof $$ CR-5a Roselle Center for the Arts Downspout Disconnection to Rain Garden $ CR-5b Roselle Center for the Arts Downspout Disconnection to Rain Garden $ CR-6 Kent Hall Parking Parking Lot Bioretention Island $$ CR-7a Chambers Street Curb Extension - Stormwater Planter $ CR-7b Benny Street Curb Extension - Stormwater Planter $ CR-8 Morris Library Green Roof $$$ Central Campus Stormwater Buffers (CB-X) Site ID General Location Representative Opportunity Relative Cost CB-1 Gilbert Complex Stream Buffer Planting $ $ < $30K $30K < $$ < $100K $$$ > $100K Central Campus Zone

Athletics Athletics Zone

Green Infrastructure Opportunities Streets Rooftops Parking lots Turf areas Quads Athletics Zone

Rooftop Bioretention Stormwater planters Detention Infiltration Trench Cisterns Grass channel/ Filter Strip Athletics Zone

Existing Conditions Athletics Zone

Proposed Conditions Combined Treatment : Cistern & Linear Bioretention Athletics Zone

Linear bioretention/ Bioswale Parking Perimeter bioretention Grass channel/ filter strip Bioretention islands Infiltration Permeable pavers Reforestation/ impervious cover removal Athletics Zone

Existing Conditions Athletics Zone

Proposed Conditions Parking Lot Bioretention Island Athletics Zone

Turf Bioretention Grass channels Reforestation Native vegetation Athletics Zone

Existing Conditions Athletics Zone

Proposed Conditions Stream Daylighting Athletics Zone

Preliminary Opportunities Stormwater Retrofit (ATR) Stream/Outfall Repair (ATS) Athletics Zone

Preliminary Opportunities Athletics Stormwater Retrofits (ATR-X) Site ID General Location Representative Opportunity Relative Cost ATR-1a Rust Ice Arena Cistern $$ ATR-1b Rust Ice Arena Parking Parking Lot Bioretention Island $$ ATR-2 Carpenter Center Parking Parking Lot Bioretention Island $$ ATR-3a Football Parking Parking Lot Bioretention Island $$ ATR-3b Football Parking Parking Lot Bioretention Island $$ Athletics Stormwater Stream/Outfall Repair (ATS-X) Site ID General Location Representative Opportunity Relative Cost ATS-1 North of Baseball Drainage Stream Daylighting $$ ATS-2 North of Track Drainage Stream Daylighting $$ $ < $30K $30K < $$ < $100K $$$ > $100K Athletics Zone

Agriculture Agriculture Zone

Restoration Opportunities Riparian corridor Pasture Forest Agriculture Zone

Existing Conditions Agriculture Zone

Proposed Conditions Stormwater Wetland Agriculture Zone

Existing Conditions Agriculture Zone

Proposed Conditions Stream Buffer Planting Agriculture Zone

Existing Conditions Agriculture Zone

Proposed Conditions Stream Buffer Planting Agriculture Zone

Preliminary Opportunities Stormwater Retrofit (AGR) Buffers (AGB) Invasive Plant Removal (AGI) Agriculture Zone

Preliminary Opportunities Agriculture Stormwater Retrofits (AGR-X) Site ID General Location Representative Opportunity Relative Cost AGR-1 Dairy Unit Drainage Stormwater Wetland $ AGR-2 Worrilow Hall Drainage Stormwater Wetland $ Agriculture Stormwater Buffers (AGB-X) Site ID General Location Representative Opportunity Relative Cost AGB-1 East of Dairy Unit Stream Buffer Planting $ AGB-2 West of Equine Center Stream Buffer Planting $ AGB-3 North of Equine Center Stream Buffer Planting $ AGB-4 Neighborhood on East Property Line Buffer Planting $ Agriculture Stormwater Invasive Management (AGI-X) Site ID General Location Representative Opportunity Relative Cost AGI-1 Forest Patch North of Equine Center Invasive Eradication (multi-flora rose) $ $ < $30K $30K < $$ < $100K $$$ > $100K Agriculture Zone

Facilities and Biotech Park Zone Facilities and Biotech Park Zone

Green Infrastructure Opportunities Streets Rooftops Parking lots Turf areas Quads Facilities and Biotech Park Zone

Stormwater curb extensions Streets Stormwater tree pits Permeable pavers Infiltration Filter Strips Grass swales Facilities and Biotech Park Zone

Rooftop Bioretention Stormwater planters Detention Infiltration Trench Cisterns Grass channel/ Filter Strip Facilities and Biotech Park Zone

Linear bioretention/ Bioswale Parking Perimeter bioretention Grass channel/ filter strip Bioretention islands Infiltration Permeable pavers Reforestation/ impervious cover removal Facilities and Biotech Park Zone

Turf Bioretention Grass channels Reforestation Native vegetation Facilities and Biotech Park Zone

Existing Conditions Facilities and Biotech Park Zone

Proposed Conditions Stream Restoration Facilities and Biotech Park Zone

Preliminary Opportunities Stream/Outfall Repair (FBS) Invasive Plant Removal (FBI) Facilities and Biotech Park Zone

Preliminary Opportunities Facilities and Biotech Park Stream/Outfall Repair (FBS-X) Site ID General Location Representative Opportunity Relative Cost FBS-1 Forest Patch West of Institute of Energy Stream Restoration $$-$$$ Facilities and Biotech Park Invasive Management (FBI-X) Site ID General Location Representative Opportunity Relative Cost FBI-1 Stream West of Institute of Energy Invasive Eradication (multi-flora rose and privet) $ $ < $30K $30K < $$ < $100K $$$ > $100K Facilities and Biotech Park Zone

University of Delaware Restoration Opportunities Stormwater Retrofits Outfall/ Stream Repair Buffer Restoration Invasive Plant Species Management Conclusions

University of Delaware Restoration Opportunities Stormwater Retrofits Outfall/ Stream Repair Buffer Restoration Invasive Plant Species Management Conclusions

End