Vernon Loo Community Engagement Manager Area Central
Online HS2 has partnered with Commonplace to provide a locally focused website. This is currently being updated with content but you can still visit the site / sign up: https://hs2inbucksandoxfordshire.commonplace.is The HS2 corporate website - https://www.hs2.org.uk is in testing and we are keen for feedback. There is a link on the site to give comments. Alternatively you can email comments to online@hs2.org.uk
Community Funds Community and Environment Fund (CEF) & Business and Local Economy Fund (BLEF) The administration of these funds is managed on behalf of HS2 by the charity Groundwork. For more information visit: www.groundwork.org.uk/sites/hs2funds Or contact Groundwork by telephone 0121 237 5880 or by email at HS2funds@groundwork.org.uk The Funds have a combined value of 40 million. There are over 300 CEF and BLEF applications currently in progress from along the line of route.
Contact us HS2 helpdesk High Speed Two (HS2) Ltd Two Snowhill Snow Hill Queensway Birmingham B4 6GA HS2 Engagement Team Vernon Loo Vernon.Loo@hs2.org.uk Northamptonshire and South Warwickshire Email: HS2enquiries@hs2.org.uk Freephone: 08081 434 434 Minicom: 08081 456 472
Chris James Community Engagement Manager EiffageKier
HS2 Phase One Delivery
Eiffage Kier Joint Venture Experienced multi-national joint venture Eiffage have successfully delivered 180km Bretagne-Pays de la Loire high speed line in France 26 Mm 3 Earthworks 240 structures Rail systems track, signalling and OLE Kier brings major project experience from Hinkley Point, Crossrail, etc.
Main Works 80 km high speed line 17 Viaducts 75 Overbridges 22km of road diversions 5km green tunnels 24 million cubic metres of excavation
Additional Ground Investigatio n Further GI planned from May 2018 Provide further design input Reduces risk in time, disruption, cost and assurance
Heave Trial Monitor ground & inform the design 12 M deep cutting 200,00 Cubic Metres Excavation Starting in May, 6 months duration. Access from Stoneton Lane
Interface with Align Regular meetings Defined ownership of issues Identified phasing of the works Working together on Design development Traffic movements Engagement Undertakings & Assurances
15 Main Earthworks ID Task Name 2017 2018 2019 2020 2021 2022 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 2023 Q2 1 Information gathering 2 Option Selection 3 Develop Scheme Design 4 Develop Methodology 5 Initial Public Engagement 6 Pre-application Engagement 7 Gateway 5 Draft Final Submission 8 Gateway 6 Final Submission 9 Notice to Proceed 10 Prepare Submissions 11 Detailed Design 12 Stage 2 Commencement 13 Site Mobilisation 14 Highways and Structures
Principles of Mass Haul Identify areas for placement Use the right material in the right place Construct overbridges and viaducts to enable material movements within the trace Move material once and deposit material as close to the source as possible Utilise modern plant, methods and equipment
C2 Main Works in Chiltern District Wendover Dean Viaduct Leather Lane Overbridge South Heath Cutting and Overbridges
Chilterns AONB Design Principles Landscape character Overbridges Viaducts Noise Barriers
Wendover Dean Viaduct The relative simplicity of the backdrop of this viaduct suggests a matching simple and elegant structure.
Traffic Routes Determine traffic movements Measure against ES Discussions ongoing with Bucks CC Identify requirements and prepare Local TMP Route Plans and S.17 applications to be prepared from Main route from M40
Code of Construction Practice www.gov.uk/government/publications/environmental-minimum- Code of Construction Practice (CoCP) means the series of objectives and measures to be applied generally throughout the construction period to maintain satisfactory levels of environmental protection and limit disturbance from construction activities,
Engagement Residents Charter Ten Community Commitments Community Investment 52 Parish Councils 3 County Councils 6 District Councils
Charlotte Hewes Community Liaison Officer Fusion JV HS2 Enabling Works Contract Area Central C2a (Great Missenden to Fleet Marston)
What are enabling works? Ecology Surveys looking for protected species along the line of the route Construction of new habitat sites for wildlife Archaeology surveying and investigations Highways alterations to increase capacity and address safety concerns Fencing of land temporarily and permanently acquired for HS2 Ground investigations to improve the understanding of what is below ground Utilities works on services such as gas, electricity and water Construction of Great Missenden Haul Road (a temporary road for construction traffic)
Local Habitat Creation sites Park Hill AWE1a Thompson Habitats 4xponds dug lined and filled 3x hibernacula completed 2x basking banks completed Bury Farm AWE1b Forkers Delays to works due primarily to extended period of Local Authority determination and Fusion JV working with HS2 Ltd to agree archaeology works. As with Park Hill contractors will make all efforts for only off peak deliveries.
Great Missenden Haul Road and A413 Works Scheme design for works completed - now in detailed design phase Detailed Designs will go to CDC and BCC in June Trial Trenching to be carried out June/early July Fencing and Newt Fencing to start end June Further non-intrusive utility investigations to be carried out Works by UKPN to 11kv overhead power lines running across the haul road Works to start on construction of Haul Road and highway alteration to A413 / Link Road - August 2018
Archaeology Grim s Ditch project plan June 2018 - Setting survey with drone to record scheduled monument setting a few days with non intrusive site survey Summer 2018 - Trial trenches (1 or 2) in the woodland of the monument. Followed by further trenching (up to 70) on land around the ditch to assess monument and surrounding area Autumn 2018 - Tree clearance Late 2018 to Spring 2019 - Excavation of the ditch and possible further excavation of area around monument if needed
Looking Forward Questions & Answer Session