Design GuidelineThemes: Integrated Stormwater Detention and Landscape

Similar documents
Design Guideline Themes: Course and Community Facilities

City of Lafayette Study Session Staff Report Design Review Commission

Stormwater Solutions for Residential Sites. Section 2 Stormwater Management Approach VERSION 1.0. EcoWater Solutions. Prepared for

Site Design (Table 2) Fact Sheet & Focus Questions:

When planning stormwater management facilities, the following principles shall be applied where possible.

River Corridor Overlay Zone (RCOZ) Article 5

Green Gables. April 24, 2013

City of Lafayette Staff Report

RESIDENTIAL GUIDELINES CHECKLIST

CHAPTER 26 LANDSCAPING (Chapter added in its entirety 05-08)

STREAM BUFFERS

Design Specifications & Requirements Manual

NAPA COUNTY PUBLIC WORKS Standards & Specifications

Landscaping Standards

CHAPTER 13 DESIGN GUIDELINES

A: Downtown Diversion Pipe

Design Specifications & Requirements Manual

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

QUEENSTOWN LAKES DISTRICT COUNCIL SUBDIVISION DESIGN GUIDELINES

Improve the appearance of off-street parking areas, vehicular use areas, and property abutting public and private roads;

Plan Review Checklist

Problem Understanding

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

CHESAPEAKE LANDSCAPE ORDINANCE

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

HICKORY NUT FOREST DESIGN GUIDELINES

ARTICLE IV: DEVELOPMENT STANDARDS 404 MASTER PLANNING

Kearney Post-Construction Stormwater Program

6.5 Lakewood Gulch. Basin Snapshot

ARTICLE 3 LANDSCAPING AND SCREENING REQUIREMENTS

5.0 Storm Water Landscape Guidance Introduction

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

City of Lafayette Study Session Staff Report Design Review Commission

4.6. Low Impact and Retentive Grading

Toronto Complete Streets Guidelines

ORDINANCE NO. SECTION 1. This ordinance, due to its length and corresponding cost of

Stormwater Management Plan (SWMP) Revision Date: 11/05

County of Fairfax, Virginia

DIVISION 32 EXTERIOR IMPROVEMENTS

Village of Glenview Appearance Commission

Red Fox Commercial Outline Plan

Parks, Recreation, and Open Space Land Use Goals

HUDSON VALLEY REGIONAL COUNCIL 3 Washington Center, Newburgh NY

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

STORMWATER QUALITY MARION STREET GREEN INFRASTRUCTURE PROJECT COMMON SOURCES OF URBAN POLLUTANTS URBAN STORMWATER

Request for an Exception to the Napa County Road and Street Standards

UCONN Athletic District Improvements Scoping Meeting

Site Development Plan (SDP) Checklist

PLANNING APPROVAL & SIDEWALK WAIVER STAFF REPORT Date: December 1, 2016

Logan Gilbertsen, EI, CFM Phil Stuepfert, Sr. Project Manager

City of Waco Stormwater Management Regulations

Caribbean Area PO Box San Juan, PR Page Topics

Perfect Building Site

Figure 1 Cypress Street Study Area Location Map

Community Design Guidelines. Port Wallace DRAFT

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

Public Meeting #3 May 9, 2009 MVVA Team

Purpose of Open House #3

Kittson Parkway / Watershed Park Parking Lot

LEGEND : FUTURE M18 CORKER OVERFLOW OFFICE OF PUBLIC WORKS REGRADING WORKS LAYOUT PLAN AT KILTARTAN PROPOSED WORKS AREA LIABLE TO FLOODING N18

IV. Development in the Rural Overlay District

2.1 Principles & Objectives

Policy & Procedure Effective Date: Parks Department Page of

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT


CHAPTER 22 Rural Open Space Community Developments

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

SITE PLAN REVIEW ITEMS - REFERENCE CHECKLIST

6.1. INTRODUCTION AND SUMMARY OF FINDINGS

PCE PRELIMINARY DRAINAGE ANALYSIS REPORT FOR WESTWOOD MIXED USE NEIGHBORHOOD PROJECT 772 NORTH FOREST ROAD TOWN OF AMHERST, ERIE COUNTY, NEW YORK

Project Narrative For Fruita RV Resort Conditional Use Permit

Tucson Koi & Water Gardens

USF System Campus Master Plan Updates Goals, Objectives and Policies

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: June 2, 2016

Specification and Construction Plans For: South Bethany Landscaping Improvement Plan Contract Number T

Mississauga Waterfront. Parks Strategy - Draft

SkyScape Built-In-Place (BIP) Systems WITH VEGETATIVE ROOFING OPTIONS, THE SKY S THE LIMIT.

North Oakville East Parks Facilities Distribution Plan. November, 2009

Zoning Ordinance Chapter 10

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA JULY 24, 2017

A District Council of the Urban Land Institute

Sun City Lincoln Hills ARC Application Checklist

CITY OF VALPARAISO STORMWATER MASTER PLAN

Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment

Northeast Quadrant Plan

The following principles guide the development of goals and strategies to protect and promote these amenities:

B L A C K D I A M O N D D E S I G N G U I D E L I N E S for Multi-family Development

Prado Ranch North Common Open Space Tentative Map. Washoe County Planning Commission July 3, 2018

DIVISION 32 EXTERIOR IMPROVEMENTS

Red Hill Valley Project More Than A Road October 16, 2006

CITY OF TUCSON LAND USE CODE Sec ARTICLE III. DEVELOPMENT REGULATIONS DIVISION 7. LANDSCAPING AND SCREENING REGULATIONS

Woodland Conservation and the Master Plan

LANDSCAPE STANDARDS PURPOSE AND INTENT OF LANDSCAPE ORDINANCE

Kingswood Site Development Preliminary Site Evaluation Report March 23, 2015

1.0 Circulation Element

Rolla Comprehensive Plan Update, 2005 COMMUNITY ISSUES MEMORANDUM 11/1/2004

I602. Birdwood Precinct

Transcription:

Design GuidelineThemes: Integrated Stormwater Detention and Landscape

Design Integrated Stormwater Detention Detention/Flood Control Provide needed flood control while improving playability 100 year event Seamless incorporation into the design of the course Maintain playability to the greatest extent possible Must be dry outside of major events (approx. 10 year storm) Dell Urich Golf Course, Tucson, AZ Water Quality Support for opportunities to integrate a natural water treatment channel that enhances course playability A naturalized open channel will be integrated into the course as a design element and water hazard Design should handle minor events and serve water quality needs as well as minimizing damage to the course in smaller events Glacier Club, Durango, CO

Design Grading General Prefer high efficiency grading plan to ensure needed detention while minimizing impacts to existing trees, views and existing topography Minimize impacts to existing horizon lines Minimize impacts to existing trees whenever possible The sweeping vistas and parklike feel of the course should be maintained Grading should preserve the greatest number of trees possible Areas of fill should not exceed existing high point/ridgeline on the site Golf course edges should be similar slopes to existing conditions East/west topographical relationships should remain consistent Contractor should design and construct the golf course to incorporate all grading, drainage, and water quality components as attractive and naturally appearing strategy features Course Operations/Playability South Platte River Trail at Overland Golf Course Construction Grading should retain Grading should integrate stormwater existing look/feel and detention areas that allow golf holes to topography, as well remain playable within a reasonable Impacts to adjacent All grading practices should incorporate as enhance course timeframe following large storm events neighborhoods and businesses appropriate Best Management Practices (e.g., playability, operations and Grading should consider the existing from construction activities (e.g., dust and erosion control) to ensure minimal maintenance characteristics of the golf course dust, traffic, duration) should be impacts to neighbors The undulations and slight including view sheds and look and feel of mitigated whenever possible Options to haul dirt off-site may be considered shifts in topography are a parkland style course given opportunity to do so efficiently and with important to the course minimal impacts to neighboring communities, businesses and park users

Design Trees General Preservation of course trees is a top community priority As many trees as can be saved, should be saved Priority should be given to the protection of perimeter trees and large, healthy tree stands Tree preservation and new tree plantings should continue to contribute to the park-like look/feel of the course Species of replacement trees should be diverse and sustainable with reclaimed water irrigation and in Denver s climate Avoid/limit impact to high-priority perimeter and interior stands of trees; enhance and replace perimeter plantings where appropriate All efforts should be made to protect as many trees on the course as possible Tree preservation and protection should consider the existing characteristics of the golf course, grading, view sheds, contribution to the park-like feel of the course and playability of the golf course Tree replacement approach will follow the City s policy (replace impacted canopy coverage) and be approved by the City Forester and Denver Golf with the possibility to relocate existing trees into tree protection areas based upon cost, aesthetics, feasibility, playability and sustainability The most effective tree protection elements from all design submittals will be integrated into final design Course Operations/Playability Existing trees significantly contribute to the playability of the course Consideration should be given to species diversity and ultimate size of mature replacement trees Golf Course tree placement and species selection should consider long term effects on playability and turf health Tree placement around greens complexes must not interfere with southern sun exposure in winter and morning sunlight in the spring, summer, and/or fall Planting plan must account for variation in tree species, size/foliage, growth/maturation, and ease/ effectiveness of maintenance

Views Distant Skyline/Mountain Views Local Views