SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF PORTABLE FIRE EXTINGUISHER- PERFORMANCE AND CONSTRUCTION AS PER IS 15683: 2006

Similar documents
BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III

BUREAU OF INDIAN STANDARDS ( CENTRAL MARKS DEPARTMENT-III ) Our Ref: CMD-III/16:

क द र य म हर व भ ग III

Fire fighting Portable fire extinguishers Performance and construction

Technical Data Sheet No. JS-SM-40 DOCUMENT TITLE 2.0 LITRE STORED PRESSURE WET CHEMICAL FIRE EXTINGUISHER

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE GENERAL INDUSTRY SAFETY STANDARDS PART 8. PORTABLE FIRE EXTINGUISHERS

0.4 In the preparation of this standard, assistance has been derived from the following standards:

IGS-M-SF-01(0) IGS. Iranian Gas Standards. CO2 Fire Extinguisher, Portable Type

ARKANSAS FIRE PROTECTION LICENSING BOARD ACT 743 OF 1977

GUILFORD COUNTY SCHOOLS

Government of Bermuda Department of Maritime Administration BERMUDA SHIPPING NOTICE

Fire fighting Portable fire extinguishers Performance and constructionfire fighting Portable fire extinguishers Performance and construction

SOUTH AFRICAN NATIONAL STANDARD

Guide to Membership Assessments

Model Policy On Portable Fire Extinguishers (Ontario Version)

Technical Data Sheet No. JS-SM-33 DOCUMENT TITLE. 2.0kg ABE TYPE STORED PRESSURE DRY POWDER PORTABLE FIRE EXTINGUISHER MODEL: R2.

Flammable liquids, gasoline, oil etc. Advantages. 21 B. Ø 920 mm 21 B. Ø 920 mm

Service Requirements SEMI- ANNUAL ANNUALLY OTHER REF. REQUIREMENT

C-NRPP Quality Assurance Guidance for Radon Test Devices

Statement of Policy. Fire Extinguisher Use Policy #: SMS-041

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

Attachment 1. to ClassNK Technical Information No.TEC-0764 Malta Maritime Authority Date Revised 28 August 2008 Page 1 of 10 This Administration Requi

BMA INFORMATION BULLETIN No. 97 FIRE FIGHTING EQUIPMENT

Extinguishers. Commercial Industrial High rise buildings

IMO. Resolution A.951(23) Adopted on 5 December 2003 (Agenda item 17) IMPROVED GUIDELINES FOR MARINE PORTABLE FIRE EXTINGUISHERS

CERTIFICATION SAFETY & BEYOND

Technical Specification For Design and supply of Water Mist cum CAFS (Compressed Air Foam System) Backpack Fire Fighting System

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE EXTINGUISHERS TABLE OF CONTENTS

TECHNOSKLO Ltd. Držkov

FINAL DRAFT UGANDA STANDARD First Edition 2008-mm-dd

FIRE EXTINGUISHER SERVICING & MAINTENANCE INSTRUCTIONS

MERAMEC VALLEY R-III SCHOOL DISTRICT 126 North Payne Street Pacific, MO

- Check Test Methodology for Tumble Dryers Energy Label & Ecodesign -

OPTIONAL INFORMATION PORTABLE FIRE EXTINGUISHERS SELF INSPECTION CHECKLIST

DRY POWDER FIRE EXTINGUISHER (Stored Pressure) ABC TYPE - PORTABLE

ORDINANCE FOR TECHNICAL SPECIFICATIONS PERTAINING TO AEROSOL TYPE EXTINGUISHER APPLIANCES

ISO INTERNATIONAL STANDARD. Fire-fighting hoses Rubber and plastics suction hoses and hose assemblies

ARKANSAS FIRE PROTECTION LICENSING BOARD RULES AND GEGULATIONS FOR PORTABLE/FIXED SYSTEMS EFFECTIVE: JULY 1, 2013

PURPLE K POWDER EXTINGUISHERS INSTALLATION, OPERATION, MAINTENANCE AND RECHARGE MANUAL

Tender document for Supply/ Installation of New Fire extinguishers & Refilling TENDER NOTICE

Subchapter 7. General Industry Safety Orders Group 27. Fire Protection Article 157. Portable Fire Extinguishers. Return to index New query

REGISTRY OF RADIOACTIVE SEALED SOURCES AND DEVICES SAFETY EVALUATION OF DEVICE (Amends In Its Entirety)

MOBILE FOOD SERVICE EQUIPMENT FIELD APPROVAL SUBMISSION INFORMATION

GASTEC QA. Approval Requirements 31-1

5.07 Air Replenishment Systems

AMENDMENT NO. 1 TO IS 2878:2004 FIRE EXTINGUISHER, CARBON DIOXIDE TYPE (PORTABLE AND TROLLEY MOUNTED) - SPECIFICATION

SECTION WET-PIPE SPRINKLER SYSTEMS

A.C.A. Tit. 20, Subtit. 2, Ch. 22, Subch. 6 Note

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE PROTECTION SPRINKLER SYSTEM CONTRACTORS

SERVICE MANUAL (v1) UL / ULC. WET CHEMICAL HAND PORTABLE RESTAURANT KITCHEN FIRE EXTINGUISHERS Model: SF-6LK / WBDL-6LK

F-CLASS MODEL M6L WET CHEMICAL FIRE EXTINGUISHER Installation, Operation, Recharge and Maintenance Manual

Cat 5 Pro Vacuum OPERATOR S MANUAL

Risk Management Resources

AS Australian Standard. Portable fire extinguishers Guide to servicing. This is a free 7 page sample. Access the full version online.

ISO 6183 INTERNATIONAL STANDARD. Fire protection equipment Carbon dioxide extinguishing systems for use on premises Design and installation

Information Bulletin

SUBSIDIARY LEGISLATION STEAM AND HOT WATER BOILERS REGULATIONS

OWNER'S SERVICE MANUAL NO INSPECTION, MAINTENANCE AND RECHARGE

GASTEC QA. Approval Requirements 31-2

FIRE EXTINGUSIHER INSPECTION, MAINTENANCE, AND TESTING PROCEDURES

Coatings for protection of FRP structures with heavy rain erosion loads

IQ/OQ Protocol Installation Qualification/ Operation Qualification

Capital Projects Group Fire Extinguishers Specification

MAINTENANCE AND INPSECTION OF FIRE PROTECTION SYSTEMS AND APPLIANCES

Australian/New Zealand Standard

Public Notice of Amendment to New Shoreham General Ordinances Chapter 5 Fire Prevention and Protection New Article IV Fire Alarm Ordinance

NUCLEAR POWER CORPORATION OF INDIA LIMITED (A Government of India Enterprise)

Iranian Classification Society Convention and Legislation Department Code: Tech Contents

Winnipeg Fire Department Fire Prevention Branch

DOSH-SIRIM PPE APPROVAL CERTIFICATION & TESTING. Presenter; Azmi Musa SIRIM QAS INTERNATIONAL SDN. BHD.

Installation & Maintenance Instructions

Loss Prevention Standard

The New EMC Directive 2004/108/EC

THE FIRE SAFETY GUIDE FOR BUSINESS OWNERS

Technical Data Sheet No. JS-SM-38 DOCUMENT TITLE 3.5KG CARBON DIOXIDE FIRE EXTINGUISHERS

Aenor Mark Specific Rules for polyethylene compounds (PE) for the manufacturing of pipes for gaseous fuels

GUIDELINES FOR THE APPROVAL OF EQUIVALENT FIXED GAS FIRE-EXTINGUISHING SYSTEMS, AS REFERRED TO IN SOLAS 74, FOR MACHINERY SPACES AND CARGO PUMP-ROOMS

PRESTO DRY POWDER FIRE EXTINGUISHERS - AB:E

Kidde Nitrogen Inert Gas Clean Agent Fire Suppression System

THE REPUBLIC OF UGANDA ATOMIC ENERGY ACT, 2008 SCHEDULE 1 FORM 2A

AMENDMENTS TO THE BUILDING AND FIRE CODE FOR THE CITY AND COUNTY OF DENVER

ANN ARBOR CITY NOTICE ORDINANCE NO. ORD ALARM SYSTEMS

OWNER S MANUAL WARRANTY INFORMATION AND INSTALLATION INSTRUCTIONS PROFLO AND MARATHON ELECTRIC STORAGE WATER HEATERS

GASTEC QA. Approval Requirements 136

ISO/TS TECHNICAL SPECIFICATION. Fire protection Portable and wheeled fire extinguishers Part 2: Inspection and maintenance

OUT CARBON DIOXIDE (CO2) EXTINGUISHER Certified & Approved to AS/NZS Lightweight Aluminium Cylinder. AS High pressure hose assembly with

IMO INTERPRETATIONS OF FIRE PROTECTION-RELATED PROVISIONS OF THE HSC CODE

Council Directive 93/68/EEC of 22 July 1993 amending Directives

GK/GN0612. Guidance on Signalling Lockout Systems to Protect Railway. Undertaking Personnel. Railway Group Guidance for GK/RT0212.

Code of Practice Version 2 Metal Detection and X-Ray Systems

Hydrostatic Retest Requirements for ANSUL Pressure Vessels

ISO INTERNATIONAL STANDARD. Fire protection Automatic sprinkler system Part 9: Requirements and test methods for water mist nozzles

High Plume Blowers Suggested Specification Section (Master Format 1996) Suggested Specification Section (Master Format 2004)

FIREWORLD DRY POWDER ABE FIRE EXTINGUISHERS

Reflex fire detection and extinguishing system filled with ABC dry powder. Installation, operation and maintenance instructions

Standard ECMA th Edition - December Declared Noise Emission Values of Information Technology and Telecommunications Equipment

ISO INTERNATIONAL STANDARD. Coating powders Part 13: Particle size analysis by laser diffraction

THÔNG BÁO KỸ THUẬT TÀU BIỂN TECHNICAL INFORMATION ON SEA-GOING SHIPS

June 2018 Safety Meeting Fire Extinguishers Part I

Black Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment

Transcription:

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF PORTABLE FIRE EXTINGUISHER- PERFORMANCE AND CONSTRUCTION AS PER IS 15683: 2006 1. LABORATORY 1.1 A Laboratory shall be maintained which shall be suitably equipped and staffed, where tests shall be carried out in accordance with the methods given in the specification. 1.2 All testing apparatus / measuring instruments shall be periodically checked and calibrated and records of such checks/calibration shall be maintained. 2. TEST RECORDS 2.1 All records of tests and inspection shall be kept in suitable forms approved by the Bureau. 2.2 Copies of any records and other connected papers that may be required by the Bureau shall be made available at any time on request. Note: The existing forms etc. as being maintained by the manufacturers may be retained. These forms, however, shall contain all the information required for operating this scheme of Testing and Inspection. 3. QUALITY CONTROL 3.1 It is recommended that, as for as possible, Statistical Quality Control (SQC) methods may be used for controlling the quality of the product during production as envisaged in this scheme. [See IS 397(part 1) to IS 397 (part 4)]. 3.2 In addition, effort should be made to gradually introduce a Quality Management System in accordance with IS/ISO 9001 to all activities of the organization. 4. STANDARD MARK 4.1 The Standard Mark as given in column (1) of the first schedule of the license, shall be marked/applied indeligibly by stenciling/screen printing/transfix labels/engraving on each fire extinguisher provided always that the item to which this mark is thus applied conforms to every requirement of the specification.

In case the mark is applied by engraving/punching, it shall be applied in such a manner that it does not impair the strength and dimensional requirements of the fire extinguisher in anyway. 4.2 Marking - In addition, fireextnguisher shall be clearly and indeligibly marked by means as stated above (Ref. Clause 10.2 of IS 15683:2006 also) with the followinga) Name or Trade mark of manufacturer b) BIS License number (CM/L- xxxxxxx) c) Type of media of fire extinguisher d) Base material and its percentage for Powder e) Model number e) Rating and classification of fire extinguisher f) Acceptable to use at temperature from... to... o C g) Empty mass in kg h) Nominal full mass in kg/ Gross mass with tolerance or Min & max gross mass in kg i) Year of manufacture j) Sequential serial number k) following statement as applicable l) For rechargeable extinguishers: Recharge immediately after any use m) For disposable extinguishers ; Discard immediately after any use n) Operating, recharging, inspection and maintenance instructions (in the form of an etched or embossed metal name plates or band or an acceptable pressure sensitive nameplates or by silk screening of paint. Operating instructions also to be shown by pictorial view. 5. LEVELS OF CONTROL 5.1. The Tests as indicated in the Table 1 and at the levels of controls specified therein shall be carried out on the whole production of the factory covered by this scheme and appropriate records and charts maintained in accordance with clause 2 above. All the production which conforms to this Indian Standard and covered by this license shall be marked with Certification Mark of the Bureau. 5.3 CONTROL UNIT 5.3.1 For the purpose of this scheme a control, shall be taken as 100 or part there of, extinguishers of the same type/classification and capacity manufactured continuously or on consecutive days from same consignment of inputs (material, machine and man power in case of manual welding employed). 5.3..2 For Plastic components, a control may be taken as the quantity manufactured continuously on same machine using same source and consignment of raw material, with same mix of ingredients, if any used.

5.3.3 For Pressure gauges and Indicators- Control Unit may be taken as the quantity of gauges and indicators received from same supplier / manufacturer, of same size, model, and material. 5.3.4 On the basis of tests and inspection results, decision regarding conformity or otherwise of the control to a given requirement of the specification shall be made. 5.3.5 When any sample fails in respect of a given requirements the material of entire control may be suitably corrected and subject twice the number of samples to test for all requirements again, and the control shall be accepted for certification marking only when the re-processed material conforms to all the requirements. If further failure occurs in any of the requirements, the entire lot/control shall not be marked. Alternately, on the discretion of manufacturer all material of the control may not be marked in the first instance of failure. 5.3.6 Records of such failure and reprocessing and retesting shall be maintained. 5.4 PROCESS CONTROL 5.4.1 In respect of all other clauses of the specification and at all stages of production, the factory shall maintain appropriate control & checks to ensure that their product conforms to the various requirements of the specification. 6. REJECTIONS 6.1 A separate record shall be maintained giving information relating to the rejection of the production not conforming to the requirements of the specification and the method of its disposal. Such material shall in no circumstances be stored together with that conforming to the specification. 7. SAMPLES 7.1 The licensee shall supply, free of charge, the samples required in accordance with the Bureau of Indian Standards (Certification) Regulations, 1988, as subsequently amended, from the factory or godowns. The Bureau shall pay for the samples taken by it from the open market. 8. REPLACEMENT 8.1 Whenever a complaint is received soon after the goods with Standard Marks have been purchased and used, and if there is adequate evidence that the goods have not been misused, defective goods or their components are replaced or repaired free of cost by the licensee in case the complaint is proved to be genuine and the warranty period (where applicable) has not expired. The final authority to judge the conformity of the product to the Indian Standard shall be

with the Bureau. The firm shall have own complaint investigation system as per IS/ISO 10002. 8.2 In the event of any damages caused by the goods bearing the Standard Mark, or Claim being filed by the Consumers against BIS Standard Mark and not Conforming to the relevant Indian Standard, entire liability arising out of such non conforming product shall be of licensee and BIS shall not in any way be responsible in such cases. 9. STOP MARKING 9.1 The marking of the product shall be stopped under intimation to the Bureau if, at any time, there is some difficulty in maintaining the conformity of their product to the specification, or the testing equipment goes out of order. The marking may be resumed as soon as the defects are removed under intimation to Bureau. 9.2 The marking of the product shall be stopped immediately if directed to do so by Bureau for any reason. The marking may then be resumed only after permission by the Bureau. The information regarding resumption of markings shall also be sent to the Bureau. 10. PRODUCTION DATA 10.1 The licensee shall send to BIS as per the enclosed Proforma-1 to be authenticated by a Chartered Accountant, a statement of quantity produced, marked and exported by them and the trade value thereof at the end of each operative year of the licence.

SCHEME OF TESTING AND INSPECTION FOR PORTABLE FIRE EXTINGUISHERS- PERFORMANCE AND CONSTRUCTION AS PER IS 15683: 2006 Table 1 Levels of Control Levels of Control Sl. No. of Frequency Remarks No. Test sample Requirements clause References 1 Extinguishing media i) Carbon di- 5.1.1 IS 15683, One Each Manufacturer s oxide IS 15222 consignment certificate may be accepted. Firm to arrange for testing of samples at an ii) Clean agents 5.1.2 IS 15683, -do- -do- independent IS 15493 approved lab once in six month. *Or as per supplier standard of Clean agent iii) Powders 5.1.3 IS 15683, -do- -do- IS no.s as IS 4308, applicable IS 14609, IS 4861 iv) Foam 5.1.4 IS 15683, -do- -do- IS no.s as agents IS 4989, applicable ISO 7203 2 Propellants 5.2 IS 15683 One Three As above months

3 Filling 5.3 IS 15683 requirements i) Fill density 5.3.1 IS 15683 One Each control Firm to declare fill density as per the Standard of clean agents. ii) Filling 5.3.2 IS 15683 One Each control tolerance iii) Capacities 5.3.3 IS 15683 One Each control 4 Test Pressure 6 IS 15683 i) Test pressure 6.1 IS 15683 All Each control ii) Min Burst 6.2 IS 15683 One Each control Pressure 5 Gen Operating 7 IS 15683 performance requirements i) Operating 7.1 IS 15683 Firm to declare temperatures any one of the temperature ranges. ii) Min. effective 7.2.1, IS 15683 One Each control For Class A discharge time 7.2.2 IS 15683 One Each control For class B iii)bulk range of 7.2.3 IS 15683 One Each control discharge Resistance to 7.3.1, IS 15683 One Once in Type Test temp changes 7.3.2 IS 15683 three months Retention of charge

a) Routine 7.4.1 IS 15683 All Each control checks b) Retention of 7.4.2 IS 15683 One Each control charge following partial discharge c) Long-term 7.4.3, IS 15683 One Once in Six Type Test leakage test 9.7.2 months Mechanical 7.5 IS 15683 Type Test resistance test a) Resistance 7.5.1 IS 15683 One Once in Type Test to impact three months b)resistance to 7.5.2 IS 15683 One Once in Type Test Vibrations three months Resistance to 7.6 IS 15683 Type Test corrosion a) External 7.6.1 IS 15683 Two One year One sample each corrosion of two different sizes (or of one size if different sizes not manufactured) from same type (same extinguishing media). All types to be covered in a year. However, all sizes of different types to be covered in three years. b) Internal 7.6.2 IS 15683 Two One year As above. corrosion (for water based media and gaseous extinguishers) Tapping test 7.7 IS 15683 One Three All sizes and types

months to be covered in two years. Intermittent 7.8 IS 15683 One Three As above. discharge test months 6 Performance 8.1.to IS 15683 One One year All sizes, types requirement for 8.5 and extinguishing Test Fires media to be covered in a year. The fire rating shall be declared by the manufacturer. Preferably be done in presence of BIS inspecting officer at least once a year. If test facility does not exists, test shall be done in a BIS recognized Lab. 7 Electrical 8.6 IS 15683 One Six months Applicable to conductivity of water based extinguisher extinguishers that discharge are marked as suitable for use on energized electrical equipment. All sizes to be tested once in six months.

8 Construction Requirements i) High 9.1 IS 15683, Pressure *IS 7285, extinguishers *IS15660, *IS 4947 ii) Low pressure extinguishers General 9.2.1.1 IS 15683 requirements to 9.2.1.7 Determination 9.2.1.8 IS 15683 of max service pressure Burst test 9.2.2, IS 15683 9.7.1 Crushing Test 9.2.3 IS 15683 (Type Test) Permanent 9.2.4 IS 15683 Volumetric expansion test (Type Test) Pressure Cyclic 9.2.5 IS 15683 Test (Type Test) Welded low 9.2.6 IS 15683 carbon steel cylinder i) Cylinder and 9.2.6.1 IS 15683

All Each control *IS number as applicable. For Steel body. For Aluminium body. For Gas cartridge. All Each control Three Once in All sizes and Three types. months One Three Each control Each control May be carried out on the same cylinder taken for burst test. One Each control For high pressure cylinder only. No further testing is required if material is ISI marked and accompanied by a Test Certificate from supplier. Two Every 5 th Start from 1st control control and whenever there is change in material source One Each Firm may get the

filler material to consignment material tested at 9.2.6.2 independent BIS approved lab, if in house facilities are not available. ii) Cylinder 9.2.6.3 IS 15683 All Each control thickness Stainless steel 9.2.7 IS 15683 cylinders i) Material, 9.2.7.1 IS 15683 One Each Firm may get the domes and to consignment material tested at bottoms 9.2.7.2 independent BIS approved lab, if in ii) Cylinder 9.2.7.3 IS 15683 All Each control house facilities are thickness not available. Aluminium 9.2.8 IS 15683 cylinders i) Material 9.2.8.1 IS 15683 All Each control Firm may get the material tested at ii) cylinder 9.2.8.2 IS 15683 All Each control independent thickness approved lab, if in house facilities are not available. Carrying handle 9.3.1 to IS 15683 All Each control 9.3.3 Mounting 9.4.1 to IS 15683 All Each control 9.4.2 & 9.4.5, 9.4.6 i) Mounting 9.4.3, IS 15683 Two Each control bracket 9.4.4 strength Caps, Valves 9.5.1 to IS 15683 All Each control and Closures 9.5.4 & 9.5.6 i) Burst test- for 9.5.5 IS 15683 One Each control above Safety devices 9.6.1, IS 15683 Two Each control 9.6.2 Each control Hydrostatic 9.7.1.2 IS 15683 All pressure test

9 Requirement Whenever for plastics provided components i) General 9.8.1.1 IS 15683 All Each control requirements to 9.8.1.4 ii) Burst 9.8.2.1, IS 15683 Three Each control For normally Strength 9.2.2, pressurized & non- 9.8.5.1 pressurized components. iii) Air-oven 9.8.2.2, IS 15683 Three Each control ---- do --- ageing 9.2.2, 9.8.5.1 iv) Ultraviolet 9.8.3, IS 15683 Six Each control light exposure 9.8.5.2 v) Impact 9.8.4, IS 15683 Four Each control Two with and two resistance 9.8.2.2, without the safety- 9.8.5.1, locking device 7.5.1 engaged vi) Test for 9.8.6, IS 15683 Three One year or For water based Exposure to 7.5 whenever extinguishing extinguishing source is media only media changed 10 Hose 9.9 IS 15683 Two Each control assemblies 11 Method of 9.10, IS 15683 One Each control Test may be operation 7.5 combined with min effective discharge time and bulk range of discharge test 12 Safety locking 9.11 IS 15683 devices i) Release of 9.11.1 IS 15683 Two Each control safety device

ii)breaking test 9.11.6 IS 15683 Each control for tamper indicator iii) General 9.11.2, IS 15683 Two Each control requirements 9.11.3, 9.11.4, 9.11.5 13 Requirements 9.12 IS 15683 For Stored for Pressure Pressure type gauges and extinguishers Indicators i) General 9.12.1 IS 15683 All Each control ii) Calibration 9.12.2 IS 15683 All Each control Calibration test certificate from recognized laboratory may be considered. iii) Burst 9.12.3 IS 15683 One One Gauge used for strength test hundred or Over Pressure test part there off (clause- 9.12.4) from same may be used. source iv) Over 9.12.4 IS 15683 One As above pressure test v) Water 9.12.5, IS 15683 One As above All sizes of resistance test 7.6.1 pressure gauges to be tested. vi) Leakage test 9.12.6 IS 15683 Six month Testing may be done at independent reputed lab.

vii) Plastic 9.12.7, IS 15683 One components 9.8 Three hundred (pressure gauges) or part there off 14 Dip-Tubes and 9.13 IS 15683 Each control For water based Filters All extinguishers 15 Test for Horns 9.14 IS 15683 One Each control 1) For CO 2 extinguishers. 2) Test may be combined with min effective discharge time and bulk range of discharge 16 Colour for 10.1 IS 15683 All Each control extinguisher IS 5 body IS 2932 17 Marking 10.2.1, IS 15683 All Each control Fig 5 18 Operating 10.2.2 IS 15683 All Each control Instructions

19 Code Symbols 10.2.3, IS 15683 All Each control Fig 6 20 Recharging 10.2.4 IS 15683 All Each control Instructions 21 Inspection 10.3 IS 15683 All Each control Instructions 22 User Manual 11 IS 15683 All Each control To be provided and Service with each Manual Extinguisher PDF to Word