Main changes to draft SR 21:2013 Hardcore material for use under concrete floors

Similar documents
S.R ANNEX E: 2016

Standards and Standardisation. An Overview

This document is a preview generated by EVS

Assessment Report Construction Product Regulation* * CPR - REGULATION (EU) No 305/2011

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA -

Construction Products Regulation (EU) No 305/2011

Implementing the Construction Products Regulation (EU) 305/2011

Implementation of the Construction Products Regulation (CPR) in harmonized standards - Template for Annex ZA -

Technical Bulletin CE marking: from 1st July 2013

CE Marking for Fire Resistant doors. The future EN Agustín Garzón Cabrerizo Technical Director Fire Resistance Lab.

STS Directory Accreditation number: STS 0030

Guidance from the Group of Notified Bodies for the Construction Products Regulation 305/2011/EU

Guidance Note No 21/1. CE Marking Windows and doorsets to BS EN 16034

Aggregates Table 1 No. Title Options

YOUR GUIDE TO UNDERSTANDING CPR

CEPE guidance to a quality control fire test regime for intumescent coatings Date of issue: 24 May 2011

EN CE instead of approval Opportunities for manufacturers and trading to enter new markets in Europe

Specification for Road Works Series Introduction

Cylinder Mortice Dead lock Lockcase(mm) A=87 Backset (mm) B=55. Follower (mm) 8 Latch Bolt

CE marking of industrial doors under the CPR Michael Skelding, Secretary and General Manager Door and Hardware Federation

Co-ordination of the Group of Notified Bodies for the Construction Products /Regulation 305/2011/EU

1. Terms defined in the Construction Products Regulation (CPR)

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

Guidance from the Group of Notified Bodies for the Construction Products Directive 89/106/EEC

Building Regulations Update. by Eamonn Smyth

Convener, CEN/TC226/WG6/TG1

asphalt applications European Asphalt Standards and their application in the UK mpa asphalt Asphalt Information Service Mineral Products Association

DECLARATION OF PERFORMANCE

Your Key to achieving C.E Marking Compliance

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Sýnishorn Specification for mortar for masonry - Part 2: Masonry mortar

DECLARATION OF PERFORMANCE

Construction Products Directive

GNB-CPR Position Paper: Issuance of certificates under CPR

Sýnishorn Glass in building - Insulating glass units - Part 5: Evaluation of conformity

DECLARATION OF PERFORMANCE

Declaration of Performance

Guideline Construction Products Regulation (EU) 305/20122

Enquiry period: 13 th April 2010 to 11 th May 2010

STS Directory Accreditation number: STS 0329

ETICS and the EU Internal Market The European framework. G. Katsarakis European Commission, DG GROWTH Unit C-1: Clean technologies and products

STS Directory Accreditation number: STS 0133

The Danish Energy Agency will carry out inspections in June 2013

The New Generationn of Firedoors

Window and Door Standards for Performance and Security. Russell Day Senior Technical Officer Glass and Glazing Federation

STS Directory Accreditation number: STS 0021

Construction Products Regulation (CPR)

Guidance Note No 19/1. CE Marking windows and doorsets

DECLARATION OF PERFORMANCE

CE marking of noise barriers and foundations

BUSINESS PLAN CEN/TC 124 TIMBER STRUCTURES EXECUTIVE SUMMARY

Contents EN :2006+A2:2016 (E)

This document is a preview generated by EVS

MINATURA2020 Public Conference in the Raw Materials Week 2017

PLANNING FOR THE SUPPLY OF BUILDING AND ROOFING STONE The Planning Officers Society 2008

BUSINESS PLAN CEN/TC 164 WATER SUPPLY EXECUTIVE SUMMARY

DID YOU GET USED TO THE NEW CPR? HERE S A QUICK REVIEW!

Regulation 574_2014: Annex III CPR. and. Regulation 568_2014: Annex V CPR

CONSTRUCTION PRODUCTS REGULATION MOLEX CES COPPER AND FIBRE CABLE

Mandate M/118 WASTE WATER ENGINEERING PRODUCTS

Timber in construction Eurocode 5 Span tables and guidelines

CE marking: implications for timber products

For the Design, Installation, Commissioning & Maintenance of Fire Detection and Fire Alarm Systems

CPR, CE-marking of construction products 1

COMMISSION DELEGATED REGULATION (EU) /... of XXX

PENRHYN QUARRY BETHESDA GWYNEDD. Proposed Inert Recycling Facility DESIGN AND ACCESS STATEMENT

Frequently Asked Questions on the Construction Products Regulation (CPR) - Enterprise and Industry

For structural use in all types of construction works according to EN

CERTIFICATE. Conformity of the Factory Production Control CPR TÜVRh

F O C U S D O O R C L O S E R S

This document is a preview generated by EVS

The New EU-Regulation on Construction Products

New Hardstone Quarry at Ta Klement, l/o Qala, Gozo. Environmental Planning Statement. August 1998

Kiwa Regulations for Certification in accordance with the CPR

PROGRESS OF ELABORATION OF NDPs AND NAs IN SERBIA

STS Directory Accreditation number: STS 0099

CE MARKING OF WOOD-BASED PANELS

SOUTH AFRICAN NATIONAL STANDARD

PTSPAS Product Assessment Certificate in accordance with Equivalent Scheme MCHW SHW Volume 1 Clause and

BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY

Declaration of Conformity Declaration of Performance Notes

Guidance Note on the Construction Products Regulation

API MANUAL OF PETROLEUM MEASUREMENT STANDARDS

Labels for PET - Wash Water Evaluation

Europacable FAQ on CPR Status: 26/01/17

Additional reaction to fire classification report No H

Construction Products Directive

CI/SfB (16)(17) Common Arrangement D11 Uniclass L1411/ L132/ L6634. Woven Polypropylene Geotextiles.

Introduction. Declaration of performance (DoP) CE marking

DECLARATION OF PERFORMANCE ref. no

BUSINESS PLAN CEN/TC 79 RESPIRATORY PROTECTIVE DEVICES EXECUTIVE SUMMARY

Dr. Peter Brändlein, Thomas Gahm

volume 11 environmental assessment section 2 environmental impact assessment Part 2 ha 202/08 environmental impact assessment

ISO INTERNATIONAL STANDARD. Mobile elevating work platforms Design, calculations, safety requirements and test methods

Construction Products Regulation (CPR) and cables. British Cables Association Guidance to Specifiers

Centexbel. General certification regulations. Construction products

Fact File 48 Guide to BS EN 54-13:2017 Fire Detection and alarm systems:

BUSINESS PLAN CEN/TC 58 SAFETY AND CONTROL DEVICES FOR BURNERS AND APPLIANCES BURNING GASEOUS OR LIQUID FUELS EXECUTIVE SUMMARY

High Speed Rail (London- West Midlands)

Information Bulletin

Transcription:

Main changes to draft SR 21:2013 Hardcore material for use under concrete floors Engineers Ireland 5 th November 2013 Sarah Neary BE MBA CEng MIEI Senior Adviser Building Standards Environment, Community and Local Government

Presentation overview Report of the Pyrite Panel What is in SR 21? Specification for hardcore for use under concrete floors SR 21 - Annex E.

Report of the Pyrite Panel

Report of the Pyrite Panel Report of the Pyrite Panel - June 2012 Summary Panel investigated the nature, scale and reason for the problem Panel examined the roles and responsibilities of stakeholders Panel made recommendations for solving the existing problem and for preventing similar problems arising in the future Recommendations for standards Rec1: Testing Protocol Rec3: Method statement for remediation works Rec15: (a)review of SR 21:2004+A1:2007 (b)standalone specification for hardcore

Response to the Report of the Pyrite Panel Legacy issues Irish Standard I.S. 398 Irish Standard I.S. 398 1: 2013 Reactive pyrite in sub-floor hardcore material Part 1: Testing and categorisation protocol Irish Standard I.S. 398 2: 2013 Reactive pyrite in sub-floor hardcore material Part 2: Methodology for remediation works

Use of documents in Remediation works Legacy issues Irish Standard I.S. 398 Irish Standard I.S. 398 1: 2013 Testing Reactive pyrite in sub-floor hardcore material Part 1: Testing and categorisation protocol Irish Standard I.S. 398 2: 2013 Reactive pyrite in sub-floor hardcore material Part 2: Methodology for remediation works Remedial works methodology

Use of documents in Remediation works Legacy issues Irish Standard I.S. 398 Irish Standard I.S. 398 1: 2013 Reactive pyrite in sub-floor hardcore material Part 1: Testing and categorisation protocol Irish Standard I.S. 398 2: 2013 Testing Reactive pyrite in sub-floor hardcore material Part 2: Methodology for remediation works Remedial works methodology Future prevention Standard Recommendation S.R.21 201X S.R. 21: Guidance on the use I.S. EN 13242:2013 Aggregates for unbound and hydraulically bound materials for use in civil engineering work and road construction Annex E: Recommendations for the specification of unbound granular fill (hardcore) for use under concrete floors and footpaths Irish Standard I.S. XXX 201X Code of Practice for the procurement and use of unbound granular fill hardcore for use under concrete floors

Use of documents in Remediation works Legacy issues Irish Standard I.S. 398 Irish Standard I.S. 398 1: 2013 Reactive pyrite in sub-floor hardcore material Part 1: Testing and categorisation protocol Irish Standard I.S. 398 2: 2013 Testing Reactive pyrite in sub-floor hardcore material Part 2: Methodology for remediation works Remedial works methodology Future prevention Standard Recommendation S.R.21 201X S.R. 21: Guidance on the use I.S. EN 13242:2013 Aggregates for unbound and hydraulically bound materials for use in civil engineering work and road construction Annex E: Recommendations for the specification of unbound granular fill (hardcore) for use under concrete floors and footpaths Irish Standard I.S. XXX 201X Specification for hardcore Code of Practice for the procurement and use of unbound granular fill hardcore for use under concrete floors Procuring & using hardcore

Status of documents - November 2013 Legacy issues Future prevention Irish Standard I.S. 398 Standard Recommendation S.R.21 201X Irish Standard I.S. 398 1: 2013 Reactive pyrite in sub-floor hardcore material Part 1: Testing and categorisation protocol Irish Standard I.S. 398 2: 2013 Reactive pyrite in sub-floor hardcore material Part 2: Methodology for remediation works S.R. 21: Guidance on the use I.S. EN 13242:2013 Aggregates for unbound and hydraulically bound materials for use in civil engineering work and road construction Irish Standard I.S. XXX 201X Code of Practice for the procurement and use of unbound granular fill hardcore for use under concrete floors

What is in SR 21?

Evolution of SR 21 SR 21: 2004 Guidance on the use of I.S. EN 13242:2002 Aggregates for unbound materials for use in civil engineering work and road construction SR 21:2004+A1:2007 Guidance on the use of I.S. EN 13242:2002 Aggregates for unbound materials for use in civil engineering work and road construction (incorporating amendment 1: 2007) Annex E: Example specification for unbound granular fill for use under concrete floors and footpaths Section 3.4.2 SR21: 201X Guidance on the use of I.S. EN 13242:2013 Aggregates for unbound materials for use in civil engineering work and road construction What s new?

What s new? (SR 21 - Public Enquiry document) SR 21: 201X - Guidance on the use of I.S. EN 13242:2013 Aggregates for unbound materials for use in civil engineering work and road construction What s new? Complete revision of text due to change from I.S. EN 13242:2002 to I.S. EN 13242:2013 Recycled aggregates Manufactured aggreates Factory production control elsewhere (I.S. EN 16236:2013 ) Guidance on the change from CPD to CPR Guidance on the use of I.S. EN 16236:2013 Evaluation of conformity of aggregates - initial type testing and factory production control Provides guidance on specifying aggregates for use in unbound and hydraulically bound materials Revision of Annex E in line with the I.S. EN 13242:2013 and the recommendations of the pyrite panel Recommendations for the specification of unbound granular fill (hardcore) material for use under concrete floors and footpaths» Material properties» Procedures for production

What s new? (SR 21 - Public Enquiry document) SR 21: 201X - Guidance on the use of I.S. EN 13242:2013 Aggregates for unbound materials for use in civil engineering work and road construction What s new? Complete revision of text due to change from I.S. EN 13242:2002 to I.S. EN 13242:2013 Recycled aggregates Manufactured aggreates Factory production control elsewhere (I.S. EN 16236:2013 ) Guidance on the change from CPD to CPR Guidance on the use of I.S. EN 16236:2013 Evaluation of conformity of aggregates - initial type testing and factory production control Provides guidance on specifying aggregates for use in unbound and hydraulically bound materials Revision of Annex E in line with the I.S. EN 13242:2013 and the recommendations of the pyrite panel Recommendations for the specification of unbound granular fill (hardcore) material for use under concrete floors and footpaths» Material properties» Procedures for production

Specification for hardcore SR 21 - Annex E

Annex E Recommendation for the specification of unbound granular fill (hardcore ) for use under concrete floors and footpaths Material properties 1. Geometric properties 2. Physical properties 3. Chemical properties 4. Geological & petrographic properties 5. Aggregate type Procedures for production 1. Evaluation of conformity 2. Sampling and testing plan 3. Traceability 4. Certification

Annex E: Material properties 1. Geometric properties grading Special aggregate grating because of particular use eg crushed rock 0/31.5DG 80 Changed from single size (2007) to all-in aggregate ease of compaction

Annex E: Material properties 2. Physical properties Los Angeles Coefficient (LA) An indicator of resistance to fragmentation Limit set at < or = 30 (previously LA40 improved strength) Water Absorption (WA) An indicator of potential durability Limit set at < or = 2% for gravels and non-limestone rock Irish Concrete Federation to carry out survey Limit for limestone may be reduced subject to survey by Irish Concrete Federation Magnesium sulfate soundness (MgSO4) An indicator of potential durability This test must be done (previously only when WA exceeded 2%) Limit set at < or = 25%

Annex E: Material properties 3. Chemical properties Acid soluble sulfate (AS) Limit maintained at < or = 0.2% Total sulfur (S) Limits revised as follows: S < 0.3% S between 0.3% and 1% (inclusive) - Petrographic Assessment required S > 1% - Not suitable

Annex E: Material properties 4. Geological & petrographic properties Geological description of the aggregate (end product) Professional geologist - to identify deleterious rock types (if present)on the basis of mineralogical composition. All information on lithologies and mineral recorded Mudrock most likely to swell and to contain framboidal pyrite Mudrock content limited < 10% Petrographic assessment of the aggregate (end product) Only carried out when total sulfur content is between 0.3% and 1% Professional geologist/ petrographer Thin Section petrographic assessment & (if necessary) X-Ray Diffraction Primarily to establish the form & distribution of pyrite present (if any) Predominantly reactive pyrite means it is unsuitable as hardcore for use under concrete floors Professional geologist to make a declaration taking all parameters into account to deem it suitable. If Pyrrhotite is present a limit of < or = 0.4% S

Annex E: Material properties 5. Aggregate type No recycled aggregates No manufactured aggregates Only natural aggregates should be used for hardcore

Annex E Recommendation for the specification of unbound granular fill (hardcore ) for use under concrete floors and footpaths Material properties 1. Geometric properties 2. Physical properties 3. Chemical properties 4. Geological & petrographic properties 5. Aggregate type Procedures for production 1. Evaluation of conformity 2. Sampling and testing plan 3. Traceability 4. Certification

Annex E Procedures for production 1. Evaluation of conformity (I.S. EN 16236:2012) Assessment and verification of constancy of performance (AVoCP) System 2+ (Previously System 4) Initial Type Testing (ITT)* A new source of aggregates Major change in raw materials Factory Production Control (FPC)* Organisation, control procedures, inspections & tests, records, control of non-conformities, handling, storage & conditioning of production areas, transport and packaging, training. Initial inspection of quarry and FPC* * * Continuous surveillance, assessment & approval* Regular testing - to a prescribed test plan*

Annex E Procedures for production 2. Sampling and testing plan Note 1: Test frequencies may be revised based on the advise of the professional geologist. Note 2: Test frequencies are generally related to periods of production. A period of production is defined as a full week, month, or year of production working days.(i.s.en 16326 6.4.3)

Annex E: Material properties Geological assessment of the quarry deposit Professional geologist initially, annually and at a major change of lithology (or as per Prof Geo) Initial assessment to identify & map proportions of lithologies, document problematical lithologies, evidence of reactive pyrite, reference any limitations on use. I.S. EN 16236 (6.3.4 Knowledge of the raw material)

Annex E Procedures for production 3. Traceability The Declaration of Performance (DoP) should include a statement declaring Annex E material as a special aggregate required for a particular end use i.e. unbound granular fill (hardcore) for use under concrete floors and footpaths. The relevant delivery docket should state that the material complies with Annex E of SR 21. The following description should be used on dockets: "GRANULAR FILL SR21:2013 ANNEX E"

Annex E Procedures for production 4. Certification Materials produced in compliance with I.S. EN 13242 and SR 21 Annex E should only be supplied by producers who have achieved third party certification in accordance with assessment and verification of constancy of performance (AVoCP) system 2+. CE Marking Declaration of performance

Annex E Recommendation for the specification of unbound granular fill (hardcore ) for use under concrete floors and footpaths Material properties 1. Geometric properties 2. Physical properties 3. Chemical properties 4. Geological & petrographic properties 5. Aggregate type Procedures for production 1. Evaluation of conformity 2. Sampling and testing plan 3. Traceability 4. Certification

What s next? SR 21 - Public enquiry closed on 1/11/2013 Committee to review comments Final version of SR 21 to be published asap Irish Standard I.S. XXX 201X - Code of Practice for the procurement and use of unbound granular fill hardcore for use under concrete floors In progress Post production activities Procurement, haulage, delivery, receipt, storage and handling, placing, record management etc.

Thank you