MODULAR INTEGRATION OF PROCESS EQUIPMENT PACKAGES FOR OIL AND GAS FACILITIES

Similar documents
THE USE OF COMBUSTIBLE GAS DETECTION IN HAZARDOUS LOCATIONS

August Process Industry Practices Electrical. PIP ELEHA01 Engineering Guide for Determining Electrical Area Classification

Electrical Area Classification 101 An Introduction to Area Classification the Basics IEEE Houston CED

HAZARDOUS AREA CLASSIFICATION AND SELECTION OF EQUIPMENT FOR SAFE USE THEREIN FROM AN ELECTRICAL VIEWPOINT

ELECTRICAL SAFETY Information Bulletin

PIP ELEHA01 Engineering Guide for Determining Electrical Area Classification

ELECTRICAL SAFETY Information Bulletin


ELECTRICAL SAFETY Information Bulletin

SEMICONDUCTOR FABRICATION FACILITIES

SEMICONDUCTOR FABRICATION FACILITIES

First Revision No. 1-NFPA [ Chapter 2 ]

Smoke detection in hazardous areas:

SEMICONDUCTOR FABRICATION FACILITIES

DuPont Formacel Z-2. Safety and Handling of DuPont Formacel Z-2: Thermoplastic* Foam Extrusion Applications FOAM EXPANSION AGENT TECHNICAL INFORMATION

THE IMPORTANCE OF INSPECTIONS ON ELECTRICAL INSTALLATIONS IN HAZARDOUS LOCATIONS

SEMICONDUCTOR FABRICATION FACILITIES

Products Solutions Services CT287. Hazardous Area Classifications and Protection Systems

INTERNATIONAL STANDARD

This is a preview - click here to buy the full publication. High-voltage switchgear and controlgear

AREA CLASSIFICATION AND ELECTRICAL EQUIPMENT SPACING FOR NORTH AMERICAN APPLICATION

Selection of Explosion Protected Equipment for Hazardous Locations. Compiled by: Pieter Coetzee ZONE 2 ZONE 1 ZONE 0.

First Revision No. 20-NFPA [ Section No ]

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

Executive Summary. Shell Offshore Inc. BY: Keith M. Gonzales Sr., P.E. Regulatory Requirements for Hazardous Locations

GASEOUS HYDROGEN SYSTEMS

9/7/2010. Chapter , The McGraw-Hill Companies, Inc. AND BONDING. 2010, The McGraw-Hill Companies, Inc.

Enclosed modules, explosion pressure and operational challenges with intense cold. Liv Ranveig Rundell, Technical Safety Petroleum Safety Authority

Certificate of Compliance

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

IECEx TEST REPORT IEC Explosive atmospheres Part 0: Equipment General requirements

AS/NZS :2008

Certificate of Compliance

Test procedure/ method name. method identification. Testing of industrial and explosion isolation valves and tank lining

Flexible Schedule of Accreditation. SIRA CERTIFICATION SERVICE Unit 6, Hawarden Industrial Park, Hawarden, CH5 3US.


Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Related Public Inputs for This Document

EZ Path System Addressing the Enclosure Integrity Issue Tim Lochner, P.Eng

Flexible Schedule of Accreditation. SIRA CERTIFICATION SERVICE Unit 6, Hawarden Industrial Park, Hawarden, CH5 3US.

AM54. Armored Variable Area Flowmeter Series AM54331/32 Series AM54371/72/73/74 Series AM54431/32 Series AM54471/72/73/74

Part I Extraction Process Equipment

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Before proceeding with the selection process, let s briefly look at the various explosion protection options:

Hazardous Area Classification in Oil & Gas Industry. A Fire Prevention Tool

Guidelines for Market Surveillance of Equipment for Explosive Environments (Hazardous Locations)

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 1 GENERAL

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS

NFPA STANDARDS DEVELOPMENT SITE FIRST DRAFT REPORT Closing Date: February 25, 2013

Australian/New Zealand Standard

Understanding Hazardous Locations Concepts

Second Revision No. 5-NFPA [ Section No ] Supplemental Information. Submitter Information Verification. Committee Statement

Special Occupancy Requirements

EUROPEAN DIRECTIVES Explosive atmospheres ATEX 2014/34/EU

OPTIBAR DP 7060 Supplementary Instructions

Survey of electrical equipment installed in hazardous areas on tankers

Certification Supplement Manual

Second Revision No. 36-NFPA [ Detail ] Submitter Information Verification. Committee Statement 5/18/2015 1:01 PM

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD. Hydrogen generators using fuel processing technologies Part 1: Safety

1303 Trans Canada Way SE Medicine Hat, AB T1B 3Z9 Phone

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

NCS/SAS IAS/PES Chapter Seminar January 25-27, Hazardous Locations. OBIEC Consulting George Morlidge Fluor Canada

Preventing Fires And Explosions In Pilot Plants And Laboratory Units

CENTRAL STATE HOSPITAL PLAN SAFE USE HANDLING AND STORAGE OF FLAMMABLE AND COMBUSTIBLE LIQUIDS

Public Input No. 1-NFPA [ Global Input ] Statement of Problem and Substantiation for Public Input. Submitter Information Verification

Matters Needing Attention of Electrical Equipment Installation Engineering in Hazardous Areas. Wang Qiaoli

INSTRUCTION MANUAL IS-mB1 Minialite Intrinsically Safe Round LED Beacon

MEMORANDUM. NFPA Technical Committee on Solvent Extraction Plants. NFPA 36 First Draft TC FINAL Ballot Results (F2016)

Flammable Liquid: A liquid whose flashpoint is greaterless than 100 F when tested by closed-cup test methods.

Objectives. NFPA Dust Specific Documents. Combustible Dust Process Hazard Safety Overview of NFPA Standards for Combustible Dusts

Selecting a Safe Tank Gauging Product. Understanding Hazardous Area Definitions for Equipment Approvals

PART 2. Basic Code Requirements - Semiconductor & Microelectronic Facilities using HPM s

Advance Optima Continuous Gas Analyzers AO2060-Caldos15, -Caldos17, -Magnos106, -Uras14 Category 2G Analyzer Modules

Hazardous Location Surge Protection Solutions

Fire Department HEADQUARTERS Cathedral Oaks Road Santa Barbara, CA (805) FAX: (805) CODE SUMMARY

First Revision No. 2-NFPA [ Global Input ] Submitter Information Verification. Committee Statement. 1 of 11 1/18/2016 5:43 PM

Certificate of Compliance

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

INTERNATIONAL STANDARD

MODELS 304GC, 304GCX, 314GC, and 314GCX

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY

SYSTEMS PRODUCT OVERVIEW

Notice of Proprietary Rights

Assembly COM NO NC. Wiring configuration Wiring configuration. 120 VAC power supply (supply voltages 24 VDC and 240 VAC available upon request)

T22 - Arc Flash Hazards and Arc Resistant Equipment- Understanding the Standards

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

ICC CODE CORNER 2015 International Fire Code

NOTICE. (Formulated under the cognizance of the CTA R3 Audio Systems Committee.)

WATLOW IND. WATROD Modular Duct Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2

Report on Proposals June 2013 NFPA 70

SECTION AUTOMATIC TRANSFER SWITCHES

Certification Supplement Manual

Intrinsically Safe Pressure Transmitters for installation in hazardous locations Models IS-20-S, IS-21-S, IS-20-F, IS-21-F WIKA Datasheet IS-20

Control Panels Switchgear Motors Generators Analysers Rooms/Buildings. Pressurized Enclosure. Static Pressurization. Leakage Compensation (LC)

Public Input No. 52-NFPA [ Section No [Excluding any Sub-Sections] ]

Intrinsic Safety. Intrinsically Safe Solutions. Accurate Weighing in Hazardous Areas

Certificate of Compliance

Above Ground Fuel Tank Requirements

(h) Pesticide Application.

Meeting NFPA standards for

Transcription:

MODULAR INTEGRATION OF PROCESS EQUIPMENT PACKAGES FOR OIL AND GAS FACILITIES Copyright Material PCIC Europe Paper No. PCIC Europe LO-70 Allan Bozek EngWorks, Inc. 1620 49 th Avenue, SW Calgary, AB T2T 2T7 Canada Allen Gibson Roxtec International AB 1340 Camelot Drive Liberty, MO 64068 USA Abstract - An integrated design approach to a modular process equipment package is discussed. By incorporating the electrical, instrumentation and control equipment on the same platform as the process equipment, a higher level of modular integration is achieved. The benefits include a reduced number of on-site equipment terminations and the ability to pre-commission equipment prior to field installation. The area classification, installation and transit barrier requirements for an integrated modular design approach are reviewed. Index Terms cable termination, hazardous area classification, modular integration, process building design, cable transit, vapor barrier, cable entry I. INTRODUCTION Prefabricated modular buildings are extensively used for skid packages in both upstream and downstream oil and gas facilities. A typical skid package may incorporate process vessels, compressors, pumps manifolds and other miscellaneous equipment handling flammable materials. The interiors of such buildings are usually classified as hazardous locations in accordance with API RP 500[1], API RP 505[2] or IEC 60079-10-1[3]. Once a process module has been classified, the certification of electrical equipment and the wiring methods are impacted in accordance with the relevant installation codes within the jurisdiction of the installation. Switchgear, motor control centers and process control equipment are typically designed for installation in a nonhazardous This requires that the equipment be located off-skid, usually in a remote building The electrical equipment connections are then completed onsite when the skid modules are set in place. This approach requires that the interconnection, commissioning and testing of the systems be performed on-site. This can be both expensive and time consuming depending on the location and project logistics. What if the process equipment and the protection, instrumentation and control equipment could be installed on the same skid assembly? This would permit the wiring connections to be completed at the fabrication facility and allow the pre-commissioning of process equipment in a controlled environment. It would reduce on-site labor and improve quality by allowing the majority of work to be done in a factory controlled environment. This would ultimately reduce overall installation costs. Is there some way of promoting this design concept? There are several options with respect to the area classification design, building layout, and the construction methods used to implement the integrated design concept. This paper looks at ways of executing an integrated process package design where both process equipment and electrical, instrumentation and control equipment are installed on a common skid package. II. STANDARD MODULAR PROCESS PACKAGE CONCEPT A typical oil and gas process skid package will incorporate only the process equipment. This is primarily due to the requirement to classify the immediate area surrounding the process equipment for hazardous area classification purposes. Depending on the probability of a flammable release, the duration of a release and the level of ventilation available, a process skid may be classified Class I Division 1 or Class I Division 2 using API RP 500 as a basis for design, or Zone 1 or Zone 2 using API RP 505 or IEC 60079-10-1 as a design reference. Once the process module has been classified as a hazardous location, the electrical and instrumentation equipment must be certified for Hazardous location certified equipment is typically more costly and often of limited availability. For this reason, the majority of the electrical and control equipment is located off-skid in a non-hazardous location with only the end device sensors located on the process skid. This results in a large number of wiring interconnections that must be completed in the field. Fig. 1 illustrates a typical design approach to a modular oil and gas process package. 1 of 5

Fig. 1 Standard Modular Process Skid Design Concept III. INTEGRATED MODULAR PROCESS PACKAGE CONCEPT The integrated modular design package concept incorporates all process, instrument, electrical and control systems on a common skid. To install non-hazardous location certified utility, electrical and control equipment on a process skid handling flammable materials, a safe area must be created. The design of the safe area is part of the hazardous area classification design for the skid package. This can be accomplished in one of three ways. 1. Physically separate the non-hazardous location from the hazardous location on a common skid. 2. Create a positive pressure zone within the hazardous location to prevent the migration of flammable gas/vapours into the non-hazardous 3. Incorporate the use of a physical barrier to segregate the hazardous location from the nonhazardous A. Option 1 Physical Separation Option 1 separates the hazardous location from the nonhazardous location by distance. A building incorporating the electrical and control equipment is located outside the classified area on a common skid. The distance between the buildings and the process equipment is determined by the extent of area classification design for process equipment. This is a function of the process parameters and vapor density of the flammable materials and the level of ventilation within the immediate area. Fig. 2 illustrates this concept. The primary disadvantage of using distance as means to separate a hazardous from the non-hazardous location is the size of overall skid package is increased impacting the size and weight of the shipping envelope. Fig. 2 Option 1 Integrated Design using Physical Separation B. Option 2 Pressurized Control Building within a Classified Area Option 2 involves creating a non-hazardous location within a process unit by using a positive air purge. An enclosed building is pressurized to a value slightly beyond normal ambient pressure to prevent any flammable fugitive emissions from entering the designated non-hazardous The requirements for a pressurized building are defined in IEC 60079-13[4] and Chapter 7 of NFPA 496[5]. The basic requirements for a purged room or building as defined by IEC 60079-13 are as follows: 1. The positive pressure air system must provide 25pa (0.1 inch WC) of pressure with 50% of all outlets opened. The minimum air velocity through an open door is 0.3 m/s. This requirement may require the use of an air lock entry system. 2. The purge system must be monitored by a pressure or flow switch. If flow detection is not possible at the outlet, gas detectors shall be used to ensure that the air within the room is at or below 25 % of the lower flammable limit (LFL). 3. All safety devices, the pressurization system and its controls and the electrical isolation means, system fan and motor shall be suitable for the area external to the room unless located in a non-hazardous area. 4. The purge volume for pressurization and for general artificial ventilation shall be a minimum of 10 room volumes. The purging flow rate is required to be a minimum of 5 air changes per hour. 5. In the event of an interruption to the purge system, a procedure is required to prevent equipment from becoming potential ignition sources. 6. The pressurization system is required to energized independently from the electrical power to the room. 7. The entry of cables, electrical conduits and other penetrations into the room is required to be sealed so that the necessary pressure differential or ventilation integrity can be maintained. 8. Personnel access doors are required to be automatically self-closing, close fitting and designed to close and latch against the normal pressure 2 of 5

differential. Restricted access doors are not required to be self-closing. Depending on if the unclassified room or building is located in a Zone 1 or Zone 2 location, additional requirements will apply. Within a Zone 1 location, a type px purge is required. A type px purge requires that the source air for the purge system be sourced from a nonhazardous In the event of a pressurization system failure, all equipment not certified for a Zone 1 location must be de-energized. The concept is illustrated in Fig. 3. Within a Zone 2 location, a type pz purge is required. Although it is preferable that the purge air for a type pz system be sourced from a non-hazardous area the standard does allow air from a Zone 2 classified area to be used as a source of air for the purge system as illustrated in Fig. 4. Under such conditions, the air intake to the room must incorporate combustible gas detection. Gas detection on the air intake system must be configured to shut down the air source if the combustible gas LFL value exceeds 40%. The supply fan and motor, gas detection and all other equipment used for alarming and emergency actions/interlocks are required to be certified components suitable for installation in a Zone 2 Upon failure of a type pz purge system, power to the room may be maintained for a limited duration. If the pressurization system is not restored following this limited duration period, power to the room is de-energized to all equipment within the room not certified for a Zone 2 The purged building option is often used when the nonhazardous building or room is surrounded on all sides by a hazardous This is often the case where the nonhazardous location resides within the classified boundaries of a large refinery or petrochemical complex. Fig. 3 Option 2 Pressurized Building within a Zone 1 Classified Location Fig. 4 Pressurized Building Using Air Sourced from a Zone 2 Hazardous Location C. Option 3 Physical barriers as a means of segregation A non-hazardous room or building may be installed adjacent to a classified area provided a suitable barrier is placed between the hazardous location and the nonhazardous Fig. 5 illustrates the use of a physical barrier in the context of an integrated skid module. IEC 60079-10-1 discusses the use of physical barriers to limit the extent of a zone. The document does not describe what a physical barrier should be and how it should be constructed. It is generally accepted that in the context of a modularized process skid, the physical barrier must be constructed to prevent the migration of flammable gas/vapours from a hazardous location to a non-hazardous location under normal ambient pressure conditions. Section 6 of API RP 500 and API RP 505 describe in more detail the design of a physical barrier used for such purposes. The vapor barrier as it is termed in the API documents must meet the following performance criteria: a wall or other obstruction that will limit the passage of gas or vapor at atmospheric pressure, thus preventing the accumulation of vapor-air or gas-air mixtures in concentrations above 25% of their lower flammable (explosive) limit, LFL (LEL) [1] One simple way of achieving this performance objective is to specify construction materials and installation methods that conform to the definition of air-tight or air barrier as referenced in the national building codes and standards. The following design criteria is based on standard building code requirements for air barriers and will meet or exceed the API performance specification for a vapor barrier in the context of an area classification design: 1) Materials: materials used for an air barrier system shall have an air permeance not to exceed 0.02 L/s.m2 @ 75 Pa. 3 of 5

2) Assemblies of materials and components: shall have an air permeance not to exceed 0.2 L/s.m2 @ 75 Pa. 3) The entire building: The air leakage of the entire building shall not exceed 2.0 L/s.m2 @ 75 Pa. The primary advantage of using a vapor-tight barrier to segregate an unclassified area is the simplicity of design. There are no elaborate HVAC or interlocking schemes required to maintain the integrity of the non-hazardous area. All that is required is that the integrity of the vaportight barrier be maintained and no positive pressure differentials exist between the hazardous and the nonhazardous locations. barrier. Fig. 6 illustrates the use of a transit barrier in integrated modular application. Fig. 6 Cable Transit Used as Vapor Tight Wall Barrier The combination of a steel-framed window, rubber or silicon-based cable or pipe blocks and a mechanical compression wedge ensures the integrity of the industrialstrength vapor barrier wall or floor and minimizes the loss of pressure in a purged Cable and pipes are easily installed and can be opened or closed repeatedly as required to install new cable and pipe penetrations. This allows the flexibility of changes in the future without compromising the integrity of the segregation method used. V. CONCLUSION Fig. 5 Option 3 Building Incorporating an Physical Barrier for Segregation from a Hazardous Location IV. PIPING AND CABLE TRANSIT BARRIERS A transit barrier can be an important element of an integrated module design. It facilitates the penetration of piping, conduits and cables through walls or floors which may have certification requirements to be fireproof, vaportight or designed to maintain a pressurized environment. A transit barrier must be capable of being installed in a variety of wall constructions, must be equal to the fire rating of the constructed wall, must allow a variety of conduits and cable connections of various configurations to pass though, and allow for future changes and modifications. Transit barriers through walls and floors vary widely in materials and installations. Materials such as cement, compounds, steel gland plates and some foam type sealants may be considered as suitable vapor-tight barriers. However, within the construction of modular and/or skid-based units, these traditional solutions are often not effective or area efficient. In modular and/or skidbased unit construction, a mechanical transit barrier, which allows opening and closing the system throughout the life of the unit has significant benefits. Most often, these mechanical transit barriers allow multiple cable and/or pipes to transit the wall or floor through a single opening, with each cable secured within a rubber-based block and the entire transit window is mechanically compressed to create a gas-tight, water-tight There are several advantages to integrating process, electrical and instrumentation equipment on a common skid package. It allows the wiring connections to be completed in a controlled fabrication environment, facilitates the pre-commissioning of instrumentation and control equipment prior to shipment to site, reduces on-site labor and reduces overall installation costs. There are several ways to integrate the process and the electrical and instrumentation equipment. The, instrumentation and electrical equipment may be enclosed in separate building on a common skid. Unclassified equipment may be protected using a pressurized building enclosure or segregated using a physical barrier. The building envelope penetrations require careful consideration. They must facilitate the installation of piping and cables and must maintain the structural and fire integrity of the wall, the physical barrier or pressurized building requirements and allow for future expansion. A mechanical transit barrier design meets these requirements and incorporates innovations to reduce installation costs and facilitate future expansion. X. REFERENCES [1] ANSI/API RP 500, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Division 1 and Division 2, American Petroleum Institute, Washington, DC, 2012. [2] API Recommended Practice 505, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class 4 of 5

I, Zone 0, Zone 1, and Zone 2, American Petroleum Institute, Washington, DC, 1997. [3] IEC 60079-10-1, Electrical Apparatus for Explosive Gas Atmospheres Part 10 Classification of Hazardous Areas, International Electrotechnical Commission, Geneva, Switzerland, 2008. [4] IEC 60079-13, Electrical Apparatus for Explosive Gas Atmospheres Part 13 Construction and Use of Rooms or Buildings Protected by Pressurization, International Electrotechnical Commission, Geneva, Switzerland, 2010. [5] NFPA 496, Standard for Purged and Pressurized Enclosures for Electrical Equipment., 2003 Edition, Quincy, MA. H. VITA Allan Bozek, P.Eng., MBA, is a Principal with EngWorks Inc. providing consulting engineering services to the oil and gas industry. He is a registered professional engineer in the provinces of Alberta, Ontario and British Columbia, Canada and has been a member of the IEEE since 1989. Allan s areas of expertise include hazardous area classification, power systems design, protective relaying and grounding for large scale industrial and petrochemical facilities. Mr. Bozek graduated from the University of Waterloo in 1986 with BASc in Systems Design Engineering and a MBA from the University of Calgary in 1999. Allan may be contacted at abozek@engworks.ca. Allen Gibson graduated from Oklahoma State University with a BScBA degree in Finance. Since 1990, he has worked for international oil and gas companies in both technical and commercial roles, and served as President / CEO of a US-based LPG company. He is a member of the IEEE Industrial Applications Society and a member of the PCIC Europe Committee and serves as Local Committee Chairman for PCIC Middle East. Since 2007 he has worked for Roxtec Group and serves as the Global Manager for Process Industries. Allen may be contacted at agibson.project@gmail.com 5 of 5