J. S. Baker J. A. Smith

Similar documents
A FIRST RESPONDERS GUIDE TO PURCHASING RADIATION PAGERS

W. T. Roybal J. T. Bradley III D. E. Rees P. Torrez D. K. Warner J. Debaca. LINAC 2000 Monterey, CA August ,2000

THERMAL VACUUM TESTS OF A FIVE WATT PSEUDO CHIP SEM-X ELECTRONIC MODULE CLAMPED IN A SATELLITE BOX

A Cost Effective Multi-Spectral Scanner for Natural Gas Detection

Report on the Suitability of Class 6, U.S. Government Security Repositories for the Storage of Small Quantities of High Explosives

FINAL ABSTRACT. CRADA TITLE. Miniature Transducers for Flight Test Unit Instrumentation - Magnetic Field Detector CRADA NUMBER: LA98C10367.

NATURAL CONVECTION HEAT EXCHANGERS FOR SOLAR WATER HEATING SYSTEMS. Technical Progress Report April 1,1995 to May 31,1995

Energy and Angular Responses of the Criticality Accident Alarm System Using Current-mode-operated Scintillation Detector

p?:uam SYSTEMS Technical Progress Report Jane H. Davidson NAllJRAL CONVECTION HEAT EXCHANGERS FOR SOLAR WATER HEATING February 1,1996 to March 31,1996

Los Alamos NATIONAL LABORATORY. A Review of Acceptance Testing of t h e. Continuous Air Monitor (CAM)

EVALUATION OF A NEUTRON-PHOTON SHIELD FOR TRANSURANIC (TRU) WASTE CONTAINERS

50(394) IEC. ore content meter ore sorting equipment overvoltage (of a Geiger-Müller county tube)...

Portable Survey Instruments NISP-RP-01

Experimental Assessment of the Thermal Performance of Storage Canisterm01d ing Fix ture Conj?gurations

Title Page. Report Title: Downhole Power Generation and Wireless Communications. for Intelligent Completions Applications

Electronic Refrigerant Leak Detector DE-FG36-98G Micronic, Inc. Elie Talamas, Jr. Period: 10/1/99 to 12/31/99

Why Thermostats Matter

NUCLEAR INDUSTRY STANDARD PROCESS Radiological Protection. Level 3 Information Use

/,6 REMOTE MONITORING DESIGN CONCEPTS FOR SPENT FUEL STORAGE FACILITIES

2.13 RADIOLOGICAL INCIDENTS and EMERGENCIES RCT STUDY GUIDE Identify in general how an RCT should respond to an emergency.

This document was prepared in conjunction with work accomplished under Contract No. DE-AC09-96SR18500 with the U. S. Department of Energy.

PORTABLE ISOTOPE IDENTIFIER Search Tool / Sample Counting System

Summary. Assessment Methodology

Radiation Control and Monitoring System on the HTTR

Food Service Technology Center

Lawrence Berkeley National Laboratory Lawrence Berkeley National Laboratory

Replacement of the Criticality Accident Alarm System in the Tokai Reprocessing Plant

Identify the following features and specifications for the ESP1

New Construction Builders Challenge: Sealed Attic and High Efficiency HVAC in Central Florida: A Year in Review

Southern California Gas Company Customer Programs Department

Maximize safety and productivity. Thermo Scientific Nuclear Power Radiation Detection and Monitoring Solutions

Fundamentals is subdivided into Sources of Radiation, Biological Effects, Mathematics, Chemistry, Physics, and Units and Terminology.

BOP Ram Sensing and Interface Concept Rationale Intelligent BOP RAM Actuation Sensor System

TABLE OF CONTENTS. Section Title Page 1.0 SUMMARY TEST SPECIMEN Materials and Construction TEST PROGRAM 4

Maximizing safety and productivity. Nuclear Power Radiation Detection and Monitoring Solutions

Advanced Radiation Measurement Solutions

COMPATIBILITY OF REFRIGERANTS AND LUBRICANTS WITH MOTOR MATERIALS UNDER RETROFIT CONDITIONS. Final Report

HEAT REMOVAL TESTS FOR THE HIGH PERFORMANCE VAULT STORAGE SYSTEM OF SPENT NUCLEAR FUEL

Investigation report. Radiation resistance of fire detectors under the influence of radioactive gamma radiation

Portable Instruments For First Response & In-Situ Analysis of Radiation

STER 1981 ANNUAL INDUSTRIAL SUMMARY OF FIRE AND PROPERTY DAMAGE EXPERIENCE. Monsanto. MOUND FACILITY Miemisburg. Ohio MLM.ML

Post Accident Monitoring in PFBR Safety in Nuclear Power Plant

Co-60 irradiator for therapy level calibrations at SSDLs

REGISTRY OF RADIOACTIVE SEALED SOURCES AND DEVICES SAFETY EVALUATION OF DEVICE (Amends In Its Entirety)

Food Service Technology Center

INTERNATIONAL STANDARD

QUALITY ASSURANCE AND SAFETY AT A TID RADIATION TEST LABORATORY

Environmental Radiation Monitoring System

LUDLUM MODEL 44-2 GAMMA SCINTILLATOR. February 2018 Serial Number PR and Succeeding Serial Numbers

National Atomic Energy Commission ( NATEC ) Radiation Exposure and Laboratories General Directorate

American Nuclear Society (ANS)

Condensate Induced Water Hammer in a Steam Distribution System Results in Fatality

Quality Assurance of Radiation Protection Monitoring Instruments in India

Evaluation of the Incon TS-LLD Line Leak Detection System

Ultraviolet radiation detector to obtain the rate of particles at different heights

Plant Performance 2017 User Symposium

COUNTING ROOM EQUIPMENT RCT STUDY GUIDE

Evaluation of the Red Jacket Fx1, Fx2, Fx1V and Fx2V Line Leak Detectors For Hourly Monitoring on Rigid Pipelines. Final Report

Radiation Safety and Equipment Considerations. Bonnie Meilner Regional Sales Manager LAURUS Systems Inc.

Dual-Diode Dosimeter Patient Dose Monitor

AP1000 European 11. Radioactive Waste Management Design Control Document

HI-3510 RF Radiation Badge Broadband Electromagnetic Radiation Detector User s Manual

Fiber Optic Cable Qualification Update

AVIATION TECHNOLOGY SERVICES: PIPELINE LEAK DETECTION

Lifting of evacuation orders and subsequent efforts in Japan

Heavy Ion Beam Characteristics of ICCHIBAN 7 and 8 Experiments and Brief Summary of the ICCHIBAN Experiments

Radiation Monitoring Systems

PlateScrape Plate Pre-Scrapper Test Report

DEVELOPMENT OF LARGE AREA PLASTIC SCINTILLATION DETECTOR FOR RADIOACTIVE CONTAMINATION MONITOR

Ionisation Chambers Containing Boron as Neutron Detectors in Mixed Radiation Fields

Unattended Radiation Sensor Systems for Remote Terrestrial Applications and Nuclear Nonproliferation

Grain and Soybean Drying on Georgia Farms

INTERNATIONAL STANDARD

Complete Stress Analysis of Sucker- Rod Pumping Installations

Today s Outline - September 12, C. Segre (IIT) PHYS Fall 2016 September 12, / 21

HEALTH AND SAFETY MANUAL

HIGHLY SENSITIVE FOR NUCLEAR POWER PLANTS Real-Time Continuous Water Monitor

Users Manual. LAURUS Systems, Inc. - Ph: Fax:

SIGMADEK, LTD. FIRE TEST REPORT

Digital Reactivity Meter NFA-09.03

TG-10 Wall Mount Installation and Operation Manual. High Output Ozone Generator

Title: Standard Operating Procedure for Measurement of Total Hydrocarbon Using a Flame Ionization Detection

THE NEXT GENERATION IN VISIBILITY SENSORS OUTPERFORM BOTH TRADITIONAL TRANSMISSOMETERS AND FORWARD SCATTER SENSORS

Depleted Uranium Waste Assay at AWE. T.J. Miller AWE, Aldermaston, Reading, Berkshire, England, RG7 4PR UK

Competency: Critically evaluate the function of the ionisation chamber in the Linear Accelerator and its importance for correct treatment delivery

2.18 Air Sampling Equipment RCT Study Guide Identify the factors that affect the operator's selection of an air sampling system.

Department of State Health Services

Re: Energy Conservation Standards for Residential Boilers; Proposed Rule Docket Number EERE-2012-BT-STD-0047

Safeguards in Prototype Fast Breeder Reactor Monju

Use of MCNPX for Alpha Spectrometry Simulations of a Continuous Air Monitor

Model 5190-F Temperature/Humidity Probe

Dynamic Radon Detection Over Measurement

Detection of Inherent and Laser-Induced Scatter in Optical Materials

HYDROGEN DETECTION INSTRUMENTATION FOR THE SIAC HYDROGEN RECOMBINERS. Summary

Monitoring Flammable Vapors and Gases in Industrial Processes

Energy Consumption Data Analysis Phase II Final Report

Detecting Radiation. Protection through Detection. February Animations in this training work best in Windows XP

MODEL 23 AND 23-1 ELECTRONIC PERSONAL DOSIMETER. August 2017

CONTAMINATION MONITORING INSTRUMENTATION RCT STUDY GUIDE LEARNING OBJECTIVES:

DECOMMISSIONING OF THE REACTOR VESSEL OF THE COMPACT SODIUM COOLED NUCLEAR REACTOR FACILITY (KNK)

Transcription:

% 2 ESTMATNG RADUS OF COVERAGE OF THE Y-12 PLANT CRTCALTY ACCDENT ALARR.. SYSTEM FRQM EXPEQMENTS AT %HELOS ALAMOS CRTCAL EXPERMENTS FACLTY J. S. Baker J. A. Smith Nuclear Criticality Safety Department Oak Ridge Y-12 Plant June 15, 1995 Paper for submission to: 'The Fifth nternational Conference on Nuclear Criticality Safety Albuquerque, New Mexico September 17-22, 1995 Prepared by the Oak Ridge Y-12 Plant Oak Ridge, Tennessee 37831 managed by Lockheed Martin Energy Systems, Hnc. for the U.S. DEPARTMENT OF ENERGY under contract DE-AC05-840R2 1400

DSCLAMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

ESTMATNG RADUS OF COVERAGE OF THE Y-12 PLANT CRTCALTY ACCDENT ALARM SYSTEM FROM EXPERMENTS AT THE LOS ALAMOS CRTCAL EXPERMENTS FACLTY J. S. Baker, J. A. Smith Lockheed Martin Energy Systems P.O. Box 2009 Oak Ridge, TN 37831-8238 NTRODUCTON An operation at the Oak Ridge Y-12 Plant is considered to be covered by the Criticality Accident Alarm System (CAAS) if the operation is located within the radius of coverage of two detector stations. Experiments were performed at the Los Alamos Critical Experiments Facility (LACEF) to evaluate the radius of coverage for the detectors used in the Y-12 CAAS. deally, the detectors would be tested using a source term that is comparable to the minimum accident of concern as described in ANS/ANS-8.3[1]. The minimum accident of concern that is suggested by ANSUANS-8.3 is an excursion that results in a dose of 20 rad at 2 meters from the reacting material within 60 seconds. The most limiting situation is when the 20 rad is delivered at a constant dose rate for 60 seconds. This steady state excursion produces the smallest radius of coverage. The peak dose rate that resulted from each excursion in this study was estimated so that the reactor source term could be compared to the minimum accident of concern. The reactor source term, distance from reactor, intervening shielding and status of detector alarms were used to evaluate the radius of coverage for the Y-12 CAAS detectors for a given alarm set point. EQUPMENT AND MATERALS The detectors were exposed to radiation fields provided by SHEBA, a cylindrical critical assembly operating at the LACEF. SHEBA is fueled with a uranyl fluoride solution that has been enriched to 5% 23sU. SHEBA has a well-moderated neutron spectrum. Reactivity is typically controlled by varying the solution level. SHEBA has three pumping speeds, three drain speeds and a poison safety rod. For these experiments, SHEBA was operated above ground and with the steel doors open to provide direct line of sight measurements. The detectors used in the Y-12 Plant CAAS are NMC Model GA-6 detectors. These detectors indicate exposure rates and are set to alarm when the exposure rate exceeds a predetermined set point. The detectors are comprised of plastic scintillators, photomultiplier tubes, amplifiers, meters, relays and alarms. The detectors have a five-decade range from 0.1 to 10,000 mwhr and were set to alarm at 25 mr/hr. When the exposure rate exceeded the alarm set point, the high radiation warning lights were illuminated. The warning lights were set to latch so that the lights remained lit after the radiation levels fell below the alarm set point. The radius of coverage for the CAAS detectors is dependent on the type and amount of intervening shielding. Concrete and hollow clay tile block were used as the shielding materials because they are primary constituents of the buildings at the Y-12 Plant. The detectors were surrounded by up to three layers of hollow clay tile block or two layers of concrete block. The

clay tile blocks measure approximately 11lh" x 11lh" x 7%". The thickness of the shell is approximately % " and the thickness of the webs is approximately 5/8", forming six openings that measure approximately 11%" x 2%" x 2%". Each day tile block wall was 7%" thick. The primary constituent of the clay is SiO,. Other constituents are H,O and oxides of Al, Ca, Cd, Fe, K, Mg, Na, and Ti. The clay has an average density of 2.35 g/cm3. Because almost 60% of the volume of the block is void, the block has an average density of 0.99 g/cm3. The concrete blocks are solid, measure approximately 15%" x 7%" x 5%'' and have densities of approximately 2.3 g/cm3. Because the shielding walls were temporary, they were constructed without mortar. ndividual blocks and adjacent layers were carefully placed to minimize openings. MEASUREMENTS AND DOSMETRY Thermoluminescent dosimeters (TLDs) from the Y-12 Plant and Los Alamos National Laboratory (LANL) were used to estimate neutron and gamma doses from various SHEBA excursions. These dose values were used to relate the experimental results to the criteria in ANSUANS-8.3. The TLDs were placed on phantoms that were positioned at approximately midheight of the fuel and 3 m from the edge of the SHEBA assembly. The TLDs from Y-12 Plant were placed on phantoms comprised of 20 cm by 20 cm by 10 cm blocks of Lucite while the TLDs from LANL were placed on large plastic jugs filled with water. During some experiments, TLDs were also placed on the side of the SHEBA building at two meters from the vessel surface. Two configurations of Y-12 Plant TLDs were used to estimate neutron and gamma doses individually. The neutron TLDs were paired with beta/gamma TLDs for evaluation of each excursion. The TLDs were processed in accordance with an approved fixed nuclear accident dosimetry processing procedure. Neutron doses were evaluated using the calculated spectral correction factor for SHEBA. A single configuration of LANL TLDs was used to estimate both gamma doses and neutron doses from the various SHEBA excursions. Neutron doses were calculated by applying an appropriate facility-specific neutron correction factor. Neutron doses were also measured with a tissue equivalent proportional counter (TEPC). The TEPC is a gas proportional counter that responds to neutrons. SHEBA uses a compensated ion chamber (CC) for the linear channel for fission power. SHEBA was set to trip at a certain ion chamber current (e.g., 1E-5 amp). The CC provided a measurement of the current in amps and integrated current in amp-seconds for each excursion. During each experiment, data was acquired from the signal used to drive the meter display for one detector. Because this signal was inherently noisy, it was averaged over one second intervals to smooth the data, while still providing good resolution of the transient. The data was recorded on a portable PC located next to the detector. SETUP AND OPERATXON The SHEBA building is located on the floor of a canyon about 1200 feet from the building that houses the LACEF control rooms. The canyon floor is essentially flat. Detectors were placed at distances ranging from 400 feet to 1000 feet. ntervening shielding included two concrete walls, two clay tile walls, three clay tile walls, or air only. An attempt was made to build four

clay tile walls around the detectors but due to the limited number of clay tiles available only the top and wall facing SHEBA contained four clay tile walls; the remaining sides were made up of three clay tile walls. Three detectors were placed in the same location for the first three tests. Not only was the number of clay tile blocks limited, but time was also a constraint. Therefore, to avoid delays for reconstructing the walls, two inner walls were banded together on a large pallet that could be moved. This configuration could have only two detectors in the opening. Uranyl fluoride solution was pumped into the cylindrical tank. As the assembly approached delayed critical, the speed at which solution was pumped into the tank was slowed. As SHEBA was brought to delayed critical, solution was added such that a positive period of no less than 20 seconds was achieved. After the assembly became critical, the excursion was terminated manually by an operator or automatically because an area monitor reached its preset limit. RESULTS The doses that were measured with TLDs and TEPC are presented in Table. Table. Dose Estimi.es made from TLDs and TEPC placed 3 m from SHEBA LANL TLD gamma dose LANL TLD neutron dose LANL TEPC neutron dose gamma dose Y-12 TLD neutron dose 94NOV7A 10.9 10.2 11.4 7.6 118 94NOV8A 1.2 1.2 1.2 0.8 94NOV8B 2.0 2.0 2.0 94NOV9A 4.1 4.8 4.1 94NOV9B 3.6 3.8 3.3 94NOV10A 2.9 3.O 3.1 3.9 3.5 3.6 Experiment 94NOV10B Y-12 TLD The neutron doses that were measured using the Y-12 TLDs were much larger than expected. The neutron doses that were measured with the TEPC were very close to the neutron doses that were expected and measured using the LANL TLDs. Therefore, the neutron doses and gamma doses that were measured using the LANL TLDs were used for estimating the peak dose rate for each excursion. The peak dose rate that resulted from each excursion in this study had to be estimated SO that the reactor source term could be compared to the minimum accident of concern. t was assumed that the current measured by the CC was proportional to the dose rate and the integrated current measured by the CC was proportional to the dose; therefore, the ratio of the peak current to the integrated current equaled the ratio of the peak dose rate to the total dose for a given experiment. The SHEBA operators provided the integrated current and peak current for each excursion. The dose was estimated using TLDs. The TLDs were collected as soon as health physics

considerations would allow. Some of the dose measured by the TLDs was received after SHEBA tripped. The gamma doses were lowered by 20 per cent to subtract out the effects of the residual radiation following the reactor trip. Based on TLD measurements made at 2 meters and 3 meters, the gamma doses that were measured at 3 meters were doubled to estimate the doses at 2 meters. The neutron doses that were measured at 3 meters were doubled to estimate the doses at 2 meters. Based on past measurements made with bubble dosimeters, it appears as this will overestimate the dose to the detectors, giving a larger estimate of the peak dose rate than the detectors were actually exposed to. The gamma and neutron doses were then combined to give the total dose estimates at 2 meters from the assembly for each excursion. The total dose estimates were multiplied by the peak current and divided by the integrated current to calculate the peak dose rate. A summary of each test setup and selected results is provided in Table 11. Table X. Calculated and Measured Data from Detector Tests Experiment Peak Detector Signal ntegrated Current Peak Current Dose' at 2 m at 2 m (radlmin) Peak Dose Rate' Distance (feet) Shielding Alarms' 94NOV7A 111 1.5E-3 2.5E-5 38 38 800 none 3 94NOV8A 108 1.5E-4 6.8E-6 4.3 12 400 2 clay tile 3 94NOV8B 111 2.6E-4 2.6E-5 7.2 43 400 3 clay tile 3 94NOV9A 116 5.4E-4 17 42 400 3+ clay tile 2/2 94NOV9B 107 4.3E-4 40 600 3 clay tile 112 94NOV10A 91 4.1E-4 2.3E-5 11 37 800 2 clay tile 012 94NOV10B 103 4.7E-4 37 600 2 concrete 011 94NOV10B 103 4.7E-4 37 900 none 01 1 94NOVlOB 103 4.1E-4 37 none 011 ' combined gamma and neutron, adjusted to remove effects of residual radiation * detectors that alarmed detectors available to alarm The calculated total dose at 2 meters shows that these experiments did provide a source term similar to that suggested by the ANSUANS-8.3 Standard. For the Y-12 Plant detectors, a dose rate criterion is more appropriate. t would be reasonable to propose a peak dose rate criterion of 40 rad per minute. That is equivalent to 20 rad per minute with a peak-to-average exposure rate of two. This peak-to-average value is conservatively low with respect to the known criticality accidents and the typical SHEBA transients. Fine control of such a system is necessary to achieve steady state conditions. Table 11 provides the data from bench tests that were done to determine the relationship between the signal current (scaled to arbitrary units) and the indicated dose rate on the detector meter.

Table m. Detector Signal versus ndicated Dose Rate Dose Rate (mfuhr) 1 Detector Signal 1 25 50 114 300 157 2000 198 After each transient, the detector signal data was downloaded from the portable PC to another computer or disk for permanent storage. t was initially hoped that the detector signal would be useful for scaling the results to various combinations of distance, shielding and alarm set point. Unfortunately, the test results showed that the peak detector signal was not a precise indicator of whether the alarm signal would occur. There was insufficient data to quantify this uncertainty. Also, the logarithmic relationship yields a large change in dose rate for a small change in detector signal. CONCLUSONS A peak dose rate of 40 rad per minute is a reasonable choice based on the physical phenomena. For a minimum accident of concern that is defined as resulting in 20 rad at 2 meters within 60 seconds and allowing for a peak dose rate of 40 rad per minute, the radius of coverage for an alarm set point of 25 mr/h is as follows: - 400 feet with 2 concrete block walls, or - 600 feet with 3 clay tile walls, or - 800 feet with no shielding. The detector signal data was helpful in that it showed approximately how close the detector came to its set point. However, the large uncertainty in the data does not allow it to be readily used for interpolating combinations of distance and shielding for a given set point and source term. RECOMMENDATONS t is recommended that additional work be done to improve the dose estimates from the TLDs exposed during these experiments. Additional experiments with other combinations of distance and shielding would help in applying these results to specific facility applications. REFERENCES 1. CriticalityAccident Alarm System, ANSUANS-8.3-1986, American Nuclear Society, 1986.

Portions of this document be illegiile in electronic image products mages are produced fmm the best available original d 0 ~ 5 t