SYSTEM MANUAL Description

Similar documents
Flexible Gas Tubing. Semi-Rigid Corrugated Stainless Steel Tube System PRODUCT GUIDE.

M07. Wunda Premium Manifold. Before you start: Check the contents THE BRAND YOU CAN TRUST

Installation Instructions Air Sourced 310 Heat Pump Module

SEALED THERMAL STORE

Alpha CombiMax 350 and 600

Installation, Operating and Maintenance Guide

ZIP Varipoint III. Installation, Maintenance and User Instructions. Models VP303, VP503 VP803, VP953 direct unvented water heaters. Issued August 2008

WALLACE MAXIPUMP 3000, 5000, 6000 and HYDROJET 30P, 30C, 140 AND HJ400 INSTALLATION AND MAINTENANCE INSTRUCTIONS

Varsity Concealed Shower System

HEAVY DUTY BRASS SHOWER PUMPS

Instructions. Certifications CH Chrome SS Stainless Steel. Single Handle, Industrial Style, Pull-Down Kitchen Faucet.

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

Instructions CH Chrome SS Stainless Steel Certifications. Single Handle, Pull-Down, Kitchen Faucet. Tools Required.

CalMag Heating Pack Installation Instructions

UPONOR Ltd. Specification for UPONOR Q&E PEX Shrinkfit Plumbing Systems

Male elbow, copper x BSP taper male thread

Installation guide Sahara & Sahara Plus

POWERFLOW Series. Unvented Electric Storage Water Heaters. Installation & Operating Instructions Manual

Installation and Maintenance

INSTRUCTIONS FOR USE PORTABLE VACUUM SYSTEM LEI Part # s / , , , IMPORTANT INFORMATION

Union coupling. copper x copper. Cone joint to BS 1010.

Installation, Operation & Maintenance Instructions

Instructions. 110-KVD-CYSCH-AD-Z Chrome 110-KVD-CYSSS-AD-Z Stainless Steel Certifications. Single Handle, Pull-Down, Kitchen Faucet

INSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

Installation and Maintenance

Quartz. Digital. Bath with bath waste filler. Quartz Digital Bath with bath waste filler installation instuctions page 1

INTEGRA PLUS ABC. 230V~ 50Hz. Stock Ref. N. Installation and Wiring Instructions IPX2

JANUS 3 CIRCULATOR WATER HEATER INSTALLATION, COMMISSIONING & SERVICING INSTRUCTIONS G.C. No

Enzo and Enzo Deluxe Safe Touch Thermostatic Shower EN10031CP & EN10035CP

Inta City Concealed Shower Mixing Valve CT80010CP

MICROFAST SR/QR EXTENDED COVERAGE HSW SPRINKLER VK605 (K5.6) TECHNICAL DATA

METRO BASIN MONO MIXER CHR

Parasitic Cysts - Cryptosporidium and Giardia, Chemicals, Heavy Metals, Dissolved Salts, Offensive Tastes and Odours, Sediment, Dirt,

INSTALLATION INSTRUCTIONS GEO PRIME TANK. (Patent Pending) GPC

Polypipe Plumbing & Heating

X62 Tap Range. Please keep these instructions for future reference

BOILING UNIT REDITAP. Installation and User Guide. IMPORTANT: This booklet should be left with the user after installation and demonstration

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

Enzo Safe Touch Thermostatic Shower EZ10010CP & EZ10014CP

900 Quadrant Steam Shower Cabin with 6 Body Jets

Enzo Concealed Shower Mixing Valve

Powerflow Unvented water heater

Installation, Operation & Maintenance Instructions

SuperKlean Washdown Products

Dishwasher Installation Instructions DW 24XT/DW 24XV

Flomate Mains Boost Pump Installation & Maintenance Instructions

Installation and Maintenance

Installation guide Billi B-3000 Sparkling Dual levered slimline tap option

Installation and servicing instructions

culus Listed: Category VNIV Refer to the Approval Chart on page 3. VK697 Attic Upright Sprinkler Specifications:

in-bench PITCHER rinser installation intructions

Installation, Operating and Maintenance Guide

Models Series Series

Models Series Series

TECHNICAL DATA 2. LISTINGS AND APPROVALS 3. TECHNICAL DATA

UB110DNC/L/U/B BASIN MONOBLOC WITH NO POP-UP WASTE BASIN MONOBLOC TALL WITH NO POP-UP WASTE UB112DNC/L/U/B INSTALLATION INSTRUCTIONS

esfr dry pendent sprinkler Vk502 (k14.0)

Kallista Bath Flip Drain

PolyMax H2-24 Dutch Bucket System

Special Features: For Light Hazard Occupancies Only Designed for Corridor Applications 28 Maximum Width Spacing. 3. technical data

WARM WATER UNDERFLOOR HEATING SYSTEMS. Guidance Notes

CEILING FED RISER RAIL KIT. Installation Guide. tritonshowers.co.uk/digital

OWNER S MANUAL AND INSTALLATION GUIDE PLEASE READ THIS MANUAL CAREFULLY BEFORE ATTEMPTING INSTALLATION

CONCEALED THERMOSTATIC SHOWER MIXER VALVE installation & aftercare instruction

PolyMax H1-10 Dutch Bucket System

Built-In Dishwasher. Installation Instructions. BEFORE YOU BEGIN Read these instructions completely and carefully. IMPORTANT The dishwasher MUST be

CalMag Filter Installation Instructions

Installer s Guide IMPORTANT INFORMATION Read This Document First On completion, sign and leave with owner

Case Study - Yardley Park Road Gerpex MLCP and Press Fit System, Underfloor Heating and Manifold Based Sanitary Systems

Winchester Heated Towel Rail. Fitting Instructions

Safety. Rinse Kit for Multi-Pro 1200 and 1250 Turf Sprayers Model No Safety and Instructional Decals. Installation Instructions

Flo~mate Mains Boost Pump Installation & Maintenance Instructions

TIDALWAVE I/G POOL PUMP INSTRUCTION MANUAL

Mimosa dual control mixer shower Installation and operating instructions

Top Control Dishwasher

PERFORMANCE SHOWER PRODUCTS

Kinetic. Logic. Astin. THERMOSTATIC INLINE CONTROL SHOWER VALVES Installation & aftercare instructions. Please retain for future reference

INSTALLATION INSTRUCTIONS WARRANTY

Model vkfd28b braided flexible sprinkler drops (lpcb approved)

CATALOGUE NUMBERS. Pressure Reducing Valve (PRV)** Mains Supply. Cold Water Outlets

Model AV Alarm Valve With and Without Model RC-1 Retard Chamber European Conformity Valve Trim General Description

AquaFlo II. Issue 3 December Please read these instructions carefully before commencing installation of the AquaFlo unvented water heater

ATTIC UPRIGHT SPECIFIC APPLICATION SPRINKLER VK696 TECHNICAL DATA

TECHNICAL DATA. * Refer the Approval Charts and Design Criteria on pages 3-5 for culus Listing and FM Approval requirements that must be followed.

Installation, Operation & Maintenance Instructions

Basin Mixer. Installation & Aftercare Instructions. Please retain for future reference.

PROBOIL.3.0. i Please read carefully and then retain all instructions for your customer s future use. Installation & Commissioning Guide

Beautifully Traditional

Installation Instructions For Monsoon Universal Twin Pump

Kiko Concealed Shower Mixing Valve KK80010CP

Alcor dual control mixer shower

AVAILABLE TO DOWNLOAD ON THE APOLLO APP. Pocket guide to. Fire Alarm Systems Design BS Standard

Installation Manual PS-225 & PS-275

Installation Instructions Solar Controller Kit (Part Number AQ )

Cold water HD 9/18-4 ST

Grant Spira 6-26kW and 9-36kW Wood Pellet Boilers

Beautifully Traditional

Telo Shower Mixing Valve TL10016CP

Fire Safety Register

Transcription:

SYSTEM MANUAL Description PUCK is a revolutionary fire suppression system offering discrete protection coupled with industry leading pricing, efficient system design and easy install. PUCK s lightweight nozzles sit just 3mm below the ceiling making them non-intrusive whilst offering complete protection. These nozzles connect to a compact pump unit using flexible pipework and easyfit fittings. This keeps design and install time to an absolute minimum and allows for potentially large install savings. The PUCK pump unit includes a self-test facility which is adjustable in the companion app. The app monitors the unit in real time whilst receiving alerts on faults and activations. PUCK is compatible with all fire panels offering fire and fault n/o and n/c contacts. Rev.01 17.02.17 2016 by Puck Fire Ltd

Advantages Industry leading pricing Low profile nozzles (colour matching available) Compact pump unit Low flow system, mains supplied, does not require large water storage tank Push fit fittings, allows for easy system install Flexible pipework, pipework can be easily measured and cut on site minimising design time Customisable self-test facility Compatible with fire panels using voltage free contacts Wireless monitoring Stainless steel pipework available where system is not installed behind fire rated barrier Certifications PUCK is 3 rd party fire tested to BS:8458 for use up to 80m 2 PUCK is 3 rd party fire tested BS:9252 Requirements PUCK s flexible pipework must be installed behind fire rated barrier Only PUCK supplied products to be used to ensure system performs as marketed Connected water source must supply no less than 12 litres per minute Pump unit must not be installed in sealed area, ventilation required.

TECHNICAL DATA Technical Data Pump Unit Part No: Dimensions: Voltage rating: Current rating: Fire relay contact rating: Fault relay contact rating: Inlet connection: Outlet connection: Water requirement: LED status colours: PU_0001 345mm x 280mm x 268mm 240V 13A 30VDC, 1A max 30VDC, 1A max ½ BSP ¼ BSP 12 lpm - 1 bar Minimum Blue - Primed Orange - Wi-Fi connection fault Red - Activation

Nozzle Part No: Dimensions: Weight: Standard Colour: Bulb specification: Fixing method: Hole diameter for install: PU_0034 72mm x 19mm 48g White 57 C, quick response Torsion springs 56-60mm Flexible Pipework - 30m coil Part No: Dimensions: Colour: Bend Radius: Max pipework length: Fixing method: PU_0031 10mm, 30m reels (longer on request) Red 40mm Straight run reach - 20m Loop reach - 30m (60m total pipework) P-clips

Stainless Steel Rigid Pipework Part No: Dimensions: Material: Finish: Max pipework length: Fixing method: PU-0045 3/8, 3m lengths Stainless steel Metallic TBC 8mm munsen ring

Compression Fittings Part No: Fixing type: Material: Finish: Works with: PU-0046 - Tee PU-0047 - Elbow PU-0048 - Threaded adapter PU-0049 - Straight Compression Brass Nickel Plated PUCK Flexible pipework PUCK stainless steel rigid pipework Inlet Manifold Part No: Inlet connection: Outlet connection: Approvals: PU-0041 15mm compression fitting ½ BSP (to pump) WRAS approved ¼ Isolation Valve Part No: Inlet connection: Outlet connection: Material: PU-0043 ¼ BSP ¼ BSP Stainless steel

Self-Centring Bonded Seal Part No: Material: Seal type: Diameter: PU-0037 Zinc plated steel Nitrile ¼ BSP P-Clip Part No: Material: Diameter: PU-0040 Galvanised steel, Rubber 12mm Pressure Relief Valve Part No: Material: Diameter: Function: PU-0054 Brass 1/4-1/8 BSP Prevents system over pressurisation ¼ BSP CAP Part No: Material: Diameter: Function: PU-045 Brass Nickel Plated 1/4 - BSP End cap

1/2 Strainer Part No: Material: Diameter: Function: PU-042 Brass 1/2 - BSP Water Filtration WARNING: ONLY PUCK APPROVED COMPONENTS MAY BE USED WITH THIS SYSTEM. NO COMPONENT OF THE PUCK SYSTEM MAY BE MODIFIED. DOING SO WILL VOID THE COMPONENTS/SYSTEMS WARRANTY

SYSTEM DESIGN This manual contains manufacturers recommendations for the design, installation and commissioning of the PUCK fire and suppression system. This manual should be read in conjunction with the following standards as applicable: BS 8458 BS 9251 BS 9252 BS 7671 (Other standards may apply) Category of System The designer should at an early stage determine which category of system is applicable, as this affects various design considerations, such as the water requirements for the system. The category of system should be determined by the type of building as shown below. Domestic occupancy Single family dwellings such as: Individual dwelling house Individual flat Individual maisonette Transportable home Houses of multiple occupation (HMOs) A) Bed and breakfast accommodation A) Boarding houses A) Blocks of flats 18 m or less in height and with a maximum total floor area of 2 400 m2 B), C) Residential occupancy Blocks of flats greater than 18 m in height C) Sheltered and extra care housing Residential care premises Residential rehabilitation accommodation Dormitories (e.g. attached to educational establishments) Hostels A) Buildings with more than two floors and five or more lettable bedrooms should be treated as a residential occupancy. B) Where the fire strategy requires the communal rooms and corridors to be protected by a watermist system, then the building should be treated as a residential occupancy.

C) This height is the height of the floor of the top storey above ground. Water Supplies Our recommendation is to install 1 pump for domestic occupancies and a dual pump system for residential occupancies. Where the mains water supply connection serves only the watermist system, the flow rates at each pump must be 12lpm. Where the mains water supply connection serves both the watermist system and the domestic or residential occupancy supply, the watermist system should be capable of providing the water demand at the pump/s by: a) the operation of an automatic priority demand valve; or b) for domestic occupancies, the flow rate at the pump plus at least 25 L/min; or NOTE 1 Attention is drawn to the water regulations, which might require a greater minimum flow rate. c) for residential occupancies, the flow rate at the pump plus at least 50 L/min. NOTE 2 Attention is drawn to the water regulations which might require a greater minimum flow rate depending on the design demand for the occupancy Flows should be tested and verified at the main water supply pipe to the property

Nozzle Spacing, Flat Ceilings 4x4m Grid (16M2) Max 2m from wall Minimum distance between nozzles =2m Nozzle Spacing, Sloped Ceilings- Where nozzles are fitted within a sloping ceilings, nozzle positions should be determined by the pitch of the ceiling. Where the pitch is below 30, nozzles should be mounted at standard spacing s when measured in line with the pitch of the ceiling. Where the pitch is 30 and above, the first row of nozzles should be mounted within 300 mm radially from the apex of the ceiling. All nozzles should be mounted perpendicular to the ceiling as shown below

Distance from Obstructions Nozzles should be positioned away from obstructions to allow a 140 degree spray pattern. Nozzle orientation

The preferred nozzle outlet orientation is perpendicular to the walls Maximum Pipe Lengths Pipe work should be configured as a loop not exceeding 60m in total length. Maximum 40 nozzles per loop. Loop length must be reduced by 1m for every tee or elbow added on the loop. Pipe length from the tee to the nozzle can be up to 1m long with one elbow without reducing the loop length.

Multi Loop Configuration example Pipework Flexible tubing should only be used behind a fire rated barrier Stainless steel tubing should be used for any areas where pipework is exposed. Nozzles for exposed pipework should not be positioned more than 300mm below the slab

The image below shows example piping networks for domestic and residential. Domestic Residential Pump 1 Pump 2

INSTALLATION & COMMISSIONING WARNING Mains voltage electricity and high pressure water are present within this product. Care should be taken when installing the product. Installation should only be carried out by trained engineers. Appropriate PPE should be worn at all times when installing the product. Eye protection, gloves, safety boots and hard hat. 1. Remove all packaging from the components provided. 2. Install a 240v, 13A un-switched spur next to the proposed pump position.

3. Connect strainer, inlet manifold and flexible hose to the mains water (ensure mains water is switched off before breaking into the water supply). 4. Verify the water supply flow by running it into a bucket to confirm the correct flow 5. Ensure the isolation valve in the inlet manifold is set to the closed position. 6. If provided with a monitoring system make connections to fire and fault relays as required. Access can be gained to the electronics by removing the screws on the lid on the underside of the pump.

WARNING The pump unit must be completely powered down before opening the electronics enclosure Fire & fault connections 7. Refit lid to the electronics and position the pump it it s final location. The pump must be situated in a well ventilated area with no less that 100mm of free space around all sides of the unit. The top of the pump unit must stay clear of any objects to allow for proper airflow and performance. The pump must be located in a position above 4 C. 8. Connect power cable to un-switched spur ensuring that the power remains switched off at all times. Do not run the pump without water running through it. This will damage the pumps. 9. Use the threaded end of the inlet Manifold to connect directly to the threaded fitting on the bottom section of the pump. Warning! This fitting should only need to be hand tight if this does not create a seal tighten very slightly with a spanner until a seal is created. Overtightening will damage the components.

10. Install pressure relief arrangement to the top of the pump ensuring it is correctly orientated and connect the drain from the pressure relief manifold to the waste pipe. Do not adjust the pre-set pressure relief valve TO SYSTEM PIPEWORK AND NOZZLES CONNECT TO DRAIN 11. Install pipework to the system using flexible pipework push fit fittings and supporting P-clips. All flexible pipework should be installed behind a fire rated barrier such as plaster board, any

exposed pipe should be installed in steel pipework. Pipework must never be exposed to temperatures below 4 C. 12. Cut the pipework to length using pipe cutters ensuring a square edge is achieved with the cut. CORRECT INCORRECT X 13. Easyfit fittings Insert pipe into fitting until it will not go any further. Tighten nut by using two spanners. One spanner to tighten the nut and one spanner to hold the body of the fitting Example of ferrules correctly seated on pipe work

14. Pushfit - Apply silicone lubricant to the end of the pipework. Insert the pipe into the fitting pushing hard to ensure that the pipe is inserted by 25mmmm. Ensure pipe is straight and is not being pulled to one side as this may create leaks CORRECT INCORRECT X WARINING Pipework and fittings must not be installed in temperatures lower than 5 C as this can affect the ability of the pushfit to grip onto the pipework and create the required seal. 15. Use a 57-64mm hole saw to create the holes in the ceiling for fitting the nozzles. 16. Install nozzles ensuring that the 1/4 adaptor with a bonded seal is tightened with a spanner. Ensure bonded seal is used. Thread lock may be used if required. DO NOT USE PTFE OR ANY OTHER TYPE OF THREAD TAPE 17. Ensuring that the pipe network is complete open isolation valve on the inlet manifold to allow mains pressure water into the system.

18. Slowly loosen the nozzle furthest away from the pump set to bleed the pipework of any trapped air. Allow any excess water to drain into a bucket. When all of the air has escaped remake the seal. Most remote nozzle Max pipe length before tee 800mm 19. After ensuring that there are no initial leaks power up the pump to charge the system. 20. Leave to stand at system pressure for 1 hour. The pipe work will stretch over time causing some initial loss in pressure however it will settle to around 45bar. The pumps may operate for up to 1 second to a day to make up for any small losses in pressure in the system. The pipe network should not be subject to significant leaks. The pumps should not operate more than once a day to make up loss of pressure or it may risk affect the life span of the components. Any leaks should be repaired immediately to avoid risk of damage to equipment. 21. When satisfied that there are no leaks power the pump down, shut off the water supply and put the nozzles into position using the retention springs. 22. Switch water supply and power back on to re-enable the system

SYSTEM MONITORING (COMING SOON)

Model Certificates The system should be commissioned and inspected in accordance with the schedules below.

SYSTEM INSTALLATION CERTIFICATE Pump Serial Number Address Extent of system coverage Ensure nozzles are not painted and are free from obstruction Check nozzles are spaced in accordance with Puck design guide Where possible ensure pipework in not damaged and in good condition Check age of the system and condition. Check that all relevant areas of the property are protected Verify water supply is adequate for the property Self-test the pump by pressing test button or opening a manual test valve Confirm operation of fire and fault relays Confirm operation of priority demand valve if provided Check pump casing is in good condition Ensure pump is positioned in a well ventilated cupboard with at least 100mm of space around top and sides Check filter is clear Optional - Test flow and pressure at the pump set through and open nozzle. Flow should be >10.8lpm Exercise stop valves if provided to confirm correct operation As the competent person responsible for the design, installation and commissioning of the PUCK fire suppression system identified above, I CERTIFY that the said work for which I have been responsible complies to the best of my knowledge and belief with the following standards where applicable BS8458, BS9251, BS7671 and manufacturer s recommendations *except for the variations, as listed in the design specification and/or the attached schedule (delete if not applicable). Name Position Signature Date

SYSTEM MAINTENANCE Pump Serial Number Address Ensure nozzles are not painted and are free from obstruction Check nozzles are spaced in accordance with Puck design guide Where possible ensure pipework in not damaged and in good condition Check age of the system and condition. Check that all relevant areas of the property are protected Verify water supply is adequate for the property Self-test the pump by pressing test button or opening a manual test valve Confirm operation of fire and fault relays Confirm operation of priority demand valve if provided Check pump casing is in good condition Ensure pump is positioned in a well ventilated cupboard with at least 100mm of space around top and sides Check filter is clear Optional - Test flow and pressure at the pump set through and open nozzle. Flow should be >10.8lpm Exercise stop valves if provided to confirm correct operation Comments & Recommendations: Name Position Signature Date