Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Draft Rhode Island Stormwater Design and Installation Standards Manual

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

C-10. Disconnected Impervious Surface

SOIL EROSION AND SEDIMENT CONTROL

SECTION 6. Routine Maintenance Activity Details

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

Project Name: Project Address or Location: Principal Designer Name and Company: Principal Designer Phone Number:

Florence County Small Commercial Land Disturbance Permit Application

Erosion Control for Home Builders in the. City of Jacksonville

Chapter 3 Site Planning and Low Impact Development

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Why Control and Prevent Erosion?

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

Protect Stormwater Quality Project and Site Management Training for General Contractors. Presenter Becky Pearson Professional Civil Engineer

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages

4.6. Low Impact and Retentive Grading

Weston s Wetlands, Stormwater, & Open Space

Chapter 1: General Program Information

All materials in this presentation are taken from materials produced by:

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Huntington Stormwater Utility

Chapter 4 - Preparation of Stormwater Site Plans

ARTICLE VI: SITE PLAN REVIEW

Construction Management & Engineering Division. Understanding Swales

4. Contractor (and subcontractors if applicable) certification statement(s)

Subsurface Infiltration Bed

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Kearney Post-Construction Stormwater Program

CHECKLIST FOR PHASE II DRAINAGE REPORT

Wisconsin Contractors Institute Continuing Education

OFFICE CONSOLIDATION By-law Number 30-92

Lesson 2: Stormwater Best Management Practices (BMPs)

CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08)

Use of Best Management Practices

Raingardens. Conserving and Protecting Water L

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

C-12. Dry Pond. Design Objective

QUARRY REHABILITATION PLANS Specifications (version 1.3)

4. CONCEPT PLAN DEVELOPMENT

Buffer Zone (BZ) Stream Protection. The width and plant composition of a buffer zone will determine its effectiveness.

STREAM ALTERATION PRACTICES

DEALING WITH STORM WATER MANAGEMENT

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

Non-Metallic Mining Reclamation Checklist

RAIN GARDENS. Task: PART 1 (60 minutes) Student Directions: Steps you will be following: Directions for beginning: Source Information:

5.0 Storm Water Landscape Guidance Introduction

SECTION 1 CLEARING /GRADING PERMIT APPLICATION:

EROSION & SEDIMENT CONTROL

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

SITE PLAN REVIEW APPLICATION AND CHECKLIST

Homeowners Guide to Stormwater BMP Maintenance

Volume 2, Chapter 12 - Revegetation

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

SECTION 5: REACH RECOMMENDATIONS/MAPS

Information for File # JTF

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

Effects of Erosion. Grades 6-8

Chapter 11 Site Rehabilitation and Stabilization

Preventing Storm Water Pollution: What We Can Do

ORDINANCE NO LC

When planning stormwater management facilities, the following principles shall be applied where possible.

POST CONSTRUCTION STORMWATER MANAGEMENT FOR "WHITE OAK SEWER INTERCEPTOR"

A Guided Tour of the 2014 Update to the Rhode Island Soil Erosion and Sediment Control Handbook

Site Formation Excavation - 6' depth square yard $8.00 $0.00 Grading square yard $1.50 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.

Lake and Stream Restoration Project

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management

4.0 EROSION AND SEDIMENT PROCESS. 4.1 Mechanics of Erosion

Vegetated Filter Strips and Buffers

POST-FIRE RESTORATION Dos and Don ts

POND Construction. Perry L. Oakes, PE State Conservation Engineer Natural Resources Conservation Service

Landscape Design. earth-wise guide to. earth-wise guide to

BIORETENTION FACILITY

The following general requirements will be met for all planter box installations:

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Drainage Analysis-Newgate/Phelps & Hatchett Hill Road Areas Rev. 0 Erosion & Sediment Control Measures

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type

Small Project Guidance Document

Town of Windsor. Stormwater Manual

Understanding Drainage Options What s Feasible and Legal. February 2019

Problem Understanding

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance

CHECKLIST BMPs for FIELD NURSERIES REGULATIONS, SITE SELECTION, WATER MANAGEMENT

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

Transcription:

Caribbean Area PO Box 364868 San Juan, PR 00936-4868 IBM Plaza 654 Muñoz Rivera Ave. Suite 604 Hato Rey, PR 00918-4123 Page Topics Guide to Erosion and Sediment Control in Urban Areas Erosion and Sedimentation in the Urban Setting Guidelines for Urban Erosion Prevention During Construction How and When to Use the Guide Step-By-Step Approach for Erosion Control on Small Urban Sites Site Evaluation Project Layout Practice Selection Guide to Erosion and Sediment Control in Urban Areas This guide is designed to help landowners or developers minimize erosion problems resulting from construction on small development sites. Since it is not always possible for trained. soil. conservation personnel to visit every planned development site, this guide provides a stepby-step approach for lay persons to use in evaluating a site's erosion potential and what erosion control practices should e implemented. Each control practice is described in detail with instructions on design, construction and maintenance. These guidelines are intended to supplement, not replace technical advice from local soil conservation personnel or private engineering consultants. EROSION AND SEDIMENTATION IN THE URBAN SETTING http://www.pr.nrcs.usda.gov/urbcons/sguide.htm (1 of 8) [8/14/2003 9:53:45 PM]

Soil erosion occurs when the soil surface is exposed to rain or runoff. Unprotected soil particles are first dislodged by the impact of raindrops or surface runoff. These loosened particles may then be moved by stormwater and deposited as sediment at some downstream location. In urban areas this process is frequently started when a site is graded and protective vegetation is removed in preparation for construction. The results can be: damage to the site by gullying, loss of topsoil or flooding of structures damage to the property of others by sediment deposits in streets and stormdrains or through the siltation of a downstream water body runoff damage to slopes or structure due to improper drainage streambank erosion with resulting lo1s of trees slope failures in cuts or embankment The cost of repairing this damage (i.e., regrading the site or repairing structures) or for securing legal defense against a damage suit by a downstream landowner could significantly hinder an otherwise successful development plan. To prevent these problems, landowners considering development should plan to use sound soil conservation practices throughout their projects. http://www.pr.nrcs.usda.gov/urbcons/sguide.htm (2 of 8) [8/14/2003 9:53:45 PM]

On the surface it may appear the application of soil and water conservation measures is costly and time consuming. In fact, the practices included in this guide have been chosen to be compatible with typical urban construction activities. Further, when considered in the original plan, the costs of properly installed and maintained practices should be only a small portion of total project costs. These costs become even less burdensome because of savings in erosion or flood damage repair costs and through prevention of litigation. WHEN PROPERLY APPLIED, THESE MEASURES WILL SAVE TIME AND MONEY DURING MOST URBAN CONSTRUCTION ACTIVITIES. GENERAL GUIDELINES FOR URBAN EROSION PREVENTION DURING CONSTRUCTION The best approach in preventing erosion is the use of common sense in planning and designing urban construction projects. Activities should be limited to those, which suit the soil conditions and topography of the chosen site. Construction activities should accommodate the natural drainage patterns and anticipated runoff volumes at the site. Finally, only the smallest possible amount of land should be disturbed to achieve the purpose of the project and any disturbed areas should be restabilized as soon as possible. This will minimize the loss of the sediment from the project site onto neighboring properties or into area streams. These guidelines can best be attained through the use of appropriate soil and water conservation practices. Listed below are the types of practices most often needed during urban construction activities: http://www.pr.nrcs.usda.gov/urbcons/sguide.htm (3 of 8) [8/14/2003 9:53:45 PM]

Managing Stormwater Runoff -The greatest driving force in the erosion and sedimentation process is rainfall and the resulting runoff. Nearly all practices in this guide are designed to reduce or eliminate the harmful effects of stormwater runoff on the project site and on downstream property. Particular attention is given to hydrological modifications (activities that may disturb or impair natural water courses) where the forces of runoff can cause severe damage. Establishment of Vegetative Cover -The most effective and direct means of controlling erosion during and after urban construction activities is to attain a good vegetative cover over all soil surfaces laid bare or disturbed by the project. Plants or grasses suitable for the site and locale are used for this purpose. Stabilizing Disturbed Areas -Whenever soil will be laid bare for an extended period more than 2 weeks, steps should be taken to protect the soil from the erosive forces of rainfall and runoff. These practices normally involve temporary vegetation, natural or artificial mulches and other methods of covering any exposed soil surface. Trapping Sediment on Site -Because it is impossible to prevent rainfall on unstabilized, disturbed areas; practices to trap sediment carried by site runoff are also valuable. These practices provide both a backup mechanism should other practices not prove effective and protection against offsite damage to the property of others. Managing Site Excavation Activities -The multitude of grading, trenching, excavation and fill activities that are encountered during construction give rise to the need for many erosion control practices. Whenever exposed soil will be left in a sloping configuration the erosive forces of stormwater will be at their greatest. Steps must be taken to minimize the time of exposure of these unprotected, sloping soil surfaces and to restabilize them as soon as possible. Road Management -Soil disturbance during road construction can lead to serious erosion problems. Proper planning, design, construction and maintenance of roads is essential to minimize soil loss. If possible, locate the roads across the slope o grade instead of straight up the slope. Maintenance- Nearly all erosion control practices require some shortterm or even continual follow-up attention. Temporary measures, if not removed when their purpose is satisfied, may cause the damage they were designed to prevent. Other measures should be inspected frequently to detect and repair damage from the powerful natural forces that act upon them. HOW AND WHEN TO USE THIS GUIDE http://www.pr.nrcs.usda.gov/urbcons/sguide.htm (4 of 8) [8/14/2003 9:53:45 PM]

The practices suggested in this guide are appropriate for the following types of sites: 1. A small development where the only drainage area is 10 acres or less. 2. A larger development where there are several small (10 acres or less) drainage areas. Drainage areas larger than 10 acres require different erosion control practices and professional assistance should be sought from the local conservation district or private engineering consultants. Sites with complex problems such as excessive slopes (greater than 5%), flowing streams, drainage or flooding problems or highly erosive or unstable soils also require professional help beyond the scope of the practices suggested in this guide. In addition, if changes in the drainage area could potentially threaten life or property downstream due to increased flooding, professional advice should definitely be sought. ENGINEERS MANUAL TO ASSIST THE ENGINEER, ARCHITECT OR OTHER PERSONS WITH A TECHNICAL BACKGROUND, WE HAVE ALSO DEVELOPED AN ENGINEER'S MANUAL. THIS MANUAL PROVIDES SPECIFICATIONS AND NOMOGRAPHS FOR DESIGNS FOR LARGER SITES OR MORE COMPLEX SITUATIONS THAN ARE COVERED BY THE STANDARD SMALL SITE DESIGNS IN THIS GUIDE. STEP-BY-STEP APPROACH FOR EROSION CONTROL ON SMALL URBAN SITES Even the smallest construction project begins with a plan and it is in this planning stage that the decisions about erosion control should be made. Before you draw your initial project layout we suggest you perform a site erosion evaluation. STEP ONE - SITE EVALUATION The most useful tool during this process will be good site maps. You may draw your own or have maps prepared by an architect or engineer. Some good sources for mapping information are the appropriate city planning and zoning departments, a regional planning agency or the U.S. Geological Survey (for topographic maps). You will also need information on the soil at your site. Your local conservation district has current soil maps and information on the erosiveness of the soil. In fact, we suggest you plan to visit the conservation district during this early planning stage. Call for an appointment, bring available information on your project and obtain guidance on the type of erosion control planning you will need. In many instances the best approach is to have an erosion control plan developed specifically for your site by the district with suggestions on which erosion control practices to employ. http://www.pr.nrcs.usda.gov/urbcons/sguide.htm (5 of 8) [8/14/2003 9:53:45 PM]

STEP TWO - PROJECT LAYOUT Once you have information on the topography, vegetative cover, and soils at your site you may layout your proposed project and evaluate its erosion potential. We suggest that this evaluation be done for three time frames; pre-project, during construction and post-project. The following are a few pertinent questions to ask when evaluating each planning period. Pre-Project PLANNING CONSIDERATIONS FOR PROJECT LAYOUT What type of vegetation does the site presently support? Are there trees or other types of vegetation that should be saved for erosion control or to improve site aesthetics and landscaping? Are there areas where extensive cutting or filling will be needed to attain the level areas needed for construction? What are the natural drainageways on the site? Are there adjacent properties that should be considered in project planning? During Construction Where will soil be disturbed during site grading, road building or project construction and for what length of time? (Evaluate each individually and then in combination) Are measures needed to protect valuable trees or other resources? Will flood protection be needed near streams and drainageways? Will topsoil be stockpiled or will there be spoil piles from excavation? Is slope protection needed to accomplish any part of the project? What are the locations of planned roadways and will they cross drainageways or slopes where special protection will be needed? Will downslope properties or streets heed protection from sediment that might result from rainfall during construction? Will drainageways be adequate to handle increased runoff after vegetation is removed or sites are paved? Are downstream flooding, streambank erosion or siltation of streams or lakes likely to result from project activities? Post-Project Will soil in fill areas support needed vegetation? Will slopes of fills, cuts or berms need permanent protection? http://www.pr.nrcs.usda.gov/urbcons/sguide.htm (6 of 8) [8/14/2003 9:53:45 PM]

Will drainageways or stream channels need permanent erosion protection to safely carry design flows? Are stormwater retention/detention ponds needed to hold expected site runoff and prevent flooding? Assessment of downstream and downslope impacts warrants further consideration. One of the largest costs in both time and money to previous urban development projects has arisen from litigation over sediment damage to downstream water bodies. To prevent downstream damage and resulting claims against you or your project, extra time in project planning is clearly warranted. If your site will pave large areas, construct buildings with extensive roof area, drain into an otherwise unprotected stream or lake, make certain that you have adequately planned for downstream protection. STEP THREE - PRACTICE SELECTION The next step is to determine modifications to the site development ~ plan to accommodate needed erosion protection measures. Modifications might vary from simply rescheduling the sequence of operations to relocating planned structures in order to avoid erosion or flood prone areas. Once needed changes are incorporated into the site development plans, final erosion management practices may be selected. Practice selection is the keystone of a sound management plan. This step will involve matching the practices recommended in this guide with the needs and conditions of your site. To assist in this selection, practices are arranged in categories as follows: Managing stormwater runoff and drainage. Stabilizing disturbed areas and/or establishing vegetative cover. Trapping sediment. Managing excavation activities. Road management. You will find one or more practices recommended for use in each category. You should select the simplest most direct practice or practices that will serve your purposes. Once you have determined which practices you will be using, they may be incorporated into your overall project design and drawn into your final plans. When planning and scheduling soildisturbing activities remember to: 1) minimize the length of time soil will be exposed, http://www.pr.nrcs.usda.gov/urbcons/sguide.htm (7 of 8) [8/14/2003 9:53:45 PM]

2) avoid leaving slopes in unstabilized condition, 3) avoid excavating within natural drainageways or streams, 4) minimize excavation work during the seasons when rain most often occurs 5) be prepared to take time during construction to install or maintain erosion control practices. When these considerations are included in a construction plan, time and money lost in combating soil erosion will be reduced. *****REMEMBER, THE DESIGNS FOR THE PRACTICES IN THIS GUIDE ARE INTENDED ONLY FOR SMALL SITES, WITH OBVIOUS AND STRAIGHTFORWARD EROSION CONTROL NEEDS. IF YOUR PROJECT DOESN'T FIT THESE CRITERIA, YOU MAY NEED ON-SITE ASSISTANCE FROM CONSERVATION DISTRICT PERSONNEL OR ENGINEER. SELF-HELP IS PREFERRED WHEN APPLICABLE BUT DIFFICULT SITES REQUIRE PROFESSIONAL EXPERTISE.***** top of page Return to Caribbean Area NRCS Home Page Return to Urban Conservation Main Page Comments to: webmaster@pr.usda.gov August 08, 2001 http://www.pr.nrcs.usda.gov/urbcons/sguide.htm (8 of 8) [8/14/2003 9:53:45 PM]