WATERS EDGE AT DOBBS FERRY DRAFT ENVIRONMENTAL IMPACT STATEMENT VOLUME I

Similar documents
MacDonnell Heights Town Center

STATELINE RETAIL CENTER FINAL ENVIRONMENTAL IMPACT STATEMENT

PepsiCo R & D Facility Expansion Town of Mount Pleasant, Westchester County, NY Draft Environmental Impact Statement Scoping Outline

East River Waterfront Esplanade and Piers New York, New York Draft Environmental Impact Statement

ROCKEFELLER UNIVERSITY

DRAFT SCOPE FOR THE DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR HUDSON HIGHLANDS RESERVE TOWN OF PHILIPSTOWN, NEW YORK June 5, 2018

Located in the Town of North Castle 1700 Old Orchard Street, North Castle, Westchester County, NY Tax ID:

STATE UNIVERSITY CONSTRUCTION FUND Lead Agency, State Environmental Quality Review Act

SCOPING DOCUMENT FOR BAKER RESIDENTIAL CLUSTER SUBDIVISION DRAFT ENVIRONMENTAL IMPACT STATEMENT (DEIS)

Northern Branch Corridor SDEIS March Table of Contents

6.1. INTRODUCTION AND SUMMARY OF FINDINGS

City of Larkspur. Notice of Mitigated Negative Declaration for the 285

SUPPLEMENTAL DRAFT ENVIRONMENTAL IMPACT STATEMENT River Club Apartments

Essential Skills: Reading and Interpreting Maps and Plans

4-Town Comprehensive Plan DRAFT 7/30/07

Town of Blooming Grove Comprehensive Plan. Public Meeting October 13, 2004

Table of Contents. Executive Summary...S-1

the To: April 8, 2016 Date: Ltd., to amend Permits, to of the Work municipal Ridge Town of and Center in The Lower Blind Branch.

Town of Malta Planning Board 2540 Route 9 Malta, NY (518) Fax: (518)

Project Description June 24, DESCRIPTION OF THE PROPOSED ACTION. 2.1 Introduction

City of Westbrook PLANNING BOARD MINUTES 2 York Street Westbrook, Maine (207) Fax: (207)

ENVIRONMENTAL IMPACT REPORT COMPREHENSIVE GENERAL PLAN AND ZONING ORDINANCE SCH NUMBER:

DALEY FARM PLANNED DEVELOPMENT DISTRICT Town of LaGrange, New York

B. DESCRIPTION OF THE PROPOSED ACTION

TOWN OF BETHLEHEM MEETING SUMMARY LOCAL WATERFRONT REVITALIZATION PROGRAM UPDATE

Scoping Document A. C. Dutton Tract Redevelopment City and Town of Poughkeepsie, New York

TOWN OF NORTH CASTLE WESTCHESTER COUNTY 17 Bedford Road Armonk, New York R E S O L U T I O N

Thompson Education Center

Advance Engineering & Surveying PLLC

TABLE OF CONTENTS. Transportation Chapter 1 - Introduction and Purpose of Planning to 1-3. Utilities

Holmberg & Howe, Land Surveyors and Civil Engineers Zoning District: R-35

Town of Liberty, NY COMPREHENSIVE PLAN & ZONING UPDATES

Low Impact Development/Better Site Design Roundtable

11 March 9, 2011 Public Hearing APPLICANT: BUDDHIST EDUCATION CENTER OF AMERICA DONG HUNG TEMPLE, INC. PROPERTY OWNER: MOY FAMILY, LLC

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

Environmental Assessment

Appendix I. Checklists

DETERMINATION OF SIGNIFICANCE FOR THE LONGWOOD PUBLIC LIBRARY EXPANSION & RENOVATION; STATE ENVIRONMENTAL QUALITY REVIEW ACT (SEQRA) RESOLUTION

Kevin M. Rampe, President -- Lower Manhattan Development Corporation

STATE ENVIRONMENTAL QUALITY REVIEW ACT (SEQRA) FINDINGS STATEMENT

APPENDIX G: TOWN ORDINANCE REVIEW

APPENDIX M. Correspondence with the New York State Office of Parks, Recreation and Historic Preservation. Continued

MINUTES TOWN OF HORSEHEADS PLANNING BOARD MEETING August 2, 2017

EXPANDED ENVIRONMENTAL ASSESSMENT FORM PART III Bear Mountain Triangle Rezoning

34 B R I A R C L I F F M A N O R C O M P R E H E N S I V E P L A N

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

RESOLUTION NO

Local Waterfront Revitalization Programs

City of Lafayette Study Session Staff Report Design Review Commission

Major Subdivision Sketch Plan Checklist

Public Hearing. Preliminary Draft Development Plans (zoning plans) Dutch Quarter and Middle Region. June 28, 2016

City of Farmington. Downtown Plan. Amendment to the 1998 Master Plan Adopted October 11, 2004

Saranac River Trail Greenway C O N D I T I O N S R E P O R T

State Environmental Quality Review NOTICE OF COMPLETION OF DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT AND NOTICE OF SEQRA HEARING

Draft TISCORNIA ESTATE SPECIFIC PLAN/EIR

McDonald s Restaurant - Purcellville Town of Purcellville Special Use Permit Statement of Justification July 24, 2014

6.1. INTRODUCTION 6.2. EXISTING CONDITIONS

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table

17.18 SENSITIVE AREAS

Application for Certificate of Environmental Compatibility and Public Need

Cobb County Design Guidelines Mableton Parkway & Veterans Memorial Highway Community Design Workshop January 12, 2017

that the Town Board of the Town of East Greenbush will hold a public hearing on April 11,

Chesapeake Bay Critical Area Conservation Plan

COUNTY COUNCIL OF PRINCE GEORGE'S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL 2010 Legislative Session. Council Members Dernoga and Olson

SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT

Example Codes. City of Brentwood, Tennessee Brentwood Hillside Protection Overlay District Summary

Colerain Township report to. Hamilton County Regional Planning Commission. December 2, 2010, 1:00PM. t a f f r e p o r t

Asbury Chapel Subdivision Sketch Plan

How To Get the Development You Planned

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

1.0 INTRODUCTION. EIS for Improved Station Access and Additional Parking at the North White Plains Station Final Scoping Information Document

Scoping Document / DEIS Cross Reference

CITY OF CHARLOTTESVILLE DEPARTMENT OF NEIGHBORHOOD DEVELOPMENT SERVICES STAFF REPORT REQUEST FOR A WAIVER: CRITICAL SLOPES

Slope Stability Management Framework

TOWN OF NEW CASTLE - Master Plan Update

DRAFT MAP AMENDMENT FLU 04-4

R E S O L U T I O N. Designation: R-2A (1-Family, 2-acre Minimum Lot Size)

Procedures IV. V. Rural Road Design Option

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

Stockport Comprehensive Plan. Adopted June 11, 2013

City of Westbrook. 2 York Street Westbrook, Maine (207) Fax:

MINUTES OF TOWN BOARD MEETING HELD ON OCTOBER 18, 2017 AT 7:00 PM AT TOWN HALL, ONE OVEROCKER ROAD POUGHKEEPSIE, NEW YORK

Neo-Traditional Overlay Application

EPOD Environmental Protection Overlay Districts.

Riparian Buffer on the Bushkill Creek. Policies

Chapter 2: Strategies for Local Governments Chapter 3: Site Assessment and Design for Low Impact Development. Break Out Group 10:30 am to 12 pm

Final Generic Environmental Impact Statement for Adoption of the Town of New Hartford Comprehensive Plan Update

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

Chapter 3 Site Planning and Low Impact Development

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

APPLICATION SUBMITTAL CHECKLIST LAND USE PERMITS

Appendix C Agency Correspondence

CHECKLIST FOR PHASE II DRAINAGE REPORT

City of Toronto. Emery Village Transportation Master Plan

Title slide..poughkeepsie Planning Initiatives POUGHKEEPSIE PLANNING INITIATIVES

CITY OF BEACON NOTICE TO LANDSCAPE ARCHITECTS GENERAL INFORMATION AND REQUEST FOR PROPOSALS

#8) T-1409 CENTENNIAL & LAMB TENTATIVE MAP

Transcription:

WATERS EDGE AT DOBBS FERRY DRAFT ENVIRONMENTAL IMPACT STATEMENT VOLUME I Atilda, Fairlawn and Constance Avenues Village of Dobbs Ferry Town of Greenburgh Westchester County, New York Tax Lot Numbers Section 7, Block 535, Lots 1-4 and 15-19 Section 7, Block 536, Lots 1-4 Section 7, Block 537, Lot 9-22 and P-1 Section 7, Block 537, Lots 23-31 Co-Lead Agencies: VILLAGE OF DOBBS FERRY PLANNING BOARD VILLAGE OF DOBBS FERRY BOARD OF TRUSTEES 112 Main Street Dobbs Ferry, NY 10522 Attention: Edward Plotkin, Chair Joseph J. Bova, Mayor Project Applicant: WATERS EDGE AT DOBBS FERRY, LLC 8 Pebble Brook Way, Suite 101 Chappaqua, NY 10514 Attention: Jacqueline Finkelstein Prepared By: TIM MILLER ASSOCIATES, INC. 10 North Street Cold Spring, New York, 10516 Attention: Tim Miller/ Kendra Billings (845) 265-4400 Project Engineer: PAUL J. PETRETTI, P.E., L.S., CPSWQ - CPESC 30 Gould Avenue Dobbs Ferry, New York, 10522 Attention: Paul J. Petretti (914) 674-9827 Co - Lead Agency Acceptance Date: Date of Public Hearing: March 1, 2007 Written Comments will be Accepted by the Co - Lead Agencies until: 10 days after close of Public Hearing 2007 Tim Miller Associates, Inc.

List of DEIS Consultants: Carlin Simpson Consulting Geotechnical and Environmental Engineers 61 Main Street, Sayerville, NJ 08872

WATERS EDGE AT DOBBS FERRY Draft Environmental Impact Statement Village of Dobbs Ferry, Westchester County, NY VOLUME I Table of Contents Page 1.0 EXECUTIVE SUMMARY 1-1 2.0 DESCRIPTION OF THE PROPOSED ACTION 2-1 2.1 Introduction 2-1 2.2 Site Location and Description 2-2 2.3 Description of the Proposed Action 2-3 2.4 Project Purpose and Need 2-13 2.5 Approvals, Reviews, and Permits 2-15 3.0 Existing Setting, Potential Impacts and Mitigation 3.1-1 3.1 Soils and Topography 3.1-1 3.1.1 Existing Conditions 3.1-1 3.1.2 Potential Impacts 3.1-5 3.1.3 Mitigation Measures 3.1-13 3.2 Surface Water Resources 3.2-1 3.2.1 Existing Conditions 3.2-1 3.2.2 Potential Impacts 3.2-5 3.2.3 Mitigation Measures 3.2-8 3.3 Terrestrial and Aquatic Ecology 3.3-1 3.3.1 Existing Conditions 3.3-1 3.3.2 Potential Impacts 3.3-6 3.3.3 Mitigation 3.3-7 3.4 Aesthetic and Cultural Resources 3.4-1 3.4.1 Visual Resources - Background/Introduction 3.4-1 3.4.1.1 Existing Conditions 3.4-2 3.4.1.2 Impacts 3.4-3 3.4.1.3 Proposed Mitigation Measures 3.4-10 3.4.2 Historic and Archaeological Resources 3.4-11 3.4.2.1 Existing Conditions 3.4-11 3.4.2.2 Potential Impacts to Historic and Archaeological Resources 3.4-13 3.4.2.3 Proposed Mitigation Measures 3.4-13 3.5 Critical Environmental Areas 3.5-1 3.5.1 Hudson River Critical Environmental Area 3.5-1 3.5.2 Local Waterfront Revitalization Program Consistency Review 3.5-2 3.5.3 Potential Impacts 3.5-6 3.5.4 Proposed Mitigation Measures 3.5-7 TOC-1

3.6 Transportation 3.6-1 3.6.1 Introduction 3.6-1 3.6.2 Existing Traffic Conditions 3.6-1 3.6.3 No-Build Traffic Conditions 3.6-7 3.6.4 Potential Impacts - Build Traffic Conditions 3.6-8 3.7 Energy 3.7-1 3.7.1 Effects on the Use and Conservation of Energy Resources 3.7-1 3.8 Noise 3.8-1 3.8.1 Existing Conditions 3.8-1 3.8.2 Potential Impacts 3.8-5 3.8.3 Mitigation Measures 3.8-8 3.8.4 Traffic Based Air Quality Impacts 3.8-8 3.9 Public Health 3.9-1 3.9.1 Phase 1 Site Assessment 3.9-1 3.9.2 Mitigation - Construction Generated Dust 3.9-1 3.10 Safety 3.10-1 3.11 Community Character 3.11-1 3.11.1 Community Character 3.11-1 3.11.1.1 Existing Conditions 3.11-1 3.11.2.2 Potential Impacts and Mitigation Measures 3.11-2 3.11.2 Community Resources and Services 3.11-4 3.11.2.1 Demographics 3.11-4 3.11.2.2 Schools 3.11-5 3.11.2.3 Police Protection 3.11-7 3.11.2.4 Fire Protection 3.11-8 3.11.2.5 Emergency Services 3.11-9 3.11.2.6 Solid Waste Disposal 3.11-9 3.11.2.7 Sewage Treatment Facilities 3.11-10 3.11.2.8 Neighborhood Quality of Life 3.11-10 3.12 Fiscal Analysis 3.12-1 3.12.1 Existing Conditions 3.12-1 3.12.2 Potential Impacts 3.12-2 3.12.3 Mitigation Measures 3.12-7 TOC-2

4.0 UNAVOIDABLE ADVERSE IMPACTS 4-1 5.0 ALTERNATIVES 5.1 No Action Alternative 5-1 5.2 A Conventional Subdivision (Maximum Number of Lots) 5-2 5.3 A Ravine Preservation Alternative (with use of cul de sacs) 5-4 5.4 A Ravine Preservation Alternative (without the use of cul de sacs, if possible) 5-6 5.5 Subdivision with Maximum Number of Lots 5-6 5.6 Conservation Subdivision Alternative 5-6 6.0 IRREVERSIBLE AND IRRETRIEVABLE COMMITMENTS OF RESOURCES 6-1 7.0 GROWTH INDUCING ASPECTS OF THE PROPOSED ACTION 7-1 TOC-3

List of Tables Page Table 2-1: Compliance with Bulk Requirements 2-6 Table 3.1-1: Soil Characteristics and Limitations 3.1-1 Table 3.1-2 Existing Slopes Analysis 3.1-2 Table 3.3-1: Site Vegetation 3.3-3 Table 3.3-2: Observed and Expected Wildlife List 3.3-5 Table 3.6-1: Local Roadway Conditions 3.6-2 Table 3.6-2: Approximate Sight Distance 3.6-3 Table 3.6-3: Sight Distance 3.6-4 Table 3.6-4: Unsignalized Intersections - Level of Service Criteria 3.6-6 Table 3.6-5: Existing Condition - Level of Service Summary 3.6-6 Table 3.6-6: No-Build Condition - Level of Service Summary 3.6-8 Table 3.6-7: Project Site Trip Rate Summary 3.6-9 Table 3.6-8: Project Site Total Trips Generated 3.6-9 Table 3.6-9: Build Condition - Level of Service Summary 3.6-10 Table 3.6-10: Level of Service Summary 3.6-10 Table 3.8-1: Perception of Changes in Noise Levels 3.8-1 Table 3.8-2: Community Response to Increases in Noise Levels 3.8-2 Table 3.8-3: Sound Levels of Common Activities Perception of Changes in Noise Levels 3.8-2 Table 3.8-4: Average Sound Levels (dba) 3.8-4 Table 3.8-5: Site 2&4 - Average Sound Levels (dba) 3.8-6 Table 3.8-6 Construction Noise Level 3.8-7 Table 3.11-1: 2004 Population Statistics 3.11-4 Table 3.11-2: 2000 Population Statistics 3.11-4 Table 3.11-3: Dobbs Ferry Union Free School District 2004/2005 School Year 3.11-6 Table 3.12-1: Tax Lots and 2006 Assessed Value 3.12-1 Table 3.12-2: Current Taxes Generated by Project Site 3.12-2 Table 3.12-3: 2005 Assessed Value of Residences at Waters Edge 3.12-3 Table 3.12-4: Projected Tax Revenues Waters Edge at Dobbs Ferry 3.12-3 Table 3.12-5: Revenue & Cost Summary: Waters Edge at Dobbs Ferry 3.12-7 Table 5-1: No Action Alternative Impacts 5-1 Table 5-2: Maximum Lot Count Subdivision Alternative Impacts 5-3 Table 5-3: Ravine Preservation Alternative Impacts 5-5 Table 5-4: Alternative Impact Comparisons 5-7 TOC-4

List of Figures After Section Figure 2-1: Regional Site Location Map 2.0 Figure 2-2: Aerial Overlay Map 2.0 Figure 2-3 Geologic Map 2.0 Figure 2-4 Conceptual Landscape Plan 2.0 Figure 2-5 Zoning Map 2.0 Figure 3.1-1: Soil Map 3.1 Figure 3.1-2: Local Topography 3.1 Figure 3.2-1: Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map 3.2 Figure 3.4-1: Site on Aerial Photo 3.4 Figure 3.4-2: Existing Views of Project Site 3.4 Figure 3.4-3: Existing Views of Project Site 3.4 Figure 3.4-4: Existing Views of Project Site 3.4 Figure 3.4-5: Existing Views of Project Site 3.4 Figure 3.4-6: Existing Views of Project Site 3.4 Figure 3.4-7: Existing Views of Project Site 3.4 Figure 3.4-8: Existing Views of Project Site 3.4 Figure 3.4-9: Existing Views of Project Site 3.4 Figure 3.4-10: Existing Views of Project Site 3.4 Figure 3.4-11: Existing Views of Project Site 3.4 Figure 3.4-12: Existing Views of Project Site 3.4 Figure 3.4-13: Existing Views of Project Site 3.4 Figure 3.4-14: Existing Views of Project Site 3.4 Figure 3.4-15: Existing Views of Project Site 3.4 Figure 3.4-16: Existing Views of Project Site 3.4 Figure 3.4-17: Existing Views of Project Site 3.4 Figure 3.4-18: Existing Views of Project Site 3.4 Figure 3.4-19a:Photosimulation of Proposed Action 3.4 Figure 3.4-19b:Photosimulation of Proposed Action 3.4 Figure 3.4-19c:Photosimulation of Proposed Action 3.4 Figure 3.4-20: Existing Views of Project Site 3.4 Figure 3.4-21: Existing Views of Project Site 3.4 Figure 3.4-22: Scenic Resources Map 3.4 Figure 3.4-23: Existing Views of Project Site 3.4 Figure 3.4-24: Existing Views of Project Site 3.4 Figure 3.4-25: Existing Views of Project Site 3.4 Figure 3.4-26: Open Space Inventory Map 3.4 Figure 3.6-1: Site Location 3.6 Figure 3.6-2: Traffic Controls 3.6 Figure 3.6-3: Existing AM Peak Hour Traffic 3.6 Figure 3.6-4: Existing PM Peak Hour Traffic 3.6 Figure 3.6-5: U.S. Route 9 Hourly Traffic Volumes 3.6 Figure 3.6-6: No Build AM Peak Hour Traffic 3.6 Figure 3.6-7: No Build PM Peak Hour Traffic 3.6 Figure 3.6-8: Existing Street Layout under Proposed Layout 3.6 Figure 3.6-9: Percent Distribution - Arrival and Departure 3.6 Figure 3.6-10: Site Generated AM Traffic 3.6 Figure 3.6-11: Site Generated PM Traffic 3.6 TOC-5

After Section Figure 3.6-12: Build AM Peak Hour Traffic 3.6 Figure 3.6-13: Build PM Peak Hour Traffic 3.6 Figure 3.6-14: Proposed and Existing Stop Signs 3.6 Figure 3.8-1: Noise Monitoring Locations 3.8 TOC-6

List of Drawings - Preliminary for DEIS (Attached to Document) Table of Contents Sheet Number 1/5 2/5 3/5 4/5 5/5 Separate Sheet Zoning, Steep Slopes and Tree Location Site and Utility Plan Grading and Drainage Plan Title Stormwater Pollution Prevention Plan (SWPPP) Tree Preservation and Erosion and Sediment Control Plan (E&SCP) Existing Conditions Plan - Topography, Slopes, and Trees VOLUME II (Separate Binder) Table of Contents Appendix A SEQRA Documentation Appendix B Stormwater Pollution Prevention Plan/Erosion Control Plan Appendix C Report of Investigation of the January 28, 1994 Fairlawn Avenue Slope Failure Appendix D Drainage Report Prepared Waters Edge at Dobbs Ferry Appendix E Correspondence Appendix F Traffic Volumes US Route 9 and Traffic Count Data Sheets Appendix G Phase I - TEAM Consultants Appendix H Geotechnical Report Appendix I Full Environmental Assessment Form Appendix J Village of Dobbs Ferry Budget 2006-2007 TOC-7