Alarm Switchgear AS1-M

Similar documents
Capacitive leakage detectors of the Leckmaster range for installation in normally dry rooms

EHW 3-KNI The units described in this documentation may only be installed, connected and started up by suitably qualified personnel!

Capacitive leakage detectors of the Leckmaster range for installation in normally dry rooms

Regulated Ex-Heater HEX with internal controller, HEX with external controller II 3 G II 3 D

Electronic Crimping Tools REF Operation Guide

TIH 300 S / TIH 400 S / TIH 500 S / TIH 700 S / TIH 900 S / TIH 1100 S

2CKA001473B System Manual Busch-Infoline. Handicapped toilet signal set 1510 UC

USER GUIDE. DRENA 2 - User Manual ELECTRICAL PANEL FOR 2 MOTORS - WASTE WATER -

Toplock Indoor. Originalbedienungsanleitung

Conductive Leakage detectors of the Leckstar range

Installation and Operating instructions for. C9900-U battery pack. Version: 2.0 Date:

User manual. Explosion-safe window air conditioning system Type series AR-054. II 3 G Ex ic nac h IIC T3 Gc

OPERATING MANUAL CDP 115 Peltier cooling unit for waterbaths

Kettle SWK 3000 EDS A1

3-way switching valve

Betriebsanleitung / Operation manual. Druckwächtereinheit QUINGUARD / Pressurization Controller QUINGUARD

INSTRUCTION MANUAL (ATEX)

GSME Tester GTL-2. Operating manual GTL EN10. GTE Industrieelektronik GmbH

Operating Manual MS220KA and MSR220KA

Inspection Light LED 6149/2. Operating instructions EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN EN

FastGene Plate Centrifuge. Instruction Manual. Catalog No. NG

AIRGOCLEAN 10 E OPERATING MANUAL AIR CLEANER TRT-BA-AIRGOCLEAN10E-TC-001-EN

Device Technology. Supply Operating voltage Implemented via the bus KNX: V DC XIB: 12 V DC (rated voltage) Voltage range: 10.

TTV 4500 / TTV 4500 HP / TTV 7000

EN - english. Instructions for installation and operation. Mobile humidity meter DP 207

TTK 70 S OPERATING MANUAL DEHUMIDIFIER TRT-BA-TTK70S-TC-001-EN

BHW INSTALLATION, OPERATION AND MAINTENANCE MANUAL MEDIUM STATIC PRESSURE DUCTABLE TYPE. Models:

Remote alarm unit Art. Nr.:

Kitchen Appliance Lift INSTRUCTION MANUAL

Operating Instructions!

TTK 75 ECO OPERATING MANUAL DEHUMIDIFIER TRT-BA-TTK75ECO-TC-002-EN

Electronic Temperature Controller 70304,

Electronic Smoke Detector m-rmf150

Waste water ejection unit

MANUAL Overflow sensor NVF-104/34-PF

62 MAX/62 MAX + Infrared Thermometer. Users Manual

Operating Manual. Please keep this manual. with the unit! Cooling Unit. For Heat Recovery Unit santos (F) 570 DC. Status:

OPERATING INSTRUCTIONS MAXIMAT LW CX COMPACT LEAKAGE SENSOR

BN30 OPERATING MANUAL SOCKET THERMOSTAT TRT-BA-BN30-TC-001-EN

Manual. Above-counter dispenser for hot drinks OTHG /12

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80

Operating manual 1 SAFETY REGULATIONS AND INFORMATION. Original operating manual INDEX. RG CPAP 24 V mit Powermodul 24V sensorless

TTK 75 E OPERATING MANUAL DEHUMIDIFIER TRT-BA-TTK75E-TC-002-EN

Automatic Waste Water Lifting Unit

Explosion Protection Enclosure with integrated measuring system

Flameproof Manual Call Points

Table of Content

62 MAX/62 MAX + Infrared Thermometer

SMART EVO 2 - User Manual ELECTRICAL PANEL FOR 2 MOTORS

Operating Manual MS220DA

Dry Block Heater Operating Manual

CU-02 with Senaco Plus

Manual Isolating Barrier D461R1 (Revision 01)

Gira nurse call system Installation, start-up, operation. Gira emergency set

4) Intrinsic Safety Certification

Operating manual 1 SAFETY REGULATIONS AND INFORMATION. Original operating manual INDEX 2218 F/2TDH4P

Automatic Waste Water Lifting Unit. Ama-Drainer-Box Mini. Type Series Booklet

Installation and operation manual DPC200 - DIFFERENTIAL PRESSURE CONTROLLER. Low pressure with PI-control-mode

Operating instructions Safety-monitoring module SRB 302X3. 1 About this document

Leakage detection sensor

Instruction Manual August sitrans CU 02

HYTEK ATEX APPROVED BUND ALARM

SWARCO TRAFFIC SYSTEMS GMBH. TDD1-MW Traffic Detector User Manual TDD1-MW_BE_00

Installation and user manual for the BiWire / Conventional Repeater Panel

Instructions For Use ENG. LED Magnifier Lamp

L+T GASETECHNIK. Klöpper-Waldmann GmbH & Co. K G. Alarm unit LSG4

MANUAL Oil Level Sensor

Cooling with compressed air partial flow: the Heat Regenerating Adsorption Dryer EVERDRY FRP

Tornado Operations & Maintenance Manual

GESTRA Steam Systems LRG English. Installation Instructions Conductivity Electrode

SAFETY AND OPERATING MANUAL. Original Instructions 5.0

BSK-RPR Fire Damper. Additional operating instructions according to

Sip Vacuum Cleaner 1400/35 Wet & Dry

L / -014L / -015L

Par 16 with GU10 Socket

Materials Handling and Intralogistics. Industrial Trucks. In accordance with the Directive Equipment for potentially explosive atmospheres (ATEX)

Operating manual GTL 369 GTL 369M GTL 389 GTL 389M. Temperature probe. Please keep the manual for future use.

Snifter ATEX22 VERSION. User Manual. Distributor

Additional deviations may possibly be found if a complete type test is carried out on the product.

TFV 900 OPERATING MANUAL RADIAL FAN TRT-BA-TFV900-TC-001-EN

INSTRUCTION MANUAL IS-mB1 Minialite Intrinsically Safe Round LED Beacon

F17W44_MFB_F_EN INSTALLATION INSTRUCTIONS

Manual Isolating Barrier D461 (Revision 05)

Technical Data. General specifications Switching element function Rated operating distance s n 4 mm

HSGM Heißschneide-Geräte

Electronic Crimping Tools

PERSONAL COOL MIST ULTRASONIC HUMIDIFIER

Temperature Sensor TRG Original Installation Instructions English

User Guide. Portable banknote counter AB300

Remote alarm indicator and test combination MK2430

VC-1, VC-1-SL, VC-2-L, VC-2-SL

Instruction Manual December 2001 ENACOCU02

Analox 1000 Series. User Manual. Analox Sensor Technology Ltd. 15 Ellerbeck Court, Stokesley Business Park North Yorkshire, TS9 5PT, UK

Electrical Preventive Maintenance (EPM) Program

CO2 Gas Warning System Assembly and Operating Instructions

Conductivity Electrode LRG Original Installation Instructions English

Operating instructions for the radio heat detector GS412

SCHMIDT LED Measured Value Display MD Instructions for Use

Operating Instructions Edition 11/2005. Process monitoring Ex-barrier for Diagnostics Unit SITRANS DA400 7MJ2010-1AA. sitrans

Translation of the assembly instructions with operating instructions and technical appendix

Transcription:

Installation, Operating and Maintenance Instructions 1/7 Installation, Operating, and Maintenance Manual for Alarm Switchgear AS1-M These installation, operating and maintenance manual must be handed to the fitter/installer/operator/service personnel of our products together with all other relevant documentation and user information! The manual must be carefully stored in a safe place along with all the other documents so that they can be consulted whenever needed. Jola Spezialschalter GmbH & Co. KG Klostergartenstr. 11 67466 Lambrecht (Germany) Tel. +49 6325 188-01 Fax +49 6325 6396 contact@jola-info.de www.jola-info.de

Installation, Operating and Maintenance Instructions 2/7 Contents 1. Technical Description and Field of Application Page 3 2. Conditions for Safe Application Page 5 3. Installation, Connection, Commissioning and Maintenance, Governing Rules and Regulations Page 5 4. Installing the AS1-M Alarm Switchgear Page 6 5. Connecting Alarm Contactor M 1 (K) Page 6 6. Commissioning Page 6 7. Maintenance Page 6 8. Repair Page 7 9. Disposal Page 7 Annex: Declaration of Conformity

Installation, Operating and Maintenance Instructions 3/7 1. Technical Description and Field of Application KSB Alarm Switchgear AS1-M The AS1-M alarm switchgear, used in conjunction with the M 1 (K) alarm contactor, can report impermissibly high water levels. The M 1 (K) alarm contactor has a connection cable with a jack plug for connecting to the AS1-M alarm switchgear. The AS1-M alarm switchgear is fitted with a SCHUKO plug that is inserted into a 230 V AC SCHUKO socket (type C+E). In the event of a power failure, the operative function is maintained for approximately 5 hours via a 9 V NiMH battery. The 9 V NiMH battery is supplied fully charged. During normal mains-powered operation a permanent trickle charge is provided (refer to Section 2 of these instructions: Excessive Discharging). A switch on the underside of the housing can be used to turn the AS1-M alarm switchgear on and off. Pressing the switch in turns the device off; releasing the switch turns the device on. When the AS1-M alarm switchgear is turned on, an alarm is emitted as soon as the liquid level raises the float switch of the M 1 (K) alarm contactor. The alarm stops as soon as the liquid level causes the float switch to travel downward again. The AS1-M alarm switchgear features a monitored jack socket so that when the device is turned on and the jack plug is pulled out, an alarm is also triggered. No alarm is triggered, however, in the event of a broken wire in the connection cable. Technical data Mains voltage AC 230 V ±10 %/50-60 Hz Power input Approx. 3 VA Rechargeable battery 9 V NiMH battery; provided with a permanent trickle charge during mains operation Service life of battery Approx. 7 years but only if excessive discharging is avoided No-load voltage DC 9 V Housing Upper section made from ABS; lower section made from PC/ABS with integrated SCHUKO plug, dimensions excluding plug: 120 x 65 x 40 mm Enclosure IP 20; for interior application only Temperature range 0 C to +40 C Altitude requirements Max. of 1,000 m above sea level Sound pressure level of buzzer Approx. 95 db at a distance of 0.1 m

Installation, Operating and Maintenance Instructions 4/7 M 1 (K) alarm contactor and AS1-M alarm switchgear All technical parameters of the AS1-M switchgear are specified in this brochure and must be observed and followed, without exception, at all times. Applications outside the envelope of the key technical data specified are prohibited. This brochure must have been read and understood by the qualified specialist personnel responsible prior to any installation, connection or commissioning work. If any pages of this brochure do not accompany the product or are missing, they must be requested and provided prior to engaging in installation, connection or commissioning work.

Installation, Operating and Maintenance Instructions 5/7 2. Conditions for Safe Application Nominal Power Supply Mains voltage: AC 230 V ±10 %/50-60 Hz All limits and restrictions defined for the voltage source must be upheld. Chemical and Mechanical Resistance Before the AS1-M alarm switchgear is deployed, it must be ensured that the materials comprising the switchgear resist the ambient conditions present in the room in which the device will be installed as well as sufficiently resist all other external influences from a chemical and mechanical compatibility perspective. In there is any doubt, an expert must be consulted before the device is deployed. The product must not be used until final clarification has been made. Exclusion of Damp and Moist Rooms The AS1-M alarm switchgear must not be installed in damp and moist rooms. Exclusion of Rooms That Can Become Flooded The AS1-M alarm switchgear must not be installed in rooms that can become flooded. Exclusion of the Effects of Moisture and Humidity on the AS1-M Alarm Switchgear The AS1-M alarm switchgear must not be used in areas in which the device could be subjected to moisture and humidity. Exclusion of Potentially Explosive Atmospheres The AS1-M alarm switchgear and the M 1 (K) alarm contactor must not be installed in potentially explosive atmospheres. Excessive Discharging Not using the AS1-M alarm switchgear for an extended period of time can cause the builtin rechargeable battery to become excessively discharged. This, in turn, greatly reduces the service life of the battery, so that the device, when subsequently used, may not emit an alarm in the event of a power failure. 3. Installation, Connection, Commissioning and Maintenance, Governing Rules and Regulations The AS1-M alarm switchgear and M 1 (K) alarm contactor must be installed, connected, commissioned and maintained in full compliance with all information and documentation provided, and the instructions contained therein must be observed and followed without exception. Installation, connection, commissioning and maintenance personnel must also familiarise themselves with all applicable standards, requirements, local regulations and special circumstances and act accordingly. The AS1-M alarm switchgear must be installed in compliance with VDE

Installation, Operating and Maintenance Instructions 6/7 standard 0100 and all associated ancillary and successor standards. 4. Installing the AS1-M Alarm Switchgear The AS1-M alarm switchgear is installed by connecting it to a C+E-type socket outlet. Attention must also be paid to ensure that the switchgear is seated properly. 5. Connecting the M 1 (K) Alarm Contactor The jack plug of the M 1 (K) alarm contactor must be inserted into the socket of the AS1-M alarm switchgear located on the underside of the housing. In the process, attention must be paid to ensure that the plug is inserted all the way into the socket (i.e. up to the stop) and is firmly connected there so that it does not become loose or disconnected later on. 6. Commissioning The installation position, mechanical attachment and electrical connection must be checked and verified a second time before commissioning is carried out. A further check must also be performed to ensure that dangerous or hazardous situations cannot arise as a result of not having followed one of the instructions, standards or legal provisions and requirements. If both of these checks are successful (i.e. no problems are detected), the device may then be commissioned. 7. Maintenance The AS1-M alarm switchgear and the M 1 (K) alarm contactor connected to it require no maintenance. The rechargeable battery of the AS1-M alarm switchgear must be replaced by qualified staff every 7 years at the latest, however. When the battery is replaced, caution must be exercised to avoid compromising the safe galvanic isolation that separates the mains voltage from the jack socket. A visual inspection and functional test of the alarm switchgear and alarm contactor must be carried out every three months (or sooner). In cases in which this is not sufficient, a monitoring schedule adapted in line with the application scenario must be observed.

Installation, Operating and Maintenance Instructions 7/7 If the alarm switchgear is used as a safety link in a system, the installation may need to be inspected and checked at designated intervals approved by the local supervisory authority. Qualified specialist personnel must familiarise themselves with all applicable standards, requirements, local regulations and special circumstances and proceed accordingly prior to performing maintenance work. 8. Repair Any opening of the alarm switchgear and alarm contactor, and all repairs made to them, must be carried out by specialist personnel appointed by the manufacturer. Individuals other than those appointed by the manufacturer must never attempt to open or perform repair work on the device. 9. Disposal The alarm switchgear and alarm contactor must be disposed of by depositing them at an appropriate collection point for electrical and electronics devices.

EC Declaration of Conformity Jola Spezialschalter GmbH & Co. KG Klostergartenstr. 11 67466 Lambrecht declares that the following product, which is new and designed for use in dry rooms: Alarm Switchgear AS1-M complies with: the Directives 2006/95/EC (low voltage) and 2004/108/EC (EMC) and the standard DIN EN 60730-1 (VDE 0631-1) : 2012-10. 2015/10/04 Volker Mattil