CITY OF VAUGHAN KIRBY GO TRANSIT HUB SUB-STUDY

Similar documents
WELCOME and introduction

The West Vaughan Employment Area Secondary Plan Policies

Port Credit Local Advisory Panel October 20 th Meeting

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

The Master Plan Framework

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

AMENDMENT NUMBER ## TO THE VAUGHAN OFFICIAL PLAN 2010 FOR THE VAUGHAN PLANNING AREA

CONTENTS 2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH 2.1 MANAGING SUSTAINABLE GROWTH THE VISION TO GOALS AND OBJECTIVES 2.3 MARKHAM STRUCTURE

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

1.3 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community planning

Urban Design Manual PLANNING AROUND RAPID TRANSIT STATIONS (PARTS) Introduction. Station Study Areas

2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS

~!VAUGHAN NOV Z November 21, Mr. Denis Kelly, Regional Clerk The Regional Municipality of York Yonge Street Newmarket, ON L3Y 6Z1

THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER

2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS

SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies

Edward R. Sajecki Commissioner of Planning and Building

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

Complete Neighbourhood Guidelines Review Tool

burlington mobility hubs study Downtown Burlington Mobility Hub

Official Plan Review: Draft Built Form Policies

CITY OF VAUGHAN D R A F T YONGE STREET STUDY. June 2008 YOUNG + WRIGHT /IBI GROUP ARCHITECTS DILLON CONSULTING LTD.

McCowan Precinct Plan Study Background & Deliverables

11.4 Highway 400 North Employment Lands Secondary Plan APPROVED BY THE ONTARIO MUNICIPAL BOARD ON NOVEMBER 21, 2011

Workshop #1 Outcomes. The Planning Partnership

New Westminster Downtown Parking Strategy Public Open House #1 September 13, 2012

THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER A By-law to adopt Amendment Number 1 to the Official Plan of the Vaughan Planning Area.

*** DRAFT 2 FOR PUBLIC REVIEW ***

MOUNT PLEASANT SECONDARY PLAN & VILLAGE BLOCK PLAN. Wednesday, March 5, 2008 Informal Public Open House

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

Welcome. Walk Around. Talk to Us. Write Down Your Comments

SECTION ONE: INTRODUCTION. introduction

3. Urban Design in the Central Area

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

5 Direct Growth. 5.1 Introduction

Niagara GO Hub and Transit Stations Study

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

Lakeview and Port Credit District Policies Review Public Engagement Process

11.4 Highway 400 North Employment Lands Secondary Plan

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

MAYFIELD WEST SECONDARY PLAN PHASE 2

PILLAR FOUR INTEGRATE LAND USE & TRANSPORTATION

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN

Further input invited as Colchester Growth Strategy nears final phase

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

Portage Parkway Environmental Assessment Public Information Centre No. 1

Derry Green Corporate Business Park

WELCOME Mayfield West Secondary Plan (Phase 2) Open House #2: June 25, 2009

Table 8-4: Road Classification Local Roads, second table, of Chapter 8 Create a Multi-Modal City, be amended by adding the following:

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

Edward R. Sajecki Commissioner of Planning and Building. SUBJECT: Draft Lakeview Local Area Plan (January 2014)

CONSULTING SERVICES FOR THE WHITEBELT VISIONING EXERCISE ADDENDUM TO THE GTA WEST LAND USE STUDY WORK PROGRAM

Key Themes and Responses May 2016

Agenda. 7 Wright Crescent Urban Design Study. Public Meeting and Urban Design Workshop. 1 INTRODUCTION AND BACKGROUND (City of Kingston)

Carrville District Centre Urban Design Streetscape Master Plan Study

178 Carruthers Properties Inc.

1 Introduction. Chapter. In this chapter:

DOWNTOWN GEORGETOWN PLANNING STUDY

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

1071 King Street West Zoning Amendment Application - Preliminary Report

1.0 PLANNING MARKHAM S FUTURE CONTENTS

Official Plan Review

Create Policy Options Draft Plan Plan Approval. Public Consultation Events. Phase 2

This Review Is Divided Into Two Phases:

Courtice Main Street Study Community Vision Workshop PLANNING SERVICES DEPARTMENT

Report to: Development Services Committee Report Date: April 24, 2017

MAYFIELD WEST SECONDARY PLAN PHASE 2

GO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018

Trafalgar Road Corridor Planning Study Open House

URBAN DESIGN BRIEF 181 Burloak Drive, Oakville

DRAFT Northeast Quadrant of Kipling Avenue and Highway 7 DRAFT AUGUST 29, Goals Land Use. The goals of this Plan are to:

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

Draft Urban Hamilton Official Plan. Amendment No. XX

The Proposed Auckland Unitary Plan (notified 30 September 2013)

GUIDELINES EXHIBITION PLACE LOCATION: OBJECTIVES. Structure Plan URBAN DESIGN GUIDELINES

URBAN DESIGN BRIEF. 2136&2148 Trafalgar Road. Town of Oakville

COMMITTEE OF THE WHOLE SEPTEMBER 13, 2011

11.12 Vaughan Metropolitan Centre Secondary Plan

Rapid Transit Implementation Working Group Transit Oriented Development and Transit Villages January 12, 2017

Hamilton Pier 7&8 Public Meeting and Workshop #1

Sustainable Growth. Sustainable Growth

CDAC. Update: Downtown Dartmouth Update: CDAC July 25 th Motion

Employment and Commercial Review Analysis of Policy Directions

Transit-supportive development and city-building

K. SMART ASSOCIATES LIMITED

City of Kingston. North King s Town Secondary Plan Open House + Workshop #1 February 28, 2018

PUBLIC MEETING April, 20161

Hurontario/Main Street Corridor Master Plan Mississauga and Brampton Building a new and integrated vision for the corridor

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

WELCOME TO OPEN HOUSE TWO November 28, 2018

UTSC SECONDARY PLAN COMMUNITY OPEN HOUSE

HEMSON IV EMPLOYMENT LAND CONVERSION

11.7 Vaughan Mills Centre Secondary Plan (OPA #2)

Land Use Policies Urban Area. Land Use Policies Urban Area

LAKEVIEW LOCAL ADVISORY PANEL. THE COPORATION OF THE CITY OF MISSISSAUGA THURSDAY, NOVEMBER 18, 2010

Transcription:

WELCOME! Thank you for attending, and welcome to the first of three Public Meetings for the Kirby GO Transit Hub Study. Your feedback is important to us, and will help inform the development of the draft and preferred Transit Hub Area Concept Plans, which will be prepared in the next phase of the study. CONTACT US Arminé Hassakourians Senior Planner Policy Planning & Environmental Sustainability tel: 905-832-8585 ext. 8368 email: armine.hassakourians@vaughan.ca Winnie Lai Transportation Project Manager Development Engineering & Infrastructure Planning tel: 905-832-8585 ext. 8192 email: winnie.lai@vaughan.ca Anna Sicilia New Community Areas Project Manager Policy Planning & Environmental Sustainability tel: 905-832-8585 ext. 8063 email: anna.sicilia@vaughan.ca

2 CITY OF VAUGHAN Block 27 Study Area Physical and Policy Context The Kirby GO Transit Hub Sub-study Area is located within the northeast corner of Block 27 in North Vaughan. Block 27 is bounded by Jane Street to the west, Keele Street to the east, Teston Road to the south, and Kirby Road to the north. It has an area of approximately 400 hectares, and is primarily rural. A significant portion of the site has been designated Natural Heritage and Greenbelt and the TransCanada Pipeline traverses the site in an east-west direction. The Vaughan Official Plan identifies Block 27 as one of two new community areas. In support of the ongoing Block 27 King Vaughan Rd Secondary Plan Study, the sub-study is being prepared to provide greater clarity through a detailed review, and to identify lands and infrastructure needed to support the future development of the proposed Kirby GO Station Transit Hub. King Vaughan Rd King Vaughan Rd King Vaughan Rd Kirby Rd Kirby Rd Keele St Dufferin St Dufferin St Jane St Teston Rd Keele St Keele St BLOCK 27 Weston Rd HWY 400 Teston Rd Dufferin St Keele St Teston Rd Kipling Ave BLOCK 27 r Jane St Weston Rd Teston Rd Kirby Rd BLOCK 27 Pine Valley D Kirby Rd Dufferin St BLOCK 27 HWY 400 zie Dr W Islington Ave Major MacKenzie Dr W Major MacKenzie Dr W zie Dr W N N Rutherford Rd Rutherford Rd TransCanada Pipeline Intensification Areas st of Kipling/Isling, & Primary bc Idk where the gtacentre ne extends to Local Centre N N Study Area Study Area TransCanada Pipeline Areas cut the Intensification image west of Kipling/Isling, & Primary Centre east of Dufferin bc Idk where the gta GTA West Options TransCanada Pipeline west areas/pileline extends to Local Centre Intensification Areas Study Area Stable Areas Primary Centre Employment Area Local Centre GTA West Options Stable Areas Employment Areato GTAexact Westlocation Optionsand size of Streets & Centres, Note: For the please refer Schedule 1 of VOP2010. Stable Areas Employment Area Start copy here. Study Area TransCanada Pipeline Intensification Areas Primary Centre Local Centre GTA West Options Stable Areas Employment Area

STUDY PURPOSE The purpose of the Kirby GO Transit Hub Sub-study is to: 1. Provide a vision based on a robust planning rationale that directs the future development of the transit hub area; 2. Support and provide greater clarity in the development of the Block 27 Secondary Plan and to create inspiring places for people to live, work, play and do business; 3. Encourage the use of multiple transportation modes through enhanced connectivity and mobility; 4. Design a transit hub area supported by high quality mixed-use and residential neighbourhoods; 5. Identify the required infrastructure, which will serve as the blueprint for integrating the transit hub with the rest of Block 27 and surrounding areas; 6. Help inform any future approval processes; and 7. Reflect the City s commitment to the future GO Station as an important priority. STUDY SCHEDULE BLOCK 27 SECONDARY PLAN PHASE 1: PHASE 2: PHASE 3: PHASE 4: BACKGROUND STUDY & REPORT PLAN DEVELOPMENT PROCESS PREPARATION & REFINEMENT OF THE APPROVAL PROCESS THE DRAFT SECONDARY PLAN JAN 2015 - MAY 2015 JAN 2015 - DEC 2015 JAN 2016 - DEC 2016 DEC 2016 - APR 2017 PHASE 1: PHASE 2: PHASE 3: PHASE 4: PHASE 5: BACKGROUND REVIEW & VISIONING & OPPORTUNITIES HUB AREA CONCEPT PLAN POLICY & GUIDELINE IMPLEMENTATION & PHASING ANALYSIS RECOMMENDATIONS PLAN APR 2016 - MAY 2016 MAY 2016 - JUNE 2016 JULY 2016 - SEPT 2016 AUG 2016 - DEC 2016 JAN 2017 - APR 2017 NORTH VAUGHAN & NEW COMMUNITIES TRANSPORTATION MASTER PLAN (NVNCTMP) PHASE 1: PHASE 2: PHASE 3: PHASE 4: PROBLEM AND OPPORTUNITY ALTERNATIVE SOLUTIONS NETWORK AND PHASING PLANS IMPLEMENTATION PLAN & STRATEGIES MAY 2015 - JUL 2016 JUL 2016 - DEC 2016 JAN 2017 - MAR 2017 APR 2017 - JUN 2017

WHAT IS A TRANSIT HUB? A transit hub is a defined area or location with significant levels of planned transit services having the widest range of mobility options where travelers change to or from transit. Transit hubs are usually surrounded by transit-oriented developments or other higher-density land uses and form the heartbeat of a community, seamlessly connecting people to places. The success of a transit hub depends on the careful balancing of place making, transportation infrastructure, land use planning, transportation planning and urban design. Using Metrolinx s Mobility Hub Guidelines (Sept. 2011) as the basis for the Kirby GO Transit Hub Sub-study, the elements required to develop a successful transit hub can be organized in the following three categories. 1. Placemaking 2. Seamless Mobility 3. Successful Implementation Public Spaces Support vibrant public spaces Become a part of the community s identity Provide amenities that encourage transit use Minimized Ecological Footprint Design the hub with the Greenbelt and the area s natural heritage as a focal point Implement innovative sustainable energy, water, landscape and waste management practices Multi-Modal Connectivity Facilitate and encourage the use of multiple transportation modes Provide accessible transit for all ages and abilities Reduce reliance on the car Mix of Uses and Activities Focus the greatest mix of uses and activities close to the transit station and along major roads Plan for active uses at the pedestrian scale Create appropriate transitions to the surrounding community A Well Designed Transit Station Design a high quality station and public spaces Provide safe and efficient pedestrian connections between the station and surrounding areas Provide comfortable customer amenities Strategic Parking Management Create a phased, area-based approach to parking management Integrated Technology Create a transit system designed with access to real time travel information to support the user experience Transit Supportive Densities Locate a critical mass of people to support a mix of uses and transit Locate highest densities close to the station Ensure development is sensitive to community context Pedestrian Priority Encourage pedestrian- friendly design of public and private spaces Provide easy access to stations and stops Create vibrant, comfortable and well-designed pedestrian spaces and corridors Flexible Implementation Develop policy that will accommodate new growth Explore partnerships and incentives for increased public and private investment

Guiding Documents Outlined on this board are the primary Provincial, Regional, and Local plans containing policy that influence the direction for the hub area. These include the: Growth Plan for the Greater Golden Horseshoe City of Vaughan Official Plan 2010 (VOP 2010) York Region Official Plan (under review) Metrolinx Mobility Hub Guidelines City of Vaughan Transportation Master Plan Also outlined on this board are the two key interrelated studies which were initiated in 2015 and will inform the Kirby Go Transit Sub-study. 1. Block 27 Secondary Plan The City of Vaughan is undertaking the Block 27 Secondary Plan to develop the policy framework for the site. The Plan will identify the area s land use designations, minimum and maximum heights, collector road network, natural heritage network, parks and open spaces, community facilities and stormwater management facilities. Proposed 2. North Vaughan and New Communities Transportation Master Plan (NVNCTMP) The purpose of the NVNCTMP is to provide the policy and infrastructure framework necessary to develop a well-integrated, multi-modal, sustainable transportation network to accommodate growth to 2031. The NVNCTMP supports the Kirby GO Transit Hub Substudy by considering the transportation needs and how the hub area will integrate with the regional transportation infrastructure improvements required to service the site. The NVNCTMP builds on the City of Vaughan s Official Plan and Transportation Master Plan and aligns with the York Region Transportation Master Plan update. N Kirby Go Mobility Hub Sub-Study Area

ANALYSIS & KEY DIRECTIONS Draft Land Uses The emerging direction from the Secondary Plan is to locate the highest concentration of uses and densities close to the proposed Kirby GO Station within the lands designated Local Centre Precinct. Draft Automobile, Public Transit and Bicycle Network Through the NVNCTMP, local transit to service Block 27, including the proposed Kirby GO Station is under consideration. A number of active transportation connections are also being identified through the NVNCTMP study. These connections will be further refined as part of the the Kirby GO Transit Hub Sub-study. Draft Primary, Secondary & Tertiary Zones 400 m 800 m Primary Zone: Planned Transit Station and associated facilities (e.g. parking) as well as the immediate surrounding area. This area is most influenced by the high level of accessibility offered by the station services. Secondary Zone: Less influenced by the transit station but still provides many opportunities for transit-oriented development. Tertiary Zone: Area within a roughly 10 minute walking distance of the station. Transition from the transit hub to the broader area.

VISION The vision for the Kirby GO Transit Hub Area is of a vibrant local community centre, unique to Vaughan, with seamless multi-modal connections and excellent regional and local transit. Centred on the GO Station and public square, the Hub will incorporate a combination of lowto-mid-rise mixed-use buildings with ground floor retail and commercial. The study will embrace and strategically plan for the future, while recognizing and respecting the area s strengths. Attributes of the area include: its access to transportation and public transit infrastructure; and, its proximity to the Greenbelt and surrounding natural heritage system. GUIDING PRINCIPLES 1. A Balanced Mobility Mix The Kirby GO Station Hub Sub-study will be based upon providing appropriate priority to all modes of travel including walking, cycling, public transit, ride-sharing and taxis, and private motorized vehicles. 2. Connected Provide strong connections from the proposed Kirby GO Station to surrounding communities and nearby key destinations including Carrville Centre, Maple, Canada s Wonderland, Vaughan Mills, and Vaughan Metropolitan Centre (VMC). 3. Walkable, Inviting Streets & Open Spaces Streets within the Kirby Go Station Transit Hub will be pedestrian-oriented, and accessible for people of all ages and abilities. They will be framed by animated building edges with wide sidewalks, weather protection, lighting and way-finding. 4. Existing Neighbourhoods Adjacent and surrounding stable residential neighbourhoods, to the east and south, will be protected from any potential adverse impacts related to intensification. Taller buildings will be designed and located to minimize shadowing, overlook and other adverse impacts.

GUIDING PRINCIPLES (CONTINUED) 5. Appropriate Scale, Form & Density Intensification will be encouraged, where appropriate, through careful design and within close proximity to transit. Development will be sensitive to the character and context of existing adjacent and surrounding neighbourhoods to the east and south. 6. Design Excellence New buildings and public spaces will be designed with the highest built-form standards. New development will maintain the rhythm and scale of the existing adjacent and surrounding built environment, and will integrate natural heritage elements. 7. Mix of Uses Development within the Kirby GO Transit Hub will aim to create a vibrant mixed use community that supports existing and new transit infrastructure. 8. Strategic Parking Management Parking will support local retail and commuters. Parking management strategies should facilitate new development while protecting the character of adjacent and surrounding neighbourhoods to the east and south, and strengthen urban design by maximizing the use of shared public parking resources in strategic locations. 9. A Flexible Phasing Plan that Accommodates Growth and Change Phasing strategies for the Kirby GO Transit Hub Sub-study will account for long-term growth and market changes, as well as measures to evaluate and monitor implementation progress.

OPPORTUNITIES & CONSTRAINTS Please provide comments on opportunities and constraints in the space below, using the post-it notes and pencils which have been provided. Please provide your feedback on a post-it note. Transportation, Transit and Circulation Walking and Cycling Development Key Destinations and Open Space Rail Oriented Development

0 KIRBY CITY OF VAUGHAN GO TRANSIT HUB SUB-STUDY CASE STUDY EXAMPLES mount pleasant mobility hub brampton, ontario James Street North Mobility Hub hamilton, ontario AREA CHARACTERISTICS: Location & Prominence of the Station: The station s architectural design features a vintage-style clock that articulates the presence of the Mount Pleasant GO Station. It is clearly visible from the village s central square, creating a distinct landmark in Mount Pleasant. Built Form & Land Use: Built form is arranged in a radial pattern, featuring low and mid-rise residential, commercial, and institutional uses. Medium density buildings are typically found near the GO station and along major streets, with lower density buildings further from this central area. Open Space: The Mobility Hub is focused around a square north of the GO station, which connects to a green spine that provides access to a city park, woodlots, and renaturalized areas. AREA CHARACTERISTICS: Location & Prominence of the Station: The West Harbour GO Station in the James Street North Hub is located north west of the James Street North and Murray Street West intersection. It is marked by a station plaza fronting James Street North and provides access to the waterfront and destinations along the GO Transit Lakeshore West line. Built Form & Land Use: Predominantly low-density built form with low-rise residential uses, and two to four storey commercial, industrial, and employment buildings. James Street North has a traditional Ontario main street fabric and is an important destination for music and the arts. Open Space: Significant park space at the northern portion of the mobility hub, particularly Bayfront Park north west of the GO Station. Streets & Active Transportation: The location provides access to local transit through the Mount Pleasant GO rail station and a local bus service. The close proximity of residential areas to the GO station provides easy pedestrian access to transit. Streets & Active Transportation: The mobility hub provides users access to GO Transit, two public buses, and pedestrian and bicycle pathways. Cycling access exists on James Street, and along and east of the Escarpment Rail Trail. The north and south sides of the area are divided by the CN Rail Corridor. Vehicular access is provided through a traditional street grid network.

1 KIRBY CITY OF VAUGHAN GO TRANSIT HUB SUB-STUDY CASE STUDY EXAMPLES port credit mobility hub mississauga, ontario odenplan transit area stockholm, sweden AREA CHARACTERISTICS: Location & Prominence of the Station: Port Credit GO Station is situated northwest of the intersection of Lakeshore Road West and Hurontario Road, east of the Credit River. AREA CHARACTERISTICS: Location & Prominence of the Station: The Odenplan metro station features a modern curvilinear design, and acts as a clear landmark within the historic Odenplan public plaza. Built Form & Land Use: Variety of building forms, featuring low and mid-rise residential development, and industrial, office, retail, and waterfront-related uses. A pocket of high rise residential development exists in close proximity to the GO station. Built Form & Land Use: Large blocks of mid-rise buildings are the dominant type of built form, featuring historic architectural styles. The area includes residential, commercial, and institutional uses. Open Space: Includes a diverse park and open space network along the waterfront and the Credit River. Streets & Active Transportation: Its location along Lakeshore Road West, its proximity to the Queen Elizabeth Way, and the Port Credit GO Station facilitates ease of vehicular transport, local and regional transit and future rapid transit. A cycling trail along the waterfront, a multi-use trail, and a defined street grid pattern create opportunities for active transportation and pedestrian mobility. Open Space: Odenplan plaza is centralized around the metro station, featuring seating and some greenery. Large green spaces exist to the immediate southeast and northeast of the metro station. Streets & Active Transportation: Odenplan exists along a public transit node, providing access to the metro and local bus routes. The station s centralized location provides easy access for pedestrians and cyclists, with major arterials to the north and west of the area.

2 KIRBY CITY OF VAUGHAN GO TRANSIT HUB SUB-STUDY NEXT STEPS Ongoing Site Analysis - May to June, 2016 Develop Evaluation Criteria - July, 2016 Prepare Draft Hub Area Concept Plans - July to August, 2016 Evaluate Draft Hub Area Concept Plans - July to August, 2016 Prepare Preferred Hub Area Concept Plan - August, 2016 Public Consultation Session #2 - September, 2016 COMMENTS Please provide any additional comments in the space below, using the post-it notes and pencils which have been provided. Please provide your feedback on a post-it note.