SECTION ISOLATED POWER SYSTEMS

Similar documents
SECTION AUTOMATIC TRANSFER SWITCHES

SECTION AUTOMATIC TRANSFER SWITCHES

SECTION GENERATOR PARALLELING CONTROLS

SECTION LIGHTING CONTROLS

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW)

PART GENERAL 1.01 SECTION INCLUDES

SECTION EXTERIOR LIGHTING

SECTION AIR COILS

SECTION GAS-FIRED RADIANT HEATERS

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS (August 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION PANELBOARDS. A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section.

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

SECTION (16460) - LOW-VOLTAGE TRANSFORMERS

SECTION LOW VOLTAGE POWER PANELBOARDS - SPECTRA

SECTION AUTOMATIC TRANSFER SWITCHES

Data Bulletin. Hospital Isolated Power Systems. Dual Output Voltage Isolation. Class 4817 INTRODUCTION

Isolated Power Panels Line Isolation Monitor (LIM) Remote Indicators/Displays Accessories 15-6

1. Distribution panelboards. 2. Lighting and appliance branch-circuit panelboards. 3. Load centers.

SECTION COMMERCIAL-KITCHEN HOODS

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems.

ORDINANCE NO

A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Student Services & Classroom Addition. A. Section includes distribution panelboards and lighting and appliance branch-circuit panelboards.

SECTION AUTOMATIC TRANSFER SWITCHES PART 1 - GENERAL

SECTION (16140) - WIRING DEVICES

VACUUM BREAKER MEDIUM VOLTAGE AUTOMATIC TRANSFER SWITCHES

CONTENTS AUTOMATIC TRANSFER SWITCHES

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

SECTION FUEL-FIRED DOMESTIC WATER HEATERS

PowerWave 2 Busway System

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION LOW VOLTAGE LIGHTING CONTROLS

A. Furnish and install wiring devices and plates as specified herein and as shown on the Drawings.

EG Controls. SLIMVIEW 120 VOLT FLOAT SERIES DUPLEX PUMP CONTROL PANEL SPECIFICATION for CITY OF E G

SECTION CUSTOM FABRICATED LABORATORY EQUIPMENT. This section specifies necropsy // dissecting tables // and // animalcage

Emery County Senior Center Green River 06/07

SECTION INTRUSION DETECTION

1.3 REFERENCE STANDARDS

Schneider Electric ibusway for Data Center: Schneider Electric Powerbus Plug-In Busway

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

A. This Section includes transfer switches rated 600 V and less, including the following:

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017

PANELBOARDS & BUILDING DISTRIBUTION

SECTION STEAM CONDENSATE PUMPS

Fort Rouge Leisure Centre Section HVAC Upgrades Phase 2 Page 1 of 5 Bid Opportunity No March 2013 FIRE ALARM SYSTEMS

SECTION BIOLOGICAL SAFETY CABINETS AND LAMINAR AIRFLOW WORK STATIONS

B. Shop Drawings: List of legends and description of materials and process used for premarking wall plates.

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION ELECTRICAL GENERAL PROVISIONS

Design & Construction Standards, Revised January

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

CHAPTER 20 SERVICE EQUIPMENT

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

Electrical Tech Note 107

*************************************************************************** SECTION D50 ELECTRICAL 02/18

B. Configuration of system shall be through Schneider Electric in Homewood, Illinois (Jerry Lanfear ).

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

Element D Services Electrical

SECTION SOLAR PHOTOVOLTAIC (PV) POWER GENERATION SYSTEM

SUGGESTED SPECIFICATION For Series 300 Manual Transfer Switches (3MTS)

IDENTIFICATION FOR ELECTRICAL SYSTEMS July Electrical Systems

SECTION STEAM CONDENSATE PUMPS

DONALD H. BERG, ARCHITECT

D. Reference Standards (Utilize latest editions available):

SECTION ELECTRIC-DRIVEN, FIRE PUMPS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

PART 4 ELECTRICAL STANDARDS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

CHAPTER 8 ELECTRICAL

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY

SECTION Fire Pumps

National Electrical Code

SECTION (15900) - INSTRUMENTATION AND CONTROL FOR HVAC

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS

2016 CDM Smith All Rights Reserved July 2016 SECTION FIBER OPTIC DATA NETWORK

15900 HVAC INSTRUMENTATION AND CONTROLS

SECTION ENCLOSED CONTROLLERS

SECTION FIRE DETECTION AND ALARM

Elements Headwall System (P2008A)

SECTION SECURITY TESTING AND COMMISSIONING

SECTION MORTUARY EQUIPMENT

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

DETEX ARCHITECTURAL SPECIFICATIONS, June 2012 AO19 SERIES HEAVY DUTY LOW-ENERGY ELECTRIC SWING DOOR OPERATOR

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

SECTION WATER-SOURCE UNITARY HEAT PUMPS

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

9/7/2010. Chapter , The McGraw-Hill Companies, Inc. AND BONDING. 2010, The McGraw-Hill Companies, Inc.

SECTION FIRE ALARM SYSTEMS

SECTION COMPRESSED-AIR EQUIPMENT FOR LABORATORY FACILITIES

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

SECTION CLEAN AGENT FIRE SUPPRESSION SYSTEMS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION ROTARY-SCREW WATER CHILLERS

SPECIFICATIONS - DETAILED PROVISIONS Section Magnetic Flowmeters C O N T E N T S

UFGS (August 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

Transcription:

PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 20 11 ISOLATED POWER SYSTEMS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also, delete any other item or paragraph not applicable to the section and renumber the paragraphs. A. This section specifies the furnishing, installation, connection, and testing of complete isolated power systems. 1.2 RELATED WORK A. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: Requirements that apply to all sections of Division 26. B. Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES: Low-voltage conductors. C. Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS: Requirements for personnel safety and to provide a low impedance path for possible ground fault currents. D. Section 26 05 33, RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS: Conduits. 1.3 QUALITY ASSURANCE A. Quality Assurance shall be in accordance with Paragraph, QUALIFICATIONS (PRODUCTS AND SERVICES) in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS. 1.4 SUBMITTALS A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements: 1. Shop Drawings: a. Submit sufficient information to demonstrate compliance with drawings and specifications. b. Include electrical ratings, dimensions, weights, mounting details, front view, side view, equipment and device arrangement, main and branch circuit overcurrent protection, wiring diagrams, materials, and connection diagrams. 2. Manuals: a. Submit, simultaneously with the shop drawings, complete maintenance and operating manuals, including technical data 26 20 11-1

sheets, wiring diagrams, and information for ordering replacement parts. b. If changes have been made to the maintenance and operating manuals originally submitted, submit updated maintenance and operating manuals two weeks prior to the final inspection. 3. Test Reports: a. Two weeks prior to the final inspection, submit field test reports. 4. Certifications: a. Certification by the manufacturer that the isolated power systems conform to the requirements of the drawings and specifications. b. Certification by the manufacturer that the isolation transformers have been tested and conform to the leakage current and sound level requirements specified. c. Certification by the Contractor that the isolated power systems have been properly installed, adjusted, and tested. 1.5 APPLICABLE PUBLICATIONS A. Publications listed below (including amendments, addenda, revisions, supplements, and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by basic designation only. B. National Fire Protection Association (NFPA): 70-17...National Electrical Code (NEC) 99-18...Health Care Facilities C. Underwriters Laboratories, Inc. (UL): 50-15...Enclosures for Electrical Equipment 797-07...Electrical Metallic Tubing-Steel 1022-12...Line Isolation Monitors 1047-15...Isolated Power Systems Equipment SPEC WRITER NOTE: Delete between // ---- // if not applicable to project. Also delete any other item or paragraph not applicable to the section and renumber the paragraphs. PART 2 - PRODUCTS 2.1 EQUIPMENT A. Isolated power systems shall be in accordance with NFPA and UL. B. Isolated power systems shall be flush mounted, as shown on the drawings, and include isolated power units (IPUs), power receptacles, 26 20 11-2

grounding receptacles, modules with power and grounding receptacles, line isolation monitors and remote line isolation monitors, and related circuitry. C. Incorporate the IPUs in factory-assembled units. House the isolation transformer, line isolation monitor, and circuit breaker panelboard in each IPU. D. Line isolation monitors shall be in accordance with the following: 1. Shall be capable of detecting any combination of resistive and/or capacitive faults, including balanced, unbalanced, and hybrid faults. 2. Shall incorporate in each line isolation monitor, or on the front trim of the IPU, a hazard meter or digital display, indicator lights, an audible alarm with a local silencing switch, a test switch, and provisions for transmitting the alarm signals to a remote location. Transmission of the alarm signals to remote locations up to several hundred feet from the monitor shall not unduly increase the leakage current for the system. E. Isolation transformers shall be in accordance with the following: 1. Single phase with kva rating, and primary and secondary voltages as shown on the drawings. These ratings are for continuous duty without the use of cooling fans. 2. Self-cooled by natural convection, dry, isolated windings, conventional (stacked design) type, with a grounded electrostatic shield between the primary and secondary windings. 3. Cores shall be grain-oriented silicon steel. 4. Sound levels shall not exceed the following in accordance with NEMA standards: a. 5 kva transformers or fewer: 28 db. b. 7.5 kva transformers: 32 db. 5. Temperature rise shall be limited 80 degrees C above ambient temperature. 6. Each nameplate shall include the wiring diagram, leakage current, and sound level. F. Circuit breaker panels shall be in accordance with the following: 1. Dead-front, with protection for the breaker handles. 2. Bus bars: a. Shall be copper with silver-plated joints. b. Panel to include ground bus. 26 20 11-3

3. Only the handles of the breakers shall be accessible. 4. Molded Case Circuit Breakers: a. A rugged, integral housing of molded insulating material. b. Silver alloy contacts. c. Arc quenchers and phase barriers for each pole. d. Quick-make, quick-break, operating mechanisms. e. A trip element for each pole, a common trip bar for all poles, and molded insulating material handle. f. Electrically and mechanically trip-free. g. Indicating operating handle showing the ON, TRIPPED, and OFF positions. G. Modules with power and ground receptacles shall have //4// //3// duplex receptacles and equal number of hospital-grade ground jacks. Power receptacles shall be hospital grade, NEMA 5-20R unless otherwise shown on the drawings. H. Remote line isolation monitor panel shall be in accordance with the following: 1. Monitor all of the isolated power systems as shown on the drawings. 2. Include a set of red and green indicator lights and a audible alarm with a local silencing switch for each of the isolated power systems monitored by the panel. All of the items shall operate in the same manner as the corresponding items at the line isolation monitor for the same isolated power system. 3. Stainless steel or anodized aluminum faceplates. I. Clearly identify individual devices on the faceplates of all equipment. Method of identification shall be permanent and shall not be effected by hospital-type cleaning materials. J. Use stainless steel for exposed faceplate surfaces of isolated power systems equipment in operating rooms. SPEC WRITER NOTE: Delete between // ---- // if not applicable to project. Also delete any other item or paragraph not applicable to the section and renumber the paragraphs. PART 3 - EXECUTION 3.1 INSTALLATION A. Install isolated power systems in accordance with the NEC, as shown on the drawings, and as recommended by the manufacturer. 26 20 11-4

B. Branch circuits that are energized by the isolated power system shall conform to the following requirements: 1. Shall not be grounded, but shall be protected by circuit breakers with one pole for each circuit conductor. 2. Shall comply with applicable paragraphs in specification Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES. 3. Branch circuits shall be as short as practical to minimize leakage currents. 4. Identical receptacle poles shall be connected to the same isolation transformer terminal. 5. Install the branch circuit wiring in rigid steel conduit or electrical metallic tubing. Do not use wire lubricating compound on branch circuits connected to an isolated power system. C. Install a printed schedule of circuits in each IPU after approval by the //Resident Engineer// //COR//. Schedules shall reflect final load descriptions connected to each circuit breaker. 3.2 ACCEPTANCE CHECKS AND TESTS A. Once the isolated power systems and all branch circuits and control wiring have been completely installed, furnish factory-certified test equipment and perform the following tests in the presence of the // Resident Engineer// //COR//. An authorized representative of the manufacturer shall perform acceptance checks and tests. B. Perform manufacturer s required field tests in accordance with the manufacturer's recommendations. In addition, include the following: 1. Test to verify that wiring is properly connected and clear of ground faults, shorts, and open circuits. 2. Test to verify that isolated power systems are operating properly. 3. Tests: a. Perform a calibration test on each of the micro-ammeters. The tests shall be accurate within 3%. b. With all of the circuit breakers closed and without any equipment plugged into the receptacles, read and record the inherent total leakage current indicated by the micro-ammeter. The leakage currents shall be small enough to indicate that all of the equipment and circuits are satisfactory for proper operation of the equipment. 26 20 11-5

c. With an electrical test, demonstrate that identical poles of power receptacles for each of the isolated power systems are connected to the same terminal of the isolation transformer. d. Demonstrate that either terminal of each of the isolation transformers, when shorted to ground in one of the power receptacles, will activate the line isolation monitor alarm without tripping the circuit breaker. e. Coordinate with the //Resident Engineer// //COR//, and successively connect not fewer than eight pieces of typical medical equipment to the power receptacles for each of the isolated power systems. As each item is connected, read and record the total leakage current. Each of the readings should be equal to or larger than the preceding reading. 4. When any defects are detected, correct the defects and repeat the tests as requested by the //Resident Engineer// //COR// at no additional cost to the Government. 3.3 FOLLOW-UP VERIFICATION A. Upon completion of acceptance checks and tests, the Contractor shall show by demonstration in service that the isolated power systems are in good operating condition and properly performing the intended function. 3.4 INSTRUCTION A. Furnish the services of a competent and factory-trained technician for one 4-hour training period for instructing personnel in the maintenance and operation of the isolated power systems, on the dates requested by the //Resident Engineer// //COR//. ---END--- 26 20 11-6