Installation, Operation and Maintenance of Central Boiler Plants

Similar documents
2007 ASME Boiler & Pressure Vessel Code 2007 Edition July 1, 2007

CHAPTER 6. HEATING PRODUCTION EQUIPMENT AND SYSTEMS

Math & Physics. Complete combustion requires an Air-FuelRatio of 14.7 to 1 for combustion.

Limestone Cements. Why are we doing this? What are they? What s in it for you? Limestone Cements, Holcim (US) Inc.

Annex A-8 CONCENTRATED SOLAR POWER UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES

BULK PURCHASE DISCOUNTS Valid for purchases any time of year

Boiler Basics. Design and operation

Simply the Best WHOLE HOUSE COMFORT SAVE WHOLE HOUSE TANKLESS ELECTRIC WATER HEATERS

ANNEX A-1 GEOTHERMAL UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES BOILER BALANCE OF PLANT STEAM TURBINE GENERATOR MISCELLANEOUS - GEOTHERMAL EXTERNAL

REFERENCE SYLLABUS. For FOURTH CLASS POWER ENGINEER S. CERTIFICATE of COMPETENCY EXAMINATION. AB-54 Edition 1, Revision 1,

Simply the Best WHOLE HOUSE COMFORT SAVE WHOLE HOUSE TANKLESS ELECTRIC WATER HEATERS

Featured Fish-Week ofmay 29th

Reactor-Boiler and Auxiliaries - Course 433 BOILER STEAM AND WATER SYSTEMS

Annex A-7 FOSSIL STEAM UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES

Appendix B Index to System/Component Cause Codes

Annex A-6 FLUIDIZED BED COMBUSTION UNITS INDEX TO SYSTEM/COMPONENT CAUSE CODES

Appendix B9 Geothermal Unit Cause Codes

WHAT IS A BOILER? BOILER IS AN EQUIPMENT WHICH PRODUCES STEAM AT THE REQUIRED PRESSURE AND TEMPERATURE. BOILER DESIGN, MANUFACTURE & INSTALLATION ARE

Appendix B2 System/Component Cause Codes

Tempra / DHC-E. The Finest Tankless Electric Water Heaters Available! Simply the Best Featuring Advanced Microprocessor Control

- Residential Fire Sprinkler -

DEPARTMENT OF THE ARMY TECHNICAL MANUAL TECHNICAL MANUAL

Power Boiler Design, Inspection, and Repair

PIPING SYSTEM EQUIPMENTS

Tempra Series WHOLE HOUSE TANKLESS ELECTRIC WATER HEATERS Whole House Comfort

Inventory Management Guide

Unit Design Data. Fossil Steam

Hello. What can I do for you? QUALITY CUSTOMER SERVICE. Joseph Griffith Regional Sales Manager. Cooling Tower Depot is Global, I am Local

Ball Float Controlled. Thermo Dynamic(TD) Trap Safety Valve Condensate Pump Flash Vessel Moisture Separators Deaerator Head Steam Injector Sight Glass

SECTION HEATING BOILERS

9707 Key West Avenue, Suite 100 Rockville, MD Phone: Fax:

Biomass Energy Systems

Advanced Microprocessor Control The Finest Tankless Electric Water Heaters Available! DHC-E / Tempra

Presentation to NC Home Inspectors Licensure Board April 7, Opportunities and Partnerships

Standards and Safety Update

Division III Process Gas Treatment Equipment

This presentation is posted for public use. ACEEE does not endorse any product or service.

Volume 10 Summer Understanding Terminology Key to Treatment Program Success

4 th Class Power (Operating) Engineer Certification and Examination Guide

REFERENCE SYLLABUS. For FIRED PROCESS HEATER OPERATOR S. CERTIFICATE of COMPETENCY EXAMINATION AB-239. Edition 3, Revision 1, Issued

ProcessBarron is a leader in the design, fabrication, installation, maintenance, and repair of air, flue gas and bulk materials handling system

Bosch Tankless Water Heater Troubleshooting Guide

WATER TUBE SOLID FUEL SERIES YOSHIMINE CO., LTD

Unit Design Data. Fossil Steam (Voluntary Reporting) Unit name: Location of unit (State): Energy Information Administration (EIA) Number:

Pulse Jet Baghouse ASTEC PULSE JET BAGHOUSE. for Asphalt Facilities

CLASS POWER ENGINEER S CERTIFICATE

Adca Training. Part 2

Rental Boiler Specifications (Nebraska Boiler)

ADVANTAGE SERIES. Popular Technologies for Outdoor Living

BHA Powerwave Acoustic Cleaning Systems Powerful cleaning to help increase performance

WELCOME TO THE AWT REGIONAL TRAINING PROGRAM

MODEL ANSWER FOR ELEMENTS OF MECH.ENGG.(17413) 1) steam boiler- It is a closed vessel in which steam is produced from water by combustion of fuel.

2. Sketch and describe a steam drum internal feedwater pipe. 3. Identify and describe a steam drum continuous blowdown line.

Boiler Draft Equipment

ADDRESS (NO PO BOX) COMMUNICATIONS GENERAL INFORMATION. First Name*: John. Last Name*: Smith. Job Title*: President Company Name*: Custom Homes

Introduction to Control Technology

STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK

Problem Cause Remedial action. Gauge glass There was excess chemical dosage The normal ph recommended was 9.5 to See photo 3 & 4.

Solid and Liquid Pollutants

Condensate Recovery and Return System SDR A

Plumber Level 3 Rev. May 2011

The equipment and materials shall be designed and constructed in accordance with the ASME code section I 2001 ED A02 and Chinese Standards.

ALDRICH COMPANY THREE PASS FIRETUBE BOILER CLASSIC SERIES OPERATING & MAINTENANCE MANUAL

Continuing Education Units (CEU)

Burner Comparisons. Typical Competitor s Burner

Diocese of Cleveland Facilities Services Corporation

FIFTH CLASS POWER ENGINEER S

Basic information about quick steam generators/boilers System GEKA Heat Technology Gottfried Kneifel

DOCUMENT TABLE OF CONTENTS

A Newsletter published by. for Industrial Steam and Power Users

INFINITI K APPLICATIONS MANUAL. Indoor Residential and Tankless Water Heaters. Warning: Follow each appliance's instructions precisely.

POWER GENySYS P ROJECT E XPERIENCE I NFORMATION - D ISTRIBUTED G ENERATION

PIPE LINE IDENTIFICATION MARKINGS

PART 0 A/E INSTRUCTIONS 0.01 DESIGN REQUIREMENTS

USE OF A LOWER RATE WHEN APPLIED ON CEREALS AT THE HERBICIDE TIMING (FEEKES 4-6) - AL, AR, AZ ETC.

Guidelines for Preparing for a Temporary Steam Plant

Overview of Biosolids Composting Science, Production and Use Albert Cox Kuldip Kumar

200 GARDEN COMPOSTER OWNERS MANUAL. SUN-MAR CORP. -The Composting Company. Composting Toilets. Home & Garden Composters CONTACT INFORMATION

Department of Mechanical and Production Engineering Ahsanullah University of Science and Technology (AUST) Lab Manual on ME 4202

Water Fuel + Air for combustion Blowdown

AUTOMATION OF BOILERS USING LABVIEW

Silhouette. Feedwater Heater. Boiler Feedwater

Fig.: macroscopic kinetic energy is an organized form of energy and is much more useful

Introduction to Industrial Mechanical Components Course# ME810

Steam Ancillary Equipment. Primary Steam System, Water Treatment and Auxiliary Steam System Equipment

SAMPLE SPECIFICATION FOR RIELLO ARRAY MODULATING BOILER

2018 PRICING. alderonind.com STANDARD PRODUCTS

When you complete this module you will be able to: Describe various watertube boiler designs, including large generating units.

NOW I 50% OFF. CALL TODAY! H.L. Flake McDonald Dash ORDER ONLINE! HLFLAKE.COM BUY AT LIST PRICE

Poinsettia Season Recap 2012 White Paper

2x58 MW Coal Fired Power Plant at Mauritius

FLUIDIZED BED BOILERS

.2 Section Waste Management and Disposal..4 Section Vibration Isolation and Seismic Control Measures.

[1] Lecture 2 Particulate emission control by mechanical separation & wet gas scrubbing

Griddle Stands REFRIGERATORS & FREEZERS. Call us toll free at (800) INNOVATIVE DESIGNS FOR YOUR FOODSERVICE NEEDS

Standard Procedure s for Tenant Fire Sprinkler Work

ASSSIGNMENT 3. Textbook Assignment: Boilers, chapter 4, pages 4-1 through 4-15, and Steam Turbines, chapter 5, pages 5-1 through 5-1.

Integrated Solutions for the. Primary Metals. Industry. Engineered Products for the Process Industries

Module 3: Liquid Fossil Fuel (Petroleum) Lecture 25: Refinery Equipments

Unit Design Data. Fluidized Bed Combustion (Voluntary Reporting) Unit name: Location of unit (State): Energy Information Administration (EIA) Number:

Transcription:

PDH-Pro.com Installation, Operation and Maintenance of Central Boiler Plants Course Number: ME-02-303 PDH: 9 Approved for: AK, AL, AR, GA, IA, IL, IN, KS, KY, MD, ME, MI, MN, MO, MS, MT, NC, ND, NE, NH, NJ, NM, NV, OH, OK, OR, PA, SC, SD, TN, TX, UT, VA, WI, WV, and WY New Jersey Professional Competency Approval #24GP00025600 North Carolina Approved Sponsor #S-0695 This document is the course text. You may review this material at your leisure before or after you purchase the course. In order to obtain credit for this course, complete the following steps: 1) Log in to My Account and purchase the course. If you don t have an account, go to New User to create an account. 2) After the course has been purchased, complete the quiz at your convenience. 3) A Certificate of Completion is available once you pass the exam (70% or greater). If a passing grade is not obtained, you may take the quiz as many times as necessary until a passing grade is obtained (up to one year from the purchase date). If you have any questions or technical difficulties, please call (508) 298-4787 or email us at admin@pdh-pro.com. Telephone (508) 298-4787 396 Washington Street, Suite 159, Wellesley, MA 02481 www.pdh-pro.com

TM5650zyxwvutsrqponm TECHNICAL MANUAL C ENTRAL BO ILER PWNTSzyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPON 1 Approved for public release; distribution is unlimited. 1 1 -- 1 HEADQUARTERS, DEPARTMENT OF THE ARMY OCTOBER 1989

TM 5-650 TECHNICAL MANUAL No. 5-650 HEADQUARTERS DEPARTMENT OF THE ARMY CENTRAL BOILER PLANTS CHAPTER 1. Section I. Section II. Section III. CHAPTER 2. Approved for public release; distribution is unlimited. Paragraph GENERAL CONSIDERATIONS Introduction Purpose...l-l l-l Central Boiler Plants...zyx 1-2 l-l Equipment...l-3 1-5 Elementary Combustion Principles. Fossil Fuels...zyx 1-4 1-6 Combustion......l-5 1-6 Combustion of Coal... 1-6 1-8 Combustion of Oil... 1-7 1-13 Combustion of Natural Gas... 1-8 Soot and Smoke... 1-9 Flue Gas Analysis and Temperature... 1-10 Combustion Efficiency... 1-11 Boiler Efficiency.... 1-12 Central Boiler Plant Efficiency... 1-13 Principles of Steam and Hot Water Generation Basic Principles...1-14 Heat Transfer... 1-15 DESCRIPTION OF EQUIPMENT 1-13 1-15 1-15 1-17 1-17 1-23 1-23 Section I. Section II. Section III. Boilers and Heat Exchangers Boiler Classifications... 2-1 Boiler Design Requirements 2-2 2-1 Fabrication...2-3 Fire Tube Boilers...2-4 Water Tube Boilers...2-5 Hot Water Generators...2-6 Economizers... 2-7 Air Heaters...2-8 Boiler Accessories and Fittings ASME Requirements...2-9 Gage Glass, Gage Cocks... 2-10 Water Columns... 2-11 Pressure Gage, Temperature Gage... 2-12 Safety Valves...2-13 Boiler Outlet Valves... 2-14 Blowoff Valves and Piping.... 2-15 Fusible Plugs... 2-16 Sootblowers... 2-17 Fuel- Handling and Combustion Equipment 2-1 2-1 2-2 2-2 2-13 2-13 2-13 2-19 2-19 2-19 2-19 2-24 2-27 2-27 2-27 2-31 T his Manual Supersedes TM 5-650, dated August 1962 and rescinds TM 5-651, dated December 1946.1946. i

. Figure No. Title Page 1-4 Combustion of Oil...z 1-12 1-5 Combustion of Coal... 1-14 1-6 Combustion Efficiency Motor... 1-16 1-7 Elementary Boiler... 1-24 1-8 Water Circulation... 1-28 1-9 Effects of Soot and Scale on Heat Transfer... 1-29 2-1 Tube Expander... 2-3 2-2 Flared and Beaded Tubes... 2-3 2-3 Scotch Boiler... 2-3 2-4 Two, Three, and Four Pass Scotch Boiler Designs... 2-4 2-5 Horizontal Return Tubular Boiler... 2-5 2-6 Four Drum Water Tube Boiler... 2-6 2-7 Refractory Expansion Joints... 2-8 2-8 Water Wall Construction... 2-9 2-9 Steam Drum Internals... 2-10 2-10 Superheater in Two Drum Boiler... 2-11 2-11 Package Boiler Configurations... 2-12 2-12 D Package Boiler... 2-12 2-13 Hot Water Generator... 2-14 2-14 Hot Water End Uses... 2-15 2-15 Hot Water Distribution... 2-16 2-16 Bare Tube Economizer... 2-17 2-17 Extended Surface Economizer... 2-17 2-18 Cold End Corrosion - Minimum Metal Temperatures... 2-18 2-19 Tubular Air Heater... 2-20 2-20 Regenerative Air Heater... 2-21 2-21 Water Gage Glass... 2-22 2-22 Water Column... 2-23 2-23 Safety Valve Installation... 2-25 2-24 Huddling Chamber Safety Valve... 2-26 2-25 Outside Screw and Yoke Gate Valve... 2-28 2-26 Non-ReturnValve... 2-29 2-27 Slow-Opening Blowdown Valve Set... 2-30 2-28 Fire Tube Cleaning System... 2-32 2-29 Fixed Position Mechanical Sootblower... 2-33 2-30 Underfeed Stoker...... 2-355 2-31 Power Dump Grate Spreader Stoker... 2-37 2-32 Underfeed Spreader... 2-38 2-33 Traveling Chain Grate Stoker... 2-33 2-34 Vibrating Grate Stoker... 2-34 2-35 Fluidized Bed Fire Tube Boiler... 2-42 2-36 Coal Handling System... 2-44 2-37 Types of Bucket Elevators... 2-46 2-38 Weigh Larry... 2-47 2-39 Pneumatic Ash Handling System... 2-48 2-40 Hydraulic Ash Handling System... 249 2-41 Steam Atomizer... T 2-51 2-42 Rotary Atomizer... 2-52 2-43 Register Burner... 2-54 2-44 Low Excess Air Burner... 2-55 245 Arrangement of Above-Ground Fuel Oil Tank...2-56 2-46 Underground Fuel Oil Storage Tank... 2-57 ii

TM 5-650 Section IV Section V. Section VI. CHAPTER 3. Section I. Section II. Paragraph Coal Combustion Equipment...2-18 Coal-Handling Equipment...2-19 Ash-Handling Equipment...2-20 Oil-Firing Equipment...2-21 Oil Storage and Handling...2-22 Gas-Firing Equipment...2-23 Liquified Petroleum Gas...2-24 Controls and Instrumentation Feedwater-Drum Level Controls...2-25 Combustion Controls...2-26 Boiler Safety Control...2-27 Additional Controls and Instrumentation... 2-28 2-89 Water Treatment Control...2-29 2-110 Pollution Control Equipment Pollution Regulations... 2-30 2-110 Types of Pollutants and Control Methods... 2-31 2-110 Mechanical Collectors...2-32 2-112 Fabric Filters...2-33 2-120 Electrostatic Precipitators... 2-34 2-123 Wet Scrubbers...2-35 2-125 Auxiliary Equipment... Feedwater Heaters...2-36 Pumps and Injectors...2-37 Forced Draft Fans...2-38 2-125 2-125 2-135 Induced Draft Fans...2-39 2-137 Stacks, Flues, and Ducts... 2-40 2-137 Steam Turbines.... 2-41 2-140 Electric Motors...2-42 2-140 Electrical Equipment...2-43 2-140 Variable Speed Drives...2-44 2-140 Air Compressors...2-45 2-142 2-142 Steam Traps...2-46 Piping Systems. 2-47 Page 2-34 2-43 2-45 2-50 2-53 2-53 2-62... OPERATION Preliminary Operating Procedures Plant Operation Considerations... 3-1 3-1 Standing Operating Procedures... 3-2 3-1 Daily and Monthly Boiler Plant Operating Logs.... 3-3 3-1 Inspection...3-4 3-1 Applicable Codes...3-5 3-1 Basis for Comments... 3-6 3-1 Preparation for Startup..... 3-7 Starting Fire...3-8 Warm-up Time...3-9 2-62 2-65 2-76 2-145 3-4 3-4 3-5 Placing a High Pressue Steam Boiler in Service... 3-10 3-6 Placing a Hot Water Boiler in Service... 3-11 3-7 Operating Adjustments and Procedures Boiler Operation.... 3-12 3-8 Maintaining Pressure or Temperature...3-13 3-8 Feedwater and Boiler Water Treatment... 3-14 3-8

TM 5-650 Section II. Paragraph Responsibility...5-3 5-1 Inspection...5-4 5-1 Housekeeping...5-5 5-1 Utilities Inspection and Service Records... 5-6 5-1 Tools... 5-7 5-3 Spare Parts...5-8 5-3 Special Supplies...5-9 5-3 Scheduled Preventive Maintenance... 5-5 Scheduling and Use of The Information...zy 5-10 5-5 Boilers... 5-11 5-5 Economizers...5-12 5-8 Air Heaters... 5-13 5-9 Water Columns...i.. 5-14 5-9 Safety Valves 5-15 5-9 Fusible Plugs...zy 5-16 5-10 Sootblowers...... 5-17 5-10 Stokers...5-18 5-10 Pulverized Coal Equipment... 5-19 5-10 Coal Handling Equipment...5-20 5-10 Ash Handling Equipment...5-21 5-11 Oil Burners...5-22 5-11 Oil Handling Equipment...5-23 5-11 Gas Burners...5-24 5-11 Feedwater Drum Level Controls...5-25 5-11 Combustion Controls...5-26 5-12 Boiler Safety Controls...5-27 5-12 Instrumentation...5-28 5-12 Mechanical Collectors...5-29 5-12 Stacks...5-30 5-12 Zeolite Water Softeners...5-31 5-13 Hot Lime-Soda Softeners...5-32 5-13 Deaerating Heaters and Dearators...5-33 5-13 Pumps...5-34 5-14 Centrifugal Pumps... 5-35 5-14 Reciprocating Pumps... 5-36 5-14 Steam Injectors... 5-37 5-15 Steam Turbine (Non-Condensing)...5-38 5-15 Air Compressors...5-39 5-15 Steam Traps...5-40 5-16 Electric Motors...5-41 5-16 Forced-Draft and Induced-Draft Fans...5-42 5-16 Command Inspections...5-43 5-17 Technical Inspection...5-44 5-17 Major Army Command Inspections...5-45 5-17 Page APPENDIX A. APPENDIX B. REFERENCES...A-1 CHEMICAL ANALYSIS PROCEDURES External Treatment Plants...B-l Boiler Water...... B-2 Miscellaneous Tests...... B-3 A-l A-3 A-4 A-10 vi

TM 5-650 APPENDIX C. APPENDIX D. Paragraph HEAT BALANCE CALCULATIONS 100 PSIG Steam Heat Balance...C-l 15 PSIG Steam Heat Balance...C-2 High Temperature Water Heat Balance...C-3 BOILER WATER CALCULATIONS Boiler Blowdown Calculations...D-I Determining Feedwater Requirements...D-2 Determining Makeup Requirements...D-3 Determining Chemical Treatment Requirements... D-4 A-11 A-13 A- I5 A-17 A-17 A-17 A- 19 LIST OF TABLES Table No. l-l 1-2 1-3 1-4 1-5 1-6 1-7 1-8 1-9 1-10 2-l 2-2 2-3 2-4 2-5 2-6 2-7 2-8 2-9 3-1 4-1 4-2 4-3 4-4 4-5 5-1 5-2 Title Page Classification of Coals... 1-7 Standard Specification for Fuel Oils... 1-9 Fuel Oil Characteristics... 1-10 Combustion Efficiency for Natural Gas... 1-18 Combustion Efficiency for Number 2 Oil... I-19 Combustion Efficiency for Number 6 Oil... 1-20 Combustion Efficiency for Coal, 3.5 Moisture, Bituminous... 1-21 Combustion Efficiency for Coal, 9.0% Moisture, Bituminous... 1-22 Water/ Steam Characteristics... 1-25 Water/ Steam Mixtures... 1-27 Typical Point Source Emission Levels for Various Pollutants... 2-110 Comparison of NOx Reduction Techniques... 2-111 Performance Characteristics of Flue-Gas &sulfurization Systems... 2-113 Performance Characteristics of Particulate Control Devices... 2-114 Characteristics of Mechanical Dust Collectors... 2-118 Removal Efficiencies of Uncontrolled Particulate Emissions from 2-120 Combustion Process... Permissible Maximum Suction Lits and Minimum Suction Heads in 2-128 Feet for Various Temperatures and Altitudes... Piping Codes and Standards for Boiler Plants... 2-148 Typical Piping Material Applications... 2-149 Flue Gas Analysis at 25%, 50%, and 100% Load for Natural Gas, No. 3-23 2 Oil, No. 6 Oil, and Stoker Coal... Common Cations and Anions... Water ph... Guide for Selection of External Treatment Equipment y... Common Sodium Phosphates... Deaerator Temperature Versus Pressure... Lubricating Oils, Greases, and Preservatives... Lubricating Oil and Grease Uses... 4-1 4-5 4-11 4-30 4-48 5-6 5-7 LIST OF FIGURES Figure No. Title Page l-l 100 psig Steam Heat Balance... 1-2 1-2 15 psig Steam Heat Balance... 1-3 1-3 High Temperature Water Heat Balance... 1-4 vii

Figure No. 2-98 2-99 2-100 2-101 2-102 2-103 2-104 2-105a 2-105b 2-106 2-107 2-108 2-109a 2-109b 2-110 2-111 2-112 2-113 2-114 2-115 2-116 2-117 2-119 2-119 2-120 2-121 2-122 2-123 2-124 2-125a 2-125b 3-1 3-2 3-3 3-4 3-5 3-6 4-1 4-2 4-3 4-4 4-5 4-6 4-7 4-8 4-9 4-10 4-11 4-12 4-13 4-14 4-15 Title Multicyclone Configuration... Cyclone Fractional Efficiency Curve...;... Reverse Flow Baghouse...... Pulse Jet Baghouse... Weighted Wire Type Electrostatic Precipitator... Wet Approach Venturi Scrubber... Tube and Shell Heat Exchanger... Maintain Proper Slope to Suction Line... Suction Line Installation... Centrifugal Pump... Reciprocating Piston Pump... Two Methods of Providing Lost Motion... Rotary Screw Pump... Rotary Gear Pump... Steam Injector... Forced Draft Fan with Inlet Damper... Typical Outlet Fan Dampers....:.... Fan Curves for Different Inlet Vane Positions... Fan Curve for Fan with Outlet Damper... Single-Stage Impulse Non-Condensing Turbine... Thermostatic Steam Trap... Float and Thermostatic Steam Trap... Disc/ Thermodynamic Steam Trap... Inverted Bucket Steam Trap... Standard Hanger Types for Piping Systems... Sdid Wedge Disc Gate Valve... Single Port Globe Valve... Non-Lubricated Plug Valve... Butterfly Valve... Swing Check Valve... Y-Type Spring Lift Check Valve...d.. Daily Boiler Plant Operating Log... Monthly Boiler Plant Operating Log... Gil viscosity versus Temperature...<...a...?... Smoke Density versus Percent Oxygen... Fuel/Air Ratio Biasing... Boiler Efficiency versus Load.....-... Condensate Pipe Corrosion... Boiler Tube Failure Caused by Scale... Superheater Tube Showing Carryover Deposits... Effects of Treatment on Raw Water... Sodium Zedite Softener...Z...!... Hot Process Lime Soda Softener... Hot-Lime Hot-Sodium Zedite Softener... Hydrogen and Sodium Zeolite Softeners Operating in Parallel... Hydrogen Zeolite with Alkaline Neutralization... Degasifier/ Decarbonating Tower... Sodium Zedite-Chloride Ion Exchanger System... Dcmineralizer... Tray Deaerator... Spray Deaerator... Type I Deaerator Installation... Page 2-117 2-119 2-121 2-122 2-124 2-126 2-127 2-129 2-129 2-130 2-132 2-133 2-134 2-134 2-136 2-138 2-138 2-139 2-139 2-141 2-143 2-144 2-146 2-147 2-151 2-152 2-152 2-154 2-154 2-155 2-155 3-2 3-3 3-14 3-17 3-17 3-25 4-2 4-2 4-3 4-12 4-13 4-15 4-16 4-17 4-17 4-18 4-20 4-21 4-23 4-24 4-25 viii

TM 5-650 Figure No. 4-16 4-17 4-18 4-19 4-20 4-21 4-22 4-23 4-24 4-25 4-26 4-27 4-28 4-29 4-30 4-31 4-32 4-33 4-34 5-1 C-l c-2 c-3 D-l D-2 Title Type II Deaerator Installation.... Type III Deaerator Installation... Blowdown System with Flash Tank and Heat Exchanger... Automatic Continuous Blowdown Controls... Conductivity Meter... Boiler Water Treatment Operating Log... Water Cooled Sample Cooler... Condensate Corrosion Tester... Zeolite Softener Water Flows... Effect of Excessive Water Flow Bates... Zeolite Bed Inspection Points... Solubility of Oxygen in Water... Pressure Pot Feeder... Automatic Proportioning Feeder... Chemical Mixing Tank with Chemical Feed Pump... Chemical Feed Pump Plunger/ Diaphragm Type... Eyewash Station... Safety Shower... Wet Storage Method... Record Card Example... 100 psig Steam Heat Balance... 15 psig Steam Heat Balance... High Temperature Water Heat Balance... Example of Boiler Feedwater, Steam Generation and Blowdown Relationships... Example of Boiler Calculations... Page 4-27 4-28 4-32 4-34 4-35 4-36 4-39 4-42 4-43 4-44 446 4-49 4-52 4-53 4-54 4-55 4-57 4-58 5-4

2-90