Blackfriars Bridge Municipal Class Environmental Assessment. Public Information Centre #1 November 19 th, 2014

Similar documents
Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

Commissioners Road West Realignment Environmental Assessment

The purpose of tonight s PIC is to:

WILLIAM STREET STORM SEWER OUTFALL. PUBLIC INFORMATION CENTRE March 23, 2017

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Heritage Road Improvements from Steeles Avenue to Rivermont Road

Victoria Bridge Municipal Class EA Civic Works Committee

Cherry Beach Shoreline Protection Infrastructure Conceptual Design and Class EA

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

St. Clair Avenue West Area Transportation Master Plan

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

Baby Point Wastewater Pumping Station Forcemain Class Environmental Assessment Study

Welcome. Mill Creek Ravine Pedestrian Bridges Rehabilitation. Public Information Session #1. Thursday, October 27, :00 8:00 p.m.

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Portage Parkway Environmental Assessment Public Information Centre No. 1

Public Information Centre. Welcome

City of Toronto. Emery Village Transportation Master Plan

Public Information Centre No. 1 King-Vaughan Road Bridge Replacement Municipal Class Environmental Assessment City of Vaughan

Commissioners Road West Realignment Environmental Assessment

Western Road/Wharncliffe Road North Widening from Platts Lane to Oxford Street. Municipal Class Environmental Assessment Public Information Centre #1

WELCOME TO OPEN HOUSE TWO November 28, 2018

Bridge Type Assessment and Evaluation

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

One River Environmental Assessment. Welcome!

Boca Raton II Tri-Rail Station PD&E Study and 30% Documents Public Kick-Off Meeting. August 29, 2017 Spanish River Library

Meeting Agenda. City of Guelph. River Systems Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4 Ward to Downtown Pedestrian Bridge

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

Mavis Road Class Environmental Assessment

3 Development Process 3.1 Stage One page Stage Two page Stage Three page CENTRAL PICKERING DEVELOPMENT PLAN

North Commuter Parkway and Traffic Bridge Project Market Sounding

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

Improvements Municipal Class Environmental Assessment. Public Information Centre #1 June 11, 2015

Master Environmental Servicing Plan & Secondary Plan

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #1 SEPTEMBER 28, 2016

Recreational Pathway Crossing of Richmond Street Municipal Class Environmental Assessment. Public Information Centre #2 April 22, 2015

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON JUNE 19, 2018

11.4 Highway 400 North Employment Lands Secondary Plan APPROVED BY THE ONTARIO MUNICIPAL BOARD ON NOVEMBER 21, 2011

Wellington County Badley Bridge Replacement/Rehabilitation Environmental Assessment (EA)Study Welcome

Design Specifications & Requirements Manual

Elfrida Growth Area Study

Public Information Centre #1

Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways

Rapid Transit Implementation Working Group September 14, 2017

Introduction. Public Information Package. Project website. Overview. Class Environmental Assessment Process

Public Information Centre

Victoria Street Pedestrian Bridge

THE CORPORATION OF THE CITY OF WINDSOR Office of the City Solicitor Planning Department

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

Design Specifications & Requirements Manual

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

Master Plan Class Environmental Assessment for Downtown Mississauga Road Improvements

HURON COMMUNITY PLAN

plan context INTRODUCTION 10 EXISTING SITE CONDITIONS 16 RELATED PLANS & INITIATIVES 10 CONSULTATION 30

APPENDIX L3. Table of Contents. SWP EA Information Sheets

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

Meadowlily Footbridge Rehabilitation Municipal Class Environmental Assessment Schedule B Screening Report

Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013

Scarborough Waterfront Project

Strachan Ave. Overpass Community Design Update. October 26, 2010 Stephen Lipkus Executive Director Georgetown South Project GO Transit

Burloak Drive Grade Separation

Evaluation Criteria. Detailed Evaluation Criteria

TERRESTRIAL NATURAL HERITAGE SYSTEM STRATEGY APPENDIX F: MODEL POLICIES FOR THE IMPLEMENTATION OF THE TARGET TERRESTRIAL NATURAL HERITAGE SYSTEM

The Gore Road Queen Street East to Castlemore Road

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan

Rapid Transit Implementation Working Group

Edgeley Pond + Park Public Meeting

Goals and Objectives Survey December 4, 2013

Declarations of Pecuniary Interest under the Municipal Conflict Of Interest Act

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

Glen Road Pedestrian Bridge Environmental Assessment

PLANNING, DESIGN & DEVELOPMENT OPEN HOUSE

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Northwest LRT Downtown to. Northwest Edmonton Study. Public Workshops

Director, Community Planning, Toronto and East York District

The West Vaughan Employment Area Secondary Plan Policies

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

WILLAMETTE FALLS LEGACY PROJECT

Southeast Extension to RidgeGate Parkway Scoping Booklet

1071 King Street West Zoning Amendment Application - Preliminary Report

West London Dyke, April 1947 Flood. Forks of the Thames, July 2000 Flood. Source: UTRCA

Sustainable Natural Environment Wetlands

Project Overview. Get Involved. Public Information Meeting. Contact Information

MAYFIELD WEST SECONDARY PLAN PHASE 2

Leaside to Main Infrastructure Refurbishment Project

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY

Lawrencetown Beach & Rainbow Haven Beach

MAYFIELD WEST SECONDARY PLAN PHASE 2

Corridor Enhancements

The Planning Partnership Baird + Associates TCI Management Consultants Ltd. Plan B Natural Heritage Wills Consulting Engineers Poulos & Chung Limited

Inter River Park Sportsfields

edmonton.ca/ribbonofgreen #ribbonofgreen

ONE RIVER MASTER PLAN ENVIRONMENTAL ASSESSMENT

Historic Yonge Street HCD Plan Community Consultation October 14, 2015

CAPITAL LINE SOUTH LRT EXTENSION INTRODUCTION

Location. Need GOAL 14 URBAN GROWTH BOUNDARY. Urban Planning in Oregon 7/8/2015

SDOT DPD. SDOT Director s Rule DPD Director s Rule DCLU DR SED DR of 7 CITY OF SEATTLE

Transcription:

Blackfriars Bridge Municipal Class Environmental Assessment Public Information Centre #1 November 19 th, 2014

Why are you here tonight? To determine the future requirements of the river crossing at Blackfriars Street, including: rehabilitation, replacement, or removal of the existing bridge recognizing: its importance as a significant heritage structure, its role as a component of the parks and pathway system, its role in the transportation network (including cycling and pedestrian transportation), and its socio-economic value to the community. this is known as the problem/opportunity statement for the Municipal Class Environmental Assessment (EA)

Municipal Class EA Process We are here We are presenting Phases 1 & 2 tonight Phase 1 - Understand what the problems and opportunities are within the project boundaries and develop a problem statement to guide the EA Phase 2 - Develop & evaluate alternative solutions to address the problems/opportunities identified and select the preferred solution Phase 3 - Develop & evaluate alternative design concepts for the preferred solution Phase 4 - Write the Environmental Study Report that summarizes the entire EA process including how public comments were addressed, the potential environmental impacts, and how the project team proposes to mitigate the impacts Phase 5 - Implementation which includes detail design and construction

The Blackfriars Bridge EA Study Area Area of review for natural environmental inventories (200m buffer) Blackfriars Bridge crossing location & focus for EA

Background & Existing Condition of Blackfriars Bridge The existing wrought iron bowstring arch-truss bridge was constructed in 1875 (the video presentation provides details on the significance of the structure to the community) Following a risk assessment (2012), detailed inspection and evaluation of the bridge in 2013, the City completed temporary repairs and modified the bridge to pedestrian/cyclist-use only A Municipal Class EA is required when a bridge over 40 years old is reconstructed or altered The City initiated this Class EA to identify the preferred future use of the Blackfriars Bridge A long term solution is required for the bridge!

Relevant Policy Documents & Studies Examples include: City of London Official Plan and related land use, transportation and natural environment schedules Blackfriars-Petersville Heritage Conservation District Plan (2014) Bicycle Master Plan (March 2005) Thames Valley Corridor Plan Smart Moves 2030 Transportation Master Plan London Strengthening Neighbourhood Strategy

Existing Natural Environment Conditions The following natural environment surveys have been completed to date: Ecological Land Classification Wildlife Habitat Birds, flora, other wildlife Aquatic assessment 3 natural vegetation communities are found within and adjacent to the Blackfriars Bridge including: Cottonwood Mineral Treed Shoreline, Fresh-moist Cottonwood Deciduous Forest, and Mixed Deciduous Treed Bluff Several common species of birds typical of urban areas were observed including: Blue Jay, Northern Flicker, Mourning Dove, House Sparrow, Mallard, European Starling, Canada Goose, Black-capped Chickadee, American Robin, Northern Cardinal, Downy Woodpecker, Rock Dove and Common Grackle Confirmation of Species at Risk is ongoing and targeted field studies (e.g. detailed tree inventories and basking surveys for reptiles) may be carried out to confirm presence

Existing Transportation Conditions Blackfriars Street is designated as a Secondary Collector Road, previously carrying approximately 5000 vehicles/day Secondary Collectors are designed for light volumes of traffic for short distances between local and arterial streets; full property access; bus routes; and bicycle/pedestrian facilities (Table 18.1 of the Official Plan) When the crossing was open for vehicle use, traffic typically flowed eastbound in the AM and westbound in the PM and was a popular access route to and from London s downtown The river crossing provides a key connection to the Thames Valley Parkway (TVP) trail system for alternative modes of transportation With Blackfriars Bridge closed to vehicular traffic, the project team is evaluating short and long term impacts to the adjacent road network.

Assessing the Alternatives The following provides an overview of the environmental factors to be considered by the project team when reviewing existing and future conditions, developing the alternatives; analyzing and evaluating them to determine the preferred solution: Transportation Environment Road safety Addressing existing and future traffic needs Emergency service access Accommodation & safety of cyclists/pedestrians Natural Environment Fisheries and aquatic resources Terrestrial features and wildlife Species at Risk Technical Considerations Structural requirements Utility impacts Geotechnical considerations Hydrology Economic Environment Capital costs Property costs Maintenance costs Social Environment Residential land uses Commercial land uses Parkland/TVP connectivity Future development/ redevelopment potential Land use planning objectives Noise and vibration Aesthetics Cultural Environment Cultural heritage impacts Archaeological impacts

Alternative Solutions Rehabilitate* Blackfriars for pedestrian and cyclist use only Rehabilitate* Blackfriars for vehicular, pedestrian and cyclist use Replace Blackfriars with a new bridge for vehicular, pedestrian and cyclist use Remove Blackfriars Bridge Do Nothing is not considered a feasible alternative solution in this case, since the current repairs are short term only, leaving the same decision to be made when the repairs have expired The project team wants to hear from you! Share your thoughts on the alternative solutions presented today. Please complete a comment form and submit by December 5th, 2014. * We do know the existing bridge can be rehabilitated for vehicular and/or pedestrian/cyclist use it is a matter of addressing certain issues, such as: feasibility of repair methods; management of risk; economics and maintenance of heritage attributes and aesthetic appearance. These issues will be reviewed in Phase 3 of the EA process.

Next Steps The project team will: complete the full evaluation of alternative solutions based on information and comments collected select the preferred solution develop the preferred solution into alternative design concepts (Phase 3) To be presented at next public meeting anticipated in the spring 2015 Information related to this study (including the video presentation) will be uploaded to the project website www.blackfriarsbridge.ca Thank you for coming!