ABB. Fuel Air Ratio Controls (FARC) Canadian Boiler Society 2018 Education Days. Glen Harrison Regional Sales Manager, Power Generation ABB Inc.

Similar documents
OPERATING AND MAINTENANCE MANUAL

THE CORPORATION OF THE CITY OF LONDON. POTTERSBURG POLLUTION CONTROL PLANT FILTER BUILDING ODOUR CONTROL Tender No ADDENDUM NO.

A-8-01 Typical questions and answers on the boiler specifications on tender and boiler contract documents

Considerations for INDUSTRIAL COMBUSTION

Outdoor Reset Control Theory FULL versus PARTIAL reset

GP COMBUSTION EQUIPMENT INC 100 Sheldon Dr., Units 16/17 Cambridge, Ontario N1R 7S7. Model C Forced Draft Burners. Natural Gas or Propane MODEL C10

Power Flame Incorporated

Each burner shall be equipped with a Micro-Processor Based Burner Management Flame Safeguard and Parallel Positioning Control System.

Distributed By: M&M Control Service, Inc Building Technologies

Complete Boiler Management in a Compact, Affordable System

Type CG Series Forced Draft Gas Burner

Gas-Fired Indoor and Outdoor Duct Furnaces

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

AM-14/AM-14C DISHWASHERS

"NP" & "RG" AIRFLO. In-duct firing line burner

Preventative Maintenance Tables

Complete burner management in a compact, affordable system

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

- Data Brochure Mixing Control 360

Rental Boiler Specifications (Nebraska Boiler)

LAARS MINI-THERM Gas-Fired Residential Hydronic Boilers

Diocese of Cleveland Facilities Services Corporation

MAXIMIZING HYDRONIC SYSTEM DESIGN PART III

FEATURES AND BENEFITS

ClearFire Economizer Model ECF Integral or External. Addendum to manuals CFH and CFV

C-TRAC3 COMMUNICATION MANUAL FOR. BACnet NOVEMBER 2010 TO JANUARY 2014 USA HEAD OFFICE AND FACTORY

LAARS MINI-THERM Gas-Fired Residential Hydronic Boilers

Updated: September 12, 2018 DIVISION INTEGRATED AUTOMATION. INTEGRATED AUTOMATION Page 1 of INTEGRATED AUTOMATION

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

INSTALLATION & MAINTENANCE MANUAL FOR QuickDraw

Heat Link. Technical Guide

Ohio Energy. Workshop HH. Strategies & Technologies to Improve the Boiler Room Efficiency. Wednesday, February 21, p.m. to 3:15 p.m.

Boiler Walkdown Field Device Checklist. Customer. Date

Product Information. Model: HG, HL, HLG Burner Sizes: 10, 13, 15, 17, 20, 21, 25 GENERAL DESCRIPTION U.L. STANDARD EQUIPMENT

GS Series. Gas Steam Humidifiers. Designed for air handling systems and for areas requiring individual humidification control

1 INTRODUCTION SYSTEM DESCRIPTION... 3

Improving Boiler Stability Through Advanced Regulatory Control

Bosch Buderus SSB1000TL/TL2/TL3/TL4 Stainless Steel Condensing Boiler

A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

Steam Systems 101. Understanding Your Energy Systems Better. May 5, 2016

- Data Brochure Boiler Control 274

90% Efficiency without Boiler Replacement TRUE GREEN SOLUTIONS NEW. Patent Pending. EcoFlex 90 + System Modulating Fan-Powered Economizer

Parameter guide 95M-200 GAS-FIRED DIRECT VENT MODULATING HOT WATER BOILER WARNING WARNING

Gas Safety. Syllabus. For 120kW. Class B gas fitter. Certificate of qualification examination

VERTICAL TUBE HEATING COILS MV & VIFB MODELS

PVE SERIES POWER VENTER SYSTEM MANUAL

T he crude oil peak price of $147 per barrel in July 2008 demonstrated that

LGB. Control Supplement. Gas fired boiler. Universal Control System. Series 2 Propane gas. Contents

Bosch Buderus SSB800/1000/1000TL Stainless Steel Condensing Boiler

Sola Hydronic Control. An Eco-Friendly Solution.

Specifications of V-Line burners

Indirect gas-fired air heater

POWDER GUIDE. Trouble shooting tips to maximise the benefits of Apcoshield Powder Coatings

THE WORLD S FIRST FLAMELESS CRUDE HEATER

USER S INFORMATION MANUAL

Cleaver-Brooks Webinars

Summary of 60-Day Notice: Heating Efficiency

JBFX/HDFX Series Forced Draft Burners

Heat Transfer Products, Inc. 120 Braley Road East Freetown, MA The first totally integrated multiple boiler management control.

Equipment Maintenance Checklist

Section (CSI ) I-Series Drum & Tube (04/23/10) Indirect-Fired Heating & Ventilating

LPG GAS ON DEMAND WATER HEATER. Model RV-550

5.0 ALARMS & TROUBLESHOOTING

INSTY-PAC EXTERNAL MOUNT WELDED MULTIPLE TUBE ASSEMBLY

TGIF-1. Indirect Fired Heating Systems. Technical Guide for: IF Indoor Installations. IFW Outdoor Installations. Applied Air. Keeps You.

INSTY-PAC INTERNAL MOUNT WELDED MULTIPLE TUBE ASSEMBLY

Installation & Operation Manual NCB-E Condensing Combi-Boilers

Overview of Gas Range Types

Emerging Technologies: VFDs for Condensers. Douglas T. Reindl Director, IRC University of Wisconsin-Madison. University of Wisconsin-Madison

Installation & Operation Manual

SECTION HEATING BOILER FEEDWATER EQUIPMENT

BOOK 2 SPECIFICATIONS

INSTALLATION, OPERATION AND MAINTENANCE MANUAL VIFB HEATING COILS

DHW / Setpoint Demand WWSD Modulation Boiler Output (x10,000 BTU/hr) External Input Signal Offset / Priority Override

HVAC CONTROLS INTRODUCTION

CHURCH MUTUAL AND HARTFORD STEAM BOILER SENSOR TECHNOLOGY PROGRAM: IDENTIFYING FROZEN PIPE EXPOSURES

Effective october 14, 2014

MOBILE FOOD SERVICE EQUIPMENT FIELD APPROVAL SUBMISSION INFORMATION

Instruction manual. Carlin Combustion Technology, Inc. 70 Maple Street East Longmeadow, MA Ph Fx

Installation Instructions

PART 0 A/E INSTRUCTIONS 0.01 DESIGN REQUIREMENTS

Power Flame Incorporated

APPLICATION GUIDE. HOT WATER/GAS Modular Boilers CONTENTS INTRODUCTION OF FRESH WATER CODES AND STANDARDS LOCAL CODE APPROVALS

Honeywell SLATE ICM Platform

Lanemark Midco HMA2A Series Air Heating Burner and DB Duct Burner System Application Manual

LGB Gas fired boiler

15B Cast Iron Gas Fired Boilers For Forced Hot Water

T8190A/191108AJ Heating or Cooling Thermostat/Wallplate; T8190A/Q682B Heating/Cooling Thermostat/Subbase

GETTING THE MOST OUT OF HYDRONIC HEATING SYSTEMS

Tuning up ventilation systems

Boiler Basics. Design and operation

HTDM INSTALLATION, OPERATION AND MAINTAINANCE MANUAL

LMV52 Control. Specifications. Document No. LV February 3, Product Description. Sample Specification

96.2% Thermal Efficiency HIGH EFFICIENCY COMMERCIAL BOILERS CON X US REMOTE CONNECT. MODBUS AND BACnet MSTP PROTOCOL

LATTNER BOILER COMPANY 9.5 HP Low-NOx Installation and Start-Up Checklist for Dry Cleaners

Selecting Fans and Determining Airflow for Grain Drying and Storage

BOOK 2 SPECIFICATIONS

Power Flame Incorporated

ENERVEX MDF MODULATING DAMPER

Green Energy Engineering, Inc.

Transcription:

Canadian Boiler Society 2018 Education Days Fuel Air Ratio Controls (FARC) Education Days Sponsored by Glen Harrison Regional Sales Manager, Power Generation Inc. 2018 Education Days London Burlington Kingston Ottawa 1

Speaker Bio 2018 Education Days London Burlington Kingston Ottawa 2

Agenda Introduction Positioning Type FARC Metering Type FARC Q&A 2018 Education Days London Burlington Kingston Ottawa 3

Introduction A significant number of gas and oil fired appliances are being retrofitted by replacing the traditional linkage type fuel/air ratio control system with a linkage-less type system having separate actuators that control the air and fuel flow rates. This presentation will compare the FARC (Fuel Air Ratio Control) positioning type vs metering type 2018 Education Days London Burlington Kingston Ottawa 4

Positioning Type FARC Linkage Examples Typical Water Tube Package Boiler Typical Coil Tube or Fire Tube Package Boiler * * Photo courtesy of Yorkland Controls Ltd 2018 Education Days London Burlington Kingston Ottawa 5

Positioning Type FARC Ontario Requirements From Field Approval Code TSSA-FA-2016 March 2016 2.1.34 (b) Where the FARC system is of a positioning type, (i) it shall have provisions for continuous feedback of all valve/damper/actuator positions to ensure that the command position has been achieved; (ii) the inability of any of the valve/dampers or actuators to achieve the command position shall be detected and it shall prevent the associated valve/damper/actuator from traveling past the corresponding position; (vi) assured sensing of valve/damper shaft position is required. Preferably this should be achieved through a shaft position sensor attached directly and securely to the shaft. If the sensor is attached to a linkage or an actuator, or is part of the actuator, all in-between connections shall be securely fastened to prevent slippage. Use of fastening methods that could become loose is not allowed; (vii) the valve/damper/actuator assembly shall incorporate an external indication of open/close position. In many applications that use quarter-turn dampers, a permanent method of marking the damper position on the visible end of shaft may be acceptable. In other applications, marking of open/close position and, in some cases, marking of intermediate positions may be required in another accessible location; 2018 Education Days London Burlington Kingston Ottawa 6

Positioning Type FARC Linkage-less Advantages Independent actuators allow for improved control over full operating range Improved combustion efficiency Usually lower cost than Metering Type FARC Linkage-less solutions Disadvantages No certainty that the actual air flow and/or fuel flow is correct Shaft position sensors and indicators are sometimes a challenge Typical Coil Tube or Fire Tube Package Boiler * * Photo courtesy of Yorkland Controls Ltd 2018 Education Days London Burlington Kingston Ottawa 7

Metering Type FARC Ontario Requirements From Field Approval Code TSSA-FA-2016 March 2016 2.1.34 (c) Where the FARC system is of a metering type, (i) it shall have provisions for continuous feedback of fuel(s) and combustion air flow(s) to ensure that the command air-to-fuel ratio is achieved; (ii) where combustion air or fuel(s) pressure or temperature can change, appropriate temperature and pressure compensation shall be used; 2018 Education Days London Burlington Kingston Ottawa 8

Metering Type FARC Linkage-less AKA: cross-limited or flow-tie back systems Advantages Independent actuators allow for improved control over full operating range Improved combustion efficiency Certainty that the actual air flow and/or fuel flow is correct FUEL Disadvantages Cost of metering and installation 2018 Education Days London Burlington Kingston Ottawa 9

Metering Type how does it work? Assume steady state conditions at 50% demand; Demand increases to 55% The HI SELECT output increases the Setpoint to the Air Flow controller to 55% and the combustion air damper opening increases to 55% The metered air flow begins to increase towards 55% The LO SELECT output rises with the air flow, and the fuel flow controller Setpoint rises to match the airflow System is balanced once air flow and fuel flow match the 55% demand Advantages Air leads fuel on load demand increase. Fuel leads air on load demand decrease There is never a point where the controls are in a dangerous fuel-rich situation. 55% 50% 55% 50% 50% 55% 55% 55% 50% 50% FUEL 50% 55% 50% 55% 2018 Education Days London Burlington Kingston Ottawa 10

Metering Type FARC Linkage-less How does the airflow magically align with the fuel flow? By adding a function generator we can characterize the raw airflow to equal the fuel flow from minimum fire to full load FUEL f(x) % output (characterized airflow) % Input (raw airflow) 2018 Education Days London Burlington Kingston Ottawa 11

2018 Education Days London Burlington Kingston Ottawa 12

Metering Type FARC Linkage-less How do the control output signals to the FD damper and fuel control valve magically align with flows? By using positioners on the fuel control valve and FD damper + using lever angularity we can linearize the final controls elements to align with the fuel and air flow from minimum fire to full load 2018 Education Days London Burlington Kingston Ottawa 13 FUEL f(x) % output (characterized airflow) % Input (raw airflow)

Max Capacity Flow Top Range Boiler Start-Up Preliminary Curves 10 9 8 7 6 5 4 3 2 I.D. Fan F.D. Fan Feedwater Flow Desired Feedwater Desired F.D. I.D. and Fuel Fuel Flow 1 0 0 1 2 3 4 5 6 7 8 9 10 Input Signal 2018 Education Days London Burlington Kingston Ottawa 14

Techniques of Paralleling Linkage Arrangement of F.D. Fan 100% F.D. Fan Load Parallelogram Linkage Should be Avoided (Shown in Closed Position) 0 0 Signal 100% 100% F.D. Fan Load Angularity Linkage Recommended (Shown in Closed Position) 0 0 Signal 100% 100% F.D. Fan Load "Z" Linkage Arrangement To be Avoided (Shown in Closed Position) 0 0 2018 Education Days London Burlington Kingston Ottawa 15 Signal 100%

Metering Type Fuel Flow Installation Considerations Up-stream & down-stream straight piping requirements Upstream of Flow Control Valve Downstream of PRV Pressure & temperature compensation (mass flow) Main Gas Supply PRV Vent Relief Valve PRV Gas Flow Orifice Vent A Vent Vent A A A A Fast Acting Automatic Shut-off Flow Control Valve Manual Reset Shut-off Supervisory Clock 2018 Education Days London Burlington Kingston Ottawa 16 A A Pilot Ignitor Burner Manifold

Metering Type Air Flow Installation Considerations Ideal location for airflow meter on the inlet side of the combustion air fan Bell Mouth reduces noisy flow signals on inlet side of fan Alternate location for airflow meter (downstream past laminar flow zone) NOTE: potential noisy flow signal issues exist on discharge side of fan 2018 Education Days London Burlington Kingston Ottawa 17

Thank you Glen Harrison Company: Inc. Email: glen.w.harrison@ca.abb.com 2018 Education Days London Burlington Kingston Ottawa 18