HOLDING TANK COMPONENT MANUAL FOR PRIVATE ONSITE WASTEWATER TREATMENT SYSTEMS

Similar documents
HOLDING TANK COMPONENT MANUAL FOR PRIVATE ONSITE WASTEWATER TREATMENT SYSTEMS (VERSION 2.0)

APPENDIX F. Flow Tables

COMMERCIAL PLAN SUBMITTAL CHECK LIST Mercantile / Business / Educational / Storage / Factory Industrial / Hazardous / Institutional

SOUTH PLAINS PUBLIC HEALTH DISTRICT

City of Joshua 101 S. Main Joshua, Texas

Project phasing plan (if applicable) 12 copies of site plan

SITE PLAN REVIEW APPLICATION AND SUBMITTAL CHECKLIST FOR PLANNING COMMISSION

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

NEW WATER CONNECTION PROCEDURES FOR HOPE AND EDENVILLE TOWNSHIP RESIDENTS

SITE PLAN REVIEW APPLICATION AND CHECKLIST

CITY OF ZEELAND PLANNING COMMISSION

Community Development Department Commercial Permit Application

SUBMITTAL REQUIREMENTS

APPLICATION FOR REZONING PROPERTY CITY OF HOLLAND, MICHIGAN. Name of Applicant. Address, and Phone # of Applicant

Design Review Application *Please call prior to submittal meeting to determine applicable fees*

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

THE CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD, NORTH RIDGEVILLE, OHIO TELEPHONE: (440) FAX: (440) Building Department

Huntington Stormwater Utility

Commonwealth of Virginia Department of Health Division of Onsite Sewage, Water Services, Environmental Engineering and Marina Programs

ARTICLE IX SPECIAL PERMIT USES

Development Review Application Fees

Commercial Business Licensing Requirements

Sanitary Drainage Systems

Bold items are particular to the City of Euless

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

SMALL PROJECTS SIMPLIFIED APPROACH

LONDONDERRY PLANNING BOARD MINOR SITE PLAN APPLICATION & CHECKLIST

TOWN OF SPENCER FIRE and EMERGENCY SERVICES

SETEC SOIL AND ENVIRONMENTAL TECHNOLOGY, INC

NEW WATER CONNECTION PROCEDURES

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

ENVIRONMENTAL HEALTH SERVICE REQUEST FORM 2018

SOIL EROSION AND SEDIMENT CONTROL

THE CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD, NORTH RIDGEVILLE, OHIO TELEPHONE: (440) FAX: (440) Building Department

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

TOWNSHIP OF WEST WINDSOR 271 CLARKSVILLE ROAD, P.O. BOX 38 WEST WINDSOR, NJ (609) FAX (609)

PLANNING AND DEVELOPMENT DEPARTMENT SITE PLAN REVIEW SECTION / CURRENT PLANNING APPLICATION FOR PRELIMINARY SITE DEVELOPMENT PLAN APPROVAL

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

Neo-Traditional Overlay Application

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

APPLICATION FOR MINOR SITE PLAN REVIEW

Operational Certificate of Occupancy Information Packet

1 Exam Prep Plumber s Handbook Tabs and Highlights

HUNTSVILLE PHYSICAL SERVICES DEPARTMENT

Sizing Guide. For the Estimating of Flow Rates and Water Usage

APPLICATION FOR MINOR SITE PLAN REVIEW

STANDARD OF PRACTICE 2009

CITY OF KEIZER MASTER PLAN APPLICATION & INFORMATION SHEET

FIRE INSPECTION GUIDELINES FOR FOSTER GROUP HOME PARENTS Effective June 1, 2002, Update September 2011

SHORE PROTECTION ACT STAFF S FINDINGS & RECOMMENDATIONS

STAFF REPORT. April 30, 2018 May 9, 2018

C-I-10. The effect of establishing a comprehensive site review as follows will: B. Reduce the cluttered aspects of current development by:

. a facility with a fixed propane storage capacity of exactly 5,000 USWG and no more than 500

Application for Site Plan Review

CITY OF DANIA BEACH Local Business Tax Receipt Division 100 W Dania Beach Blvd. Dania Beach, FL Phone: ext 3644 / Fax

Town of West Point Plan of Development

LONDONDERRY PLANNING BOARD SITE PLAN APPLICATION & CHECKLIST

Drain and Vent Systems 6 CE Hours

4. Contractor (and subcontractors if applicable) certification statement(s)

Fats, Oils and Grease Program (FOG)

Intentionally Left Blank

ZONING COMPLIANCE PERMIT APPLICATION

PLANNED UNIT DEVELOPMENT APPLICATION

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

ARTICLE VI: SITE PLAN REVIEW

Type III Systems. MOWA Winter Convention 2015 MPCA

Site Plan Review Residential Accessory Building

Site Development Plan (SDP) Checklist

Appendix I. Checklists

TOWNSHIP OF LOGAN SOIL & FILL IMPORTATION AND PLACEMENT APPLICATION SUBMITTAL CHECKLIST

STOREY COUNTY SHERIFF PO BOX 498, VIRGINIA CITY, NV Phone (775) Fax (775) BUSINESS LICENSE

Drainage Control Plans

FIRE PREVENTION OFFICE Placer Hills Fire Protection District NEW PROJECT GUIDELINES

PERMIT APPLICATION REQUIREMENTS FOR NON-RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS

LANDSCAPE PLAN CHECK COMMUNITY FACILITY DISTRICT (CFD)/HOA PERFORMANCE

SEMSWA s Role in the Land Development Process

AUTOMATIC FIRE SPRINKLER SYSTEMS

$ Each additional variance per petition. $ All Other Zoning Districts: One variance per petition

Department of Planning & Community Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344

CHAPTER 8 APPURTENANCES

CHAPTER 10 TRAPS AND INTERCEPTORS

Boston Water and Sewer Commission

TYPICAL WATER SERVICE INSTALLATION SPECIFICATIONS AND REGULATIONS

CHAPTER 10 TRAPS AND INTERCEPTORS TABLE 10-1 HORIZONTAL LENGTHS OF TRAP ARMS (EXCEPT FOR WATER CLOSETS AND SIMILAR FIXTURES) 1, 2

SPECIAL EVENTS INSTRUCTIONS AND REQUIREMENTS Must apply at least 2 weeks PRIOR to Event Date

Department of Planning & Development Planning Unit

Level I Chapter 1 Worksheet

HOLLY HILL FIRE DEPARTMENT

NEW YORK CITY FIRE DEPARTMENT. Notice of Public Hearing and Opportunity to Comment on Proposed Rule

Non-Metallic Mining Reclamation Checklist

Plat Requirements CHECKLIST FOR SITE PLAN REVIEW

APPLICATION BRIEFING Prepared For: Submitted by: Date: Subject:

2018 City of Hillsboro Fee Schedule

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

Louisville Metro Ordinance (Chapter 94: Fire Prevention) FIRE HYDRANTS, WATER MAINS AND WATER SUPPLY.

PARKLET PROPOSAL PACKAGE & PROCESS

City of San Ramon. Zoning Ordinance. Adopted: October 27, Latest Revisions Effective: March 28, 2018

Certificate of Occupancy Application

Transcription:

HOLDING TANK COMPONENT MANUAL FOR PRIVATE ONSITE WASTEWATER TREATMENT SYSTEMS State of Wisconsin Department of Commerce Division of Safety and Buildings SBD-10571-P (R.6/99)

TABLE OF CONTENTS Page I. Introduction and Specifications 3 II. Definitions 4 III. Description and Principle of Operation 4 IV. Design 5 V. Site Preparation and Construction 8 VI. Operation, Maintenance and Performance Monitoring 9 VII. Plan Submittal and Installation Inspection 10 Published on June 11, 1999 by Dept. of Commerce Division of Safety and Buildings Safety and Buildings Publication SBD-10571-P (R.6/99) ADA Statement The Department of Commerce is an equal opportunity service provider and employer. If you need assistance to access services or need material in an alternate format, please contact the Department at (608) 266-3151 or TTY (608) 264-8777. 2 of 14

I. INTRODUCTION AND SPECIFICATIONS This Private Onsite Wastewater Treatment System (POWTS) component manual provides design, construction, inspection, operation, and maintenance specifications for a holding tank component. However, these items must accompany a properly prepared and reviewed plan acceptable to the governing unit to help provide a system that can be installed and function properly. Violations of this manual constitute a violation of chs. Comm 83 and 84, Wis. Adm. Code. Note: Detailed plans and specifications must be developed, and submitted for review and approval by the governing unit having authority over the plan for the installation. Also a Sanitary Permit must be obtained from the department or governmental unit having jurisdiction. See Section VII for more details. Holding capacity Horizontal setback Location to service access Table 1 SIZE AND ORIENTATION 5 times design daily wastewater flow or 2000 gals, whichever is greater Meets s. Comm 83.43 (9) (i), Wis. Adm. Code 25 feet to service drive or road measured from service access opening or pump out port Table 2 OTHER SPECIFICATIONS Tank design and construction Meets ch. Comm 84.25 Tank access 1 opening having an inside diameter of at least 8 inches. Alarms or warning system Meets s. Comm 83.43 (9) (e), Wis. Adm. Code Water meter Anchor for installation in saturated soils Installation inspection Management Meets s. Comm 83.54 (2), Wis. Adm. Code Meets s. Comm 83.43 (9) (g), Wis. Adm. Code and the weight of anchor is 1.5 x tank volume in cubic feet x 62.4 pounds per cubic foot - weight of tank In accordance with ch. Comm 83, Wis. Adm. Code In accordance with ch. Comm 83, Wis. Adm. Code and this manual 3 of 14

II. DEFINITIONS. Definitions not found in this section, are located in ch. Comm 81 of the Wisconsin Administrative Code or the terms use the standard dictionary definition. A Cobbles means rock fragments greater than 3 inches, but less than 10 inches in diameter. B. Service provider means the individual or company that is responsible for managing and maintaining the holding tank system. C. Stones means rock fragments greater than 10 inches in diameter, but less than 24 inches. III. DESCRIPTION AND PRINCIPLE OF OPERATION. The POWTS holding tank serves to contain wastewater or sewage on site until the contents is pumped and hauled to a proper point of disposal. Pumping and monitoring reports are submitted to the department or designated agent. The holding tank installed under this component manual holds domestic wastewater, stormwater or clearwater inclusions permitted under s. Comm 82.36, Wis. Adm. Code, and/or human excrement until pumped by an individual licensed under NR 113, Wis. Adm. Code. Industrial wastewater is regulated by the Department of Natural Resources (DNR), and is not included in this specification, unless approved by the DNR in advance. See figure 1, for a typical holding tank design. 4 of 14

IV. DESIGN Figure 1 Cross-Section of Holding Tank A. Tank Size One- and Two-family Dwellings. Minimum liquid capacity of a holding tank for one- and twofamily dwelling application must not be less than 2000 gallons or 5 times the estimated daily wastewater flow determined in accordance with s. Comm 83.42 (3), (4), or (5), Wis. Adm. Code, whichever is greater. Public Facilities. Minimum liquid capacity of a holding tank for public facilities must not be less than 2000 gallons or 5 times the estimated daily wastewater flow whichever is greater as determined in accordance with s. Comm 83.42 (6), Wis. Adm. Code or Table 3. Facilities that are not listed in Table 3 are not included in this specification. 5 of 14

Table 3 Public Facility Wastewater Flows Source Unit Estimated Wastewater Flow (gpd) Apartment or Condominium Bedroom 100 Assembly hall (no kitchen) Person (10 sq. ft./person) 1.3 Bar or cocktail lounge (no meals served) Patron (10 sq. ft./patron) 4 Bar or cocktail lounge* (w/meals - all paper service) Patron (10 sq. ft./patron) 8 Beauty salon Station 90 Bowling alley Bowling lane 80 Bowling alley (with bar) Bowling lane 150 Camp, day and night Person 25 Camp, day use only (no meals served) Person 10 Campground or Camping Resort Space, with sewer connection 30 and/or service building Campground sanitary dump station Camping unit or RV served 25 Catch basin Basin 65 Church (no kitchen) Person 2 Church* (with kitchen) Person 5 Dance hall Person (10 sq. ft./person) 2 Day care facility (no meals prepared) Child 12 Day care facility* (with meal preparation) Child 16 Dining hall* (kitchen waste only without dishwasher and/or Meal served 2 food waste grinder) Dining hall* (toilet and kitchen waste without dishwasher Meal served 5 and/or food waste grinder) Dining hall* (toilet and kitchen waste with dishwasher Meal served 7 and/or food waste grinder) Drive-in restaurant* (all paper service with inside seating) Patron seating space 10 Drive-in restaurant* (all paper service without inside Vehicle space 10 seating) Drive-in theater Vehicle space 3 Employees (total all shifts) Employee 13 Floor drain (not discharging to catch basin) Drain 25 Gas station / convenience store Patron (minimum 500 3 patrons) Gas station (with service bay) Patron Service bay Patron Service bay 3 50 Hospital* Bed space 135 Hotel, motel or tourist rooming house Room 65 Medical office building Doctors, nurses, medical staff Office personnel Patients 6 of 14 Person Person Person Migrant labor camp (central bathhouse) Employee 20 * = May be high strength waste Table 3 Public Facility Wastewater Flows (continued) Source Unit Estimated 50 13 6.5

Wastewater Flow (gpd) Mobile Home (Manufactured home) (served by its own Bedroom 100 POWTS) Mobile home park Mobile home site 200 Nursing, Rest Home, Community Based Residential Facility Bed space 65 Outdoor sport facilities (toilet waste only) Patron 3.5 Parks (toilets waste only) Patron (75 patrons/acre) 3.5 Parks (toilets and showers) Patron (75 patrons/acre) 6.5 Public shower facility Shower taken 10 Restaurant*, 24-hr. (dishwasher and/or food waste grinder Patron seating space 4 only) Restaurant*, 24-hr. (kitchen waste only without dishwasher Patron seating space 12 and/or food waste grinder) Restaurant, 24-hr. (toilet waste) Patron seating space 28 Restaurant*, 24-hr. (toilet and kitchen waste without Patron seating space 40 dishwasher and/or food waste grinder) Restaurant*, 24-hr. (toilet and kitchen waste with Patron seating space 44 dishwasher and/or food waste grinder) Restaurant* (dishwasher and/or food waste grinder only) Patron seating space 2 Restaurant* (kitchen waste only without dishwasher and/or Patron seating space 6 food waste grinder) Restaurant (toilet waste) Patron seating space 14 Restaurant* (toilet and kitchen waste without dishwasher Patron seating space 20 and/or food waste grinder) Restaurant* (toilet and kitchen waste with dishwasher Patron seating space 22 and/or food waste grinder) Retail store Patron (70% of total retail 1 area 30 sq. ft. per patron) School* (with meals and showers) Classroom (25 500 students/classroom) School* (with meals or showers) Classroom (25 400 students/classroom) School (without meals or showers) Classroom (25 300 students/classroom) Self-service laundry (toilet waste only) Clothes washer 33 Self-service laundry (with only residential clothes washers) Clothes washer 200 Swimming pool bathhouse Patron 6.5 * = May be high strength waste 7 of 14

B. Monitoring/Management Equipment. The holding tank POWTS includes the installation of a water meter meeting the AWWA C700-90 standards and a direct-reading remote registration system which meets AWWA Standard C706 on the water supply of the facility that discharges to the holding tank. The meter and remote reading system registers in gallons or cubic meters. The alarm for the holding tank installation is an audible and/or visual alarm posted in a conspicuous location in the building served or on a post near the tank protected from the weather. The alarm is connected to a float in the holding tank. V. SITE PREPARATION AND CONSTRUCTION A. Site Preparation. A minimum of 3 inches of compacted bedding material is provided under the holding tank. Bedding material is sand, gravel, granite, lime rock or any unsaturated soil material of a sandy loam or coarser texture. 100 % of the bedding material passes a 1/2 inch screen. B. Sanitary Permit Prior to the construction of the system, a sanitary permit, obtained for the installation must be posted in a clearly visible location on the site. Arrangements for inspection(s) must also be made with the governmental unit issuing the sanitary permit. C. Tank Installation. 1. Care is taken in setting the tank to avoid damage to the structural integrity of the tank. The excavation for the tank provides at least 12 inches of space around the tank to allow free flow of backfill material along the tank walls. 2. The tank is set level. 3. Access openings that terminate at grade and/or less than 2 ft. above the established regional flood elevation (if applicable) have water and gas tight access ports. Access openings that terminate at least 4 inches above the surrounding grade and 2 ft. above the established regional flood elevation (if applicable) are not required to have water and gas tight access ports. 4. The connection of the holding tank to the sanitary sewer is by means of a mechanical compression type joint conforming to s. Comm 84.40, Wis. Adm. Code. 5. All access ports are installed so as to permit a minimum of 3 feet of clear space above the port and 2 feet in all directions horizontally from any point of the access port. 8 of 14

6. Below grade connections. Joints between the tank, access ports, access opening risers, and covers are watertight if located below finished grade. 7. Where a holding tank is installed in saturated soils (see Comm 85 for the determination of soil saturation), the tank is anchored using the following equation: Weight of anchor 1.5 x tank volume in cubic feet x 62.4 pounds per cubic foot - weight of tank D. Monitoring/Alarm Equipment Installation. E. Backfill Meter installation. A water meter is installed on the water supply discharging to the holding tank. All exterior hydrants are excluded from the metered flow. The meter is installed downstream of all point-of-entry water treatment devices. A control valve is installed on each side of the meter. Alarm installation. The alarm float is set to turn on the alarm when liquid volume is at 12 below tank inlet invert or at 90% of the liquid capacity of the tank below the tank inlet invert. Alarm wiring is installed in accordance with NEC 300 and ILHR 16.23, Wis. Adm. Code. The holding tank excavation is backfilled with soil material and tamped into place. The cobble content does not exceed 35% and no stones will be permitted in the backfill material. VI. OPERATION, MAINTENANCE and PERFOMANCE MONITORING A. The system owner is responsible for the operation and maintenance of the system, locking device, alarm and access. The owner or owner's agent is required to submit reports as required by s. Comm 83.55 (1), Wis. Adm. Code, to the county or other appropriate jurisdiction and/or the department. B. Design approval and site inspections before, during, and after the construction are accomplished by the county or other appropriate jurisdictions in accordance with ch. Comm 83 of the Wis. Adm. Code. 9 of 14

C. Performance Expectations Maintenance cycle. The holding tank must be serviced by licensed pumpers. An alarm system is installed to activate when the tank is 90% full. Performance monitoring. At the time of servicing, the service provider files a report with the department or designated agent. D. User's Manual: A user's manual is to accompany the component. The manual is to contain the following as a minimum: Diagrams of all components and their location. Names and phone numbers of local health authority, component manufacturer or POWTS service provider to be contacted in the event of component failure or malfunction. Information on the periodic maintenance of the component, including electrical/mechanical components. VII. PLAN SUBMITTAL AND INSTALLATION INSPECTION A. Plan Submittal In order to install a system correctly, it is important to develop plans that will be used to install the system correctly the first time. The following checklist may be used when preparing plans for review. The checklist is intended to be a general guide. Conformance to the list is not a guarantee of plan approval. Additional information may be needed or requested to address unusual or unique characteristics of a particular project. Contact the reviewing agent for specific plan submittal requirements, which the agency may require that are different than the list included in this manual. General Submittal Information Photocopies of soil reports forms, plans, and other documents are acceptable. However, an original signature is required on certain documents. Submittal of additional information requested during plan review or and questions concerning a specific plan must be referenced to the Plan Identification indicator assigned to that plan by the reviewing agency. Plans or documents must be permanent copies or originals. Forms and Fees Application form for submittal, provided by reviewing agency along with proper fees set by reviewing agent. Copy of a Notarized Holding Tank Agreement. 10 of 14

Soils Information Complete Soil and Site Evaluation Report (form # SBD-8330) for each backhoe pit described; signed and dated by a certified soil tester, with license number. Separate sheet showing the location of all borings. The location of all borings and backhoe pits must be able to be identified on the plot plan. A soil test form is not required where lot size and/or setback limitations preclude any soil absorption system. A CST; designer, responsible for the systems design; plumber, responsible for the installation; or POWTS inspector of the governmental unit having jurisdiction must clearly indicate why the parcel may not accommodate a soil absorption system. Documentation Architects, engineers or designers must sign, seal and date each page of the submittal or provide an index page, which is signed, sealed and dated. Master Plumbers must sign, date and include their license number on each page of the submittal or provide an index page, which is signed, sealed and dated. Three completed sets of plans and specifications (clear, permanent and legible); submittals must be on paper measuring at least 8-1/2 by 11 inches. Plot Plan Dimensioned plans or plans drawn to scale (scale indicated on plans) with parcel size or all property boundaries clearly marked. Benchmark and north arrow. Setbacks indicated as per appropriate code. Location information; legal description of parcel must be noted. Location of any nearby existing system or well. System Sizing For one- and two-family dwellings the number of bedrooms must be included. For public facilities, the sizing calculations must be included. Tank And Pump / Siphon Information All construction details for site-constructed tanks. Size and manufacturer information for prefabricated tanks. Installation information must include vent and manhole locations, depth to inlet; and depth of freeboard and anchoring provisions, if applicable. Cross section of tank or tanks to be installed in a series, with information regarding liquid depth, depth of high water alarm, approved joint and any modifications (suction pipes, etc.) clearly marked. Septage Disposal 11 of 14

For design flows less than 3000 gpd, written statement from owner regarding method of disposal. For design flows greater than 3000 gpd, written verification that requirements of s. NR 113.07 (1) (e), Wis. Adm. Code are met. B. Inspections. Inspection shall be made in accordance with ch. 145.20,. Wis. Stats., and s. Comm 83.26, Wis. Adm. Code. The inspection form on the following two pages may be used. The inspection of the component installation and/or plans is to verify that the component at least conforms to specifications listed in Tables 1 and 2 of this manual. 12 of 14

POWTS HOLDING TANK INSPECTION REPORT (ATTACH TO PERMIT) GENERAL INFORMATION Permit Holder s Name City Village Town of County Sanitary Permit No. State Plan ID No. Tax Parcel No. Property Address if Available TANK INFORMATION TYPE MANUFACTURER CAPACITY SETBACKS Property Line Well Water Service Building Service Road OHWM Swimming Pool DEVIATIONS FROM APPROVED PLAN DATE OF INST. DIRECTIVE: DATE OF ENFORCEMENT ORDER: DATE OF REFERRAL TO LEGAL COUNSEL: COMMENTS (Persons present, discrepancies, etc.) COMPONENTS NOT INSPECTED Plan Revision Required Signature of Inspector: Sketch on other side 13 of 14

Point Back sight Height of instrument Bench mark Bldg. sewer Tank inlet Tank outlet Tank inlet Tank outlet ELEVATION DATA Foresight Elevation Comments SKETCH OF COMPONENT & ADDITIONAL COMMENTS 14 of 14