Genevieve Melody Elementary School

Similar documents
Agustin Lara Elementary Academy

Richard Henry Lee Elementary School

Josefa Ortiz De Dominguez Elementary School

Washington Irving Elementary School

Charles W Earle Elementary School

Edward Jenner Elementary Academy of the Arts

Joseph Brennemann Elementary School

Francis M McKay Elementary School

Oscar DePriest Elementary School

Alessandro Volta Elementary School

John Palmer Elementary School

George B Swift Elementary Specialty School

Calmeca Academy of Fine Arts and Dual Language

DeWitt Clinton Elementary School

Sidney Sawyer Elementary School

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

Briar Crest Elementary

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

PLAN REVIEW SUBMITTAL GUIDE

RECAPP Facility Evaluation Report

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

2014 Bond Project Guide

Cook - Wissahickon Elementary School

RECAPP Facility Evaluation Report

PLATTEVILLE MIDDLE SCHOOL

RECAPP Facility Evaluation Report

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

Mechanical Inspection Plumbing

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

NYC Department of Education

Ashland School District Facility & Capacity Assessment Report 2005

Florence High School / Middle School Page 1 of 3 Florence, WI

FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

Master Facility Planning Update School Board Meeting May 26, 2016

NYC Department of Education

NYC Department of Education

NYC Department of Education

RECAPP Facility Evaluation Report

New High School Concept

NYC Department of Education

NYC Department of Education

RECAPP Facility Evaluation Report

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING

DOCUMENT TABLE OF CONTENTS

NYC Department of Education

Summary of Repairs and Deficiencies

1354 CHECKLIST for Project Closeout

NYC Department of Education

NYC Department of Education

GARCIA GALUSKA DESOUSA Consulting Engineers

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

RECAPP Facility Evaluation Report

NYC Department of Education

RECAPP Facility Evaluation Report

Appendix B. Facilities Assessment Report

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1

Estimated Repair, Replacement, and Upgrade Costs

NYC Department of Education

First Floor. Historic Hall of Waters Assessment and Feasibility Study

Massachusetts School Building Authority

RECAPP Facility Evaluation Report

NYC Department of Education

NYC Department of Education

NYC Department of Education

Master Project List Report

NYC Department of Education

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

Evaluation. ems. Prepared By: Martha. a s Vineyard. Box P.O. Box June 2015

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

NYC Department of Education

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report

Inspection Report 123 My Street Midland, GA

NYC Department of Education

NYC Department of Education

School District of Milton 5- Year Capital Maintenance and Improvement Plan

Forest Hills Facilities Plan

RESERVE DATA ANALYSIS est.1983

NYC Department of Education


NYC Department of Education

NYC Department of Education

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions 7: The item/system is new or in good condition and no work is required. 6: The item/system requires general cleaning and/or routine maintenance. : The item/system requires repairs and has not reached the end of its serviceable life. : The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. 3: The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. 1: The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Concrete/ Stucco Canopy Metal Canopy CHIMNEY Brick Chimney - Concrete/ Mortar Liner 1 3 6 25 GRE 6 278 1 3 6 10 7 7 125 SF $3,539 278 SF $6,691 $10,230 110 LF $55,055 $55,055 Assessment Date: 8/17/2012 Page 1 of 16

CORNICE Cornice - Metal Projecting DOORS 1 3 6,776 7 1,776 LF $159,238 $159,238 Exterior FRP Door Exterior Steel Door 1 3 6 7 2 20 GRE 7 2 32 EA $6,682 2 EA $6,682 ENTRANCE Concrete Exterior Stairs Concrete Ramp Entrance Controls - Audio and Video Stair Handrails FOUNDATION 1 3 6 GRE 6 276 GRE 6 30 GRE 6 4 20 7 276 LF $29,601 30 LF $4,183 4 EA $5,720 120 LF $39,504 Concrete Foundation Masonry Foundation 1 3 6 7 GRE 7 1,557 GRE 7 27,803 1,557 LF 27,803 SF LIGHTING 1 3 6 7 Exterior Lights - Parapet or Roof Mounted YEL 4 32 32 EA $118,976 Exterior Lights - Wall Mounted YEL 4 33 33 EA $51,909 $170,885 Assessment Date: 8/17/2012 Page 2 of 16

LINTELS Lintels - Steel 1 3 6 7,818 180 1,998 LF $68,633 $68,633 PARAPET Coping - Metal Coping - Stone Parapet < 16" Height Parapet > 30" Height Parapet 16" to 30" Height 1 3 6 GRE 6 2,097 GRE 6 900 7 GRE 7 446 BLU 5 592 15 GRE 6 413 2,097 LF 900 LF 446 LF 607 LF $237,460 413 LF $85,754 $323,214 ROOF SYSTEM Asphalt Gravel Ballast Roof Exterior Downspouts Interior Downspouts Metal Roof Roof Structure: Steel with Clay Tile Arch Roof Structure: Steel/Metal Deck/Concrete Topping 1 3 6 7 GRE 6 3,414 25,378 26,104 GRE 7 66 GRE 7 625 GRE 6 475 GRE 7 27,803 GRE 7 27,443 54,896 SF $205,355 66 LF 625 LF 475 SF $3,586 27,803 SF 27,443 SF $208,941 SUPERSTRUCTURE Metal Deck/Concrete Topping Slab on Grade Steel with Clay Tile Arch 1 3 6 7 GRE 7 27,926 GRE 7 12,435 GRE 7 60,945 27,926 SF 12,435 SF 60,945 SF Assessment Date: 8/17/2012 Page 3 of 16

WALLS Brick Concrete Block Prefabricated Metal Panel Wall Stone - Cast 1 3 6 7 GRE 6 60 28,821 12,387 6,900 GRE 6 294 GRE 6 2,320 GRE 6 4,978 48,168 SF $739,196 294 SF $1,942 2,320 SF $19,707 4,978 SF $71,185 $832,031 WINDOWS Window - Guards perforated Windows - Sash Aluminum Double-pane EXTERIOR 1 3 6 GRE 6 336 10 5,983 7 1,397 558 6,329 SF $25,939 11,955 SF $97,786 $123,725 $1,998,137 ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Lunchroom and Gym Exit Signs - Auditorium Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - Intrusion detection 1 3 6 0 GRE 6 2 GRE 6 8 GRE 6 24 6 BLU 5 60,945 40,361 01,306 7 1 EA $1,430 10 EA $1,073 2 EA $215 8 EA $1,865 24 EA $5,594 16 EA $3,729 1 EA $1,430 101,306 SF $240,376 101,306 SF $94,164 $349,875 Assessment Date: 8/17/2012 Page 4 of 16

MAIN SERVICE Main Electrical service 1200 A 120/208/3PH Main Electrical service 1600 A 120/208/3PH POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp ELECTRICAL FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System FIRE PROTECTION MECHANICAL AIR CONDITIONING Window A/C 1 3 6 1 3 6 8 GRE 6 5 1 3 6 01,306 02,500 1 3 6 BLU 5 7 7 7 7 7 7 1 EA $7,150 1 EA $9,295 $16,445 18 EA $12,870 5 EA $7,150 1 EA $2,145 $22,165 $388,485 101,306 SF $36,217 102,500 SF $124,589 $160,806 $160,806 14 EA $16,517 $16,517 Assessment Date: 8/17/2012 Page 5 of 16

AIR HANDLING SYSTEMS Air Handling Package - Single Zone - Steam 4,000 to 8,000 cfm Air intake for all Air Handling s except built up AHU Fan Coil - Electric Multi Zone Built Up Air Handling - Steam 8,000 to 15,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam 8,000 to 15,000 cfm Return Fans - Outdoor l0,001 to 20,000 CFM Roof Top - Single Zone - Gas-Heating 11 to 20 tons Roof Top - Single Zone - Gas-Heating 5 to 10 tons BOILER SYSTEMS Boiler Assembly - Non-Condensing Flexible Tube Hot Water Boiler 1,001MBH-2,000 MBH Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler 151-200 HP Boiler Auxiliary - Steam Boiler 151-200 HP Boiler Auxiliary Non-Condensing Hot Water Boiler 1,001MBH-2,000 MBH Chemical Feed System (Steam Boilers) Combustion Dampers Feed Water Pumps and Tank - Steam Boilers Glycol Feed System HEATING DEVICES 1 3 YEL 4 1 6 YEL 4 1 YEL 4 3 YEL 4 3 GRE 6 2 ORA 3 1 YEL 4 1 1 3 6 GRE 6 2 YEL 4 2 YEL 4 2 YEL 4 2 YEL 4 2 1 YEL 4 1 7 7 1 EA $50,050 1 EA $1,430 1 EA $11,869 3 EA $171,600 3 EA $64,350 2 EA $6,578 1 EA $42,900 1 EA $28,600 $377,377 2 EA $15,730 2 EA $331,760 2 EA $48,620 2 EA $100,100 1 EA $2,145 3 EA $11,440 1 EA $31,460 1 EA $1,087 $542,342 1 3 6 7 Cabinet Heaters With Hot Water Coils YEL 4 13 13 EA $66,924 Fin Tube Hot Water YEL 4 10 10 LF $1,716 Heater - Electric YEL 4 4 4 EA $22,880 Wall Heater - Electric YEL 4 35 35 EA $36,036 $127,556 Assessment Date: 8/17/2012 Page 6 of 16

MECHANICAL PLUMBING Condensate Assembly - Pumps and Tank Piping - Condensate - Steel or Galvanized Piping - Hydronic Supply and Return - Steel or Galvanized Piping - Steam - Steel or Galvanized Pumps - Hot Water 11 to 20 HP TEMPERATURE CONTROL Direct Digital Control (DDC) System Thermostats - Direct Digital Control (DDC) Thermostats - Pneumatic Zone Dampers UNIT VENTILATION 1 3 BLU 5 2 YEL 4 2,000 YEL 4 2,000 YEL 4 2,000 6 BLU 5 2 2 1 3 ORA 3 88,526 YEL 4 1 1 ORA 3 29 6 GRE 6 29 7 7 2 EA $18,876 2,000 LF $195,910 2,000 LF $239,525 2,000 LF $239,525 4 EA $58,773 $752,609 88,526 SF $886,145 2 EA $1,859 29 EA $19,076 29 EA $4,147 $911,227 1 3 6 7 Ventilators - Hot Water-Heating BLU 5 21 21 EA $150,150 Ventilators - Self Contained Electric Heating and Cooling BLU 5 12 12 EA $102,960 $253,110 VENTILATION Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm Exhaust Fans - Roof mounted less than 500 CFM Type I Exhaust Hood - Kitchen or Culinary Arts Type II Exhaust Hood - Warming Kitchen 1 3 YEL 4 6 YEL 4 10 6 7 6 EA $25,740 10 EA $22,880 1 EA $157 1 EA $1,716 1 EA $930 $51,423 Assessment Date: 8/17/2012 Page 7 of 16

MECHANICAL $3,032,161 PLUMBING HOT WATER 1 3 6 7 Hot Water Heater - Electric less than 50 KW YEL 4 1 1 EA $11,211 Hot Water Heater - Gas 150,000-300,000 BTU/HR YEL 4 1 1 EA $22,880 Hot Water Heater - Gas more than 300,000 BTU/HR YEL 4 1 1 EA $32,032 $66,123 PIPING 1 3 6 7 Domestic Piping - Cold Water from Risers to Fixtures 101,306 SF $33,320 Domestic Piping - Cold Water Risers 101,306 SF $65,190 Domestic Piping - Hot Water from Riser to fixtures 101,306 SF $21,730 Domestic Piping - Hot Water Return Risers YEL 4 100,961 100,961 SF $46,200 Domestic Piping - Hot Water Risers 101,306 SF $55,050 Domestic Piping Cold Water Horizontal lines 101,306 SF $241,929 Domestic Piping Hot Water Horizontal lines 101,306 SF $199,917 Domestic Piping Hot Water Return Lines YEL 4 100,961 100,961 SF $115,499 Sanitary Piping 101,306 SF $97,061 Storm Piping 101,306 SF $72,434 Vent Piping 101,306 SF $57,947 $1,006,277 PUMPS Domestic Booster Pump duplex PLUMBING 1 3 6 7 1 EA $3,146 $3,146 $1,075,546 Assessment Date: 8/17/2012 Page 8 of 16

INTERIOR ADMINISTRATIVE SUITES Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Tile/Sheet Lighting - Lay-In Lighting - Pendant/Surface Walls - Concrete Block Walls - Plaster/Drywall 1 3 6 GRE 6 364 1,670 7 40 2,206 320 GRE 6 478,358 2,038 746 GRE 6 4 18 GRE 6 2 51 5 GRE 6 2,136 4,355 GRE 6 3,030 2,034 SF $5,643 2,666 SF $7,039 478 SF $684 4,142 SF $10,604 22 SF $3 58 SF $41 6,491 SF $6,109 3,030 SF $7,149 $37,273 CORRIDOR Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring Asphalt Flooring Terrazzo Flooring Tile/ Sheet Lighting - Lay-In Lighting - Pendant/ Surface Stair Handrails Stairs - Asphalt Stairs - Terrazzo Walls - Concrete Block Walls - Plaster/Drywall Walls - Structural Glazed Tile 1 3 6,426 GRE 6 3,015 13,406 YEL 4 323 GRE 6 376 7 GRE 6 3,821 11,518 1,650 BLU 5 52 18 YEL 4 64 GRE 6 302 BLU 5 119 84 GRE 6 7,494 6,912 GRE 6 728 7,667 1,426 SF $3,059 16,421 SF $55,031 323 SF $8,536 376 SF $2,129 16,989 SF $38,108 70 SF $316 64 SF $622 302 LF 119 LF $5,956 184 LF $2,084 7,494 SF $21,433 16,912 SF $39,904 8,395 SF $5,205 $182,383 Assessment Date: 8/17/2012 Page 9 of 16

DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite Transom Window 1 3 6 7 6 17 67 145 1 GRE 6 28 GRE 6 380 33 EA $4,530 214 EA $75,882 28 SF $521 380 SF $7,064 $87,996 DRINKING FOUNTAINS Double Fountain Single Fountain Single Water Cooler 1 3 6 7 GRE 7 3 4 5 GRE 6 2 1 3 EA 10 EA $3,475 3 EA $6,149 $9,624 GYMNASIUM / AUDITORIUM Bleacher Seating Ceiling - Plaster/Drywall Flooring - Wood Lighting - Pendant/Surface Scoreboards Stage Curtain Walls - Plaster/Drywall Walls - Structural Glazed Tile KITCHEN 1 3 6 GRE 6 406 GRE 6 7,000 GRE 6 7,000 YEL 4 43 3 YEL 4 1 GRE 6 3 BLU 5 4,168,982 7 406 EA $9,812 7,000 SF $59,860 7,000 SF $52,853 46 EA $39,718 1 EA $20,764 3 EA $28,314 4,168 SF $59,602 1,982 SF $14,171 $285,094 Ceiling - Plaster/Drywall Flooring - Tile Ceramic/Porcelain Lighting - Pendant/Surface 1 3 6 7 GRE 6 300 900 GRE 7 1,200 GRE 6 23 3 1,200 SF $1,133 1,200 SF 26 SF $16 Assessment Date: 8/17/2012 Page 10 of 16

Wall - Concrete Block Wall - Structural Glazed Tile LIBRARY GRE 6 630 GRE 7 1,992 630 SF $1,802 1,992 SF $2,951 Flooring Tile/ Sheet Lighting - Pendant/ Surface 1 3 6,632 7 GRE 7 28 1,632 SF $2,334 28 SF $2,334 LOCKER/SHOWER ROOM Lockers LUNCHROOM 1 3 6 GRE 6 6 7 6 EA $294 $294 Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Tile/Sheet Lighting - Lay-In Lighting - Pendant/Surface Serving Line Wall - Concrete Block 1 3 6,800 7 GRE 7 2,467 GRE 6 4,267 GRE 7 24 GRE 6 72 GRE 7 18 GRE 7 3,552 1,800 SF $3,861 2,467 SF 4,267 SF $6,102 24 SF 72 SF $51 18 LF 3,552 SF $10,014 MDF/IDF Ventilation and Cooling 1 3 6 7 GRE 7 1 1 EA Assessment Date: 8/17/2012 Page 11 of 16

MECHANICAL/SERVICE ROOMS Janitor's Closet Mechanical/Service Rooms Storage Room 1 3 6 7 GRE 6 4 1 GRE 6 5,716 72,600 352 5 SF $19 5,788 SF $26,974 1,952 SF $7,550 $34,543 STAFF RESTROOM Accessories Ceiling - Lay-In Ceiling - Plaster/Drywall Floor Drain Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Lavatory Lighting - Lay-In Lighting - Pendant/ Surface Lighting - Wall Mounted Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Wall - Structural Glazed Tile Water Closet 1 3 6 7 BLU 5 2,809 1,223 469 25 GRE 6 2,396 180 1,740 GRE 6 6 8,530 333 BLU 5 2,116 355 167 GRE 6 27 27 5 GRE 6 5 2 GRE 6 42 7 18 GRE 6 2 1 GRE 6 32 30 3 BLU 5 24 12 1 GRE 6 2,144 2,494 BLU 5 4,422 336 GRE 6 2,646 3,822 624 GRE 6 29 5 44 4,501 SF $81,025 125 SF $268 4,316 SF $14,078 14 EA $11,411 1,863 SF $3,894 2,638 SF $12,490 59 EA $60,232 7 SF $4 67 SF $65 3 EA $57 65 EA $23,684 37 EA $49,078 4,638 SF $6,132 4,758 SF $21,660 7,092 SF $152,192 78 EA $55,770 $492,039 VOCATIONAL SHOP Work Sink 1 3 6 GRE 6 5 7 5 EA $1,931 $1,931 Assessment Date: 8/17/2012 Page 12 of 16

INTERIOR $1,146,477 ROOM CASEWORK Casework CEILING 1 3 6 GRE 6 573 7 573 LF $20,485 $20,485 Lay-In/Drop Plaster/Drywall 1 3 6 GRE 6 2,268 7,368 7 2,288 11,424 9,636 SF $28,648 23,712 SF $34,792 $63,440 CHALK BOARD 1 3 6 7 Chalk Board YEL 4 907 907 LF $110,246 $110,246 FLOOR Tile/Sheet 1 3 6 7 GRE 6 7,344 16,368 9,636 33,348 SF $64,994 $64,994 GYM_FLOOR Gymnasia Floor 1 3 6 7 GRE 6 7,000 7,000 14,000 SF $112,312 $112,312 LIBRARY_CEILING Plaster/Drywall 1 3 6,632 7 1,632 SF $4,621 Assessment Date: 8/17/2012 Page 13 of 16

$4,621 LIBRARY_WALL Plaster/Drywall GRE 6 2,948 2,948 $6,956 LIGHTING 1 3 6 7 $6,956 Lay-In Pendant/Surface 1 3 6 7 20 40 GRE 6 309 128 160 EA $8,580 437 EA $22,094 $30,674 MARKER BOARD Marker Board 1 3 6 7 GRE 7 60 60 LF RESTROOM_CEILING Restroom Ceiling 1 3 6 7 GRE 7 60 60 SF WALL Concrete Block Plaster/Drywall Wall ROOM 1 3 6 7 GRE 6 9,480 4,540 7,160,350 14,020 SF $27,113 17,160 SF $40,489 1,350 SF $3,185 $70,787 $484,514 Assessment Date: 8/17/2012 Page 14 of 16

SITE CIVIL/DRAINAGE Catch Basin Site Drain Site Manhole 1 3 6 7 GRE 7 10 GRE 7 1 GRE 7 6 10 EA 1 EA 6 EA FENCING Chain Link Ornamental Iron 1 3 6 7 GRE 6 445 36 42 490 481 LF $6,383 632 LF $2,680 $9,063 LANDSCAPE Asphalt Play Area/Hardscape Benches Grass Hardscape - Concrete Parkway trees 1 3 6 7 GRE 6 5,760 31,531 GRE 7 2 GRE 7 3,739 GRE 7 6,401 GRE 6 4 7 37,291 SF $4,942 2 EA 3,739 SF 6,401 SF 11 EA $2,643 $7,585 PARKING LOT Asphalt Parking lot interior plantings 1 3 6 7 GRE 7 12,292 GRE 7 3 12,292 SF 3 LF PLAYGROUND Playground Equipment - School Age 5-12 1 3 6 7 1 EA Assessment Date: 8/17/2012 Page 15 of 16

Playground Surfacing - Poured Surface SIDEWALKS GRE 6 2,100 2,100 SF $5,556 $5,556 Internal Walks Perimeter Sidewalks 1 3 6 7 GRE 7 27 GRE 7 16,372 27 LF 16,372 SF SIGNAGE Flag Pole Marquee - Free Standing Back Lighted SITE Campus Need ² ³ 1 3 6 7 1 EA 1 EA $22,203 $8,308,329 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 8/17/2012 Page 16 of 16