Chapter 3 Site Planning and Low Impact Development

Similar documents
APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield

Pennsylvania Stormwater Best Management Practices Manual

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Chapter 4 - Preparation of Stormwater Site Plans

APPENDIX E. Flood Plain Management

Pennsylvania Stormwater Best Management Practices Manual. Chapter 4. Integrating Site Design and Stormwater Management

Tennessee Stormwater Management Program. Stormwater Management Site Assessment and Inventory Checklist. Quick Check o Vicinity Map within Watershed

When planning stormwater management facilities, the following principles shall be applied where possible.

Draft Rhode Island Stormwater Design and Installation Standards Manual

Appendix I. Checklists

Working Group Meeting

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

STORMWATER CREDITS AND BETTER SITE DESIGN PRACTICES

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Zoning Ordinance Article 3

Technical guidance to meet stormwater management design requirements; and,

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

2.1 Principles & Objectives

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

STREAM BUFFERS

LOW IMPACT DEVELOPMENT TOOLS FOR VERMONT TOWNS

Importance of Master Planning Marcy Colclough

New Development Stormwater Guidelines

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Using AutoCAD Civil 3D and ESRI ArcGIS to meet LEED-ND (Neighborhood Development) Requirements NDIA O Brien & Gere. All Rights Reserved.

Erosion & Sediment Control Plan Application Form & Checklist

Presented By: Matt Roberts and Cass Chapman The University of Minnesota Law School Environmental Sustainability Clinic

CHECKLIST FOR PHASE II DRAINAGE REPORT

DEALING WITH STORM WATER MANAGEMENT

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Appendix 6-A. Site Plan Preparation and Submission as Part of the Land Development Process

City of Waco Stormwater Management Regulations

Major Subdivision Sketch Plan Checklist

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

A LOW IMPACT DEVELOPMENT MANUAL FOR COASTAL SOUTH CAROLINA TABLE OF CONTENTS

BMP Suitability Matrix

Going Green with the NYS Stormwater Design Standards

Problem Understanding

IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT

Section 3 Non-Structural BMPs

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

Standards Manual. RIDOT Workshop. Design Strategies: How to Meet Minimum Standard No. 1 July 13, 2011

GUIDELINES FOR ECOLOGICAL PERFORMANCE

Community LID Workgroup Issue Paper #6

Low Impact Development Guidance Manual

One County s Success in Linking Watershed Protection and Land Use Planning

Weston s Wetlands, Stormwater, & Open Space

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Chapter 2: Strategies for Local Governments Chapter 3: Site Assessment and Design for Low Impact Development. Break Out Group 10:30 am to 12 pm

Rhode Island Stormwater Design and Installation Standards Manual

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County

Riparian Buffer on the Bushkill Creek. Policies

Green Infrastructure Planning Design Guidelines

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

Green Infrastructure & Low Impact Development

Climate Smart Communities Green Infrastructure Case Studies

STREAM BUFFER PROTECTION AND MANAGEMENT

understanding Green Infrastructure In Zoning

Prepared for: Central Coast Low Impact Development Initiative centralcoastlidi.org

Map Reading 201: Where Does the Water Go?? Map Reading Map Reading 201. Interconnected Systems

BE WATER WISE. Managing Your Onlot Stormwater. Sept. 23, 2006 Watershed Weekend

4.6. Low Impact and Retentive Grading

Michael Clark, P.E. & Michael Moonan, RLA Weston and Sampson Engineers & David Lachance Woodbury Ridge Developer

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006.

3. Are there any projects exempt from the definition of Regulated Projects?

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

Zoning Ordinance Chapter 10

Drainage Control Plans

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

IV. Development in the Rural Overlay District

Interpreting and Using the RI Site Specific Soil Mapping Standards and Procedures

Three threshold measures will be applied together to capture project scale and scope and impacts:

Low Impact Development in Coastal South Carolina: A Planning and Design Guide

HUDSON VALLEY REGIONAL COUNCIL 3 Washington Center, Newburgh NY

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

Watershed Planning Workshop

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Chapter 6 SITE PLANNING AND DESIGN CONSIDERATIONS

River Corridor Overlay Zone (RCOZ) Article 5

Post Construction BMPs

City of Fort Worth. December 1, 2004

SANTA CRUZ COUNTY REGULATORY IMPEDIMENT GAP ANALYSIS TOOL

Coffee Creek Park Development Low Impact Development (LID)

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

Leduc Industrial Outline Plan SE W4

Stormwater Prevention and Control

Richton Park Western Development Corridor Green Infrastructure Development Plan August 18, 2017

Model Stormwater Ordinances

Green Infrastructure Stormwater Management Applications in the Pines Frequently Asked Questions and Example Projects

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

Net Land Area (NLA): Area within zoning lot boundaries NLA= sq. ft. a) Credited Street Area (total adjacent frontage) x ½ width of public rightof-way

Transcription:

CHAPTER 3 Site Planning and Low Impact Development Chapter 3 Site Planning and Low Impact Development 3.0 Introduction The City of Charleston requires that major residential, large commercial (>1 acre), and all subdivision permit applications have a detailed site plan prepared for review and comment. The permit application is based upon the overall plan for the proposed development. The City highly recommends that a conceptual plan be prepared and submitted to the City for review in advance of preparing a formal permit application. The purpose of this conceptual review is to promote initial site planning that will minimize impacts to stormwater, create an opportunity for dialog between the City and the developer and identify limiting constraints early in a project. A conceptual plan and meeting is required for all projects exceeding three (3) acres. Introduction This chapter discusses a general approach to site planning and ideas for innovative and Low Impact Development (LID) as illustrated in Figure 3-0.1. Use of LID is strongly recommended by the City to achieve the stormwater goals promoted in this manual. In addition to this document, the City Stormwater Department endorses review and use of the West Virginia Stormwater Management and Design Guidance Manual regarding additional LID approaches, principals, and Best Management Practices (BMP s). Courtesy of haywood.edu Figure 3-0.1 LID Site City of Charleston Stormwater Manual v1.0 3-1

Goals of the Site Planning Process 3.1 Goals of the Site Planning Process Developers should be mindful of the overall goals of the stormwater permitting process when preparing their site plan. Typically, design, permitting and construction of a new development can be faster, more cost efficient, and environmentally sustainable if the design meets the following goals: Minimize impervious areas. Stage disturbance and reseeding during construction phase. Avoid long and steep cut and fill slopes which promote erosion and minimize infiltration. Promote sheet flow of stormwater. Avoid concentrating flow with inlets and pipes where possible. Maximize greenspace, particularly areas planted with native vegetation. Improve existing stormwater issues with redevelopment. Protect water quality during and after construction. 3.2 Site Inventory and Site Analysis Process The first task in the preparation of a site plan is to identify and inventory the site features that are present on the proposed site and immediately adjacent properties. For small projects this inventory would include items such as sidewalks, large trees, house location and size, driveway, parking spaces, drain inlets, etc. For larger projects this may also involve topographical, property boundaries, and site surveys that might extend off of the site. 3.2.1 Site Inventory The general steps for site inventory and analysis are: Identify existing site features and designate what must be protected. Identify unique features (cliffs, springs, etc.). Identify limits of proposed improvements. Identify utility conflicts. Identify proposed slopes, drains and other features that will affect stormwater flow. Identify final discharge point of stormwater and downstream property that could potentially be affected by the discharge. Identify site access for construction equipment. Identify site access for end users of the project. 3.2.2 Site Analysis and Conceptual Site Plan Typically, a conceptual site plan of the proposed improvements is prepared after the site analysis is complete to express the general intent of the proposed improvements. A conceptual site plan is not necessary for City review, unless the project is three (3) acres in size or larger. However, discussing plans in advance with the City Stormwater, Engineering, and the CSB staff can avoid costly delays in permitting and minimize unanticipated construction costs. 3-2 City of Charleston Stormwater Manual v1.0

CHAPTER 3 Site Planning and Low Impact Development 3.2.3 Final Site Plan Final site plans should clearly illustrate the proposed development or improvements. The City understands that private residents and small businesses often do not have experience in preparing these plans or the ability to hire someone to do it for them. As such, the City may allow hand sketches for Categories B and C (less than one [1] acre) projects as illustrated in Figure 3-2.1, page 3-4. The final site plan must present a logical and feasible approach for the permanent management of stormwater from the project. Peak flow management, volume reduction, and stormwater quality must all be considered as discussed in Section 2.3.4, particularly on projects exceeding one (1) acre. A site plan must be submitted for (major) projects classified in Categories C, D, and E as illustrated in Figures 3-2.2, page 3-5. Figure 3-2.3, page 3-6, and Figure 3-2.4, page 3-7. In an effort to meet the requirements of the new stormwater regulations, site planning must evolve to accommodate new requirements. The following sections of this chapter discuss the integrated site design approach and ideas for Low Impact Development (LID). Permittees should implement multiple aspects of LID into their stormwater management approach where possible. Every aspect of LID is not applicable for every site. Generally, demonstration that LID has been considered will be required to meet the intent of the stormwater management requirements. Site Inventory and Site Analysis Process City of Charleston Stormwater Manual v1.0 3-3

Site Inventory and Site Analysis Process Figure 3-2.1 Example Detailed Site Plan for Residential Development (Hand Sketched) Above is an example of a simple residential improvement project site that exceeds 2,000 sf of disturbance. Example calculations are written below the sketch. 3-4 City of Charleston Stormwater Manual v1.0

CHAPTER 3 Site Planning and Low Impact Development *Courtesy of Lowimpactdevelopment.org Site Inventory and Site Analysis Process Figure 3-2.2 Example Site Plan Commercial Development City of Charleston Stormwater Manual v1.0 3-5

*Courtesy of Lowimpactdevelopment.org Site Inventory and Site Analysis Process Figure 3-2.3 Example Site Plan for Single Family Residence 3-6 City of Charleston Stormwater Manual v1.0

CHAPTER 3 Site Planning and Low Impact Development *Courtesy of Lowimpactdevelopment.org Site Inventory and Site Analysis Process Figure 3-2.4 Example Site Plan for LID Suburban Apartment City of Charleston Stormwater Manual v1.0 3-7

Introduction to Low Impact Development (LID) 3.3 Introduction to Low Impact Development (LID) The primary goal of LID is to reduce damage and pollution impacts to streams, rivers, wetlands, and large bodies of water by reducing post-development runoff and promoting infiltration of stormwater on-site. Implementation of LID practices is beneficial at all levels of site design, whether it be new development, urban retrofits, or revitalization projects. These practices are most beneficial when implemented early in the design phase, beginning with a site assessment to analyze natural hydrology. Proposed BMPs consume more site area than traditional stormwater controls of the past several decades (i.e. catch basins, pipes, etc.). The objective of this chapter is to present alternative drainage/infiltration practices that promote on-site treatment and quality control of stormwater. Every site will present unique challenges that usually require a combination of controls to achieve pollutant removal as well as controlling stormwater peak runoff rate. Ultimately, LID addresses many of the environmental practices that are essential to Smart Growth strategies, which include conservation of open green space. If LID techniques are considered in the planning stages of a project, site development will more closely mimic a watershed s natural hydrologic function (discussed in Chapter 1) and as a result reduce stormwater quantity and pollutants. LID is not necessarily complicated, as shown in Figure 3-3.1, it can be simple changes, such as the removal of curbs from street edges allowing flow to parallel vegetated channels. Courtesy of Philadelphia Stormwater Manual V 2.0 Figure 3-3.1 LID Street Design 3-8 City of Charleston Stormwater Manual v1.0

CHAPTER 3 Site Planning and Low Impact Development 3.4 Integrated Site Design Managing stormwater properly begins with a holistic site planning approach at the beginning of every project. The planning process encompasses many design techniques that shape the proposed site, such as preserving natural vegetation, reducing the development footprint, utilizing natural features for stormwater management, and managing impervious surfaces. Figure 3-4.1 is an overview of an example design process that includes existing site conservation utilizing sheet flow off the parking lot (instead of piping) to direct stormwater into infiltration basins. The following are LID site design techniques that are recommended for proposed development and are applicable to the Charleston region. Conservation of Natural Features and Resources (Section 3.4.1) Preserve Undisturbed Natural Areas Preserve and Protect or Reconstruct Riparian Buffers (Vegetation Bordering Streams) Avoid Floodplains Integrated Site Design Low Impact Site Design Techniques (Section 3.4.2) Fit Design to the Terrain Reduce Limits of Clearing and Grading Cluster Development Reduction of Impervious Cover/Impervious Cover Management (Section 3.4.3) Use Fewer or Alternative Cul-de-sacs Create Parking Lot Stormwater Islands Minimize Impervious Area (including rooftop and pavement areas) Disconnect Impervious Cover Utilization of Natural Features for Stormwater Management (Section 3.4.4) Use Buffers and Undisturbed Areas Use Natural Drainageways instead of Storm Sewers Use Vegetated Swales instead of Curb and Gutter Maximize Tree Canopy over Impervious Cover Alter the Time of Concentration Figure 3-4.1 Integrated Site Design *Courtesy of Philadelphia Stormwater Manual V 2.0 City of Charleston Stormwater Manual v1.0 3-9

Integrated Site Design 3.4.1 Conservation of Natural Features and Resources The first step in LID is the conservation of the site s natural features and resources. Preservation of natural areas with significant hydrologic functions including forested areas, riparian areas and soils with a high potential for infiltration. Preserve native ground cover and riparian buffers that naturally minimize runoff. Avoid impacts to established or existing natural floodplains. A. Preserve Undisturbed Natural Areas: Preserving natural conservation areas, such as undisturbed forested and vegetated areas, natural drainageways, stream corridors and wetlands on a development site helps to preserve the original hydrology of the site and aids in reducing stormwater runoff and pollutants. Undisturbed vegetated areas also stabilize soils, provide for filtering and infiltration, and increase evapotranspiration. Natural conservation areas should be delineated before any site design, clearing or construction begins. When done before the conceptual plan phase, the planned conservation areas can be used to guide the layout of the site. B. Preserve and Protect or Reconstruct Riparian Buffers: A riparian buffer, illustrated in Figure 3-4.2, is a special type of natural conservation area along a stream, wetland or shoreline where development is restricted or prohibited. The primary function of buffers is to protect and physically separate the stream from future disturbance or encroachment. If properly designed, a buffer can provide stormwater management, can act as a right-of-way during floods, and can sustain the integrity of stream ecosystems and habitats. *Courtesy of Taranaki Regional Council Figure 3-4.2 Typical Riparian Zone Cross-Section 3-10 City of Charleston Stormwater Manual v1.0

CHAPTER 3 Site Planning and Low Impact Development Further, replacement or reconstruction of a former riparian buffer can be utilized to help stabilize and rejuvenate detrimentally impacted streams. A riparian buffer can be of fixed or variable width, but should be continuous and not interrupted by impervious areas that would allow stormwater to concentrate and flow into the stream without first flowing through the buffer. Ideally, riparian buffers should be sized to include the 100-year floodplain as well as steep banks and wetlands. The buffer depth needed for proper performance will depend on the size of the stream and the surrounding conditions, but a minimum 25-foot undisturbed vegetative buffer is needed for even the smallest perennial streams, and a 50-foot or larger undisturbed buffer is preferred. C. Avoid Floodplains: Floodplain areas should be avoided on a development site. Ideally, the entire 100- year floodplain should be avoided for clearing or building activities, and should be preserved in a natural undisturbed state where possible. Floodplain protection is interconnected with riparian buffer preservation. Both of these stormwater site design practices preserve stream corridors in a natural state and allow for the protection of vegetation and habitat. Depending on the site topography, 100-year floodplain boundaries may lie inside or outside of a preserved riparian buffer corridor. Floodplain limits for communities can be obtained from the Federal Emergency Management Agency (FEMA) website. Firmettes of a particular area can be obtained, as shown in Figure 3-4.3. No work can be performed in the 100 floodplain without approval from the Charleston Planning Department. *Courtesy of FEMA Integrated Site Design Figure 3-4.3 Typical FEMA Firmette City of Charleston Stormwater Manual v1.0 3-11

Integrated Site Design 3.4.2 Low Impact Site Design Techniques Low impact site design techniques, illustrated in Figure 3-4.4, promote maintenance of the natural water cycle. These techniques reduce runoff volume and pollutant loads, while maintaining existing groundwater recharge rates and other hydrologic functions. Key techniques include: Planning and design of the development to fit the natural topography of the site, limiting clearing and grading. Evaluating site conditions and constraints including soil types, geology, topography, slopes, drainage areas, wetlands and floodplains to maintain high groundwater recharge areas and provide runoff storage areas. Utilizing construction techniques will limit impervious areas and soil compaction. Utilizing cluster developments to keep substantial impacts in a contained area. A. Fit Design to the Terrain: This technique helps to preserve the natural hydrology and drainageways on the site, as well as reducing the quantity of excavation and disturbance of vegetation and soils. Figure 3-4.4 Courtesy of Philadelphia Stormwater Manual V 2.0 Figure 3-4.4 Example of a Low Impact Development Subdivision 3-12 City of Charleston Stormwater Manual v1.0

CHAPTER 3 Site Planning and Low Impact Development illustrates the placement of roads and homes in a residential development that avoids stream impacts. Roadway patterns on a site should be chosen to provide access schemes which are compatible with the terrain. In rolling or hilly terrain, streets should be designed to follow natural contours to reduce clearing and grading. Street hierarchies with local streets branching from collectors in short loops and cul-de-sacs along ridgelines help to prevent the crossing of streams and drainageways. A traditional pattern of streets or fluid grids, which interrupt natural drainageways, and impacts the natural flow of stormwater (see Figure 3-4.5). These traditional layouts also impact riparian buffers with home sites and replace native vegetation with individual lawns. Natural features are also often removed. Buildings and impervious surfaces should be kept off of steep slopes, away from natural drainageways, and out of floodplains and other lower lying areas. In addition, the major axis of buildings should be oriented parallel to existing contours. Integrated Site Design Natural features are not preserved Common space with native vegetation becomes lawn Common space with native vegetation becomes lawn Courtesy of Philadelphia Stormwater Manual V 2.0 Figure 3-4.5 Example of a Traditional Subdivision City of Charleston Stormwater Manual v1.0 3-13

Integrated Site Design B. Reduce Limits of Clearing and Grading: Minimal disturbance methods should be used to limit the amount of clearing and grading that takes place on a development site, preserving more of the native vegetation and natural hydrology of a site. These methods include: Establishing a limit of disturbance (LOD) based on maximum disturbance zone radii/lengths. These maximum distances should reflect reasonable construction techniques and equipment needs together with the physical constraints of the development site, such as slopes or soils. LOD distances may vary by type of development, size of lot or site, and by the specific development feature involved. Slope analysis is one technique that can be used to identify the most developable portions of a site. An example of slope analysis is illustrated in Figure 3-4.6. Slopes are analyzed, typically from 0-5%, 5%- 10%, 10%-15%, and above 15% to determine where structures, roadways and stormwater management features may be suitably located. Using special procedures and equipment which reduce land disturbance. Slope Legend 0%-5% 5%-10% 10%-15% 15% + Ridge Line Valley Figure 3-4.6 Slope Analysis Courtesy of Philadelphia Stormwater Manual V 2.0 C. Cluster Development: Cluster development, also known as open space development, is a site design technique that concentrates structures and impervious surfaces in a compact area in one portion of the development site in exchange for providing open space and natural areas elsewhere on the site. Typically, smaller lots and/or nontraditional lot designs are used to cluster development and create more conservation areas on the property. Cluster developments allow the use of common driveways, less sidewalk and roadways, and more common space. 3-14 City of Charleston Stormwater Manual v1.0