CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

Similar documents
CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015

ELEVATORS AND FIRE ALARM SYSTEM INTERFACES CANADIANFIRE ALARM ASSOCIATION 2011 ONTARIO ANNUAL TECHNICAL SEMINAR

AHJ PERSPECTIVE INTEGRATED SYSTEM TESTING. Eddy La Rocque

COMMISSIONING OF LIFE SAFETY AND FIRE PROTECTION SYSTEMS: WHAT, WHERE AND HOW?

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

1.3 REFERENCE STANDARDS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Fort Rouge Leisure Centre Section HVAC Upgrades Phase 2 Page 1 of 5 Bid Opportunity No March 2013 FIRE ALARM SYSTEMS

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS

BUILDING CODE INTERPRETATION

VERIFICATION OF FIRE ALARM SYSTEMS

Brighton Area Fire Authority

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used.

CAN/ULC-S561. To comply, or not to comply. actually it s not even a question! Underwriters Laboratories of Canada. By Alan Cavers & Brian McBain

The Technical Committee on Commissioning and Integrated Testing

Narrative Reports As Regulated by 780 CMR, Section 903.0

APPENDIX H (DESIGN SUBMISSION CRITERIA)

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

26 of 128 9/23/2014 9:25 AM

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10

Minimum Standards for Engineers Practicing Fire Protection Engineering in the State of Oklahoma September 14, 2016

PWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE

PROPOSED CHANGE TO THE 2012 BUILDING CODE O. REG. 332/12 AS AMENDED

NFPA 72 Code Changes vs 2013

WEST VIRGINIA UNIVERSITY

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

Winnipeg Fire Department Fire Prevention Branch

Florida Building Code 2010

Florida Building Code Chapter 9 Fire Protection Systems Advanced Course

Fire Signal Receiving Centres vs. Proprietary Fire Signal Receiving Centres CAN/ULC-S561 ALAN CAVERS ULC

2012 OBC Changes. Summary of key changes to Life Safety and Fire Protection Systems for CFAA January 22, 2014

FEO Initiation Devices Dean McLellan

Unified Fire Authority - Fire Prevention Bureau

2. HVAC and smoke control systems; fire, smoke, and combination fire/smoke dampers. 5. Central control and monitoring system.

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

Changes in NFPA

Advanced Fire Alarm Systems Training Program Outline (5 Day)

Are You Prepared? The impending impact of Code on Servicing Security Systems

BOMA Calgary Luncheon Thursday, October 11, 2012 Building Owners Responsibilities for Fire Safety Equipment (Fire Alarm) Canadian Fire Alarm

Louis-Philippe Gagnon Alarm System Auditor UNDERWRITTERS LABORATORIES OF CANADA May 13 th, 2015

FIRE & LIFE SAFTEY STANDARD

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

CERTIFICATION BULLETIN

COUNTY OF KINGS KINGS COUNTY JAIL EXPANSION PHASE III

Automatic Fire Alarm Association Webinar On Inspection, Testing, And Maintenance Of Fire Alarm Systems

Black Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment

THIS ORDINANCE ONLY AFFECTS EXISTING FIRE ALARM SYSTEMS.

SECTION SECURITY TESTING AND COMMISSIONING

MAINTENANCE OF FIRE PROTECTION DEVICES WITHIN RESIDENTIAL SUITES OF MULTI-FAMILY BUILDINGS

BULLETIN BU/EL Revised August 11, 2015

CFAA Alberta Technical Seminar October 24, 2013 Calgary

September 30, Dear Fire Suppression System Contractor/Designer:

Bold items are particular to the City of Euless

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

British Columbia Building Code 2006 Division B Part 3 Fire Protection, Occupant Safety and Accessibility Section 3.2 Building Fire Safety

CFAA Technical Seminar Ontario Building Code Updates to 2015

D. Reference Standards (Utilize latest editions available):

PART 1 GENERAL Quality Assurance A. Fire Alarm Contractor Qualifications:

Fire Prevention Coffee Break Training. February 2017

SOCIETY OF FIRE PROTECTION ENGINEERS POSITION STATEMENT P THE ENGINEER AND THE TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS.

CERTIFICATION BULLETIN

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION FIRE ALARM SYSTEM

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax)

COPYRIGHT ULC STANDARDS

Design & Construction Standards, Revised January

Building Standards Advisory Promoting construction of safe, healthy, habitable buildings

TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT

Fire Alarm System Inspection and Testing Report

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

Type of Fire Alarm Control Panel: System is: Existing OR New If new, provide Electrical Permit Number:

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

PART 1 GENERAL Quality Assurance A. Fire Alarm Contractor Qualifications:

MANUAL OF DESIGN CRITERIA AND SPECIFICATIONS FOR FIRE DETECTION AND ALARM SYSTEMS PUBLIC SCHOOLS IN NEW MEXICO

Design & Construction Standards, Revised January

Renovation Program. Renovation Program GENERAL

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Fire Permit Application

Fire Alarm System Fundamentals

Electronic Safety and Security

SECTION : FIRE ALARM & DETECTION SYSTEMS

DRAFT NFPA 805 TRANSITION PILOT PLANT OBSERVATION GUIDANCE

El Reno Fire Department Fire Alarm Plan Review Worksheet

Date of Authorization May 26, 2005 BMEC Authorization BMEC Application # A

Major Changes to the 2010 National Construction Codes Contractor s Breakfast January 2014

Public Notice of Amendment to New Shoreham General Ordinances Chapter 5 Fire Prevention and Protection New Article IV Fire Alarm Ordinance

American Fire Sprinkler Association. An Introduction to the IBC and IFC

May 1, Dear Fire Suppression System Contractor/Designer:

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

Slide 1. Slide 2 Instructor. Slide 3. NFPA 25 The Owner s Manual. Roles & Responsibilities DISCLAIMER

Setting the Standard in Third-party Certification

INSPECTION AND TESTING FORM

SPECIFICATION: AlarmLine TM INTELLIGENT LINEAR HEAT DETECTION

Fixed Fire Protection Getting it right, Ensuring Performance and Value

Transcription:

2013 Randal Brown & Associates Engineering Ltd. 1 RANDAL BROWN & ASSOCIATES ENGINEERING LTD. CONSULTING ENGINEERS LIFE SAFETY & FIRE PROTECTION 105 6 LANSING SQUARE TORONTO, ONTARIO CAN/ULC-S1001-11 INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS CANADIAN FIRE ALARM ASSOCIATION 2013 ONTARIO ANNUAL TECHNICAL SEMINAR MAY 31, 2013

2013 Randal Brown & Associates Engineering Ltd. 2 PRESENTED BY Simon Crosby, CET, CFPS Project Manager Randal Brown & Associates Engineering Ltd. Chair ULC Subcommittee on Commissioning

2013 Randal Brown & Associates Engineering Ltd. 3 WHY COMMISSIONING? Requirement included as a Technical Change to the 2010 NBCC & NFCC 2010 NBCC Article 3.2.4.6 2010 NFCC Article 2.1.3.8 Where life safety and fire protection systems are installed to comply with the provisions of the NBC or the NFC, the commissioning of these integrated systems must be performed as a whole to ensure the proper operation and inter-relationship between the systems.

2013 Randal Brown & Associates Engineering Ltd. 4 WHAT IS COMMISSIONING? Subcommittee discussions as to what commissioning is Two different processes identified: Commissioning Owners Process Integrated Systems Testing Code Requirement Intent of the NBCC / NFCC reviewed with NRC to ensure Standard in-line with Codes

Commissioning COMMISSIONING VS. INTEGRATED SYSTEMS TESTING A process of documentation, adjustment, testing, verification and training, performed specifically to ensure that the finished facility operates in accordance with the Owner s documented project requirements and the construction documents Integrated Systems Testing A methodology for verifying and documenting that all interconnections between systems provided for fire protection and life safety are installed and operating in conformance with their design criteria 2013 Randal Brown & Associates Engineering Ltd. 5

COMMISSIONING Highlights Owner Driven and Quality Focused Ensures Owners get what they paid for Process from Pre-Design to Turn-Over Develop Owner s Project Requirements Develop Commissioning Scope and Plan Review of Design Documents Construction Checklists and Submittals Review Construction and Testing Training and Closeout Documents and Activities 2013 Randal Brown & Associates Engineering Ltd. 6

Highlights COMMISSIONING Documentation of Design Changes and Resolutions, Verifications, and Acceptance Testing Owner gets more out of their investment Better Operating Systems Properly Maintained Systems Properly Training Building Staff Fire Commissioning is the fire protection and life safety component of Building Commissioning 2013 Randal Brown & Associates Engineering Ltd. 7

Highlights INTEGRATED SYSTEMS TESTING Code Driven Process Minimum testing required to prove integrations System A works with System B Testing of the integrations between systems in situ One input device per integration activated to confirm corresponding outputs Documentation of the testing 2013 Randal Brown & Associates Engineering Ltd. 8

INTEGRATED SYSTEMS TESTING Address gaps in existing Standards Systems typically tested and verified independently No requirements to test systems together Example Door Hold-Open Devices Fire alarm relays tested and doors confirmed as operating Testing by separate contractors Integrated Systems Testing requires a coordinated test Example Fire Pumps Fire pump installed and tested to confirm relays work Fire alarm verification to confirm inputs Integrated Systems Testing requires a coordinated test 2013 Randal Brown & Associates Engineering Ltd. 9

2013 Randal Brown & Associates Engineering Ltd. 10 INTEGRATED SYSTEMS TESTING Integrated Systems Testing is not Replacement of Design Professionals review and acceptance of systems Review of system designs or installations, only system integrations Duplication of existing inspection, testing, and verification requirements

2013 Randal Brown & Associates Engineering Ltd. 11

2013 Randal Brown & Associates Engineering Ltd. 12 CAN/ULC-S1001-11 Integrated Systems Testing of Fire Protection and Life Safety Systems

2013 Randal Brown & Associates Engineering Ltd. 13 ULC-S1001 CODE ADOPTION Reference Standard Status Code Changes submitted to the NRC Inclusion in the 2015 National Building and Fire Codes of Canada Reviewed by Reference Standards Working Group Recommendations to the Standing Committees

NATIONAL BUILDING CODE 2015 Edition Tentative Changes New Subsection 3.2.9 Removes 2010 NBC Article 3.2.4.6 New Sentence 3.2.9.1.(1) Requirements Testing of integrations between fire protection and life safety systems, and systems with fire protection and life safety functions Systems and integrations to be tested as a whole ULC-S1001 Reference Standard for Integrated Testing 2013 Randal Brown & Associates Engineering Ltd. 14

NATIONAL BUILDING CODE Appendix Note A-3.2.9.1.(1) Testing of Integrated Systems Owners must ensure fire protection and life safety systems are functioning in accordance with their design, including interconnections with other building systems CAN/ULC-S1001 provides the methodology for verifying and documenting that interconnections between building systems satisfy the intent of their design 2013 Randal Brown & Associates Engineering Ltd. 15

NATIONAL FIRE CODE 2015 Edition Tentative Changes Construction requirements in Article 2.1.3.8 New Section 6.8 on testing of integrations Article 2.1.3.8 References the NBC for installation of system integrations Section 6.8 Integrations between fire protection and life safety systems to be tested and maintained in confirmation with ULC-S1001 2013 Randal Brown & Associates Engineering Ltd. 16

ULC-S1001 CODE ADOPTION Standing Committees Proposed Change reviewed by Standing Committees Use and Egress Fire Protection Housing and Small Buildings Proposed changes accepted by all three standing committees Changes will be circulated for public comment during next review phase 2013 Randal Brown & Associates Engineering Ltd. 17

2013 Randal Brown & Associates Engineering Ltd. 18

2013 Randal Brown & Associates Engineering Ltd. 19 S1001 MAJOR SECTIONS Integrated Systems Testing Requirements Qualifications Process Testing Requirements Documentation Periodic Integrated Systems Testing Retro Integrated Systems Testing Integrated Systems Testing for Modifications

2013 Randal Brown & Associates Engineering Ltd. 20 QUALIFICATIONS Participants in the Integrated Testing Plan Design Professionals, Installing Contractors, Verifying Parties Knowledge and experience in the design, installation, and operation of their relevant systems Regulations may exist for licensing and/or certification of these individuals

QUALIFICATIONS Integrated Testing Coordinator Maybe a person, firm, or corporation Knowledge and experience of integrated systems, operation under normal and fire conditions, and methods of validation Licenses and Certifications? Standard can t dictate professional qualifications To be part of the adoption in Regulations Could also be in Owner s contractual requirements 2013 Randal Brown & Associates Engineering Ltd. 21

PROCESS Planning Phase Information gathering from Design Professionals Building Floor Plans Fire Protection / Life Safety System Design Documents Sequencing descriptions and coordination of systems M&E Riser Diagrams Operating and Testing Instructions Alternative Solutions Miscellaneous 2013 Randal Brown & Associates Engineering Ltd. 22

PROCESS Planning Phase Preparation of the Integrated Testing Plan Functional Objectives of System Integrations Sequences of Operation Integrated Testing Protocols and Procedures Occupant Notification Procedures Alternative Measures Appendix B Guidelines 2013 Randal Brown & Associates Engineering Ltd. 23

PROCESS Planning Phase Integrated Testing Plan Consider safety of personnel Consider safe operation of systems Consider Phased Occupancy, where applicable Approved by the Design Professionals Reviewed by the AHJs, where required Revised when changes to systems are made 2013 Randal Brown & Associates Engineering Ltd. 24

PROCESS Implementation Phase Prior to implementing the Integrated Testing Plan Confirmation from Design Professionals and Installing Contractors that systems are ready for testing Verification documentation from Verifying Parties Inspection Certificates from Local Authorities Occupant notification procedures implemented Alternate measures implemented Notify AHJs, where required 2013 Randal Brown & Associates Engineering Ltd. 25

PROCESS Implementation Phase Implementation of Test Protocols As per the Integrated Testing Plan Design Professionals, Installing Contractor, and Verifying Party participation required Retesting of Failed Tests Documentation of Tests 2013 Randal Brown & Associates Engineering Ltd. 26

TESTING REQUIREMENTS Project Specific Testing Procedures to demonstrate proper operation of integrated systems based on design criteria Functional operation of input devices Simulated operation permitted for non-restorable devices or where tests could harm persons or damage systems Acceptance of other documented testing at the discretion of the Integrated Testing Coordinator Performance Based Testing Requirements 2013 Randal Brown & Associates Engineering Ltd. 27

TESTING REQUIREMENTS Systems Considered Fire Alarm Systems Mass Notification Systems Elevators Emergency Generators A/V and Lighting Control Systems Notification Systems Sprinkler Systems Standpipe Systems Fire Pumps Water Supplies Water Supply Control Valves Freeze Protection Systems Fixed Fire Suppression Systems Cooking Suppression Systems Hold-Open Devices Electromagnetic Locks Smoke Control Systems Hazardous Protection Monitoring Smoke Alarms 2013 Randal Brown & Associates Engineering Ltd. 28

2013 Randal Brown & Associates Engineering Ltd. 29 TESTING REQUIREMENTS Testing effort is related to the complexity of the system For example a smoke exhaust system Various input/output correlation tests Fan and damper control and status monitoring Control interfaces (Firefighter s Smoke Control Station, BMS) For simple analog interconnections, one input activated to initiate sequence operation of fans, dampers, etc. confirmed to test integrations Complicated digital interfaces each software command string considered an integration

Fire Pumps SAMPLE TEST REQUIREMENTS FIRE PUMPS Testing of each interconnection, as provided Fire Pump Running, Trouble, Phase Reversal, Loss of Phase, Connected to an Alternate Source, Controller Main Switch in Off or Manual Position, etc. 2013 Randal Brown & Associates Engineering Ltd. 30

2013 Randal Brown & Associates Engineering Ltd. 31 Fire Pumps SAMPLE TEST REQUIREMENTS FIRE PUMPS Each monitored condition is created on the Fire Pump to show the correct integration is provided Fire Pump manually started and Fire Pump Running annunciation confirmed at the Fire Alarm System Fire Pump trouble condition created and Fire Pump Trouble annunciation confirmed at the Fire Alarm System

SAMPLE TEST REQUIREMENTS EMERGENCY GENERATORS Emergency Generators Similar to Fire Pumps Testing of each interconnection, as provided Generator Running, Trouble, etc. Each monitored condition is created on the Emergency Generator to show the correct integration is provided 2013 Randal Brown & Associates Engineering Ltd. 32

SAMPLE TEST REQUIREMENTS EMERGENCY GENERATORS Emergency Generators Additional required Generator Start-Up Test Full load test All systems running at full design capacity Simulated loss of normal power All running systems confirmed as operating under emergency power 2013 Randal Brown & Associates Engineering Ltd. 33

SAMPLE TEST REQUIREMENTS SPRINKLER SYSTEMS Sprinkler Systems Testing of Each Interconnection Typically alarm and supervisory device monitoring Test method appropriate for the integration Flow water to test an integration to a flow switch Turn valve to test an integration to a supervised valve CAN/ULC-S537 Verification acceptable, at Integrated Testing Coordinators discretion Process to not duplicate existing test and verification requirements 2013 Randal Brown & Associates Engineering Ltd. 34

DOCUMENTATION Integrated Systems Testing Report Final Integrated Testing Report consists of the Integrated Testing Plan Documentation collected during Implementation Phase Integrated Testing Forms for Initial Test Integrated Testing Forms for Re-Tests Future use throughout the building s life cycle Life Cycle Testing Modifications 2013 Randal Brown & Associates Engineering Ltd. 35

LIFE CYCLE TESTING On-Going Integrated Systems Testing On-Going Testing or Testing of Existing Systems Re-Testing after system modifications Implementation to be by Governing Bodies Building and Fire Codes Other Legislation Contract Requirements 2013 Randal Brown & Associates Engineering Ltd. 36

2013 Randal Brown & Associates Engineering Ltd. 37 LIFE CYCLE TESTING Periodic Integrated Systems Testing Routine Integrated Systems Testing throughout the building s life cycle Ensure system integrations are maintained 1 Year Confirmation Test 5 Year Periodic Testing

LIFE CYCLE TESTING Retro Integrated Systems Testing Integrated Systems Testing for Existing Buildings Confirmation that systems are properly integrated Similar process as new construction Lack of system Design requires detailed review Integrated Systems Testing for Modifications Amended Integrated Systems Testing Implement testing for effected systems 2013 Randal Brown & Associates Engineering Ltd. 38

2013 Randal Brown & Associates Engineering Ltd. 39 APPENDIX A GENERAL INFORMATION Informative Information Aligned with the Standard Numbering (e.g., A1.1) Provides background from the Working Group on the intent of requirements Examples of procedures and approaches that can be considered Examples of existing tests and reports Examples of Fire Protection and Life Safety Systems

2013 Randal Brown & Associates Engineering Ltd. 40 APPENDIX B GUIDELINES FOR INTEGRATED TESTING PLANS Introduction Sequence of Operation Test Protocols and Procedures Notifications Personnel Safety Phased Occupancies Pre-Testing Documentation Testing Forms Ongoing Integrated Systems Testing

2013 Randal Brown & Associates Engineering Ltd. 41 ULC SUBCOMMITTEE ON COMMISSIONING CURRENT PROJECTS

2013 Randal Brown & Associates Engineering Ltd. 42 STANDARDS UPDATE Published CAN/ULC-S1001, Integrated Systems Testing for Fire Protection and Life Safety Systems In Development ULC-S1002, Guideline on the Fire Commissioning Process ULC-S1003, Acceptance Testing for Active Fire Protection and Life Safety Systems ULC-S1004, Acceptance Testing for Passive Fire Protection and Life Safety Systems

ULC S1002 Fire Commissioning Process All aspects of the construction process Pre-design, design, installation, acceptance testing, closeout, training, etc. New Construction, Retro, and Modifications Review existing processes CSA Z320, NFPA, NIBS, ISO, Public Works, etc. Align with ULC-S1001, ULC-S1003, and ULC-S1004 2013 Randal Brown & Associates Engineering Ltd. 43

2013 Randal Brown & Associates Engineering Ltd. 44 ULC-S1002 PRELIMINARY ITEMS Commissioning Process Project Inception Planning & Pre-Design Detailed Design Construction Verification Acceptance Testing Occupancy and Close-Out

ULC-S1002 PRELIMINARY ITEMS Documentation Requirements Owners Project Requirements Commissioning Plans and Schedules Commissioning Documents and Forms Design Phase Construction Rough-In Phase Construction Finishing Phase Acceptance Testing Phase Closeout Phase 2013 Randal Brown & Associates Engineering Ltd. 45

ULC-S1002 PRELIMINARY ITEMS Fire Commissioning Team Owner & Facility Personnel Fire Commissioning Team Design Professionals / Contractors / Verifying Parties Authorities Having Jurisdiction Fire Commissioning Phases New Construction Re-Commissioning Retro-Commissioning 2013 Randal Brown & Associates Engineering Ltd. 46

2013 Randal Brown & Associates Engineering Ltd. 47 ULC-S1003 & ULC-S1004 Technical aspects of acceptance testing Recommended practices for design professionals Reasonable steps to ensure systems are properly installed and functioning All aspects of the construction process To align with ULC-S1001 & ULC-S1002

2013 Randal Brown & Associates Engineering Ltd. 48 ULC-S1003 & ULC-S1004 PRELIMINARY ITEMS Acceptance Testing requirements in development Active and Passive Systems Extent of testing requirements being developed Based on system components Percentage of component to be tested Permitted failure rates

2013 Randal Brown & Associates Engineering Ltd. 49 THANK-YOU, QUESTIONS? Simon Crosby, CET, CFPS Randal Brown & Associates Engineering Ltd. 416-492-5886 x234 scrosby@rbacodes.com