One River Environmental Assessment. Welcome!

Similar documents
One River Environmental Assessment Stage 2 PIC. Welcome!

ONE RIVER MASTER PLAN ENVIRONMENTAL ASSESSMENT

Cherry Beach Shoreline Protection Infrastructure Conceptual Design and Class EA

Rapid Transit Implementation Working Group September 14, 2017

Blackfriars Bridge Municipal Class Environmental Assessment. Public Information Centre #1 November 19 th, 2014

Once Upon a Gravel Pit: Reconnecting Floodplain through Aggregate Extraction

Pine Flat Lake Master Plan Update FACT SHEET September 2014

At the Heart of the Great Lakes

Call for Artists for: Design and Construction of Environmental Art Activation Story Mill Community Park, Bozeman, MT

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Rapid Transit Implementation Working Group

Commissioners Road West Realignment Environmental Assessment

Improvements Municipal Class Environmental Assessment. Public Information Centre #1 June 11, 2015

Commissioners Road West Realignment Environmental Assessment

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

2.0 REGULATORY CONTEXT

Scarborough Waterfront Project

THE CORPORATION OF THE CITY OF WINDSOR Office of the City Solicitor Planning Department

1. Introduction

West London Dyke, April 1947 Flood. Forks of the Thames, July 2000 Flood. Source: UTRCA

APPENDIX L3. Table of Contents. SWP EA Information Sheets

Alternative Route Selection

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

Community Conservation Workshop. Lake Placid

CALA Homes is preparing a planning application for a development of up to 36 new homes, including a mix of properties to meet local demand.

Christchurch City Council Civic Offices 53 Hereford Street Christchurch. Submission on: The Draft Annual Plan 2014/15

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

Western Road/Wharncliffe Road North Widening from Platts Lane to Oxford Street. Municipal Class Environmental Assessment Public Information Centre #1

An Introduction to the Far North Land Use Strategy

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD

The purpose of tonight s PIC is to:

Case Study Presentation of the Downtown Brampton Flood Protection Class EA

TRCA Field Staking Protocol December 2016

Public Information Centre No. 1 King-Vaughan Road Bridge Replacement Municipal Class Environmental Assessment City of Vaughan

Biodiversity Action Plan Background Information for discussion purposes

Presentation to Planning Committee, DMM

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

RECOMMENDATIONS. Design Recommendations

Alternative Routes. St. Vital to La Verendrye Station - Southern Loop Transmission Corridor. 20 different segments 4 segments common to all routes

U.S. Army Corps of Engineers, Los Angeles District Prado Basin Project Updates

THE GREENBELT ACT AND PLAN

Commissioners Road West. Municipal Class Environmental Assessment. City of London

Shift Rapid Transit Public Participation Meeting May 3, 2017

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

Township of Adjala-Tosorontio Official Plan Review. Natural Heritage

Sustainable Natural Environment Wetlands

South of Eastern Strategic Direction Status Update

Edgeley Pond + Park Public Meeting

OFFICIAL COMMUNITY PLANS (OCPs) AND ZONING BYLAWS (ZBs): PLANNING FOR THE FUTURE

Improving Communities Through the Arroyo Seco Sustainability Campaign and Watershed Assessment

Arkansas River Corridor

edmonton.ca/ribbonofgreen #ribbonofgreen

ENVIRONMENTAL ASSESSMENT TERMS OF REFERENCE

Resolution XII NOTING also that with the increasingly rapid urbanization, wetlands are being threatened in two principle ways:

Lawrencetown Beach & Rainbow Haven Beach

City of Missoula and Missoula County Open Space Planning Open House

2011 ASLA Design Awards. Westside Creeks Restoration Plan Merit Award AECOM, Fort Collins. Planning & Urban Design

Community Conservation Workshop. Saranac River Basin Communities

3-2 Environmental Systems

DIGITAL SCREENS PROJECT CONSULTATION. Enhancing Communication through Digital Screen Technology

Draft Resolution XII.10

section 3: Vision, Values and Goals

Central Lake Ontario Conservation Conservation Lands Master Plan

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY

SUSTAINABLE MANAGEMENT

Biodiversity Standard

Mavis Road Class Environmental Assessment

Meeting Agenda. City of Guelph. River Systems Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4 Ward to Downtown Pedestrian Bridge

TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM

Appendix G: Environmental Impact Study Report

Building Great Neighbourhoods. Strathcona

The Duke s River: Revitalising the link between the River Crane and the River Thames

Public Open House. Overview of the Downtown Plan Official Plan Amendment April 23, 2018

Raystown Lake Master Plan Revision. Public Meeting April 25 & 26, 2018 How does the revision process work?

Big Picture Protected Areas Strategy Collaborating to Protect and Conserve Nature in Ontario s Carolinian Zone

INTRODUCING THE BALTIMORE CITY GREEN NETWORK VISION PLAN

TRCA Roles and Responsibilities in Planning and Development

1 Introduction. Chapter. In this chapter:

Baby Point Wastewater Pumping Station Forcemain Class Environmental Assessment Study

STORM SEWER OUTFALLS AND CONNECTING OUTFALL CHANNELS. General Submission Requirements

4. What are the goals of the Kawarthas, Naturally Connected project? 7. What are watersheds and why are they being used as the project boundaries?

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Plenty Gorge Park Draft Master Plan Consultation Report. Draft Master Plan April 2018

Urban runoff in my neighborhood (Capitol Hill) is heavy with trash and other debris.

PEOPLE, WATER, AND WILDLIFE: BLUE PRINCIPLES FOR RIVER DESIGN

Regional Economic Development Councils & The Consolidated Funding Application. Khris Dodson SU-EFC

... on the draft Arden Vision & Framework

DEVELOPMENT PERMIT SENSITIVE ECOSYSTEMS

10.0 Open Space and Public Realm

APPENDIX 1: SCOPED ENVIRONMENTAL IMPACT STATEMENT (EIS) FORM

Appendices. Contents. Appendices - Sep 1997 CP-1 AP-1

Blue/Green Infrastructure Study Accomack County, VA

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

MEMORIAL DRIVE DESIGN DEVELOPMENT PLAN

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

Presentation August 20, 2013

Transcription:

One River Environmental Assessment Welcome!

One River Environmental Assessment Welcome to the One River Environmental Assessment Public Information Centre. Please explore each presentation area to learn about the study process and alternatives for deciding on the future of the Springbank Dam! We look forward to your questions and hearing your ideas!

The Environmental Assessment Process The environmental assessment (EA) process ensures that governments and public bodies consider potential environmental effects before an infrastructure project begins. Key Features of a Master Plan EA Include: System-wide approach to environmental planning. Consideration of potential environmental and social/cultural impacts and mitigation. Public consultation. Integration with other planning initiatives.

One River EA Process

Problem/Opportunity Statement and Feedback The river that flows through London s downtown has many names: Deshkan Ziibiing (known to the Anishnaabeg and Lenape of the Great Lakes); Kahwyˆhatati (ONYOTA:KA); and, The Thames (John Graves Simcoe). This river is both our inheritance and our living legacy. It is our collective responsibility to maintain and enhance this shared natural, cultural recreational and aesthetic resource. The One River Master Plan Environmental Assessment will consider the area historically influenced by the Springbank Dam and will provide a plan that coordinates critical infrastructure projects in ways that improve the overall health of the river, identifies and creates an understanding of potential impacts these projects may have on downstream communities, species at risk and/or endangered species and where possible avoids them and respects the vision of Back to the River s The Ribbon of the Thames concept plan. This study, in the context of many other ongoing initiatives, will preserve for future generations this valuable resource and allow people of all abilities to enjoy and access this designated Canadian Heritage River. You are welcome to provide feedback on the above statement on the survey.

Current Conditions of the Springbank Dam and the Thames River The Springbank Dam is not operating because of damage to the dam gates. The area of the river that was once a reservoir now flows freely. Access to the river for recreation has been reduced. The depth of water in the river now varies with With the dam not in operation, the river is changing, resulting in a greater diversity of habitat and species in the study area. rainfall and snowmelt. Many of the floodplain areas along the river upstream of the dam have seen new growth of a mix of native and non-native plant species. The stretch of the river within the study area is home to 17 different Species at Risk (SAR).

Potential Species at Risk (SAR) and Species of Concern Additional SAR are present in the study area such as plants, birds and mammals and insects. The table below lists those species that are most likely to use the river for various aquatic functions. Status is given to species by both the federal and provincial governments. Turtles Common Name Federal Species At Risk Act Status Provincial Endangered Species Act Status Eastern Spiny Softshell END THR Northern Map Turtle SC SC Snapping Turtle SC SC Snakes Eastern Milksnake SC NAR Queensnake END END Eastern Hog-nosed Snake Fish THR THR Silver Shiner THR THR Black Redhorse THR THR Northern Brook Lamprey SC SC Pugnose Minnow THR THR Spotted Sucker SC SC Mussels Wavy-rayed Lampmussel SC THR Salamander Mussel END END Rainbow Mussel SC THR Rayed Bean END END Round Pigtoe END END Mapleleaf Mussel SC THR END - Endangered: Species facing imminent extirpation or extinction. THR - Threatened: Species which are likely to become endangered if nothing is done to reverse the factors leading to their extirpation or extinction. SC - Special Concern: A wildlife species that may become a threatened or an endangered species because of a combination of biological characteristics and identified threats. NAR - Not at Risk: A wildlife species that has been evaluated and found to be not at risk of extinction given the current circumstances.

Consultation and Engagement Pre Consultation Pop-Up Events These events were held in the summer at various locations throughout the City (see table below) to raise awareness of the project, provide information on the project to the public and gather information from residents on their use of the river. Date Event Location July 23, 2017 Inspiration Fest Wortley Village August 3, 2017 Rib Fest Victoria Park August 10, 2017 Park Intercepts River Forks Park August 11, 2017 Park Intercepts Springbank Park August 12, 2017 Farmers Market Western Fair Grounds August 19, 2017 London Tree Fest Harris Park Notice of Commencement A formal notice to announce the commencement of the EA process was published in The Londoner on July 20 th and July 27 th. Surveys Information was collected via survey about London residents current use of the Thames River, and their ideas and wishes for the future of the river. Approximately 1000 surveys have been collected through both online submissions and written submissions at pop-up events. Webpage A project webpage was created on the getinvolved.london.ca website. The webpage is the central online resource for project information, and has received over 900 visits. Stakeholder Meetings The project team has met with local stakeholders including community associations and recreational groups to better understand their vision for the river moving forward. Media Local news media coverage raised awareness of the One River Master Plan EA, Pop-Up events and website surveys. Local coverage included CTV News London, AM980 News (CFPL AM), the London Free Press, and CBC London. Public Information Centre This event is being held over two days, Oct. 18 th and Oct. 19 th, to offer information to the public and give the public an opportunity to provide feedback on their preferred alternative. First Nations Engagement The project team has initiated engagement with First Nations on study process and objectives.

History of the Springbank Dam Springbank Dam in various forms has dammed the Thames River from the 1870s through 2005. Typically, the dam was closed to create a reservoir above the dam from May through November. 2000: The dam was flood-damaged. 2006: The dam was shut down in an open position for repairs. 2008: The repaired dam gates failed and the dam was left open.

Thames River Vision Thames Valley Corridor Plan The Thames Valley Corridor is considered London s most important natural, cultural, recreational, and aesthetic resource. Promote and enhance the Forks of the Thames River and the Thames Valley Corridor as an important natural, cultural, recreational, and aesthetic resource within our city. The London Plan Recognize and build upon the important linkages between economy and environment. Protect and enhance our Thames Valley corridor and its ecosystem. Back to the River Back to the River was an initiative to revitalize the Thames River through an international design competition. The winning design Ribbon of the Thames was submitted by Civitas, a US landscape architecture firm, and Stantec, a local consultant.

Alternatives Being Considered for the Springbank Dam Alternative 1: Do Nothing The dam will be maintained in its current condition, with no upgrades or repairs. Alternative 2: Free Flowing River Remove all or part of the dam so that it can no longer provide a water retention function. May include options for repurposing, such as using structure for viewing platform or walkway. Alternative 3: Reinstate the Dam Repair or reconstruct dam so that it can provide a water retention function. Operate at a similar capacity as it did previously. May include options for repurposing, such as using structure for viewing platform or walkway.

Evaluation Criteria The preferred alternative for the Springbank Dam will be selected based on the following sets of Environmental, Social and Cultural, and Economic and Technical criteria. Each criteria is scored based on data collected as part of the EA process.

Evaluation Criteria

Evaluation Criteria

Agency Considerations Project team has consulted with relevant regulatory agencies including: Conservation Authorities (UTRCA, LTVCA), Fisheries and Oceans Canada (DFO), Ministry of Natural Resources and Forestry (MNRF), Ministry of Environment and Climate Change (MOECC) on potential permitting requirements for the three dam alternatives. Relevant Permits Include:

Next Steps A Stage 1 report with the recommended preferred alternative for the Springbank Dam will be taken to Council before the end of 2017. Following a decision on the future of the Springbank Dam, the EA will proceed to Stage 2 to look more closely at the options for other required river management strategies. Stage 2 will put forward the preferred alternatives for river management strategies integrated with the preferred option selected for the Springbank Dam and complete the Master Plan EA process.

Give us your Opinion on the Future of the Springbank Dam! Feedback on the three alternatives for the Springbank Dam is an important part of the decision making process. Your opinion is welcome and appreciated! Please fill out the Survey provided.