Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples.

Similar documents
Popp s Ferry Causeway Park Back Bay Environmental Educational Center CASHIO COCHRAN LLC

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

Chagrin River Watershed Partners, Inc. Local Regulations. Amy H. Brennan (440)

LANDSCAPING. Design. Development of the site shall not unreasonably impair the ability of adjoining properties to utilize solar energy.

Use of Best Management Practices

Urban Water Management and Soils (ESRM 311 & SEFS 507)

Severn River Sub-Watershed: BMP 09-Retrofit

Just The Basics: Illicit Discharge. What does it mean to me?

Las Colonias Park Master Plan

STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

DRAFT SCOPE OF SERVICES PEER REVIEW OF BAKER PARK. Request for Qualifications (RFQ)

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE PUBLIC MEETING 3/26/18

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

A Vision for Walnut Creek

A.9. Cannon River. Campostella Park. Adjacent Industrial & City Facility Uses

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Goat Island Masterplan

Urban runoff in my neighborhood (Capitol Hill) is heavy with trash and other debris.

Small Town Sustainable Stormwater Solutions

PHASE 3-4 PARKS SOUTH PARK AND CHANNEL PARK

City of Miami MIAMI RIVER BASIN WATER QUALITY IMPROVEMENT REPORT FOR FIRST AND SECOND QUARTER 2010

BAY DRIVE PARK Questions and Answers

Emerson Park Master Plan Update. Public Meeting III August 27, 2014

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Constructed Stormwater Wetlands

COLLIER BOULEVARD (CR 951) CORRIDOR

russell+mills studios

6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB

USF System Campus Master Plan Updates Goals, Objectives and Policies

SOUTH FOX MEADOW STORMWATER IMPROVEMENT PROJECT

ENVIRONMENTAL PAVING SOLUTIONS

City of Waco Stormwater Management Regulations

Lesson 2: Stormwater Best Management Practices (BMPs)

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK

HURON WATERFRONT DEVELOPMENT AND AMPHITHEATER

TABLE 5-3. EXISTING AND PROPOSED YAKIMA GREENWAY FACILITIES

PROJECT UPDATE BON AIR ROAD BRIDGE REPLACEMENT AND MAGNOLIA AVENUE WATER QUALITY FACILITIES

Section 1 TABLE OF CONTENTS

Chapter 6. Overall Vision RECOMMENDATIONS. More Trail and Trail. Connections. Equal Access to Park. Facilities and Programs. Water Access.

Reconnecting to a Forgotten River St. Cloud MN. Aaron Hanson Design Design Thesis LA 572, Thesis, Spring 2012

Christchurch City Council Civic Offices 53 Hereford Street Christchurch. Submission on: The Draft Annual Plan 2014/15

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

{Best Practices. Summary of Tools, Strategies and Best Practices from 11 Michigan Case Study Communities

Adopting the Manual of Best Management Practices for Stormwater Quality. Facts for Communities

Port of Camas-Washougal Waterfront Trail Master Plan

Draft Rhode Island Stormwater Design and Installation Standards Manual

Evaluating Urban Stormwater Retrofits in the SE US Coastal Plain

4. Contractor (and subcontractors if applicable) certification statement(s)

MUNICIPAL SEPARATE STORM SEWER SYSTEM 2008 ANNUAL REPORT

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Highland Falls Waterfront Redevelopment Feasibility Study Village Board Meeting March 20, 2017

319 Grant: Baker Creek & Centenary Creek Restoration Initiative

Preferred Riverwalk Alternative Components August 17, 2017:

LAKEVIEW VILLAGE VISION & MASTERPLAN PRESENTATION TO CITY OF MISSISSAUGA. April 9, 2018

SALEM FOREST RIVER PARK PRELIMINARY POOL AREA ASSESSMENT & MASTER PLAN STUDY. For the City of Salem

2 Project Description

Town of Essex Small Site Erosion Control Guide

Park & Recreation Master Plan. March 31, 2017 Public Input Meeting

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

Urban Watershed Mentors

Sewer & Storm Drain Systems

NPDES - PCSM. Permit Preparation

Title 11 Streets and Sidewalks

TOWN COUNCIL / PLANNING COMMISSION

DESIGN CRITERIA PACKAGE

Homeowners Guide to Stormwater BMP Maintenance

MetroParks Board Meeting 2018 Capital Improvement Projects

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

BRADENTON RIVERWALK EXPANSION MASTER PLAN

Please read the entire document

VEHICULAR AND PEDESTRIAN CIRCULATION

STREAM BUFFER PROTECTION AND MANAGEMENT

Old Mill Community Association Bioretention Facility

MCCOYS CREEK RESTORATION 30% DESIGN

Summary of Changes in the DRAFT Rivers Project Natural Resource Master Plan from the 2001 approved plan to 2014 plan

Pedestrian Trails Within Regulated Areas

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

A. INTRODUCTION B. CUMULATIVE EFFECTS ANALYSIS

NAPA COUNTY PUBLIC WORKS Standards & Specifications

Fertilizer Rule, Ordinances & BMP Training

Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

EXHIBIT A CITY OF FORT WALTON BEACH, FLORIDA COASTAL MANAGEMENT & CONSERVATION

I-90 Mississippi River Bridge & Interchange Project

Worksheet #14 Water Runoff Management

Y Sports Complex PROGRAMMING Capitol Improvement Plan. Anticipated/Suggested Improvements. Sedgwick County Park: Sports Complex:

Palm Beach County Infrastructure Sales Tax Program Project Tracking. FY 2017 Projects

Swatara Township Stormwater Program. 1. There are no storm sewers on or near my property. Why should I pay a fee?

Table of Contents. Introduction...3. Facilities Requirements...4. Site Context Site Inventory...7. Existing Site Images...8

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

Weston Conservation Commission

4.1 AESTHETICS EXISTING ENVIRONMENTAL SETTING ALAMITOS BAY MARINA REHABILITATION PROJECT CITY OF LONG BEACH

Index to Projects by Project Name

Jack Creek Park Capital Improvement Project

Green Infrastructure. NYS Department of Environmental Conservation

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

DRAFT SECTION 4(F) EVALUATION STILLWATER MUNICIPAL BARGE FACILITY

Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St.

Transcription:

Gordon River Project Location Naples Beach Golf Club East Naples Naples Naples Bay Evergreen Golf and Country Club and Gordon River Greenway Connector Bridge

Gordon River Greenway CONNECTOR BRIDGE AND BOARDWALKS

Gordon River Greenway Connector Bridge and Boardwalks Proposed Boardwalk And Bridge Gordon River Greenway Connector Bridge and Boardwalks

Key Design Considerations for Bridge and Boardwalks Regulatory Agency Requirements Clearance Conservancy Requirements Navigation Gordon River Greenway Connector Bridge and Boardwalks

Regulatory Agency Requirements Florida Department of Environmental Protection Environmental Resource Permit (ERP) State Lands Authorization (Lease or Consent of Use) National Pollutant Discharge Elimination System (NPDES) US Army Corps of Engineers Section 404 (Dredge and Fill) Section 10 (Structures or work affecting navigable waters of the US) US Coast Guard Bridge Permit Aids to Navigation Permit** Florida Fish and Wildlife Conservation Commission Uniform Waterway Marker Permit** South Florida Water Management District Modification to amend easement for eastern landing. Gordon River Greenway Connector Bridge and Boardwalks

Bridge and Boardwalks Plan and Profile Gordon River Greenway Connector Bridge and Boardwalks

East Boardwalk Plan and Sections Gordon River Greenway Connector Bridge and Boardwalks

Bridge and Boardwalks Cost Estimate Total Estimated Cost: $2,444,000 Bridge: 230 feet long 12 feet wide East Boardwalk 292 feet long 12 feet wide Timber with ipe decking Top-down construction West Boardwalk 330 feet long 12 feet wide Timber with ipe decking Gordon River Greenway Connector Bridge and Boardwalks

JAY AND PATTY BAKER PARK

Alternative F

Alternative F on Aerial Photograph

Alternative F Conflict with Filter Marsh and Wetlands WETLAND BOUNDARY FILTER MARSH Conflicts 1. Wetlands 2. Filter Marsh 3. Utility Corridor

Reconfigured Alternative F 1. Moved Hills South Lawn Space too small 2. Made Hills Smaller Increased Lawn Space 3. Made Hills Smaller and Removed Gravity Stream Costs and ADA considerations

Reconfigured Alternative F Major Features DETENTION AREA HILL PAVILION CAROUSEL HILL BRIDGE TOP OF BANK DINING AREA FEATURE LAKE SPLASH AREA RAIN GARDEN DETENTION AREA SUNRISE TERRACE

Basic Park Foundation for Alternative F Landing Area for Gordon River Greenway Connector Bridge Paved Paths, Parking, Grading, Stormwater, Basic Utilities

Key Design Considerations for Basic Park Alternative F Regulatory Agency Requirements Stormwater Management Site Conditions/Geotechnical Considerations

Regulatory Agency Requirements Florida Department of Environmental Protection Environmental Resource Permit (ERP) State Lands Authorization (Lease or Consent of Use) National Pollutant Discharge Elimination System (NPDES) US Army Corps of Engineers Section 404 (Dredge and Fill) US Coast Guard Aids to Navigation Permit** Florida Fish and Wildlife Conservation Commission Uniform Waterway Marker Permit** ** Required if markers are installed to help control vessel traffic at the paddle craft launch or dock areas.

Stormwater Management Must meet treatment requirements for Built-Out Alternative F Stormwater treatment areas allocated in Alternative F Existing Conditions Riverside Circle (receives runoff from western 1/3 of site) Filter Marsh (available for park after Riverside Circle drainage improvements) No engineered stormwater management for eastern 2/3 of site Treatment Requirements for eastern 2/3 of site Must treat 1st inch of rainfall (0.97 ac-ft) Must treat additional 50% due to Gordon River Impairment (0.49 ac-ft) Total required 1.46 ac-ft Groundwater Quality and Discharge to Gordon River

Stormwater Management Drainage Basins and Treatment Areas Built Out Alternative F POND A-WEST (FILTER MARSH) 0.31 ac-ft POND A-EAST 0.35 ac-ft POND B 0.35 ac-ft BASIN C TO RIVERSIDE CIRCLE POND E 0.46 ac-ft Required Volume: 1.46 ac-ft Total Available Storage 1.47 ac-ft Note: Basins and Ponds as labeled in model

Stormwater Management Drainage Basins and Treatment Areas - Basic Park POND A-WEST (FILTER MARSH) 0.31 ac-ft POND A-EAST 0.35 ac-ft POND B 0.35 ac-ft BASIN C TO RIVERSIDE CIRCLE POND E 0.46 ac-ft Required Volume: 1.46 ac-ft Total Available Storage 1.47 ac-ft Note: Basins and Ponds as labeled in model

Site Work Basic Park Grading Plan and Major Features FILTER MARSH DETENTION AREA A ASPHALT PATH DETENTION AREA B UTILITY CORRIDOR PARKING CONCRETE PATH UTILITY CORRIDOR DETENTION AREA E

Site Work Geotechnical Boring Locations

Basic Park 30% Design Level Cost Estimate Park Feature 30% Design Level Cost Parking Area West of Riverside $85,000 Parking Area East of Riverside $80,000 Walkways, 12' Width, 1,300 LF $230,000 Walkways 2,500 LF of 8' Width & 650 LF of 10' Width $385,000 Site Grading $1,940,000 North Filter Marsh Retrofit $90,000 Silt Fence $9,000 Stormwater Infrastructure $113,000 Site Electrical $208,000 Utilities $129,000 Landscaping & Irrigation (from ALD) $930,000 Demolition $130,000 Basic Park Estimated Subtotal $4,329,000 Design, Permitting, and Services during Construction $671,000 Basic Park Estimated Total $5,000,000

Park Features Planning Level Cost Estimates Park Feature Planning- Level Cost Carousel & Shelter $1,221,000 Children's Splash Area $421,000 Outdoor Dining Shelter $220,000 Combined Features $142,000 Rock Waterfall $2,496,000 Kayak & Paddle Board Dock $91,000 Iconic Entry Tower $303,000 Viewing Tower $1,152,000 Rain Garden $1,502,000 Transient Boat Dock (8) Slips $328,000 Hillside Pavilion Structure $1,350,000 Peninsula Pavilion Structure $1,443,000 Park Feature Planning- Level Cost Feature Lake $136,000 Hilltop Bridge $134,000 Retaining Wall $518,000 Restroom Facility Pavilion (East) $176,000 Walkways (Concrete Pathways) $107,000 Public Art Nodes $16,000 Natural Stage Island $110,000 Park Hill #1 (30' tall hill) $1,210,000 Park Hill #2 (20' tall hill) $620,000 Rock Climb Rocks $28,000 Sunrise Terrace Feature $217,000 Bridge Pavilion Structure $335,000 Costs include 30% construction contingency and 20% design and construction services. Estimated total cost for all features is $14,276,000 (not including café). Estimated annual total cost for O&M is approximately $390,000.

Total Estimated Costs Bridge, Boardwalks, and Park Bridge and Boardwalks $2,444,000 Basic Park $5,000,000 Park Features $14,276,000 Estimated Total $21,720,000 Includes 30% contingency for construction Design, permitting, and services during construction and Gordon River Greenway Connector Bridge