CRTPO Bicycle & Pedestrian Project Costs Panel Discussion

Similar documents
Welcome to the first Community Workshop for Wesley Heights Greenway Cedar Street to Bruns Avenue

STATE OF TENNESSEE DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION

What is a Greenway? Active Transportation. Linear Public Park. Recreation. Health and Fitness. Desirable Amenity. Access to destinations

Welcome to the Information Session for Little Sugar Creek Greenway, Tyvola Road through Huntingtowne Farms Park

Asbury Chapel Subdivision Sketch Plan

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

BEST PRACTICES FOR PROJECT NOMINATIONS TA Set-Aside Program

SECTION 4(f) DE MINIMIS DOCUMENTATION

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

BeltLine Corridor Environmental Study

To qualify for federal Transportation Enhancement (TE) funds a project must meet two basic federal requirements:

Transportation Alternatives Program (TAP) Experience

BEST PRACTICES FOR DETAILED APPLICATIONS TA/SRTS Program

FDOT D4 Complete Streets

Categorical Exclusion (CE) Determination Project Narrative

Cottage Grove Road Reconstruction. City of Madison Engineering

DESIGN CRITERIA PACKAGE

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

Potential Green Infrastructure Strategies May 6, 2015 Workshop

CAPA ASPHALT & AIRPORT PAVEMENT MARCH 27, 2019

CENTERTON ROAD BRIDGE REPLACEMENT

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Rosecrans/Marquardt Grade Separation Project. Community Open House Meeting

Major Subdivision Sketch Plan Checklist

Public Information Meeting

Master Plan Workshop October 25, 2007 Charlotte Mecklenburg Government Center

PLANNING COORDINATING COMMITTEE

Transportation Projects Quarterly Report. Morrisville Planning Department May 22, 2018

Rezoning Transportation Analysis Petition Number: General Location Identifier:

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

JOB CREATION PROJECTS

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

SOUTHWEST CORRIDOR EXTENSION. Environmental Evaluation and Basic Engineering Results PUBLIC MEETING/OPEN HOUSE November 18, 2009

Citizen Information Meeting

TOWN BRANCH COMMONS & VINE STREET MOBILITY IMPROVEMENTS

Public Information Centre. Welcome

GYPSUM PARKWAY CORRIDOR ENHANCEMENT Gypsum, Colorado. Schematic Design January 2015

1. Parks & Recreation Neighborhood Parks Community Parks Special Use Sites 2. Open Space 3. Trails

City of Iowa City Department of Neighborhood and Development Services Department of Parks and Recreation Department of Public Works City Manager s

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Berkshire Regional Planning Commission Clearinghouse Review Report

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Nuts and Bolts (or Gravel and Asphalt) of the Main Street Project

Capital Projects in and near Odenton Town Center

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

ITS Concept Development Activity Descriptions

CONCEPT PLAN APPLICATION

Public Meeting May 20, 2014

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Project Description WOO/LUC-SR /0.00. Waterville Bridge Replacement

GOALS, OBJECTIVES, POLICIES & PROGRAMS

Fall 2017 Construction Update

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

Carrboro Greenways Commission January 9 th, 2007

UNIVERSITY CITY AREA PLAN. Volume Two: Implementation Plan

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

Rapid Transit Implementation Working Group September 14, 2017

Oconee Rivers Greenway Project. TSPLOST 2018 Project # 5 Project Concept Sub-projects 7, 8, 9, 10, & 11. Mayor & Commission Work Session

2017 Investment in Infrastructure Expo February 28, 2017 Jason Jonas, P.E. Public Works Director

PART 1: PROJECT SUMMARY. Proposed Land Use: 120 single-family lots. The application is Attachment A. The site plan is Attachment B.

FY 2005 TRANSPORTATION CAPITAL PROGRAM

Pennsy Greenway Trail

Open House RIVER DES PERES GREENWAY: LANSDOWNE SHREWSBURY METROLINK TO FRANCIS R. SLAY PARK

Capital Projects impacting Odenton Town Center

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET

Town of Cornelius Bond Update August, 2017

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015

STREETSCAPE IMPROVEMENTS - RECOMMENDATIONS

AGENDA ACTION ITEMS INFORMATION ITEMS

SOUTH UNIVERSITY Street Design Alternatives in Progress

MEETING DATE: November 12, 2013 SUBJECT: Accept Borden Road Bridge Improvement (CIP No )

Wilson County Projects

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) ; TDD (651)

Welcome to the. Open House

Overview of Southwestern Pennsylvania Commission s (SPC) 2040 Long Range Transportation Plan (LRTP)

Concluding Improvement Recommendations and Opinions of Probable Cost (calculated in may 2010 construction rates).

Rutherford County Projects

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

GREEN SHEET ENVIRONMENTAL COMMITMENTS FOR THE IOWA HIGHWAY 100 EXTENSION

Your town s subdivision or land use ordinance standards should reference the following street standards, for example:

Transportation Land Use Integration & Regional Planning. Don Kostelec, AICP Senior Planner, Louis Berger Group February 1, 2010

RUTHERFORD NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

Green Infrastructure The Indianapolis Greenways Connection

PRELIMINARY PLAT DESIGN REQUIREMENTS Updated 4/8/2016

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

BOISE, IDAHO COUNCIL WORK SESSION AGENDA September 19, :00 PM City Hall - Council Chambers

WELCOME TO OPEN HOUSE TWO November 28, 2018

PROJECTS UNDER CONSTRUCTION

Application Number: SD Project Name: Walton Farms Preliminary Subdivision (acting as Master Plan)

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

Transcription:

CRTPO Bicycle & Pedestrian Project Costs Panel Discussion Introductions & Purpose By. Curtis Bridges CRTPO: Bicycle & Pedestrian Work Group

CRTPO Bicycle & Pedestrian Project Costs CRTPO Funding Sources How can local agencies benefit? Alternatives Program (TAP) o $3.6 Million allocated in 2016 o $2.4 Million allocated bi-annually beginning in 2017 Surface Directly Attributable (STP-DA) o $27.9 Million currently available o $15.4 Million annually Congestion Mitigation & Air Quality (CMAQ) o $7.5 Million in both FY 2016 & 2017 CRTPO: Bicycle & Pedestrian Work Group

CRTPO Bicycle & Pedestrian Project Costs Panel Discussion Greenway Elements & Costs Right-of-Way, Easement, & Property Owners By. Gwen Cook & Jay Higginbotham CRTPO: Bicycle & Pedestrian Work Group

Greenways Typical Greenways Sub-urban Trail Torrence Creek Greenway Predominately asphalt, and often follow riparian corridors with sewer lines 10 min. width, 12 preferred Mowed grass shoulders Urban Trail Little Sugar Creek Greenway Combination of asphalt and concrete. Width varies, preferred 14 min. Often includes more park-like amenities

Greenways Typical Creek Crossing Fiberglass Bike/Ped Bridge Reedy Creek Greenway 6-8 wide, light weight, modular, site assembled, typically 100 psf ped loading Cost: $1,200 per LF Prefabricated Steel Bike/Ped Bridge Clarks Creek Greenway Cor-ten steel, fully assembled off site, low maintenance, 5-20 ton loading Cost: $1,500-$2,500 per LF Suspension Bike/Ped Bridge Neuse River Greenway Steel/concrete construction, Site built, great for long spans Cost: High

Greenways Typical Low Water/Swale Crossing Wooden Swale Bridge Irwin Creek Greenway Used for short spans over shallow swales. Built on site. Light duty. Cost: $5,000-$7,000 Wooden Ped Bridge with Rails Reedy Creek Greenway Used for deeper channels. Built on site. Ped rated only. Cost: $800 per LF Concrete Low Water/Swale Bridge Irwin Creek Greenway Typically 10 wide, 10 long. Poured in place. 5 ton loading. Cost: $7000- $12,000

Greenways Typical Wetlands Crossing Wood Boardwalk 4 Mile Creek Greenway, near Rea Rd. 10-12 wide, 100 PSF to 5 ton rating, max 30 off ground below. Cost: $250-$400 per LF Wood Boardwalk w/ Rails 4 Mile Creek Greenway, Matthews 10-12 clear width, 100 PSF to 5 ton rating Cost: $400-$500 per LF Concrete Boardwalk Connector at Streets of Torringdon 10-12 wide, 5 ton rated, can be wood, concrete or steel substructure. Cost: $500-$700 per LF

Greenways Roadway Underpasses Toby Creek @ Harris Blvd Torrence @ Gilead Bridge/Roadway Underpass Toby Creek Little Sugar Creek Culverts Costs vary widely depending on site specifics. Often require local or NCDOT encroachment agreements Typically poured in place concrete (for durability) Typically subject to frequent flooding Typically subject to wetland, flood plain, and water quality permitting Typically have poor construction access and overhead obstructions.

Greenways Trailheads & Neighborhood Accesses Neighborhood Connections Typical cul-de-sac Direct connection with sidewalk or streets 8-10 wide with fence and landscaping Cost: $50,000 Trailhead w/parking 4-Mile @ Bevington Typically 40 spaces +/- Light duty asphalt Cost: $200,000-$250,000 Trailhead w/ Restroom & Parking 4-Mile @ Johnston Rd. 40-60 spaces Small restroom building with water fountains Cost: $500,000-$600,000

Greenways Special Constraints Land Acquisition Can be very time consuming Easement vs. Fee Simple Potential Impact: Project delays, disconnections in the system Permitting USACE, SWIM buffer, FEMA Floodplain Development permits Potential Impact: Delays and added expense Budget Constraints Hard to estimate projects Limited number of qualified contractors Volatile bidding atmosphere Potential Impact: Delays and added cost

Greenways Special Constraints Construction Access Utilities Weather Impacts Narrow site corridors with limited road frontage Streams, wetland, poor soils Limited points of entry Water Mains, Sewer Lines and Structures PNG Gas lines Duke Transmission Low lying, Poorly drained sites Seasonal constraints (asphalt and concrete install)

Greenways Special Constraints Historic Features Cemetery at Clark s Creek Greenway Cemeteries Historic Structures Potential Impact: re-design, rerouting of trail, added expense Wetlands 4 Mile Creek Greenway Added design, permitting, and construction costs. Potential Impact: Permitting delays, added project expense Endangered/Threatened Species Mecklenburg County Probable/Potential Mandated protection of threatened species (Northern long-eared bat). Potential Impact: Schedule impacts due to clearing restrictions.

Greenway Under Construction Toby Creek Greenway, Phase 2 Rocky River Rd to Hwy. 49 1.5 Miles (To be Completed Feb. 2017) Funded by a CMAQ Grant with City & County match Design: $250,000 Construction: $2,700,000 CEI: $225,000 Total Cost: $3,175,000

Planned Greenways Cost Breakdown Creek/ Corridor Stewart Creek Greenway McAlpine Creek Greenway Section/ Description Rozzelles Ferry Rd to State St Green Rea Rd to Johnston Miles per Polaris New Gwy Miles (10% added) Base Cost (1 mile trail, 1 bridge, 1 swale bridge, 2 nbhd entr, permitting) $1.5 M Wayfinding ($25,000 per mile; $5,000 ea. Add'l mile) Extra Bridges ($150K avg; $80K under 100'; $300K over 100') Mecklenburg County Greenways: Cost Analysis Parking Lot (50 cars) ($200K) Restr'm ($350K) Underpass ($100K - $500K) Mitigation ($50K min.) Railroad (1) Trestle $500K (2)Tunnel $5K/ft (3)Atgrade impr. $1M HAWK Ped Crossing ($100K min.) Pocket Park ($100K) Add'l N'Hood Entrances 500' length ($50K each) Other Cost Const. Cost Contingency (10% of Const. cost) Cost for Federal (30% const cost Design (16%) Total Project Cost 0.7 0.77 1,155,000 25,000 450,000 0 0 200,000 0 0 0 0 0 0 1,830,000 183,000 549,000 292,800 $2,854,800 0.8 0.86 1,287,000 25,000 300,000 0 0 0 0 0 0 0 50,000 0 1,662,000 166,200 498,600 265,920 $2,592,720

Sample Greenway Cost Breakdown Creek/ Corridor Sample Creek Greenway Section/ Description ABC Rd to Sample Creek Miles per Polaris New Gwy Miles (10% added) Base Cost (1 mile trail, 1 bridge, 1 swale bridge, 2 nbhd entr, permitting) $1.5 M Wayfinding ($25,000 per mile; $5,000 ea. Add'l mile) Extra Bridges ($150K avg; $80K under 100'; $300K over 100') Mecklenburg County Greenways: Cost Analysis Parking Lot (50 cars) ($200K) Restr'm ($350K) Underpass ($100K - $500K) Mitigation ($50K min.) Railroad (1) Trestle $500K (2)Tunnel $5K/ft (3)Atgrade impr. $1M HAWK Ped Crossing ($100K min.) Pocket Park ($100K) Add'l N'Hood Entrances 500' length ($50K each) Other Cost Const. Cost Contingency (10% of Const. cost) Cost for Federal (30% const cost 0.0 0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 Design (16%) Total Project Cost

Questions? Greenway Elements & Costs Right-of-Way, Easement, & Property Owners CRTPO: Bicycle & Pedestrian Work Group

CRTPO Bicycle & Pedestrian Project Costs Panel Discussion Sidewalk Costs & Pedestrian Crossings By. Dan Leaver CRTPO: Bicycle & Pedestrian Work Group

Sidewalks Bicycle/Pedestrian Accommodations Sidewalk with Planting Strip Multi-use Path/Widewalk Sidewalk at back of curb 5 minimum width local streets 6 minimum width (thoroughfares) Typically 10 wide or more Asphalt or concrete 6 minimum width Only used in specific conditions

Sidewalk Projects Cost Breakdown Average cost/mile: $1.15M* *Not including outliers in red

Sidewalk & Pedestrian Crossings Examples Pedestrian Beacon Ardrey Kell Road New Sidewalk Colony Road Sidewalk Mid-Block Crossing W. Tyvola Road Description: Ped Hybrid Beacon Cost: $165,000 (0.05 mi.) Description: Colony Rd. Sidewalk (2009-2012) Cost: $267,000 (0.2 mi) Description: Sidewalk gap project with mid-block ped. crossing Cost: $300,000 (0.85 mi.)

Sidewalk/Ped Refuge Cost Breakdown Average cost per mile varies significantly depending on multiple factors Location/Right-of-Way acquisition Utilities Public Involvement

Sidewalk & Pedestrian Crossings Crosswalk Signal / Signage Crosswalk Striping Bike Lanes/Sharrows Cost varies depending on location Typically done with resurfacing program & Capital projects Typically done with resurfacing program & Capital projects

Roads Construction Costs* Two lane road w/ wide shoulders (no curb & gutter) Three lane road w/ curb & gutter, sidewalk & bike lane Five lane road with curb & gutter, sidewalk & bike lane Description: cost per mile Cost: $4,625,000 Description: cost per mile Cost: $5,025,000 Description: cost per mile Cost: $6,925,000 *Construction Cost Only And Does Not Include Any Necessary Right Of Way Or Utility Relocation Costs https://connect.ncdot.gov/projects/bikeped/pages/guidance.aspx

CRTPO Bicycle & Pedestrian Project Costs Panel Discussion Bicycle Facilities, Road Diets, Paint & Striping By. Michael Taylor CRTPO: Bicycle & Pedestrian Work Group

Pavement Markings Construction Costs Sharrows Plaza Midwood Description: cost per lane mile Cost: $4,000 Green Bike Lanes (Thermoplastic) E 4 th St and College St Description: cost per sf Cost: $12-$20 (city forces or contractor) Bike Box Carson and South Blvd Description: cost per sf Cost: $12-$20 (city forces or contractor)

Road Diet Construction Costs* Restripe roadway (grind existing markings install thermos markings) Description: cost per mile/lane stripe dependent on how many lines changing. Cost: $11,000/stripe/mile Restripe roadway (1.5 mill and overlay existing pavement thermos) Description: cost per lane mile Cost: $100,000 Two way protected bike lanes (cycle track) 12 th Street and Brevard St. Description: cost per mile including bollards Cost: $16,000 - $50,000 *Construction Cost Only And Does Not Include Any Necessary Right Of Way Or Utility Relocation Costs

Separated On-road Bike Facilities Construction Costs Memphis Asheville (Radtip Project) Chattanooga Raleigh (30% Design) Protected Bike Lanes Memphis, Chattanooga, Atlanta, Asheville, Raleigh, Charlotte??? Description: cost per mile/lane stripe dependent buffer treatment/drainage/ surface. Cost: Highly variable and specific per application Atlanta Charlotte Rendering

Bike and Ped Signals Construction Costs* Manual push-buttons $4,000 In-pavement, radio-control $8,000 Magnetometer sensors. $14,000 In-pavement inductive loop $16,000 Video camera $25,000 RRFB Bike Detected Signals Bike Signals Description: cost per each install Cost: $5,000 to $6,000 Description: cost per install Cost: $4,000 - $25,000 Description: cost per each Cost: $2,000 does not include signal timing revision or additional controller needs. *Construction Cost Only And Does Not Include Any Necessary Right Of Way Or Utility Relocation Costs

Questions Sidewalk Costs & Pedestrian Crossings Bicycle Facilities, Road Diets, Paint & Striping CRTPO: Bicycle & Pedestrian Work Group

CRTOP Bike & Pedestrian Project Costs Panel Discussion - October 18, 2016 NEPA Compliance Environmental Documents Derrick Weaver, Programs Management

Minor Projects Programmatic Categorical Exclusion (PCE) Other Laws and Regulations 2

Programmatic Categorical Exclusion Most Locally Administered Projects are categorically excluded from NEPA Document that the project is an approved CE action Perform a level of environmental investigation to verify there is no potential for significant project impacts 3

Other Laws and Regulations Section 4(f) Act Public Areas and Historic Resources Section 106 Historic Act Historic Resources SHPO Concurrence Section 7 Endangered Species Act Federally Protected Species 4

NCDOT Programmatic Categorical Exclusion Action Classification Form 5

Type I Categorical Exclusion Activities Construction of bicycle and pedestrian lanes, paths, and facilities Landscaping Installation of fencing, signs, pavement markings, small passenger shelters, traffic signals, and railroad warning devices Emergency repairs under 23USC 125 (Governor Declared Emergency) Replacement of Guardrail 6

Type II Categorical Exclusion Activities 7

PCE Form continued 8

PCE Form continued Ecological 1. Will the project have a substantial impact on any unique or important natural resource? 2. Does the project involve habitat where federally listed endangered or threatened species may occur? 3. Does the project involve water classified as Outstanding Water Resources (OWR) and/or High Quality Waters (HQW)? 4. Does the project involve any know underground storage tanks (UST s) or hazardous material sites. 9

PCE Form continued Permits and Coordination 1. If the project involves the acquisition of right of way, is the amount of right of way acquisition considered minor? 2. Will the project have an effect on structures /properties eligible for/or listed on the National Register of Historic Places? 10

PCE Form continued 11

PCE Form continued 12

PCE Form continued 13

Major Projects Environmental Assessments/Finding of No Significant Impact Environmental Impact Statements Merger Process Scoping Meetings Public Outreach 14

Common Issues Natural Resources Technical Report Qualified Person Right of Way Permanent and Temporary Early Scoping USFWS, SHPO Preliminary Plans Geotechnical Review Public Involvement Signatures Detailed Descriptions Location Map, Aerial Photo Review Time 15

Early Scoping US Fish and Wildlife Service Marella Buncick marella_buncick@fws.gov NC State Historic Preservation Office Renee Gledhill-Earley renee.gledhill-earley@ncdcr.gov 16

Questions Derrick Weaver dweaver@ncdot.gov 919-707-6601 17

Charlotte Regional Planning Organization October 18, 2016 Locally Administered Projects Overview Marta Matthews NCDOT Local Programs Management Office

Local Programs Management Office What you will learn from this Presentation: Overview of On-Line Local Project Management Tool Major Steps of Administering a Federal-aid Project by a Local Government Agency Typical Challenges Experienced by Locals on Federal-aid Projects 2

Federal-aid Project Delivery by Locals Federal-aid funding is cost-reimbursement Funding Authorization is required prior to each phase of work Local Government Agency (LGA) has the responsibility to deliver the project NCDOT has the responsibility to provide oversight to LGAs and ensure appropriate use of funds 3

Resources https://connect.ncdot.gov/municipalities/funding/pages/default.aspx 4

Resources 5

Navigating NCDOT 6

Local Projects On-Line Project Management Tool 7

Local Projects On-Line Project Management Tool 8

Local Project On-Line Project Management Tool 9

Getting Access to Project Management Tool 10

Local Project On-Line Project Management Tool What Projects are in the New Project Management Tool? Locally-Administered Projects with funding from STP-DA, TAP-DA, or CMAQ through your MPO. What Projects will be managed in the future in the Project Management Tool? Projects funded with TAP funding directly from NCDOT, old SRTS funding, Municipal Bridge funding will be added in a future phase. Locally-Administered Projects with state funding will also be added in a future phase. What Projects are not managed in the Project Management Tool? DOT-let projects, even if LGAs are participating in costs. 11

Local Project On-Line Project Management Tool HELPFUL RESOURCES 12

Project Delivery Major Steps

Pre-Construction Steps (climb the mountain!) Final Plans, Specifications, and Estimate Right of Way Certification Right of Way (ROW) Authorization Right of Way Acquisition (and Utility Relocation) Right of Way Plans / Location & Design Approval Environmental Document Preliminary Engineering (PE) Authorization Procuring Professional Services Agreement Programming (includes Schedule) 14

Construction Steps (another mountain!) Maintenance Final Voucher Date Final Inspection and Project Acceptance Construction Engineering & Inspection Construction Construction (CON) Authorization Bidding, Letting and Awarding Construction Contract 15

Important Items to Remember The following slides illustrate the areas where we see challenges and the need to think ahead about certain issues. 16

Initial Project Idea Before You Ask for Funding Identify project scope from Long-Range Plan, citizen input, etc. Do Your Due Diligence: Environmental Concerns ROW issues Utility relocations Project delivery Budget/Schedule Work with your Division Office Identify funding source (i.e. MPO, NCDOT, etc.) and process for approval/allocation of funds 17

Professional Services All procurement must follow qualifications-based selection. The firm you choose needs to be pre-qualified by DOT in all the work codes listed OR have subs that are pre-qualified. Average length of time to sign a contract with a PEF once funding is authorized? 8 months. City holds the contract with the consultant, not NCDOT. 18

Funding Authorization No costs can be incurred prior to authorization. Certain deliverables need to be complete prior to requesting the authorization. Once funds are authorized, move quickly to incur costs and request reimbursement to keep project active. 19

Right of Way Acquisition All acquisition must follow the Uniform Act, even if you re not receiving reimbursement for Right of Way. Acquisition of Right of Way always takes longer than you think. 20

Contract/Bid Proposal Construction Must use NCDOT Standard Specifications (unless project is one that NCDOT does not have standards for). Construction Be familiar with NCDOT Construction Manual. Ask the Division for assistance in setting up records for consistent documentation. 21

Close-out Be aware of costs that LGA may need to reimburse to NCDOT. Keep all records in a safe place for future audits. 22

Questions or Comments? 23

THANK YOU Marta Matthews Local Programs Management Office 919-707-6626 mtmatthews@ncdot.gov 24