SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

Similar documents
Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

4. CONCEPT PLAN DEVELOPMENT

Post Construction BMPs

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Green Infrastructure and Low-Impact Development Technologies

Homeowners Guide to Stormwater BMP Maintenance

High Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards

Planning and Design: Applied LID Techniques Redevelopments, Housing, Mixed Use, Infrastructure

Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located

Green Infrastructure & Low Impact Development

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

FACT SHEET: Pervious Pavement with Infiltration

EROSION PREVENTION BMP SUGGESTED USES MATRIX

Urban Water Management and Soils (ESRM 311 & SEFS 507)

Incorporating Sustainable Practices and Water Quality into Roadway Design. May 24, 2017

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

Structural Stormwater Best Management Practices

Low Impact Development Ideas and Effects in the Built Environment

6.1 Bioretention Areas

What Are We Inspecting? Stormwater Treatment Measure Type and Design

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

Appendix D - Technical Design Criteria for BMPs

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Urban Watershed Mentors

Pollutant Removal Benefits

Rainwater Management an issue for the 21 st Century. Hydrological Cycle

Selecting Appropriate Stormwater Control Measures for Your Development Project

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

City of Waco Stormwater Management Regulations

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

STORMWATER - GENERAL NOTES

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

INFILTRATION TRENCH - LEAKY PIPE

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

Chapter 2 Roof Downspout Controls

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

Green Street BMP Matrix

APPENDIX G: TOWN ORDINANCE REVIEW

Storm Water Managament at the University of Michigan

Map Reading 201: Where Does the Water Go?? Map Reading Map Reading 201. Interconnected Systems

Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019

Design Standards. Green Development. Shadow Studies. Standards. July 2010 Updated October 2014

Attachment 2: Permeable Pavement Design Guidelines

New England Grows February 8, (c) 2013, Chris Webb & Associates, Inc., PS 1

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

MDOT Stormwater BMPs: The Challenge of Design. Janeen McDermott, PE Dan DeVaun, PE

Section 11 Grading and Drainage Standards

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

Inspection and Maintenance of Stormwater Best Management Practices

Time Value of Money and Optimization Process

Low Impact Development (LID) Techniques. Associate BD Presentation, October 7, 2014

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda

Reducing New York City s CSOs Using Green Infrastructure

Best Development Practices

ATTACHMENT A STORMWATER MANAGEMENT TECHNIQUES Cahill Associates Environmental Consultants

J. Paul Guyer, P.E., R.A.

ACTION PLAN FOR RETROFITTING THE EXISTING MS4 WITH STRUCTURAL BMPS

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

VEHICULAR AND PEDESTRIAN CIRCULATION

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

FLEET AVENUE GREEN STREET USES VACANT LOT FOR CSO REDUCTION. Thomas M. Evans, AECOM Cleveland, Ohio

Rainwater Management

ROADSIDE DITCH AND SHOULDER WATER QUALITY ENHANCEMENT PLAN

STORM DRAINAGE CONSTRUCTION NOTES LENGTH RUN * See Note 2., Above or greater 500

Chapter 14. Stormwater Quality Introduction

6.2 Flow-Through Planter

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures.

Costs Design Construction Operation Maintenance

Insert Community Name. Homeowner Guide for On-Site Stormwater BMP Maintenance and Care

ANSWER KEY MGSFlood v WWHM2012 (released 5/15/2015)

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith

Going Green with the NYS Stormwater Design Standards

Green Infrastructure Modeling in Cincinnati Ohio. Small Scale Green Infrastructure Design Using Computer Modeling

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

Table 4.7.1: Swales Potential Application and Storm Water Regulation

Beyond Rain Gardens Advancing the Use of Compost for Green Infrastructure, Low Impact Development, & Stormwater Management

Metropolitan Area Planning Council 60 Temple Place, Boston, Massachusetts fax

West Virginia Stormwater Management Manual: Methods.

JCCC Campus Stormwater Project: Retrofitting Yesterday s Parking Lots With Today s Best Management Practices

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

URWH at various scales

Can Urban Redevelopment Restore Aquatic Resources

12/7/2007. Christopher B. Burke Engineering West, Ltd Aux Sable Creek Watershed Plan Update 1

Kearney Post-Construction Stormwater Program

COMPLETE GREEN STREET CHECKLIST

AWR Engineering, LLC

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011

GENERAL INFORMATION What is Stormwater? What is a stormwater utility? What is an impervious surface?

Low Density Projects. Design Objective

Before you build: Locating and Planning

n1. Design 5.4.6a Urban Bioretention 5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions.

Low Impact Development. Charlene LeBleu Auburn University Landscape Architecture (334)

Designing for Sustainability: A Consultant s Perspective

Transcription:

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways. Numerous ecosystem-based functional stormwater quantity and quality design alternatives are possible within the street ROW. Several of these options are presented below, in order of increasing capability to convey stormwater. Options include the following: A. Tree Retention B. Tree Pit Enhancement. C. Infiltration and Conveyance Trench D. Linear Bioretention E. Subsurface Linear Bioretention F. Porous Pavement G. Interconnected Vegetated Swales H. Rock and Vegetation Systems These surface conveyance systems can provide a number of the City s drainage, pedestrian and vegetation goals. However, not all systems can provide all of these benefits, so goals for the system must be clearly identified. For example, detention and water quality goals sometimes compete for the same water storage volume, so one of these goals must be prioritized. The nature of the ecosystem-based designs, however, offers some of the goals described bellow as an inherent benefit. Drainage Goals: Convey 25-yr, 24-hr design storm Reduce peak flows by meeting detention requirements/goals for projects. Creek goals = in some jurisdictions this is the 1-year storm event held to predeveloped conditions, or 2-year storm event held to ½ predeveloped conditions. City of Seattle detention goals = (2yr/25yr/100yr storms) to pre-defined release rate. Note: Multiple stage, controlled outlet orifices are difficult with these systems and may not be achievable in some of the designs. Meet water quality requirements/goals = the 6-month storm event, or 90% of the average annual runoff volume. Pedestrian and emergency vehicle safety and access: Provide porous concrete sidewalks, when appropriate. Allow safe pedestrian access from car to sidewalk. Allow fire truck and ambulance access through neighborhood. Bio-Logical goals: Optimize use of space so trees can be planted. Promote healthy tree and vegetation root growth. Reduce competition between roots and pipes. Use right-of-way area as public open space amenity. Maintenance goals: Inspire neighborhood participation. Provide easy access to hard infrastructure (inlets, CBs, pipes). Financial goal: Lower or neutral in cost than traditional piped system designs.

A. Retain Trees Design around existing trees to maintain the interception and evapotranspiration capabilities on the site. B. Tree Pit enhancement ex. Rainier Ave (5/15/2001) Widen tree pit area where problems with ponding on sidewalk exist. Larger exposed area allows more area for infiltration, reducing water problems and providing water for vegetation. Goal: Reduce ponding on walkway. Provide more water to trees. Drainage Area: Adjacent sidewalk. Applicable Site: Sidewalk areas with ponding problems. C. Infiltration and Conveyance Trench ex. 30th Ave NE (9/30/00) Traditional infiltration trench spaced in planting strip in an untraditional way. Meandering the infiltration trench within the within planting strip provides space for tree planting, and a more aesthetic look to the exposed gravel portion of the trench. System can be designed to encourage or discourage infiltration. Goal: Provide detention and/or water quality treatment. Sizing and rock type will vary according to goal. Dimensions, rock trench: 2-3 wide x 2-3 depth. Drainage Area: Adjacent sidewalk or sidewalk plus road drainage. Applicable Sites: Planting strips with width 8-feet. Linear slope 1% to 6%?

D. Linear Bioretention Systems Planting strip design using amended soil that promotes both vegetative health and runoff infiltration. Run-off filters through the soil and moves downgradient along the length of the strip where it is then conveyed through an exit pipe to the main stormwater system. The soil mixes for the BPS are still in the experimental stage. The mixes are predominantly a sandy soil mix with enough planting soils and compost to sustain vegetation growth. A gravel flow dispersion area should be included down the length of the impervious contributing area. System can be designed to encourage or discourage infiltration. Goal: Provide detention and/or water quality treatment. Sizing varies according to goal. All soil mixes used provide water quality treatment as added benefit, even when sizing for detention. Dimensions: approx. 4-5 wide x 2-3 soil depth x 1-6 ponded water depth. Drainage Area: Adjacent sidewalk or sidewalk plus road drainage. Applicable Sites: Planting strips with width 4-feet. Linear slope 1% to 6%?. Sites exceeding approximately 4% slope will require check dams. Larger drainage areas combined with steeper will likely require surface treatment with gravel instead of mulch. D-1: LBS without curb and gutter ex. NW 87 th St (10/01) Flow from both the sidewalk and roadway can enter the system as sheet flow. Subsurface flow exits the system through a slotted pipe connected to the ditch and culvert system. D-2: LBS with curb and gutter ex. NE Blakeley (12/13/00) The Blakeley pilot project provides detention and conveyance of flows from the adjacent sidewalk. In order to treat flows from an adjacent road, curb openings are included in the system s design.

E: Subsurface Linear Bioretention System (S-LBS) No pilot projects in Seattle at this time The BPS design can also be used in the ultraurban environment under pedestrian walkways. This can be achieved by several methods: concrete tree box with or without interconnection to other tree boxes, continuous concrete trench boxes with grate top, or structural soil mixes (an appropriate structural soil mix for Seattle has not yet been selected). Flow enters the system through curb openings or inlet and catch basin. F: Porous Pavement Sidewalk NW 145 th from Dayton Ave N to Linden Ave N One method of addressing stormwater flows is to reduce the amount of surface flow generated, while encouraging the amount of infiltration. Porous pavement allows water to flow through the pavement into the pavement s subbase. The subbase can be used to provide detention while water infiltrates into native soil, or is discharged through an outlet pipe. Goal: Provide subsurface detention and/or water quality treatment. Dimensions: Full pavement surface area. Drainage Area: Adjacent street, sidewalk and rooftop areas. Applicable Sites: Linear slope 0% to 5%.

G: Interconnected Vegetated Swales ex. SEA street (2 nd Ave NW, from NW 117 th to NW 120 th St) (1/01) Interconnected vegetated swales are a modification of the standard bioswale. The simplest version of an interconnected swale system is a gradually sloped vegetated ditch connected with culverts under driveways, used to achieve water quality improvement. Detention in a vegetated swale system can store volumes generated by the adjacent street and rooftop areas. Additional area contributing to the site can be conveyed through the system, but a standard street ROW will not have the capacity to achieve detention for offsite flows. Detention swales can be created in several ways, including the following: G-1: Undersized culverts to connect the swales so that flow is forced to backup during large storm events. This option detains the 25-year storm event for a street improvement project with a large contributing drainage area. G-2: Flow control structures to back flow into the detention swales. The SEAStreet pilot project is an example of this type of system. Goal: Provide detention and/or water quality treatment. Dimensions: Swale sizing varies according to goal, drainage area, and site slope. Minimum top swale width is about 9-feet. Minimum length of swale area is 200-feet. Maximum surface ponding depth of 1-foot and side slopes of 3H:1V are recommended for safety. Drainage Area: Detention goals can be met for approx. 2-acres. Conveyance capacity of approximately 10?-acres. Applicable Sites: Pervious ROW width 11-feet. Linear slope 2% to 6%. Sites exceeding approximately 4% slope will require check dams and/or surface treatment with gravel instead of mulch.

H: Rock and Vegetation Systems ex. Viewlands Cascade Stormwater flow can reach velocities that are too high for standard vegetated practices. Velocities become high when there are large drainage areas confined to proportionately small conveyance channels. In order to convey these flows while still providing a vegetated surface conveyance, the channel area is armored with rocks or geotextile fabric. Additionally numerous check dams are needed down the length of the project. Goal: Provide detention and/or water quality treatment. Due to the large drainage areas of these systems, achieving the full detention or water quality treatment volume of a given storm event is not possible without subsurface detention pipes. However, detention volumes and water quality treatment for a portion of the contributing drainage area can be achieved. Dimensions: Cells are generally designed to maximize the use of space available. Minimum top width is about 10-feet. Minimum length of swale area is 200-feet. Maximum surface ponding depth of 1-foot is recommended. Drainage Area: Approximately 10 to 35-acres. Applicable Sites: Pervious ROW width 15-feet. Linear slope 2% to 10%.