Public Meeting #3 May 9, 2009 MVVA Team

Similar documents
Purpose of Open House #3

WELCOME TO OPEN HOUSE TWO November 28, 2018

Mavis Road Class Environmental Assessment

Public Works and Infrastructure Committee

Victoria Bridge Municipal Class EA Civic Works Committee

1. Introduction

Commissioners Road West Realignment Environmental Assessment

Transportation Master Plan Environmental Assessment

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

Director, Community Planning, Toronto and East York District

St. Clair Avenue West Area Transportation Master Plan

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

Bridge Type Assessment and Evaluation

Toronto Waterfront Revitalization

The purpose of tonight s PIC is to:

Ashbridges Bay Erosion and Sediment Control Project

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1

WELCOME TO OPEN HOUSE # 3

Portage Parkway Environmental Assessment Public Information Centre No. 1

Richard Butts, Deputy City Manager

Gardiner Expressway & Lake Shore Boulevard East Reconfiguration Environmental Assessment & Integrated Urban Design Study

Public Works and Infrastructure Committee

City of Toronto. Emery Village Transportation Master Plan

PORT WHITBY COMMUNITY

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3

The West Vaughan Employment Area Secondary Plan Policies

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

2. Purpose of the Undertaking

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

3 Development Process 3.1 Stage One page Stage Two page Stage Three page CENTRAL PICKERING DEVELOPMENT PLAN

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Recreational Pathway Crossing of Richmond Street Municipal Class Environmental Assessment. Public Information Centre #2 April 22, 2015

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session

Public Information Centre. Welcome

APPENDIX K WINDSOR OFFICIAL PLAN

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

Table 8-4: Road Classification Local Roads, second table, of Chapter 8 Create a Multi-Modal City, be amended by adding the following:

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

RAILWAY LANDS EAST SECONDARY PLAN

AGINCOURT SECONDARY PLAN

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Redevelopment of Ajax Plaza Area Public Open House Meeting February 19, 2015 Questions and Answers

Public Information Centre No. 1 King-Vaughan Road Bridge Replacement Municipal Class Environmental Assessment City of Vaughan

Master Environmental Servicing Plan & Secondary Plan

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

Executive Summary. NY 7 / NY 2 Corridor

PORT LANDS ACCELERATION INITATIVE- PHASE 2 PORT LANDS PLANNING FRAMEWORK

Municipal Heritage Bridges Cultural, Heritage and Archaeological Resources Assessment Checklist Revised April 11, 2014

Public Consultation Summary: Lakeview Place Making Workshop January 30, 2008.

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

350, 370, and 390 Queens Quay West Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

Case Study Presentation of the Downtown Brampton Flood Protection Class EA

Port Lands Planning Initiatives - Final Report

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

Canadian Consulting Engineering Awards 2016 Queens Quay West Revitalization. Category B: Transportation

RAILWAY LANDS CENTRAL SECONDARY PLAN

McKay Road Interchange and Salem / Lockhart Crossing

1.0 INTRODUCTION & BACKGROUND

STRATEGIES AND GUIDELINES

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #1 SEPTEMBER 28, 2016

Toronto Complete Streets Guidelines

SDOT DPD. SDOT Director s Rule DPD Director s Rule DCLU DR SED DR of 7 CITY OF SEATTLE

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

Commissioners Road West Realignment Environmental Assessment

PRELIMINARY DESIGN + DEVELOPMENT PLAN

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON AUGUST 13, 2018

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

New-Cast Mixed-use Development Proposal King Street West, Newcastle, Ontario

City of London Adelaide Street North - Canadian Pacific Railway Grade Separation Class Environmental Assessment Study Report

TORONTO COMPLETE STREETS GUIDELINES

Complete Neighbourhood Guidelines Review Tool

Western Road/Wharncliffe Road North Widening from Platts Lane to Oxford Street. Municipal Class Environmental Assessment Public Information Centre #1

WELCOME TO PUBLIC INFORMATION CENTRE #2. Please Sign In

Introduction. Public Information Package. Project website. Overview. Class Environmental Assessment Process

Somers Point Master Plan

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

The Master Plan Framework

Official Plan Review

Toronto Complete Streets Guidelines

Summary of Changes for the Comprehensive Draft Proposed Official Plan Amendment

Mississippi Skyway Preliminary Engineering Report

DISCUSSION PAPER INFRASTRUCTURE

Master Plan Class Environmental Assessment for Downtown Mississauga Road Improvements

Stakeholders Advisory Working Groups (SAWGs) Smart Growth and TOD Land Use (#11) SAWG Meeting

There is Complexity in Beauty; Engineering Toronto s New Waterfront Boulevard Marc-Paul Gauthier, Senior Technologist, Arup Paper prepared for

GARDINER EXPRESSWAY AND LAKE SHORE BOULEVARD EAST RECONFIGURATION ENVIRONMENTAL ASSESSMENT Planning, Urban Design, Public Realm and Socio- Economic

ROME WATERFRONT VILLAGE PROJECT NARRATIVE January 25, 2018

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK

Heritage Road Improvements from Steeles Avenue to Rivermont Road

This Review Is Divided Into Two Phases:

Plano Tomorrow Vision and Policies

Services Department F May 28, 2007

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Relief Line Project Assessment

Transcription:

Public Meeting #3 May 9, 2009 MVVA Team Welcome to the third Public Meeting for the Lower Don Lands Municipal Class Environmental Assessment (EA) Infrastructure Master Plan and Keating Channel Precinct Plan

Purpose of Open House #3 The main purpose of this Open House is to present and seek input on the: Evaluation of transportation and infrastructure design alternatives in the Keating Channel Precinct; and The preferred plans for roads, transit, bridges, water, wastewater and stormwater facilities in Keating Channel Precinct. Infrastructure proposed in this Class EA for flood vulnerable lands is based on the Preferred Alternative of the Don Mouth Naturalization Project (DMNP) EA and is dependent upon its approval.

Class EA Study Area and Process Waterfront Toronto, the City of Toronto and the TTC are co-proponents for the Class EA Master Plan for Infrastructure.

Circulation: Crossings and Underpasses

Keating Channel Precinct Bridge Design Alternatives and Preferred Plan Keating Crossings The bridge design alternatives at Keating Channel were dealt with as one group. Design alternatives for the bridges at Keating Channel are Movable versus Fixed bridges. Movable bridges could include lift or swing bridges. Fixed bridges could include standard slab-on-girder bridges or arch bridges. The main advantage of movable bridges is that they maximize navigational clearances. The disadvantages are that they create delay in traffic flow through the precinct and can delay emergency access to the area. Movable bridges are also considerably more costly to construct, operate and maintain than fixed bridges. Navigability in the Keating Channel is impacted most significantly by the construction of a weir at the east end of the Keating Channel. Therefore, maximizing vertical clearances by providing movable bridges across Keating Channel does not really improve navigability in the area as it is ultimately restricted at the east end of the channel. Furthermore, the Keating Channel Precinct and adjacent land uses are being designed to include public access to the waters edge and pedestrian and cyclist friendly activities. Future land uses do not require ship (or large vessel) access to the area. Fixed bridges are preferred because they reduce travel delay through the Precinct, are more compatible with providing efficient transit service through the area, are pedestrian and bicycle friendly, and are at a scale that is appropriate for future land uses adjacent to the channel. Although navigational clearances will be reduced, the proposed fixed bridges will continue to provide access for recreational vessels, tour boats and water taxis in the Keating Channel. *Details of evaluation are provided in hand out materials

Keating Channel Precinct Bridge Design Alternatives and Preferred Plan Keating Crossings Standard versus Arch Bridges Arch bridges are preferred, because they are more aesthetically pleasing, and have reduced deck thickness, allowing for increased boat clearance and flood conveyance in the channel as well as pedestrian circulation underneath the bridges. The Preferred Design for the bridges over Keating Channel are arch type bridges that accommodate pedestrian and cyclist traffic at widths that are compatible with adjacent road, transit and trail networks.

Keating Channel Precinct Bridge Design Alternatives and Preferred Plan Lake Shore Boulevard The existing bridges on Lake Shore Boulevard and the Harbour Lead rail line at the Don River are in good condition. However hydraulic improvements are needed to provide improved flood protection and the roadway bridge needs geometric adjustments to accommodate the future profile and cross-section of the new Lake Shore Boulevard. The design alternatives for the bridges include either modifying and extending the existing bridges or reconstructing them. Because the bridges are in relatively good condition, and because its location (in plan and profile) is constrained by other structures in the immediate area (i.e., the Gardiner Expressway piers), the preferred plan is to modify and extend the existing bridges. Design Alternatives for Lake Shore Boulevard Bridge and Harbour Lead Rail Bridge at Don River Alternative 1 Modify and extend existing bridges. PREFERRED* Alternative 2 Reconstruct and extend existing bridges. NOT PREFERRED* The preferred design includes: Adding three new cells for improved hydraulic capacity, on the west end of the existing bridges; Making profile improvements to maximize hydraulic clearance and tie into the new Lake Shore Boulevard; Modifying the existing bridge deck cross-section to accommodate a bicycle path on the north side and a pedestrian sidewalk on the south side of the roadway; Removing several sections of the existing shorewall on the north side of the Keating Channel and the west side of the Don River; and Constructing steel sheet pile enclosures around the existing Gardiner Expressway pier bents. *Details of evaluation are provided in hand out materials

Keating Channel Precinct Bridge Design Alternatives and Preferred Plan Cherry St. at Rail Berm The widening of Cherry Street and the addition of LRT services provide an important connection to neighbourhoods north of the Keating Channel Precinct, including West Don Lands and the Distillery District, and are critical to the redevelopment of the area. The existing bridge on Cherry Street at the railway berm is 80 years old and requires widening to accommodate a left-turn lane for southbound traffic, bicycle lanes, sidewalks and LRT. Design Alternatives for Cherry Street Bridge at Rail Berm Alternative 1 Replace existing bridge with a new structure accommodating both a widened road cross-section and new LRT span. PREFERRED* Alternative 2 Keep the existing bridge and build a second underpass for the LRT (east of the existing bridge). NOT PREFERRED* Alternative 3 Replace existing bridge with a new structure accommodating a widened road crosssection and add a second underpass for the LRT. NOT PREFERRED* Alternative 1 is the preferred alternative because it addresses the deficiencies of the existing bridge. Keeping Cherry Street and the LRT together through the rail berm facilitates improved connections and provides preferred alignment geometrics at the intersection of Cherry Street and Lake Shore Boulevard south of the rail berm while minimizing impacts in West Don Lands, to the north.

Keating Channel Precinct Bridge Design Alternatives and Preferred Plan Trinity Street Trinity Street currently ends north of the rail berm, at Mill Street in the Distillery District. The proposed plan includes providing a new tunnel connection under the rail berm for pedestrians and cyclists to access Keating Channel Precinct. The new underpass is not for vehicular traffic. The new underpass provides multimodal access between the Distillery District and East Bayfront, allowing for the greatest potential for a vibrant, mixed-use community. It also promotes access to the water and contributes to improvements to the public realm. A new bridge is also proposed for the Trinity Street trail and bicycle path across the Keating Channel. The new bridge will connect the Central Waterfront Boardwalk and the Martin Goodman Trail from the East Bayfront lands into the Keating Channel Precinct. Trinity Street Underpass Trinity Street Trail at Keating Channel

Stormwater

Keating Channel Precinct Stormwater Design Alternatives RECAP - Preferred Planning Alternative from PIC #2 Treatment Train Approach NEW - Design Alternatives for Keating Channel Precinct PIC #3 Alternative 1 Alternative 2 Alternative 3A Alternative 3B Alternative 4A Alternative 4B All land uses (development blocks, open space/parks and roads) have individual systems for treating stormwater including Total Suspended Solid (TSS) removal and disinfection. All land uses have individual site systems for TSS removal but there is a common facility used for disinfection. All land uses share a common facility for all stormwater treatment (i.e., TSS removal and disinfection), but the facilities are only designed to service Keating Channel Precinct. Facilities are optimized to meet the required water quality targets. All land uses share a common facility for all stormwater treatment (i.e., TSS removal and disinfection), but the facilities are only designed to service Keating Channel Precinct. Facilities are sized based on available space. All land uses share common TSS removal and disinfection systems and the facilities are designed to be integrated with facilities for adjacent neighbourhoods (i.e., EBF and WDL). Facilities are optimized to meet the required water quality targets. All land uses share common TSS removal and disinfection systems and the facilities are designed to be integrated with facilities in adjacent neighbourhoods. The facilities are optimized to meet the required water quality targets. Facilities are sized based on available space. NOT PREFERRED* NOT PREFERRED* NOT PREFERRED* NOT PREFERRED* NOT PREFERRED* PREFERRED* Alternative 4B is the Preferred Stormwater Design because it maximizes efficiencies with adjacent stormwater treatment facilities and land uses, is most compatible with the City of Toronto s goals for stormwater management in the waterfront area, it uses less land in each separate neighborhood because integrated facilities are used. The Preferred Stormwater Design includes: Tying into the proposed tank in East Bayfront EA to service lands west of Cherry Street; Locating LDL tanks adjacent to the West Don Lands tanks (at the rail berm north of Lake Shore Boulevard), to service lands east of Cherry Street (north of the Keating Channel), and sharing pumping and UV treatment facilities; and Using either a new tank (permanently) to service lands north of Villiers Street (south of Keating Channel) or servicing this part of Keating North Channel (temporarily) with oil grit separators until designs are confirmed for lands south of Villiers Street, in the Lower Don Lands study area. The decision to build something permanent or temporary for lands on the north side of Villiers Street (in Keating Channel Precinct) will be made through discussions with the City prior to implementation. * Details of evaluation are provided in hand out materials

Keating Channel Precinct Preferred Stormwater Design

Infrastructure - Water and Wastewater

Preferred Design Wastewater

Preferred Design Water Supply

Keating Channel Precinct Summary of Environmental Impacts and Mitigation Theme Potential Environmental Impact Proposed Environmental Mitigation Net Impact Natural Environment Don Mouth Naturalization New natural area (wetland) Social Environment Vibrant, mixed use community Access to water Economic Environment Economically viable block sizes Cost-effective to build Cultural Heritage Traditional uses of land by Aboriginal people Heritage structures Archaeology Sustainability WT s Sustainability Framework City s sustainability standards Impervious surfaces Preferred designs in the Keating Channel Precinct are consistent with the goals of the Don Mouth Naturalization Study. Some vegetation will be removed where roads on new alignments (Cherry Street and Lake Shore Boulevard) are built. There is no significant vegetation in the study area. Improvements to the social environment at the water s edge along Keating Channel is a key component of the redevelopment. The preferred designs for roads, transit, water, wastewater and stormwater support a vibrant mixed use community and improve access to the water s edge. The new infrastructure designs and layout will accommodate blocks that are viable for redevelopment. Cost-effectiveness has been taken into consideration in the evaluation of design alternatives. Impacts will occur to docking facilities and ship navigation along the Keating Channel and at the future park promenade (south of the Keating Channel Precinct). Some impacts may occur to heritage structures. There is also some potential for archaeological resources to be impacted during construction. The proposed works support WT s Sustainability Framework and the City s standards for sustainability while reducing impervious surfaces and enhancing water quality. Landscaping is proposed on all major arterials, as shown in the roadway cross-sections. In addition, the development of Keating Channel Precinct includes new vegetation, open space and park areas. Access to the water s edge in the study area will be temporarily impacted during construction. Access to areas south of the study area (i.e., Cherry Beach etc.) will be maintained via Cherry Street during construction. Changes in land use (from existing industrial to future residential/commercial) will reduce the need for ship access to the area. All approvals required by Toronto Port Authority will be obtained during detail design and prior to construction. Impacts to heritage buildings will be confirmed and minimized where possible, during detail design. Appropriate processes and approvals for removal of heritage structures will be obtained through City of Toronto s Heritage Department and Ministry of Culture prior to construction (as required). Archaeological monitoring during construction is recommended. Erosion and sediment controls will be in place and monitored to ensure that construction activities do not impact surface water negatively during construction. Overall net improvement Overall net improvement Overall net improvement Overall net impact is minimal Overall net improvement

Keating Channel Precinct Summary of Environmental Impacts and Mitigation (continued) Environmental Criteria Potential Environmental Impact Proposed Environmental Mitigation Net Impact Land Use and Property New land uses Public realm goals Property Access to existing private properties will be maintained during construction. Overall net improvement Transportation Services Walkability Transit priority Zero-growth traffic Parking Road closures required during construction will be signed and adjacent landowners, business, residents and emergency service providers will be notified in advance. Details of construction staging and traffic impacts during construction will be confirmed during detail design. Overall net improvement Municipal Services Sustainable design technology Utilities Land uses will change from industrial/vacant to mixed use, residential and commercial/employment communities that include large areas of open space, public realm features and a new school. Some private property will be impacted although most property is publically owned. Property owners are generally supportive of redevelopment of area. The new transportation network and road designs include improved transit, pedestrian and bicycle facilities that promote non-auto modes and service compact and walkable neighborhoods. Some temporary (full or partial) road closures will be required during construction (i.e., on Cherry Street at the railberm and on Lake Shore Boulevard at the Don River bridge). Pier bents on Gardiner Expressway will also be impacted by the Lake Shore Boulevard alignment. New services support future land uses and densities using sustainable design technology. Impacts to existing services and utilities will occur. Overall net improvement Stormwater Wet Weather Flow Master Plan Toronto GREEN Development Standard Improved flood protection Natural processes for cleaning water Potential changes in extreme precipitation and water flow Proposed works are compatible with the goals of the City s Wet Weather Flow Master Plan, and provide improved flood protection and accommodate potential changes in extreme precipitation and water flow. New, natural processes (i.e., use of roof runoff for street trees) are introduced and the treatment train approach cleans stormwater before entering Lake Ontario. Extent of impacts to existing utilities will be confirmed during detail design. Affected parties will be consulted with and agreement will be reached on utility relocations prior to construction. Erosion and sediment control measures will be in place and monitored during construction. Appropriate actions will be taken in the event of an extreme storm during construction. Overall net improvement The overall net impacts of the proposed improvements to roads, transit, stormwater, water and wastewater, as identified in the Lower Don Lands Master Plan and Keating Channel Precinct Plan improve environmental conditions in the study area.

What s Next After Public Meeting #3 the study team will finalize the preferred designs for road, transit, bridge, stormwater, wastewater and water supply systems, and finish Phases 3 and 4 of the Municipal Class EA process for Keating Channel Precinct, taking into account stakeholder input from this meeting. The next step is to document the study in an Environmental Study Report (ESR) for Keating Channel Precinct. The ESR will be available for a formal public review period, currently scheduled for fall 2009. You will be contacted again at that time.

Your Input is Important Public participation is an important part of the study process. Please provide your comments to: Andrea Kelemen Communications and Marketing Waterfront Toronto 20 Bay Street, Suite 1310 Toronto, ON M5J 2N8 Tel: (416) 214-1344 ext 248 Email: lowerdon@waterfrontoronto.ca www.waterfrontoronto.ca/lowerdonlands Thank you for attending