2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK Certsure LLP trading as NICEIC or ELECSA ISO/IEC 17065:2012 to provide product conformity certification Warwick House Houghton Hall Park Houghton Regis Dunstable Bedfordshire LU5 5ZX Contact: Ms Marian Armas-Perez Tel: +44 (0)1582 531 000 Fax: +44 (0)1582 531 010 E-Mail: marian.armas@certsure.com Website: www.certsure.com Locations where certification activities covered by the above Accreditation are undertaken Certsure LLP trading as NICEIC or ELECSA Warwick House Houghton Hall Park Houghton Regis Dunstable Bedfordshire LU5 5ZX United Kingdom Certsure LLP trading as NICEIC or ELECSA Mansfield Business Centre Ashfield Avenue Mansfield NG18 2AE Assessment Manager: RW1 Page 1 of 7
DETAIL OF ACCREDITATION Fire Protection Industry Scheme SP 203 for the Design, Installation, Commissioning & Maintenance of Fire Detection and Alarm systems BAFE scheme, SP.203-1 Version 7 (September 2016) Electrical work within the scope of BS 7671 - Requirements for Electrical Installations, other than in hazardous areas (Approved Contractor scheme) BS 7671 (As Installation, inspection, testing and maintenance of electrical installations in potentially explosive atmospheres within the scope of BS 7671 BS 7671 supplemented by BS EN 60079 The requirements covering the assessment of technical competence for electrical installation activities in buildings and industrial locations, generally as encompassed in BS 7671 in accordance with the ECA Membership scheme. BS 7671 (as Microgeneration Installer Certification Scheme for supply, design, installation, set to work, commissioning and handover MCS 001 Installer scheme requirements solar heating micro generation systems heat pump systems solar voltaic systems Wind Generation of electricity MIS 3001 MIS 3005 MIS 3002 MIS 3003 Assessment Manager: RW1 Page 2 of 7
Installer scheme requirements Heat Generation technology in the form of biomass MIS 3004 Micro-CHP systems MIS 3007 Additional Requirements for MCS Installation Companies to become Green Deal Authorised Issue 1.0 MCS 023 Installation of following measures: Condensing Boilers, Gas Fired (domestic and non-domestic) Condensing Boilers, Liquefied petroleum gas-fired (domestic and non-domestic) Condensing Boilers, Oil Fired (domestic and non-domestic) Heating Controls Under-floor Heating Flue Gas Recovery Devices Gas-fired warm-air heating systems (domestic and nondomestic) Electric storage heaters (domestic and non-domestic) Cavity Wall Insulation Loft Insulation Pitched Roof Insulation Flat Roof Insulation Internal Wall Insulation External Wall Insulation Hybrid Wall Insulation Draught Proofing Floor Insulation Heating System Insulation (pipes and cylinders) Energy Efficient Glazing and Doors Lighting Fittings Lighting Controls (non-domestic) Hot water systems Mechanical Ventilation and Heat Recovery Room in Roof Insulation PAS 2030:2017 Specification for the installation of energy efficiency measures (EEM) in existing buildings Edition 4 - February 2017 PAS 2031:2017 Certification of energy efficiency measure (EEM) installation in existing buildings Edition 3 March 2017 Assessment Manager: RW1 Page 3 of 7
Installation of Combustion appliances - Oil (including liquid biofuels) an oil-fired combustion appliance or oil storage tanks and the pipes connecting them to combustion appliances Insertion of insulating material into the cavity walls of an existing building. amended Installation of Combustion appliances - Solid fuel (including biomass) Electrical installations - In dwellings Full competence schemes covering any electrical installation work in a dwelling, including lighting systems (Approved Document P: electrical safety, dwellings) Electrical installations - Defined competence schemes. Note: These schemes are defined primarily for those who do electrical installation work as an adjunct to or in connection with their primary work activities for example, in connection with gas installations of kitchen or bathroom fitting or fire alarm or security system installation (Approved Document P: electrical safety, dwellings) Assessment Manager: RW1 Page 4 of 7
Electrical installations - In buildings other than dwellings Lighting systems Installation of heating and hot water systems Connected to a heat-producing gas appliance Connected to an oil-fired combustion appliance Connected to a solid fuel appliance Connected to an electric heat source Electric heating system in dwellings Electric heating system in buildings other than dwellings Installation of mechanical ventilation and airconditioning systems In dwellings (not involving work on systems shared with other dwellings) In buildings other than dwellings (not involving work on a system shared with parts of the building occupied separately) Installation of plumbing and water supply systems Wholesome and softened wholesome water supply Non-wholesome water supply to a sanitary convenience with a flushing mechanism (not involving work on shared or underground drainage) Sanitary Conveniences, sinks, washbasins, fixed baths, showers, or bathrooms in dwellings (Not involving work on shared or underground drainage) Assessment Manager: RW1 Page 5 of 7
Installation, as a replacement of, double glazed windows & doors, roof windows & roof lights Installation of microgeneration and renewable technologies and excepted energy buildings in Wales) n accordance with the Building Regulations 2010 (as Installation of insulating materiala to the internal walls of a building Installation of insulating material to the external walls of a building, not including insulation of demountableclad buildings Assessment Manager: RW1 Page 6 of 7
Instillation of insulation material to both external and internal walls of a building ( hybrid insulation ), not including insulation of demountable-clad buildings END Assessment Manager: RW1 Page 7 of 7