A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

Similar documents
A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

5/15/2013. Basin Area. Vegetation. Rainfall & Runoff. Soil Type. Topics. Factors Influencing Erosion. Factors Influencing Erosion

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

ARCHITECTURAL PAVING STONE PRODUCT CATALOG

Installation Manual May 9/14 No revision

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Permeable Interlocking Pavers

C-10. Disconnected Impervious Surface

815 NE 172 nd Avenue Vancouver, WA Installation Manual

Wisconsin Contractors Institute Continuing Education

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

SOP 6: Erosion and Sedimentation Control SOP 6: EROSION AND SEDIMENTATION CONTROL

Appendix G. Detailed Design

PAVER BLOCK FIXING INSTRUCTIONS VYARA ROTATIONAL INTERLOCK

Subsurface Infiltration Bed

STORM WATER MANAGEMENT PLAN APPLICATION Manheim Borough

The following general requirements will be met for all planter box installations:

Analyzing the Bioretention Construction Sequence

Site Formation Excavation - 6' depth square yard $8.00 $0.00 Grading square yard $1.50 $0.00 Hauling off-site - 6' depth square yard $10.00 $0.

General Information. Site Conditions. 9b 9b. 9a 1b. Best Management Practices Illustration

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

The Concept. Features. Benefits

Case Study Bioretention Installation and Maintenance

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS

Preventing Storm Water Pollution: What We Can Do

Protect Stormwater Quality Project and Site Management Training for General Contractors. Presenter Becky Pearson Professional Civil Engineer

Erosion Control for Home Builders in the. City of Jacksonville

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

Capillary Action Subsurface Irrigation

Stormwater Control Plan: Small (Tier 1) Land Development Project

SILT FENCE MACHINE SLICED ERO-1A STEEL FENCE POST (T-POST), MINIMUM 5' LONG, 6' MAXIMUM SPACING.

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

SECTION 900 TURF ESTABLISHMENT

Town of Essex Small Site Erosion Control Guide

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

WQ-07 INFILTRATION TRENCH

GREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M

Pavement Removal Fact Sheet

EROSION & SEDIMENT CONTROL

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

Key Topics. Bioretention Crime Scene Investigation The Bioretention Construction and Maintenance Sequence

BIORETENTION FACILITY

Construction of Interlocking Concrete Pavements

Appendix D - Technical Design Criteria for BMPs

2.1.4 Roof Downspout Rain Gardens

Using the Updated RI Soil Erosion and Sediment Control Handbook. The Introductory Workshop for RIDEM/CRMC Staff January 23, 2015

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

Tree Pits Construction Guide

Installation & WillowCreekPavingStones.com POWER TOOLS YOU MAY NEED TO RENT PROJECT COMPONENTS. Willow Creek pavers Aggregate base material

9 Steps to a Lasting Paver Installation

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

n1. Design 5.4.6a Urban Bioretention 5.4.6a Urban Bioretention Variations: Planter box, Extended tree pits, Stormwater curb extensions.

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

Low Density Projects. Design Objective

Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs

EROSION & SEDIMENT CONTROL

Project: Developer/Designer: Reviewer: I. Narrative: 1. Project Description: Describes the nature and purpose of the land disturbing activity.

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

Paving - 8 easy steps for DIY and professional landscapers

Preparing a Stormwater Control Plan for a Small Land Development Project

24. Disconnected Impervious Surface (DIS)

Bioretention cell schematic key

ABBREVIATIONS: TABLE OF CONTENTS: REFERENCE MATERIALS: CITY OF SEATTLE COMBINED SEWER OVERFLOW GALLONS PER MINUTE POLYVINYL CHLORIDE SQUARE FEET

Inspection and Maintenance of Stormwater Best Management Practices

Green Infrastructure and Low-Impact Development Technologies

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) (360) (FAX)

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

The Low Risk Site Handbook

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

Structural Storm Water Best Management Practices (BMPs)

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

SMALL PAVER PROJECT. Home Gardeners School March 19, Presented by Robert W. Bellek Owner

Homeowners Guide to Stormwater BMP Maintenance

Permeable Pavement Systems

Permeable Paving. Sustainable Control Of Urban Storm Water Pollution. The volume of storm water being diverted to

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

SECTION 6. Routine Maintenance Activity Details

Te c h S p e c 3. Edge Restraints for Interlocking Concrete Pavements

2008 SWMM, 2010 Revision City of Tacoma

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

CHAPTER 102 REQUIREMENTS CRITCAL STAGES DURING CONSTRUCTION ACTIVITIES

Appendix B DETAILED DESIGN

WQ-23 MOUNTAINOUS AND STEEP SLOPE SITES

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

ABBREVIATIONS. Dwg LID of 1. Abbreviations

All materials in this presentation are taken from materials produced by:

Green Street BMP Matrix

Structural Stormwater Best Management Practices

Image: Montana NRCS USDA

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

EZ Base is a high-density panel base system that replaces traditional compacted aggregate-base installations.

Plan Review Checklist

Soil Erosion & Sediment Control Plan Requirements for Submittal to the Cape Atlantic Conservation District

Kittson Parkway / Watershed Park Parking Lot

Illinois Urban Manual

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

HORSE STABLE USING AZEK PAVERS.

Transcription:

The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language will require modification and additional detail to fit the physical conditions of the site and the final design of the BMP. TEMPORARY EROSION CONTROL A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance. B. Install storm drain inlet protection to prevent clogging of the stormsewer and increases in sediment loads to downstream stormwater facilities or waterbodies. C. Inspect erosion control measures at least once a week and after each rainfall event. Make any required repairs immediately. D. Silt fence fabric that collapses, tears, decomposes or otherwise becomes ineffective should be replaced within 24 hours of discovery. E. Remove silt fence deposits once they reach 30 percent of the height of the silt fence or silt curtain. Care should be taken to avoid undermining of the fence during cleanout. F. Erosion control devices shall be maintained until the site is stabilized, as determined by the Engineer. PERVIOUS PAVEMENT INSTALLATION Delivery & Preparation A. Unload pavers at job site in such a manner that no damage occurs to the product. B. Sand stored onsite shall be covered with a waterproof covering to prevent exposure to rain or removal by wind, and secure in place. C. Coordinate delivery and paving schedule to minimize interference with adjacent construction and landuse, to ensure protection of pervious pavement site. 1

D. Verify that the subgrade preparation, compacted density, and elevations conform to the specifications. E. Pavers and base material shall not be installed during heavy rain or snowfall. F. Pavers and base material shall not be installed over frozen base materials or subgrade. G. Frozen base material shall not be installed. Sub Base Installation A. Excavation and grading of the pervious pavement area shall be accomplished using low-impact earth-moving equipment to prevent compaction of the underlying soils. Wide tracked vehicles such as back hoes, small dozers and bobcats and/or hand-labor are recommended. B. Excavate/grade the pervious pavement area to the specified depth (elevation). All sub material below the specified elevation shall be left undisturbed, unless otherwise directed by the Engineer. Verify that the subgrade preparation, compacted density, and elevations conform to the specifications. C. In the event that sediment is introduced into the BMP during or immediately following excavation, the sediment will need to be removed from the pervious pavement area prior to initiating the next step in the construction process. D. The aggregate base should be spread and compacted in uniform layers not exceeding 6 inches in thickness. Recommended base surface tolerance should be plus or minus 3/8 inch over a 10 ft straight edge. E. Mechanical tampers are recommended for compaction of soil subgrade and aggregate base. F. Verify that the base is dry, uniform, even, and ready to support sand, pavers, and imposed loads. G. The design professional should inspect geotextile placement (if used), base preparation, surface tolerances and elevations, and conduct density tests for conformance to specifications. 2

Sand and Paver Installation A. Verify location, type, installation, and elevations of edge restraints around the perimeter area to be paved. ---or--- B. Install edge restraints per the drawings [and manufacturer's recommendations] [at the indicated elevations]. C. Spread the bedding sand evenly over the base course and screed to a nominal 1 inch thickness, and not to exceed 1 1/2 inches thick. The screened sand should not be disturbed. Place sufficient sand to stay ahead of the laid pavers. D. Do not use bedding sand to fill depressions in the base surface. E. Ensure that pavers are free of foreign material before installation. F. Install the pavers in the pattern(s) shown on the drawings, maintaining straight pattern lines. G. Joints between the pavers shall be between 1/16 and 3/16 inch wide. H. Fill gaps at the edges of paved areas with cut pavers or edge units. Cut pavers should be no smaller than one-third of the full unit size along edges subject to vehicular traffic. I. When required, cut pavers with a paver splitter or masonry saw. J. Use a low-amplitude, high-frequency plate vibrator capable of 5,000 lb (22kN) compaction at a frequency of 75-100 hz to compact pavers. K. Vibrate the pavers, sweeping dry joint sand into the joints and vibrating until they are full. This will require 2 to 3 passes with the vibrator. Do not vibrate within 3 ft of the unrestrained edges of the paving units. L. When completing work for the day, all pavers to within 3 ft of the laying edge must be left fully compacted with sand-filled joints. M. Upon completion, sweep off excess sand. N. Final surface elevations shall not deviate more than 3/8 inch under a 10 ft long straight edge. O. The surface elevation of the pavers shall be 1/8 to 1/4 inch above adjacent drainage inlets, concrete collars or channels. 3

CONSTRUCTION SEQUENCE SCHEDULING An implementation schedule should be included as part of the erosion control plan to identify the order of operations for construction activities. This is particularly important when constructing stormwater BMPs that are designed to infiltrate stormwater runoff. There are many construction activities which may contribute to the failure of a stormwater BMP if they are not planned for accordingly. The following items should be considered in developing an implementation schedule for a project: 1. Perform continuous inspection of temporary construction access to ensure that it is providing adequate erosion and sedimentation control for the construction site. 2. Install silt fence along the perimeter of the site to prevent sediment from leaving the site during the construction process. Silt fence should be installed at a uniform elevation and constructed so that flow cannot bypass the ends. Install heavy duty silt fence along the perimeter of downstream waterbodies to prevent sediment pollution. Install heavy duty silt fence along the perimeter of grading prohibited areas and all stormwater BMPs to eliminate traffic in these areas during the construction process. 3. All down gradient perimeter sediment-control BMPs (e.g. temporary outlet controls) must be in place before any up gradient land-disturbing activity begins. 4. Remove topsoil from the site and place in temporary stockpile location. Seed stockpile with temporary seed mix and mulch with weed-free straw if the stockpile is to remain in place for more than three days. 5. Install underground utilities (water, sanitary sewer, electric, telephone, etc.) taking the location and function of stormwater BMPs into consideration. 6. Rough grade the site leaving the pervious pavement area undisturbed until the contributing drainage area has been completed and the site is stabilized. 7. Seed and mulch disturbed areas on site. 8. Construct the roads in a manner that minimizes adverse impacts to the location and function of the stormwater BMPs. For example, ensure that construction access or equipment staging areas do not conflict with the final location of the infiltration trench. 4

9. Perform all other site improvements in a manner that minimizes adverse impacts to the location and function of the stormwater BMPs. 10. Construct check dams if required. 11. Stabilize the site by implementing the landscaping plan. 12. Install any required erosion control blanket, ditch checks, and other semipermanent and permanent erosion control measures. 13. Remove the temporary erosion and sediment controls after all disturbed areas have been stabilized per the Engineer s approval. 14. Pervious pavement construction shall not commence until the surrounding area is stabilized. CONSTRUCTION OBSERVATION It is strongly recommended that the design engineer be onsite during various stages of the construction process to ensure the following: 1. Construction documents are being adhered to. 2. Physical conditions of the site meet assumptions made during the design process. 3. Erosion control measures have been installed correctly and are being maintained during the entire construction process. 5