OCCASION DISCLAIMER FAIR USE POLICY CONTACT. Please contact for further information concerning UNIDO publications.

Similar documents
Country Presentation (Islamic Republic of Iran)

EXHIBIT G REFRIGERANT MANAGEMENT POLICY

Response to request for review Destruction of HFC-23 at Refrigerant (HCFC-22) Manufacturing Facility of Chemplast Ltd. (0499)

INVITATION TO BID SUPPLY OF VARIOUS PORTABLE FIRE EXTINGUISHERS

Electronic Refrigerant Leak Detector DE-FG36-98G Micronic, Inc. Elie Talamas, Jr. Period: 10/1/99 to 12/31/99

ENGINEERING STANDARDA FOR FIRE FIGHTING HOSE BOX AND SHELTER FIRST EDITION APRIL 2015

Refrigerant and Energy Regulations Update

Tourism and Local Agenda 21. The Role of Local Authorities in Sustainable Tourism aaa

This document is a preview generated by EVS

The Global E-waste Monitor 2017

SECTION REGULATORY REQUIREMENTS. A. Relationship between Code, Ordinances, Standards and Contract Documents

DuPont ISCEON 9 Series Refrigerants

COUNTY OF ROCKLAND Department of General Services Purchasing Division

IMAS nd Edition Director, United Nations Mine Action Service (UNMAS), DC2 0650, United Nations, New York, NY 10017, USA

GASTEC QA. Approval Requirements 31-1

FACT SHEET 6 Transport Refrigeration

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

American National Standard

FACT SHEET 9 Large Air-Conditioning (air-to-air)

COUNTY OF ROCKLAND Department of General Services Purchasing Division

Carwin COMPRESSOR SELECTION PROGRAM

INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD. Footwear Test methods for outsoles Flex resistance

ISO INTERNATIONAL STANDARD. Fire protection Automatic sprinkler systems Part 11: Requirements and test methods for pipe hangers

Electrical Safety Policy

TECHNICAL REPORT IEC/TR

NZQA Expiring unit standard 3397 version 4 Page 1 of 5. Convert an automotive air conditioning system from R-12 to R-134a

UNECE STANDARD FFV-22 concerning the marketing and commercial quality control of LETTUCES, CURLED-LEAVED ENDIVES AND BROAD-LEAVED (BATAVIAN) ENDIVES

GASTEC QA. Approval Requirements 31-2

UNIFIED FACILITIES GUIDE SPECIFICATIONS

GASTEC QA. Approval Requirements 200. for the GASTEC QA product certificate for fusion fittings and saddles made from Polyethylene (PE)

Enspeco RMS. The Enspeco Refrigerant Management. The following instructions will INSTRUCTIONS

ISO INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

2019 Landscape Awards

This is a preview - click here to buy the full publication ICS ISBN

FACT SHEET 9 Large Air-Conditioning (air-to-air)

DuPont Refrigerants. John McCormack Business Manager DuPont Chemicals and Fluoroproducts. R22 market and the ISCEON retrofit options

ISO 7183 INTERNATIONAL STANDARD. Compressed-air dryers Specifications and testing. Sécheurs à air comprimé Spécifications et essais

IECEE OPERATIONAL DOCUMENT

ISO INTERNATIONAL STANDARD. Welding Acceptance inspection of electron beam welding machines Part 4: Measurement of welding speed

SVENSK STANDARD SS-EN 10021:2007. Allmänna tekniska leveransbestämmelser för järn- och stålprodukter

Refrigerant & Energy Regulations Update

INTERNATIONAL STANDARD

SOCIALIST REPUBLIC OF VIET NAM CONSTRUCTION. Independence - Freedom - Happiness

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

FUNDERMAX GMBH FIRE TEST REPORT

D-TEK Select. Refrigerant Leak Detector

ISO INTERNATIONAL STANDARD. Glass containers Vacuum lug finishes Part 1: General

Updates to Section 608 ODS Management Program

SECTION AIR COILS

ISO INTERNATIONAL STANDARD. Footwear Test methods for whole shoe Washability in a domestic washing machine

GASTEC QA. Approval Requirements 136

ISO INTERNATIONAL STANDARD. Steel cord conveyor belts Part 4: Vulcanized belt joints

AUTOMATIC FIRE ALARM MONITORING

The form must be sent electronically to: and

SPECIFICATIONS FOR TENDER # SUPPLY OF A FIRE ALARM SYSTEMS SERVICE AGREEMENT FOR WESTERN HEALTH

UNECE STANDARD FFV-04 concerning the marketing and commercial quality control of ASPARAGUS

Awarding body monitoring report for: Institute of Legal Executives (ILEX) February 2008 QCA/08/3734

Refrigerant Standards

ISO INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING SuperClear 45-HS (patent pending)

Refrigerant Rule Revisions: Is Your Facility Prepared? MCTA Conference November 29, 2018

British Columbia Landscape Standard. Published by:

COMMERCIAL REBATES FOR: Food Services One-Stop Program. Effective July 1, June 30, Be Water SMART

INVITATION TO QUOTE. Page 1 of 7. Fire & Emergency Safety Plan Control Number: 2018-CFS-003 Issue Date: March 7, Purpose

FINAL ABSTRACT. CRADA TITLE. Miniature Transducers for Flight Test Unit Instrumentation - Magnetic Field Detector CRADA NUMBER: LA98C10367.

ISO INTERNATIONAL STANDARD. Fire protection Automatic sprinkler system Part 9: Requirements and test methods for water mist nozzles

The Industry s Most Complete Refrigeration Source

CONSULTING Training Courses

ISO INTERNATIONAL STANDARD. Adhesives for thermoplastic piping systems Part 1: Determination of film properties

North York Moors National Park Authority Planning Committee

Recycling Equipment for Processing recycled Refrigerators

For your commercial needs, we offer the following services:

INTERNATIONAL STANDARD

GASTEC QA. Approval Requirements 15. for the GASTEC QA product certificate for Steel pipes and sockets for the transport of gas. KE 15 January 2012

BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY

New Construction Builders Challenge: Sealed Attic and High Efficiency HVAC in Central Florida: A Year in Review

INDUSTRIAL EXTENSION BUREAU

INTERNATIONAL STANDARD

EHPA Testing Regulation

Initial Application for Emergency & Security Systems Operatives SJIB Grade (ECS) Card

COMPRESSOR SELECTION PROGRAM. Windows 95 Version

ISO 505 INTERNATIONAL STANDARD. Conveyor belts Method for the determination of the tear propagation resistance of textile conveyor belts

2017 Climate & Refrigerants Outlook. Stephen Yurek President & CEO

ISO INTERNATIONAL STANDARD

Date of Start and downloading the tender 12 sep 2018

CORRIGENDUM NO: 2 TO REQUEST FOR QUOTATION CRFQ NO E-Tender Ref. No: 9093

ISO INTERNATIONAL STANDARD

American National Standard for Electrical Lamp Bases Specifications for Bases (Caps) for Electric Lamps

INTERNATIONAL STANDARD

UL's Effort to Harmonize Product Safety Requirements for A2L, A2, and A3 Refrigerants. San Antonio, Texas 2012 Annual Conference

Exhibition Hall 1. Fachprogramm. Technical Programme

TECHNICAL SPECIFICATION

Energy Efficiency & Climate Change Benefits from Room Air Conditioners Godrej Perspective

Massachusetts COOL SMART

TECHNICAL REPORT. Household high-fidelity audio equipment and systems Methods of measuring and specifying the performance

M/s. Subros have asked for duty exemption for import of these 19 pieces of equipment.

Transcription:

OCCASION This publication has been made available to the public on the occasion of the 50 th anniversary of the United Nations Industrial Development Organisation. DISCLAIMER This document has been produced without formal United Nations editing. The designations employed and the presentation of the material in this document do not imply the expression of any opinion whatsoever on the part of the Secretariat of the United Nations Industrial Development Organization (UNIDO) concerning the legal status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries, or its economic system or degree of development. Designations such as developed, industrialized and developing are intended for statistical convenience and do not necessarily express a judgment about the stage reached by a particular country or area in the development process. Mention of firm names or commercial products does not constitute an endorsement by UNIDO. FAIR USE POLICY Any part of this publication may be quoted and referenced for educational and research purposes without additional permission from UNIDO. However, those who make use of quoting and referencing this publication are requested to follow the Fair Use Policy of giving due credit to UNIDO. CONTACT Please contact publications@unido.org for further information concerning UNIDO publications. For more information about UNIDO, please visit us at www.unido.org UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Vienna International Centre, P.O. Box 300, 1400 Vienna, Austria Tel: (+43-1) 26026-0 www.unido.org unido@unido.org

STATUS REP. GROUP I Dec.2002 Iran Project No. Status Comments Pro_iectTitle MP / IRA/94/40J Project approved at the 11 th ExCom Status:C Iran Pouya complain Conversion of domestic Completed that Perros does not refrigerator production facilities response to their to phase out CFC-12 and CFC- Completed problems 11 (First Group) MP / IRA/96/041 Project approved at the 18 th ExCom Status:C Conversion of domestic Completed for all6 companies. refrigerator production facilities to phase out CFC-12 and CFC- U (2nd group) LO.C was used for supplying safety equipment 1

Project No. Status Comments MP / IRA /97 /085 Project approved at the 22 00 ExCom. Trial Production Phasing out of CFC-II training was held in 5-11 Oct. at Henneeke Completed. from flexible Slabstock Installation completed, COllllllisioning of the Mass Production on Foam Manufacturing at equipment succcssfully completed. going. SAFOAMCo. MP / IRA /97 / 086 Project approved at the 22 00 ExCom. Status: Ongoing Phasing out of CFC-II training was held in 5-11 Oct. at Henneeke from flexible Slabstock Due to order of new conveyor. The new Foam Manufacturing at convcyor will be installcd at the latest datc of SIllZARCo. 26.03.2003. The installation of the conveyor requires one month, it is recommended Hennecke,s tcchnician to be present during the last two weeks of installation of conveyor equipment at Shizar. MP / IRA /97 /165 Phasing out of CFC-II Project approved at the 23 rd ExCom. from flexible Slabstock Foam Manufacturing at Project approved at the 22 00 ExCom Mashhad Foam training was held in 5-11 Oct. at Hennecke Due to preparation of sitc. n spite of the fact that temporary the problem of electricity supply can be solved. To start smooth installation. it is recommended that Hennecke' s technicians visit Mashad Foam on ]"1 May 2003 to complete the installation and commissioning. The required electricity will be available froms lh Apri12003. Necessary arrangement is made locally to make sure, that the sites are prepared, chemicals available for commissioning process. Status: Ongoing 2

Pi"oj«tNo. Part Status Comments. MP /IRA/97/196 Ref. Part Project approved at the 23 rd ExCom. Conversion of refrigerator Completed production facilities to phase out CFC-12 and PCR submitted to CFC-Il Foam Part Waiting for OMS to complete secretariat in June 2001. Electro Steel Co. commissioning and organize TUV visit The old equipment Cyclopentane in drums are ready to replaced by MFMP be used as blowing agent should be destroyed I.O.c. I.O.C. paid 3

Pr6jeetNcl. Part' " Status Comments Ptoject Title MP I IRA 197 1197 Ref. Part Project approved at the 23 rd ExCom. Status: Ongoing Conversion of Financial completion refrigerator Completed should be initiated end production facilities to of2001. phase out CFC-12 and CFC-ll Foam Part Since 18 month waiting for Perros PCR submitted to Zagross II Co. technician to fmalise the secretariat in June 2001. commissioning of the foaming equipment and TUV inspection. The old equipment Perross delegates has paid a visit to replaced by MFMP Zagross II to assess the situation of should be destroyed the project. The responsibiliyie of the counterpart and the foam contractor have been clearly defined on presence of UNlDO rep, at Zagross U premises. Completion of commissioning is pending due to completion of outstanding tasks by the foam contractor. MP/IRA/98/086 Project approved at the 26 th ExCom Status:C Replacement of CFC-ll Foam Blowing Agent Completed with HCFC-141b and CFC-12 Refrigerant with HFC-134a in Manufacture of Refrigeration equipment at Sobouh / MP lira 1981 087 Status:C Replacement of CFC-ll Project approved at the 26 th ExCom Foam Blowing Agent PCR submitted to with HCFC-14lb and Completed secretariat in February CFC-12 Refrigerant 2001. with HFC-134a in Manufacture of Refrigeration equipment at Yazd Arg Metal 4

Project No. Part Status. ' Comments.. MP lira 199 I 077 Foam Project approved at the 28 th ExCom. Status: Ongoing Phasing out ODS in Manufacturing of Equipment cleared from customs, the flexible PU slabstock counterpart is committed to slop the foam through the use of production by the second week of liquid CO 2 blowing March 2003, and the old equipment to technology at Bahman be moved and installed at new site by Plastic Co. 14 th of April 2003 the production at. new site by old machine should be started by '10 fh May 2003. The foam contractor will visit Iran to start with the commissioning on 10 th May 2003. Project approved at the 28 m Excam MP lira 199/109 Status: Ongoing Completed 11 to HCFC-141b and PCR submission to CFC-l2 to HFC-134a Secretariat in process Manufacture of Domestic and Refrigeration at the Sherkate Sanayee Emerson (Emerson Co.) MP lira 199 1110 Project approved at the 28 th ExCom. Status: Ongoing 11 to HCFC-14lb and Completed PCR submission to CFC-12 to HFC-134a Secretariat in process Manufacture of Domestic and Refrigeration at the Sherkate Broudati Ghandil Iran (Ghandil) MP lira 199 1121 Ref. Part 6 models of compressor developed Status: Ongoing Replacement of CFC-12 and manufactured. as refrigerant by HFC- The equipment for the first phase is l34a at Iran Compressor delivered. The scope of work for Manufacturing phase 2 is under consideration. Company (ICMC) Washing machine installed, W~Jitil1g for space part, Welding Machine is still not received 5

Project No. Part Status Comments. MP / IRA /99 /122 Project approved at the 28 th ExCom. Status: Ongoing Phasing out of CFC-II by conversion to HCFC- Completed PCR submitted to 14lb and CFC-12 to Secretariat HFC-134a in Manufacture of Refrigeration at the second group of Iranian Refrigerator Manufacturers (Aalisard,Pardis,Mohebi,Jalalzadeh,Meibod Tagarg in Yazd province and Shahab Co. in the Isfahan province of Iran) MP / IRA /99/161 Project approved at the 29 th ExCom. Status: Ongoing U to HCFC-14Ib and Completed PCR submission to CFC-12 to HFC-134a Secretariat in process manufacture of domestic and commercial refrigeration at the Sherkate Sanaayee Toulidy Bard Co. MP / IRA /99/162 Project approved at the 29 th ExCom. Status: Ongoing Conversion form CFC- U to HCFC-14Ib and Completed PCR submission to CFC-12 to HFC-134a Secretariat in process manufacture of domestic and commercial refrigeration at the Forouzan Yakhchal Company (Forouzan Ref. Co.) 6

-Project No. Part Status Comments MP / IRA /99/163 Project approved at the 29 th ExCom. Status: Ongoing 11 to HCFC-141b and Completed PCR submission to CFC-12 to HFC-134a Secretariat in process manufacture of domestic and commercial refrigeration at the Minavand Refrigeration Company. MP / IRA /99 /164 Project approved at the 29 th ExCom Status: Ongoing 11 to HCFC-141h and Completed. PCR submission to CFC-12 to HFC 134a Secretariat in process manufacture of domestic and commercial refrigeration at the Saiwan Sannat Co. MP / IRA /00 /111 Project approved at the 31It ExCom. Status:Ongoing 11 foam blowing agent Completed to HCFC-141 b and PCR preparation in from CFC-12 refrigerant process to HFC-134a In the manufacture of commercial refrigeration at the Himalia and Barez Himalia Companies 7

.Project No. Part Status Cbminents MP / IRA / 01/133 Ref. Part Project approved at the 34 th ExCom Status: Ongoing Prototypes developed and II tohcfc-141b& manufactured, refrigerant equipment CFC-12 to HFC-134a in installed and commissioned. the manufacture of (p.o. no. 05-1-46220Y) domestic & commercial Contract awarded to Cannon Afros refrigeration equipment Foam Part (Contr. No. 021003-16000003) at the Novin Enjemad Foaming equipment cleared from Customs Waiting for installation & commissioning.tra.ining was held in Oct.2002 at Cannon Afros I.o.c. I.O.C. not paid MP / IRA / 01/134 Ref. Part Project approved at the 34 th ExCom Status: Ongoing II to HCFC-141b & Prototypes developed and CFC-12 to HFC-134a in manufactured, refrigerant equipment the manufacture of installed and commissioned. commercial refrigeration received (p.o. no. 05-1-46221Y) equipment at the Takran Mobbared Co. Foam Part Contract awarded to Cannon Afros (Contr. No. 021004-16(00004) training was held in Oct.2002 at Cannon Afros. Foaming equipment has been successfully installed I.O.c. I.O.C. not paid MP / IRA / 01/137 Ref. Part Project approved at the 34 th ExCom Status: Ongoing Prototypes developed and lito HCFC-141b & manufactured, refrigerant equipment CFC-12 to HFC-134a in installed and commissioned. the manufacture of (p.o. no. 05-1-46222Y) domestic & commercial refrigeration equipment Foam Part Contract awarded to Hennecke at the Arjah Boroudat (Contr. No. 02/005-16000023) Foaming equipment cleared from Customs Wailing for installation & commissioning. I.O.c. I.O.C. not paid 8

, Pl'ojectNo. Part, ', S.atus " codi.n,e'rits " MP 1IRA 101/138 Ref. Part Project approved at the 34 th ExCom Status: Ongoing Prototypes developed and 11 to HCFC-14lb & manufactured, refrigerant equipment CFC-12 to HFC-134a in installed and commissioned. the manufacture of (p.o. no. 05-l-46223Y) domestic & commercial Contract awarded to Hennecke refrigeration equipment Foam Part (Contr. No. 02/006-16000022) at Zarifan Mashad Foaming equipment cleared from Customs Waiting for installation & commissioning.. I.O.C. not paid I.O.C. Project approved at the 34 Ul ExCom MP 1 IRA 1 01/139 Ref. Part Prototypes developed and Status: Ongoing manufactured, refrigerant equipment 11 to HCFC-141b & installed and commissioned. CFC-12 to HFC-134a in (p.o. no. 05-1-46224Y) the manufacture of Contract awarded to Cannon Afros. domestic & commercial Foam Part (Contr. No. 02/007-16000005) refrigeration equipment Foaming equipment cleared from at the Tehran Shirak Customs Waiting for installation & commissioning training was held in Oct.2002 at Cannon Afros I.O.C. I.O.c. not paid Project approved at the 34 m ExCom MP IIRA/01/140 Ref. Part Prototypes developed and Status: Ongoing manufactured, refrigerant equipment 11 to HCFC-14lb & installed and commissioned. CFC-12 to HFC-134a in (p.o. no. 05-1-46225Y) the manufacture of Contract awarded to Hennecke. domestic & commercial Foam Part (Contr. No. 01/297-05-1-46244) refrigeration equipment Foaming equipment cleared from at the Avaj Sarma Co. Customs Waiting for installation & commissioning, I.o.e. I.O.c. not paid Project approved at the 34 Ul ExCom MP 1 IRA 1 01/141 Ref. Part Prototypes developed and Status: Ongoing manufactured, refrigerant equipment 11 to HCFC-14lb & installed and commissioned. CFC-12 to HFC-134a in (p.o. no. 05-1-46226Y) the manufacture of Contract awarded to Hennecke. commercial refrigeration Foam Part (Contr. No. 02/010-16000025) equipment at the Gasso Foaming equipment cleared from Co. Customs Waiting for installation & commissioning, I.O.e. I.O.e. not paid 9

Project No. Part Status Commenis.. MP / IRA / 01/143 Ref. Part Project approved at the 34 th ExCom Status: Ongoing Prototypes developed and 11 to HCFC-141b & manufactured, refrigerant equipment CFC-12 to HFC-134a in installed and commissioned. the manufacture of (p.o. no. 05-1-46227Y) domestic & commercial refrigeration equipment Foam Part Contract awarded to Hennecke. at the Donyaye Mojdeh (Contr. No. 02/009-16000024) Foaming equipment cleared from Customs Waiting for installation & commissioning. 1.0.C. 1.0.C. not paid MP / IRA / 01/145 Ref. Part Project approved at the 34 th ExCom Status: Ongoing Prototypes developed and 11 to HCFC-141b & manufactured. refrigerant equipment CFC-12 to HFC-134a in installed and commissioned. the manufacture of (p.o. no. 05-1-46228Y) domestic & commercial refrigeration equipment at the Roshan Industrial Foam Part Contract awarded to Cannon Afros. Group (Contr. No. 02/008-16000006) Foaming equipment cleared from Customs Waiting for installation & commissioning training was held in Oct.2002 at Cannon Afros. I.O.C. 1.0.C. not paid 10