Opportunistic approaches to incorporating multi-functioning SuDS into housing redevelopments

Similar documents
Manor Ponds, Sheffield

Taking control of SuDS - with permeable paving

Green Roofs and Stormwater Management Virginia Stovin

An Introduction to Sustainable Drainage

Renfrew Close, London

Lead Local Flood Authority SuDS Policy Statement

Green Streets and Water

Retrofitting SuDS. Virginia Stovin. Department of Civil and Structural Engineering Pennine Water Group University of Sheffield.

Springhill Cohousing Development, Springfield Road, Stroud, Gloucestershire

10,000 Rain Gardens Project

Homeowners Guide to Stormwater BMP Maintenance

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

rainwise Working with communities to manage rainwater

Springhill Cohousing Development, Springfield Road, Stroud, Gloucestershire

Promoting Sustainable Drainage Systems

From and

Junction of Bispham Road and Bristol Avenue, north of Blackpool town centre, Lancashire, next to the former TVR car factory.

Green Infrastructure Overview

Northumbrian Water is required to provide investment to reduce spills at Whitburn and St Peter s, Sunderland in

The Gwennap Parish Vision Statement

Green Infrastructure & Low Impact Development

Queen Caroline Estate, London

Hopwood Motorway Service Area, Worcestershire

Sewer Flooding Alleviation in the Counters Creek Catchment

Just The Basics: Illicit Discharge. What does it mean to me?

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

Alma Road Rain Gardens, London

Greening streets, retrofit rain gardens, Nottingham

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

Low Impact Development for your homes, businesses & streets

Priors Farm Estate SuDS Retrofitting Project, Cheltenham

Fellgate Estate, Jarrow Surface Water Management Plan 2015

4. CONCEPT PLAN DEVELOPMENT

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Sewer Flooding Alleviation in the Counters Creek Catchment

Stebonheath Primary School, Llanelli

Use of Best Management Practices

Green Urban design for Can Tho city: Where to start?

St Andrews Park, Uxbridge

Sustainable Urban Drainage Systems (SuDs)

Green Infrastructure Recommendations For Parks and Public Spaces

Cambrian North Basin, Llanelli

Public Consultation. Land at Monks Farm, North Grove. Welcome

Water Cycle ARC-452 DESIGN VI: INTEGRATION A5 ENVIRONMENTAL SYSTEM BURGENER SIMON YANGCHUAN SUN

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

Circus Field. Planning & Design Guidelines

Sustainable Drainage Applied Research Group, Coventry University Priory Street, Coventry, CV1 5FB, United Kingdom 3

Sustainable Urban Drainage Systems. Diederik Rousseau Tineke Hooijmans

Olympic Park, London. SuDS used. 1. Location. 2. Description. Case study

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Green Infrastructure and Low-Impact Development Technologies

SuDS The business case. Steve Wilson

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

Grey to Green Phase 1, Sheffield

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Welcome to our public exhibition

Chapter 4 - Preparation of Stormwater Site Plans

Inspection and Maintenance of Stormwater Best Management Practices

Planning and Sustainability Statement

319 Grant: Baker Creek & Centenary Creek Restoration Initiative

Forest Way School Coalville, Leicestershire

Appendix D - Technical Design Criteria for BMPs

Sustainability Statement. Whitby Business Park Area Action Plan

Stormwater Prevention and Control

Neighbourhood Planning Network 9 th January 2018 Local Plan Review update Issues and Options consultation February April 2018

Amy Burbidge North Northants Joint Planning and Delivery Unit Tresham Garden Village

CHAPTER 5: GUIDING PRINCIPLES

JCCC Campus Stormwater Project: Retrofitting Yesterday s Parking Lots With Today s Best Management Practices

Stormwater and Your Rain Garden

Design Assessment Checklists for Ponds/ Wetlands

Green City, Clean Waters

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

Water Sensitive Urban Design Site Development Guidelines and Practice Notes. Appendix

Toronto Complete Streets Guidelines

Post Construction BMPs

4.6. Low Impact and Retentive Grading

elbridge Core Strategy

Local Development Scheme

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

Storm Water Managament at the University of Michigan

Lesson 2: Stormwater Best Management Practices (BMPs)

Bioretention cell schematic key

paving case study GREAT WESTERN PARK DIDCOT OXFORDSHIRE

Uniclass L534:L217. November paving. permeable. for amenity CASE STUDY ROBERT BRAY ASSOCIATES SUDS PROJECTS.

Post - Construction Hydromodification Development Requirements

Welcome to our exhibition

Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD

vision & process willowburn, tarves community engagement 04/18

Phase II Storm Water Permit Program MS4 Permit

LANDMARK HOUSE SUDS NOT DUDS Image Credit: RSH

Date: TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2011: REGULATION 13 SCOPING OPINION

The journey so far. The new masterplan for Dargavel Village

Elderberry Walk. Developer HAB Housing

Pollutant Removal Benefits

Hollickwood Primary School, London

Appendix I. Checklists

Statement of Community Involvement LAND OFF SOUTHDOWN ROAD HORNDEAN, HAMPSHIRE

Transcription:

Opportunistic approaches to incorporating multi-functioning SuDS into housing redevelopments Making Sustainable Drainage Schemes (SuDS) work for everyone 28th February 2018 Roger Nowell SuDS Lead Officer Sheffield City Council

Sheffield and SuDS SuDS Design Statement SuDS guidance Surface water management for new development SuDS typologies

Typologies- urban extensive Typical development Larger supermarkets, retail, extensive office, factories, operational, schools, leisure Management Privately managed, Yorkshire Water may adopt tanks, may include offsite Council managed features Criteria 30% reduction for brownfield, greenfield for greenfield sites or redevelopment where to different discharge route. Potential for discharge to surface water sewer and possibly watercourse Typical SuDS solutions Concrete block permeable paving for car parks lined for storage where contamination or discharge to sewer, non-lined for infiltration or partial infiltration where direct discharge to watercourse. Can act to store roof water through horizontal diffuser pipes in sub-base or surface inflow removing need for other storage. Landscape requirements - potential to be integrated and enhanced through SuDS function, e.g. linear green verges / planting designed to intercept lateral run-off from impermeable surfaces. Larger open spaces and peripheral landscapes within or external to the site for detention basins /ponds Pre application Application Benefit in ensuring optimum site layout to accommodate SuDS inclusion. Establishing likely discharge rates SuDS design statement should demonstrate SuDS approach /options analysis. Drainage solution should show approximate volumes from development, methods of collection, movement, treatment and storage. Confirmed discharge routes. The

Typologies- urban intensive Typical development Block development - City centre and immediate peripheral valley bottom uses, outer commercial centres Flats, offices, shops, leisure Management Criteria Typical SUDS solutions Privately managed infrastructure Typically 30 % reduction for discharge rates to be applied to the 1 in 1 return period event. Likely discharge to the combined sewer. Possible discharge to surface water sewer or watercourse if economically proportionate when greenfield discharge may be required. Treatment a high priority where discharge to surface water system Green/blue roofs and podiums can provide a considerable proportion, if not all, of a site s attenuation requirements through the inclusion of fit for purpose shallow storage, for example geocellular layer. Permeable paving in courtyards and parking areas can be adapted to store surrounding roof water through modifications of sub-base depths. Courtyard planters can be designed to receive surface and roofwater before passing flows to underground storage. Extreme events can be managed on the surface of sunken external areas. Pre application Whilst options for surface water management are less complex with these tight sites, pre application discussions are always encouraged. Application Concise SUDS design statement to outline drainage solution Green roof Planting areas playing their role in water management Conditions Detailed calculations Detailed design Confirmation of management arrangements, e.g. management company, schedule of maintenance

Manor Fields - Sheffield Retrofit SUDS Offsite system 300 dwelling housing estate 1in 100 year aspiration Local Authority adoption 05/03/2018 Roger Nowell Sheffield City Council

Existing valley connecting to main stream Lowflow channel Basin 3 Overflow channels Basin 1 Volume control device Storm basin aspiring to manage 100 year storm Overflow channel Lowflow channel Basin 2 Lowflow channel Inlet from housing

Roger Nowell, Ian Stanyon Sheffield City Council

05/03/2018 Roger Nowell Sheffield City Council

SHEFFIELD HOUSING COMPANY A Joint Venture Housing and Regeneration Company

Why Sheffield Housing Company? Undesirable neighbourhoods leading to housing market failure.

What is Sheffield Housing Company? Delivery Mechanism: SCC LAND KGP CASH Repayment of Land Value Land is matched by EQUITY Repayment of Equity Division of Surplus SHC 50:50 SCC : KGP Borrows development finance Division of Surplus KEY SHC Sheffield Housing Company KGP Keepmoat Great Places NEW HOMES

Progress to Date Phase 1 : 3 sites, 293 homes in total, 80% Open Market Sale, 20% Social and Affordable Rent. Complete. Phase 2 : 5 sites, 478 homes, 85% Open Market Sale, 5% Affordable Rent, 5% Shared Ownership, 5% Private Rent. All sites under construction. Phase 3: 2 sites, 333 homes, 35% Open Market Sale, 65% Private Rented. All sites under construction. Phase 4: 5 sites, 455 homes, 90% Open Market Sale, 10% Shared Ownership. 1 site submitted for Planning approval, remaining sites due for submission early 2018.

Sheffield south

The case for Improving viability Land management resources More sustainable approach to w ater quantity and quality management Biodiversity Open space SuDS Play/recreation Reducing flows to combined sew er Landscape investment

Shallow profiles Maximum storage depths appropriate to setting Pre-treatment basins for 1 in 1 with short-circuit wetland to allow tolerance on sediment accumulation Wider storage wet /dry return period definition Natural construction in soil and stone Stone /gabion protection to inlets and outlets Design

Sheffield Council adoption Annual income from households as part of management company charge Annual maintenance Staff management costsoperations, inspections Financial management Intermittant requiring long-term financial allocation from income - desilting, allowances for repair, replacement Transparency - reviews Generally informal maintenance mown frameworks flail/strim sufficiently often to check any unwanted incoming woody growth

Progress to date Parson Cross 150 homes, OMS/AH scheme complete 100 homes, OMS/AH scheme under const. 250 homes, OMS/AH scheme 2019 50 homes, OMS scheme 2021 65M retail development complete/ongoing 5M school investment complete 0.6M investment in parks - 2018 Initial Sales Price Latest Sales Price Percentage Increase 2 Beds 103,000 (Jan 13) 131,000 (Oct 17) 27.2% 3 Beds 118,500 (Feb 13) 151,000 (Sep 17) 28.0%

Wider site may get wet in the most extreme weather when the basin is full Wet grassy channel to carry the rainfall run-off from the inlet to wetland to help clean the flow of any di rt off the roads and to provide long habitat for animals and plants Meadow with central lawns for play Hollow that will fill with water when it rains very ha rd Everyda y s hallow wetland with gentle sides for safe access. To be planted with wetland plants to encourage wildlife. Outlet to Bagley Dyke watercourse which is below ground. All the water held within the pocket park will slowly be released through here within a day leaving the site to dry out. Central grass space that will occasionally be covered in water when it rains hard Rocky inlet to slow the flow and provide place for amphibians Inlet pipe from drainpipes and road gulleys in new housing area

Woodthorpe ravine

Pipworth Regional SuDS Development Numbers of units draining to offsite SuDS %age proportion Manor 10/11 181 43 Manor 8 82 19.5 Manor 12 130 31 Manor 13 28 6.5 Total 421

500K scheme efficiently storing over 5000m3

Success factors Past experience allays fears SHC as a partnership allowed trust to be developed and to feel confident of future revenue based resourcing Use of open space economic benefit Close working between LLFA and SHC SuDS demonstrated to bring other benefits Thank you roger.nowell@sheffield.gov.uk