Assignment Name: The Proposed Design And Construction Supervision o f AVIC Town-Phase 1 Location within Country: Armani Beach Dar Es Salaam Name of Client: AVIC Town No of Staff: 5 Address: Longido Street Plot No. 406 Upanga Dar es Salaam March 2014 Name of Associated Consultans, If Any: Space- in- Space Architects Ltd Completion Date (Month/Year): on going Country: United Republic Of Tanzania Firm/Entity/(Profiles):Electrical, Mechanical Engineers & ICT Engineers No of Staff Months; Duration of Assignment: : on going (in Current Tshs or US$): TSh 150 Billion No of Months of Professional Staff provided by Associated Consultants: 3 Eng. Sakina Mohamed Mohamedy Sakila The site is located thirty (25) kilometers from the Ferry. The project consists of 104 bangalows, and 58 double storey houses. The power will be distributed through underground cable. The main sources of water is boreholes which will be pumped to elevated tanks and distributed to the constructed house by gravity systerm. There are road construction ongoing works with expectation of a clear tarmac road reaching the site. The site is enclosed by two access roads leading to Changani Beach on the Western side and Amani beach on the Eastern side. (Caption 01). Designing and supervision of Electrical system 104 bungalows and 58 double storages houses and structured cabling and security installations Design and supervision of Mechanical system for 104 bungalows and 58 double storages houses, design of fire detection, alarm system, plumbing and drainage Design of the conference centres and solar water heating system.
Assignment Name: Tanzania National Re Insurance Corporation (TANRE) Location within Country: DAR ES SALAAM 3B. FIRM S REFERENCES Name of Client: Tanzania National Re Insurance Corporation (TANRE) Address: Longido Street Plot No. 406 Upanga Dar es Salaam March 2012 Completion Date (Month/Year): Dec 2015 Name of Associated Consultans, If Any: M/S Arqes Africa Architects And Interior Designers Ltd Country: United Republic Of Tanzania Firm/Entity/(Profiles):Electrical, Mechanical Engineers & ICT Engineers No of Staff: 5 No of Staff Months; Duration of Assignment: : 36 Months (in Current Tshs or US$): TSh 18 Billion No of Months of Professional Staff provided by Associated Consultants: 18 Eng. W. Chiwawa Edson Ruangisa A multi-storey building (16 levels), two levels of basement for car parking, ground and other 13 floors with overall approximate gross floor area of 10,000 square meters. Associated external works, parking area, walkways, soft landscaping and boundary wall. Associated building engineering and services installations that is, Electrical, Airconditioning and Mechanical Ventilation, Structured Cabling, Lifts, Security and Plumbing and drainage system. In particular, electrical installation shall comprise inter alia supply, installation, testing and commissioning of distribution transformer, prime rated generator, LV switchboard, panel boards, distribution boards and cabling. Others include cable management systems, modern high efficacy lights, switching accessories and power outlets Designing and supervision of Electrical system and structured cabling and security installations Design and supervision of Mechanical system, design of fire detection, alarm system, plumbing and drainage Design if lifts and Air conditioning
Assignment Name: Proposed Construction Of Parrot Country: United Republic of Tanzania Hotel On Plot No. 48 Block 21 Kaloleni Arusha Location within Country: Arusha City Firm/Entity/(Profiles): Design Eng Electrical Engineers, mechanical Engineers ICT Engineers Name of Client: Parrot HOTEL No. of Staff: 3 Address: ARUSHA March 2009 Completion Date (Month/Year): on going Assignment: on going TZS 20 BILLION Provided M/S Y&P Architects limited by Associated Consultants:- 3 Eng. W. Chiwawa Edson Ruangisa 126 rooms 15floors 3 Stars Hotel building is located on Plot No 48 Block 21 Kaloleni Arusha, the scope of the project include Designing and construction supervision of Electrical system, fire detection and alarm system, lift, Plumbing and drainage, Air conditioning, structured cabling, IPTV, music and security installations. The building meets all the requirements of British Standards and UK Building Regulations as well as of the rigorous developer s specification. Detailed engineering design and Supervision of building construction for electrical services which includes power, lighting and IPTV, music and security installations Detailed engineering design and Supervision of building construction for mechanical services includes Plumbing and drainage, Air conditioning and fire detection and alarm systems. Supervision of building services installations. Commissioning of all services
Assignment Name: Mnazi Bay and Songosongo Natural Gas Processing Plats Location within Country: Amani Beach-Mtwara Name of Client: TPDC and China Petroleum Engineering Company Limited Address: Manazi bay Gas field Camp March 2012 Completion Date (Month/Year): on going Name of Associated Consultans, If Any: China Petroleum Engineering Company Limited Country: United Republic Of Tanzania Firm/Entity/(Profiles):Electrical, Mechanical Engineers & ICT Engineers No of Staff: 3 No of Staff Months; Duration of Assignment: : 2Months (in Current Tshs or US$): TSh 5 Billion No of Months of Professional Staff provided by Associated Consultants: Eng. Sakina Mohamed The site is located thirty (30) kilometers from the Ferry. The main road is tarmacked apart from five (5) km from the site. There are road construction ongoing works with expectation of a clear tarmac road reaching the site. The site is enclosed by two access roads leading to Changani Beach on the Western side and Amani beach on the Eastern side. Each site has 16 staff houses and include reaction area and dinning buildings. Water to the proposed buildings is from disallination process then pumped to the elevated tanks. The sorces of power to these houses are from diesel generators Detailed engineering design and Supervision of building construction for electrical services which includes power, lighting and IPTV, music and security installations Detailed engineering design and Supervision of building construction for mechanical services includes Plumbing and drainage, Air conditioning and fire detection and alarm systems.
Assignment Name: The Proposed apartments on Plot 1207 Masaki Msasani peninsula for Transcargo limited Location within Country: Dar es salaam regional Name of Client: Transcargo limited No of Staff: 5 Address: P.o.Box: 40920 dar es salaam March 2008 Completion Date (Month/Year): on going Name of Associated Consultans, If Any: Tharan Associates, P.O.Box:1008 dar es salaam Country: United Republic Of Tanzania Firm/Entity/(Profiles):Electrical, Mechanical Engineers & ICT Engineers No of Staff Months; Duration of Assignment: : 18 Months (in Current Tshs or US$): TSh 15 Billion No of Months of Professional Staff provided by Associated Consultants: 18 Months Eng. Sakina Mohamed Edson Ruangisa The project is located along Plot No. 1207 Yacht Club Road Msasani Peninsular Dar Es Salaam. It consists of five storeys (G+Mz+6) and is intended for both commercial and residential use. There are apartments and business areas. The project shall consist of a dedicated transformer, 11/0.4kV 200kVA and a diesel powered generator of the same capacity. Each apartment will have its own meter and distribution board. Lighting will be by modern compact fluorescent lights. Air-conditioners will be split units. The installation shall also include telephone, data and security systems.
Assignment Name: Proposed 50MW Diesel power plant Location within Country: Njiro Arusha Country: United Republic of Tanzania Professional staff provided by Your Firm/Entity/ (Profiles): Design Eng Electrical Engineers, mechanical Engineers ICT Engineers Name of Client: Symbion Power (T) Ltd No. of Staff: 2 Address: DAR ES SALAAM Assignment: 6Month 2012 (Month/Year): COMPLETED TZS 100 BILLION Provided by Associated Consultants: 50 MW of diesel-fired temporary generators at installed at nyiro Arusha to provides power to the greater Arusha community. Detailed engineering design and Supervision of building construction. Supervision of building services installations. Commissioning of all services
Assignment Name: Proposed Construction of For VETA at SONGEA RUVUMA Location within Country: SONGEA RUVUMA REGIONAL Name of Client: No. of Staff: 5 Country: United Republic of Tanzania Professional staff provided by Your Firm/Entity/ (Profiles): Design Eng Electrical Engineers, mechanical Engineers ICT Engineers Address: SONGEA RUVUMA REGIONAL 2011 (Month/Year): COMPLETED Sky Architects Consultants Assignment: 6Month TZS 450 MILLION Provided by Associated Consultants: Eng. W. Chiwawa Edson Ruangisa The Vocational Educational and Training Authority (VETA)- VETA songea is implementing a project in which it is undergoing new construction building by constructing a number of structures: Construction of buildings include computer class rooms and, Library and Computer laboratory,the building services include Sewerage system and storm water system Installation of services i.e. electrical and mechanical The Consultant was required to provide design and supervision services of the project. The aim is to provide assistance to the Client in designing works and ensuring that the construction works are carried out in accordance to standard requirements - Feasibility study, Prepare detailed design for building services and Preparation of bidding documents - Supervision of construction, Supervision of building services installations and Commissioning of all services
Assignment Name: Proposed Interior Design Of Azania Bank Country: United Republic of Limited- Arusha Branch Tanzania Location within Country: Arusha City Firm/Entity/(Profiles): Electrical & Mechanical Engineers Name of Client: AZANIA BANK LIMITED No. of Staff: 3 Address: DAR ES SALAAM OCTOBER 2011 (Month/Year): FEBRUARY 2012 Assignment: NINE WEEKS TZS 300 MILLION Provided by Associated Consultants: As part of their country wide modernization plan Azania Bank Ltd are carried out a major refurbishment of their Arusha Branch. The modernization includes complete new interiors, new IT backbones, the replacement for the electrical systems, replacement of the air conditioning systems and new security. On completion the branch met international retail standards. Designing of Electrical system, fire detection and alarm system and structured cabling and security installations Designing of plumbing and drainage Designing of air conditioning, Supervision of building services installations. Commissioning of all services
Assignment Name: Proposed Remodelling of Azania Bank Limited- Moshi Branch Location within Country: MOSHI URBAN Country: United Republic of Tanzania Firm/Entity/(Profiles): Electrical & Mechanical Engineers Name of Client: AZANIA BANK LIMITED No. of Staff: 5 Address: DAR ES SALAAM Assignment: NINE WEEKS OCTOBER 2011 (Month/Year): FEB, 2012 TZS 200 MILLION Provided by Associated Consultants As part of their country wide modernization plan Azania Bank Ltd are carried out a major refurbishment of their Moshi Branch in Kilimanjaro. The modernization included complete new interiors, new IT backbones, the replacement for the electrical systems, replacement of the air conditioning systems and new security. On completion the branch met international retail standards. Designing of Electrical system, fire detection and alarm system and structured cabling and security installations Designing of plumbing and drainage Designing of air conditioning, Supervision of building services installations. Commissioning of all services
Assignment Name: Proposed Rehabilitation NIDA Data Centre Location within Country: DAR ES SALAAM CITY Name of Client: National Identifications Authority Address: DAR ES SALAAM Country: United Republic of Tanzania Firm/Entity/(Profiles):Electrical Engineers No. of Staff:2 Assignment:3 OCT, 2011 (Month/Year):MAY 2012 TZS 1 BILLION Provided by Associated Consultants: - Eng. W. Chiwawa Centre Data Centre, printing and sorting unit for National Identities Authority (NIDA) is implementing a project which will be office building: Construction of buildings structures namely, Library and Computer Block,office, the services offered include Sewerage system and storm water system Installation of services i.e. electrical and mechanical The Consultant was required to provide design and supervision services of the project. The aim is to provide assistance to the Client in designing works and ensuring that the construction works are carried out in accordance to standard requirements Designing of Electrical system, fire detection and alarm system and structured cabling and security installations Designing of plumbing and drainage Designing of air conditioning, Supervision of building services installations. Commissioning of all services
Assignment Name: Proposed Praia Hotel Location within Country: Mtwara Municipality Country: United Republic of Tanzania Firm/Entity/(Profiles): Electrical & Mechanical Engineers Name of Client: Praia Hotel Limited No. of Staff: 5 Address: MTWARA Assignment: 8Months 2012 (Month/Year): OCTOBER 2012 TZS 750 MILLION Provided by Associated Consultants: - Eng. W. Chiwawa Edson Ruangisa Narrative description of Project 36 room hotel accommodation, service block and recreation facilities, viz: gym, swimming pool, Designing of Electrical system, fire detection and alarm system and structured cabling and security installations Designing of plumbing and drainage Building services co-ordination and supervision. Supervision of construction. Commissioning of all services.