The Drying Time of Gypsol Screed

Similar documents
Who are We and what do we do?

INSTALLATION INSTRUCTIONS ONE LARGE ZONE

In this paper we will look at the aims, methods, systems and practice of bulb drying.

WARM WATER UNDERFLOOR HEATING SYSTEMS. Guidance Notes

INSTALLATION INSTRUCTIONS

Alphasense Application Note AAN 106 HUMIDITY EXTREMES: DRYING OUT AND WATER ABSORPTION

Hot-air distribution in the floor heating

Saving lives with coatings

CRAWL SPACE MOISTURE CONTROL - A Fundamental Misunderstanding By Peter Carpenter, member ASHRAE, SBCCI

Thermo Scientific ULT Freezers: Superior Thermal Performance

Desiccant Cooling with Solar Energy

EVAPORATION NEEDS ENERGY

asphalt applications European Asphalt Standards and their application in the UK mpa asphalt Asphalt Information Service Mineral Products Association

IGCSE PHYSICS GRADE 11 TERM 1 ASSESSMENT BOOKLET

ASSESSMENT OF FIRE BEHAVIOUR OF TIMBER PARTITION MATERIALS WITH A ROOM CALORIMETER

Unit 2 Fire Safety (Zone 2)

Gas Emergency Response

Secador Automatic Desiccator. vs. Comparable Competitor

Underfloor Heating Inscreed Cable System

USER APPROVAL OF SAFETY INSTRUMENTED SYSTEM DEVICES

Damp, Mould and condensation. The Facts About

DESIGN AND CONSTRUCTION OF A DE-ICING FACILITY FOR A SMALL AIRPORT ENVIRONMENT

INSTALLATION INSTRUCTIONS SINGLE CIRCUIT

LYOTRAP FREEZE-DRYING MACHINE OPERATING INSTRUCTIONS

ISHRAE. Guideline document to ISO Version 1 Feb Indian Society of Heating, Refrigerating and Air Conditioning Engineers

Introduction. A soil is an earth concrete. Composition of a soil

The Laboratory is qualified to update standards identifying the test procedures.

USER MANUAL CEF AP28 CONTROL PANEL

OneZone. Underfloor heating range. For existing properties & new build extensions. Extensions Conservatories Single rooms HEAT PUMPS

Research Newsletter No. 35. October Bill Miller

about your house Choosing a Dehumidifier

INSTALLATION INSTRUCTIONS

Press Release. How can the efficiency of the dryer section be increased? Dryer Section All Paper Grades. Heimbach wherever paper is made.

Fire resistance test on fire collars protecting a concrete slab penetrated by services

A Primer for Air Dryer Selection

Managing Fire Risk for New Rural Dwellings

about your house Measuring Humidity in Your Home Figure 1 Do you have a humitity problem? Table 1 Humidity hassles

Drying principles and general considerations

Grower Summary PO 005

MANUAL DRYING OF SEED. A Unit Standard for the Seed Industry. Unit Standard New Draft NQF Level 4 Credits: 13. Compiled by:

Electric Under Floor Heating

EMERGING NEEDS FOR CORROSION CONTROL AND PREVENTION THROUGH DESICCANT DEHUMIDIFICATION

Gambling with your fire security?

MINTRAC MEAT INDUSTRY ENVIRONMENT CONFERENCE WASTE HEAT RECOVERY FROM RENDERING PLANTS PRESENTED BY DEREK HENDERSON

Meaco 10L small home dehumidifier Instructional Manual

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.

SMOKE DETECTOR TESTERS

chocmelter (cm20) Operating Instructions

HYDROMETTE BL COMPACT RH-T RH-T flex

NOVEL COMPACT SORPTION GENERATORS FOR HEAT PUMP APPLICATIONS

The Complete Guide to Gas Sample Drying for Your Analyzer or Process

MAINTENANCE SEAL MAINTENANCE PREVENTING WINDOW CONDENSATION. Kohltech.ca

Your comprehensive guide to: Condensation & Mould Growth

HUMIDITY IN INCUBATION

In the past, contractors sized heating and cooling systems GETTING HVAC RIGHT

Thermal Properties and Temperature

The Laboratory is qualified to update standards identifying the test procedures.

Guidance. Service of Hydrocarbon Refrigerant Equipment in a Retail Environment

G R O U P. Climate control

ADVICE NOTE CONDENSATION. How to control condensation problems in your flat

Airfield Industrial Estate Hixon Staffordshire ST18 0PF

Development of best practice for the use of Type R thermocouples for creep testing

I. C O N T E N T S T A N D A R D S

Guidelines to Green Roofing

SYSTEM DATA SHEET Sikafloor MultiDur ES-44 ESD

Grape Hyacinth (Muscari) Cooling and Forcing

DD200 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

Home Owners Information and Health & Safety File and Guide SITE:

TESTS OF ADSIL COATING

Model 1174 Electric Heater User instructions for LED effect 2kw Inset Heater

Pavers Spade, rake (metal prongs), wheelbarrow, wooden stakes, string line, tape measure, pegs and spirit level

PERFORMANCE OF SOLID DESICCANT COOLING WITH SOLAR ENERGY IN HOT AND HUMID CLIMATE

Opening up the Gas Market (OGM) Project Oban - Laboratory and Field Testing Results

DOMESTIC DEHUMIDIFIERS IN COOL CONDITIONS: I PERFORMANCE FACTORS

ERGON EQUIPMENT SA PRESENTATION

Study on an environmental simulation system of low/high temperature. for great space

SIL DETERMINATION AND PROBLEMS WITH THE APPLICATION OF LOPA

QUALIFICATIONS AND CREDIT FRAMEWORK (QCF) LOGIC CERTIFICATION LIMITED (LCL) QUALIFICATION SPECIFICATION

Stockton 7 & 8 Inset Convector Stove

Thermal Environment in a Space with Capillary Mats Large-Area Cooling and Heating

REGULATED QUALIFICATIONS FRAMEWORK (RQF) LOGIC CERTIFICATION LIMITED (LCL) QUALIFICATION SPECIFICATION

THE CAUSES & EFFECTS OF CONDENSATION IN BUILDINGS

1 SLABBING, RENDERING, FLOATING AND SKIMMING

Risk Management Services. Electrical Safety Inspection and Testing. We can show you more.

Drying Groundnuts: Adapting the EasyDry M500 Portable Maize Dryer for Groundnuts

Simple. Smart. Solutions. ROOM PACK Z2105/239/0812. Step by Step Installation Guide

ELD500 PRECISION LEAK DETECTOR

MIXING RATIO AND ABSOLUTE HUMIDITY

CA-707. Manual. Read these instructions carefully before you start using the dehumidifier and keep the manual for later usage.

Museum Archive Dehumidification in Hot & Humid Climates

Water in Buildings: Chemical-Free Clean Up & Resotration for Builders & Facility Managers Case Study #2 Duration: 4-6 hours

INSTALLATION INSTRUCTIONS GB/IE

SIMULATION ANALYSIS OF BUILDING HUMIDITY CONTROL AND ENERGY CONSUMPTION FOR DIFFERENT SYSTEM CONFIGURATIONS USA

Active Dry Air Venting for Water Contamination Control

PALLET CARD PROGRAM LABORATORY REPORT

DD200 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

PASSIVE AND ACTIVE FIRE PROTECTION OF THE AIR HEATED SOLAR HOUSES

QAQC LABS ANALYTICAL DRYING

Air always contains a certain amount of water in the form of vapour. This determines the

Hybrid Refrigerated/Desiccant Compressed Air Dryers

Transcription:

1 SYNOPSIS Trials were carried out on full size rooms, specially constructed for testing purposes, and in a strictly controlled laboratory environment, and showed the following: 1.1 Gypsol anhydrite screeds at 50 mm thick dried in 11 days from installation when force dried using underfloor heating. 1.2 There was no observable benefit for drying time, where force drying was used, in removing the laitance of the Gypsol screeds. However different laitance amounts may affect this result. 1.3 In good, well ventilated conditions, unassisted drying took 27 days for a 50mm Gypsol screed. 1.4 Gypsol anhydrite screeds dry as quickly as sand:cement screeds. 1.5 Testing for moisture content and/or relative humidity can be affected by the equipment and process. It therefore requires careful thought and an understanding of this specialist field. 2 INTRODUCTION Action Dry Emergency Services Ltd was formed in 1996 by Mr Andy Habbershaw, Principal and CEO, to provide a service to builders and building owners/managers to dry out buildings, initially those suffering damage by flood or other major water ingress, later those where residual embodied water was still present in some of the construction materials, for example concrete, plaster, blocks, floors etc. He has since become a leader in the field and Steering Panel Technical Expert on the British Standard Publically Available Standard PAS 64 Mitigation and recovery of water damaged buildings. Code of Practice. Delays to building programmes are often caused by unnecessary and prolonged drying periods for both new and existing buildings undergoing refurbishment/extension. There are conflicting claims regarding the drying times of screeds and many of the often recited rules of thumb may not be applicable to modern anhydrite screeds. It is not unknown for laboratory test results carried out on small, laboratory size samples, to fail to correspond accurately to the real life situation, and perhaps to lead to misleading conclusions. It became clear that existing data, generally based on these small laboratory size samples, was inadequate. Only by testing in full size rooms, in a life size building, could data be obtained that related meaningfully to the real life situation. Page 1 of 6

Due to this deficit of sufficient data on drying times of screed Action Dry sourced a very large building of sufficient size to build within it a full size test house with a series of rooms using different material and structural forms. These were then used to test the drying of either embodied construction moisture or simulated flooding. As an example, a room could be built of a particular type of block, plastered with a particular plaster, and the drying time measured. Water could be pumped in to simulate flooding a room or rooms and the drying time measured. Drying times could then be compared when drying out naturally, or when accelerated drying was carried out using plant embodied within one of the specialist Action Dry vehicles. Similarly, different types and thicknesses of screed could be tested comparatively for drying times. 3 THE DRYING OF FLOOR SCREEDS It is not difficult to test the moisture content or relative humidity of floor screed, and Francis Flower are pleased to advise in respect of their Gypsol screeds, but there is misinformation and sometimes a lack of understanding in the field. Typically, drying times quoted for granular, cementitious or other bonded materials. For example cement:sand floor screed, brick masonry and blockwork are quoted as being about 1 mm per day, with scant regard for the specific product type or the particular on-site drying conditions. It is assumed that this relates to a theoretical temperature of 20 C and a relative humidity of 60%, but on site this is often forgotten. Further qualification is required to consider thickness, so that we have the theoretical statement above that drying proceeds at about 1 mm a day for the first 40 mm of thickness, but at only 0.5 mm a day for thicknesses in excess of that. As an example then, an 80 mm thick screed could take 40 + (40 x 2) days, or 120 days to dry. This value is generally a useful start however it is essential to remember that there must be good ventilation. Without good ventilation, i.e. air flow, generally from open windows and doors, moisture cannot escape. It is important to remember that if a newly screeded room is completely closed, with all windows and doors remaining shut, no matter how good the apparent drying conditions are the screed will not dry. Unfortunately, as modern sites increase security, there appears to be an increasing reluctance to ventilate newly screeded rooms, or indeed rooms where any wet trades, for example plastering, have been carried out. This leads to unnecessarily prolonged drying times and sometimes to the adoption of unnecessarily complex drying solutions. The application of heat is also sometimes used to accelerate drying; indeed, in colder, inclement weather conditions, adequate drying may not be realistically achievable without the assistance of this additional measure. Care must be taken however, as heating in the form of direct LPG or similar Page 2 of 6

heater/blower units create moisture vapour, so that whilst raising the temperature this also raises, rather than lowering, the moisture content of the atmosphere, thus potentially slowing or even stopping drying rates. 4 THE TEST PROGRAMME CARRIED OUT BY ACTION DRY LTD Against the background of uncertainty outlined above, an investigation was carried out by Action Dry Emergency Services Ltd, to investigate the drying of Gypsol, the market leading anhydrite based screed, under conditions that could realistically be achieved on a well-run construction site in a rigorous way and to provide factual and accurate answers. All the work was carried out in Action Dry s bespoke 110 m 2 research house with a variety of different constructions and conditions as explained below. Humidity and temperature were carefully controlled, and both the moisture content and relative humidity of the screed measured at intervals in each area. This final report of the work refers to the RH (relative humidity) of below 75% as being dry, as recommended in BS 8204-1 and BS 8204-7. 4.1 The effect of drying type Four different drying regime types were tested as follows: - With the underfloor heating operating - Using a thermo desiccant adsorption dehumidifier - Using a Speedry portable convectant heat drying system - Using a commercial refrigerant de-humidifier 4.2 The effect of removing laitance Parts of the screed surface in some test bays were left with the laitance in place, others parts had the laitance removed by sanding and vacuuming. 4.3 The effect of surface coverings Some test bays were covered with timber framed polyethylene covers, others were left uncovered. 4.4 The effect of screed binder type Both anhydrite and cement binders were tested. 5 RESULTS 5.1 The effect of drying procedure type. It was found that using underfloor heating provided the fastest results with the Speedry convectant drying system from Action Dry producing the next fastest drying results of the portable dehumidifier systems. As the Speedry system provides dry Page 3 of 6

warm air flow this was not a surprise and reinforces the importance of good ventilation and removal of damp air. Forced drying using the underfloor heating produced very rapid drying and the floor was suitable to receive moisture sensitive coverings in as little as 11 days from installation by using the underfloor heating system appropriately (Figure 1). The procedure for commissioning underfloor heating was followed from the Gypsol website. In good ambient conditions a 50 mm Gypsol screed was seen to dry suitably in approximately 27 days (Figure 2 and Figure 3) which is half the time suggested by the industry rule of thumb which would suggest 60 days were necessary. Although the conditions provided were optimal, this it would suggest that with best site practice faster drying times than the traditional rules of thumb can be regularly achieved. Figure 1 - Relative Humidity (in green) steadily drops after commissioning of underfloor heating. Page 4 of 6

Figure 2 - Relative humidity (in green) in standard conditions reaches <75% within 27 days from installation of a 40 mm Gypsol screed. Figure 3 - Using the reference method of surface box RH the 50mm Gypsol screed dries in 27 days. 5.2 The effect of removing laitance. In the areas tested no effect on drying times was apparent whether the laitance was removed or not. It is acknowledged, however, that this tested a screed Page 5 of 6

produced with a single sand source and different screeds may produce differing thickness and densities of laitance. 5.3 The effect of surface coverings. It was noted that as expected, surface coverings delayed drying times. Proper ventilation to allow exchange of air is essential to effective drying of screeds. 5.4 The effect of screed binder type. Gypsol anhydrite binder did not increase drying times. Indeed very rapid drying was achieved using several methods as noted in 5.1. Sand: cement screeds dried in similar times when left to ambient conditions (Figure 4). 6 RECOMMENDATIONS Figure 4-50mm Sand:cement screed dries in a similar time as the Gypsol screeds, 30 days. 6.1 Ventilation. Good ventilation should be provided to dry Gypsol screeds following the initial 48 hours of setting and strength formation. This can be achieved by opening all doors and windows. After 72 hours modern heat based dehumidifiers such as the Speedry system can be used to rapidly decrease drying times if desired, and after 7 days heating can be applied. All of these processes if applied correctly can lead to a rapidly dried screed ready to receive moisture sensitive floor coverings in considerably shorter timescales than the historic and frequently inaccurate rules of thumb. 6.2 Underfloor heating. Where underfloor heating is installed, if it is commissioned following the binder manufacturer s guidelines, it can dry the floor in as little as 4 days. This makes a total of 11 days from installation. 6.3 Laitance removal. Although no effect was seen in this experiment, it is still advisable to remove laitance within the first 7 days. Industry best practice dictates that any screed should be sanded prior to covering. Page 6 of 6