Looking Forward. Tuesday 22 nd April 2018

Similar documents
HS2 Environment. Protecting the environment

E16: MAINTENANCE OF LANDSCAPED AREAS

In Title Your Area 5: Amersham to Great Missenden

HS2 Hybrid Bill Petitioning. Summary of SMBC Asks 23/09/13. Background

In your area. Ravenfield to Clayton LA13. June Introduction

Providing power to the railway

Welcome to the Public Consultation Exhibition

High Speed Rail (London- West Midlands)

Town and Country Planning (Environmental Impact Assessment Regulations) 2011 SCOPING OPINION

Rannoch 132 / 33 kv Substation Extension

HS2 Interchange Station Design

Linden Homes Proposals for land off Ringwood Road, Verwood

PANSHANGER QUARRY, Hertfordshire

SOUTH WOKINGHAM STRATEGIC DEVELOPMENT LOCATION PUBLIC CONSULTATION

Start of works exhibition

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD

`Code 2 - Accepted with comments

NON-TECHNICAL SUMMARY

Welcome to our exhibition

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

Thank you for coming. We want to hear your views on proposed improvements to the A1 between junction 65 (Birtley) and junction 67 (Coal House).

A21. Start of works exhibition Tonbridge to Pembury. Welcome. Dualling Scheme

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London

Development of land adjacent to Braggs Farm Lane and Rumbush Lane, Dickens Heath. Welcome. Today s exhibition. The proposal site

Infrastructure and the environment

Slough International Freight Exchange Proposals, Colnbrook+

Rempstone Extension - East Leake 2014

Welcome to our exhibition

Location: The Wildlife Trust for Bedfordshire, Cambridgeshire and Northamptonshire, Lings House, Billing Lings, Northampton NN3 8BE

Land at Rampton Road. Cottenham

Grantham Southern Quadrant Link Road Environmental Statement

DraFt EnvironmEntal StatEmEnt

Response by the Wiltshire Archaeological and Natural History Society

Replacement Golf Course Facilities and Residential Development, Churston. Environmental Statement Non-Technical Summary

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

Dorenell Wind Farm 132 kv Grid Connection

LAND USE SHEET 3 LOWER THAMES CROSSING LOWER THAMES CROSSING STATUTORY CONSULTATION. Main works construction compound

Wednesbury to Brierley Hill Extension

Haydock Point. Welcome

Mapping produced by the Bedfordshire and Luton Biodiversity Recording and Monitoring Centre

NON TECHNICAL SUMMARY

Who Is Parkside Regeneration?

orld Heritage Site W

The Moors at Arne Project, Managing Coastal Change

City of Calgary and MD of Foothills Intermunicipal Development Plan

Canal & River Trust response to the Consultation on the Working Draft Environmental Impact Assessment Report

Experiences of dealing with Lesser Horseshoe Bats (Rhinolophus

City of Missoula and Missoula County Open Space Planning Open House

TRANSPORT AND WORKS ACT 1992 TRANSPORT AND WORKS (APPLICATIONS AND OBJECTIONS PROCEDURE)(ENGLAND AND WALES) RULES 2006

INTRODUCTION. Welcome to the third round of information events on the emerging Yorkshire Energy Park proposals. THE CONSULTANT TEAM WHERE IS THE SITE?

Kibworth Harcourt. Introduction. Introduction

WELCOME. Thanks for visiting Hadley Property Group s exhibition on its initial plans to redevelop land at Bath Road in Totterdown.

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION

Red Hill Valley Project More Than A Road October 16, 2006

Habitat Regulations Assessment (HRA) Screening Determination. May 2017

Welcome. Site/11/04. Site/11/03. Proposed Site. 11,400 new homes needed in east Cambs

Archaeological trial-trenching evaluation: New Hall School, The Avenue, Boreham, Essex. July 2015

Central Lake Ontario Conservation Conservation Lands Master Plan

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand.

Hornsea Project Three Offshore Wind Farm

In Title Your Area 10: Lower Boddington to Southam & Offchurch

LAND EAST OF SUDBURY ROAD, HALSTEAD PUBLIC CONSULTATION. Proposed Residential Development

Archaeology and Planning in Greater London. A Charter for the Greater London Archaeology Advisory Service

Key Principles. 290 Phasing Principles and Programme

Comments on the proposed scope are requested from WCC/NBBC officers to be provided to SLC Rail by 25 th March 2016 and sent to

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

Dogger Bank Creyke Beck: Community Working Group. 25 th October 2012

Electrifying the South Wales Mainline ABC Electrification Cardiff 26 th February 2016 Swansea 11 th March 2016

TOWN COUNCIL / PLANNING COMMISSION

Newcourt Masterplan. November Exeter Local Development Framework

BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT

Chalk, Cherries and Chairs Central Chilterns Landscape Partnership Scheme LANDSCAPE PARTNERSHIP DEVELOPMENT OFFICER JOB INFORMATION PACK

Chapter 4. Route Window C12: Mile End Park and Eleanor Street Shafts

Parks & Recreation Tree Board - Tree Ordinance Angola, Indiana

Public Information Centre #1

Biodiversity Action Plan Background Information for discussion purposes

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

University Park, Worcester Non Technical Summary December 2011

Temporary Bridging. Issue 2

Gryme s Dyke, Stanway Green

Ashbridges Bay TTC Maintenance and Storage Facility

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

BREEDON NORTHERN LIMITED

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

Welcome! MILLENNIUM LINE BROADWAY EXTENSION. Over the next 30 years, Metro Vancouver will welcome 1 million new residents and 600,000 new jobs.

4.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES

A737/A738 Trunk Road (Dalry Bypass)

The Place Solar Farm

PUBLIC ART COMMISSION FOR KIRKSTALL, LEEDS ARTIST BRIEF

Vancouver. Title of the Initiative. Initiative Duration. Submitted by. Comments by the Jury

Anston House, Brighton

Archaeological evaluation at Willowdene, Chelmsford Road, Felsted, Essex

Welcome to this public consultation event for the proposed South Western Relief Road. Thank you for taking the time to come along.

Burloak Drive Grade Separation

Euston Community Forum. 11 June Maria Fidelis School

What s Up Next In The Seattle Squeeze. PSRC Transportation Policy Board April 11

Archaeological evaluation: land to the rear of Clare Road, Braintree, Essex

Linden Homes Land at Hill Place Farm, East Grinstead

Introduction. Who we are. Purpose of this public consultation

A1 Scotswood to North Brunton Public Information Exhibition Executive Summary

Transcription:

Looking Forward Tuesday 22 nd April 2018

Vernon Loo Community Engagement Manager Area Central

Online HS2 has partnered with Commonplace to provide a locally focused website. This is currently being updated with content but you can still visit the site / sign up: https://hs2inbucksandoxfordshire.commonplace.is The HS2 corporate website - https://www.hs2.org.uk is in testing and we are keen for feedback. There is a link on the site to give comments. Alternatively you can email comments to online@hs2.org.uk

Community Funds Community and Environment Fund (CEF) & Business and Local Economy Fund (BLEF) The administration of these funds is managed on behalf of HS2 by the charity Groundwork. For more information visit: www.groundwork.org.uk/sites/hs2funds Or contact Groundwork by telephone 0121 237 5880 or by email at HS2funds@groundwork.org.uk The Funds have a combined value of 40 million. There are over 300 CEF and BLEF applications currently in progress from along the line of route.

Contact us HS2 helpdesk High Speed Two (HS2) Ltd Two Snowhill Snow Hill Queensway Birmingham B4 6GA HS2 Engagement Team Vernon Loo Vernon.Loo@hs2.org.uk Northamptonshire and South Warwickshire Email: HS2enquiries@hs2.org.uk Freephone: 08081 434 434 Minicom: 08081 456 472

Chris James Community Engagement Manager EiffageKier

HS2 Phase One Delivery

Eiffage Kier Joint Venture Experienced multi-national joint venture Eiffage have successfully delivered 180km Bretagne-Pays de la Loire high speed line in France 26 Mm 3 Earthworks 240 structures Rail systems track, signalling and OLE Kier brings major project experience from Hinkley Point, Crossrail, etc.

Main Works 80 km high speed line 17 Viaducts 75 Overbridges 22km of road diversions 5km green tunnels 24 million cubic metres of excavation

Additional Ground Investigatio n Further GI planned from May 2018 Provide further design input Reduces risk in time, disruption, cost and assurance

Heave Trial Monitor ground & inform the design 12 M deep cutting 200,00 Cubic Metres Excavation Starting in May, 6 months duration. Access from Stoneton Lane

Interface with Align Regular meetings Defined ownership of issues Identified phasing of the works Working together on Design development Traffic movements Engagement Undertakings & Assurances

15 Main Earthworks ID Task Name 2017 2018 2019 2020 2021 2022 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 2023 Q2 1 Information gathering 2 Option Selection 3 Develop Scheme Design 4 Develop Methodology 5 Initial Public Engagement 6 Pre-application Engagement 7 Gateway 5 Draft Final Submission 8 Gateway 6 Final Submission 9 Notice to Proceed 10 Prepare Submissions 11 Detailed Design 12 Stage 2 Commencement 13 Site Mobilisation 14 Highways and Structures

Principles of Mass Haul Identify areas for placement Use the right material in the right place Construct overbridges and viaducts to enable material movements within the trace Move material once and deposit material as close to the source as possible Utilise modern plant, methods and equipment

C2 Main Works in Chiltern District Wendover Dean Viaduct Leather Lane Overbridge South Heath Cutting and Overbridges

Chilterns AONB Design Principles Landscape character Overbridges Viaducts Noise Barriers

Wendover Dean Viaduct The relative simplicity of the backdrop of this viaduct suggests a matching simple and elegant structure.

Traffic Routes Determine traffic movements Measure against ES Discussions ongoing with Bucks CC Identify requirements and prepare Local TMP Route Plans and S.17 applications to be prepared from Main route from M40

Code of Construction Practice www.gov.uk/government/publications/environmental-minimum- Code of Construction Practice (CoCP) means the series of objectives and measures to be applied generally throughout the construction period to maintain satisfactory levels of environmental protection and limit disturbance from construction activities,

Engagement Residents Charter Ten Community Commitments Community Investment 52 Parish Councils 3 County Councils 6 District Councils

Charlotte Hewes Community Liaison Officer Fusion JV HS2 Enabling Works Contract Area Central C2a (Great Missenden to Fleet Marston)

What are enabling works? Ecology Surveys looking for protected species along the line of the route Construction of new habitat sites for wildlife Archaeology surveying and investigations Highways alterations to increase capacity and address safety concerns Fencing of land temporarily and permanently acquired for HS2 Ground investigations to improve the understanding of what is below ground Utilities works on services such as gas, electricity and water Construction of Great Missenden Haul Road (a temporary road for construction traffic)

Local Habitat Creation sites Park Hill AWE1a Thompson Habitats 4xponds dug lined and filled 3x hibernacula completed 2x basking banks completed Bury Farm AWE1b Forkers Delays to works due primarily to extended period of Local Authority determination and Fusion JV working with HS2 Ltd to agree archaeology works. As with Park Hill contractors will make all efforts for only off peak deliveries.

Great Missenden Haul Road and A413 Works Scheme design for works completed - now in detailed design phase Detailed Designs will go to CDC and BCC in June Trial Trenching to be carried out June/early July Fencing and Newt Fencing to start end June Further non-intrusive utility investigations to be carried out Works by UKPN to 11kv overhead power lines running across the haul road Works to start on construction of Haul Road and highway alteration to A413 / Link Road - August 2018

Archaeology Grim s Ditch project plan June 2018 - Setting survey with drone to record scheduled monument setting a few days with non intrusive site survey Summer 2018 - Trial trenches (1 or 2) in the woodland of the monument. Followed by further trenching (up to 70) on land around the ditch to assess monument and surrounding area Autumn 2018 - Tree clearance Late 2018 to Spring 2019 - Excavation of the ditch and possible further excavation of area around monument if needed

Looking Forward Questions & Answer Session