Indoor Environmental Quality

Similar documents
LEED for Homes V4 Provisional Alternative Compliance Paths for the Canadian market March, 2017

Ventilation for New Low-Rise Residential Buildings July 20, 2015

The V in HVAC: Mechanical Ventilation in ENERGY STAR Certified Homes

Clearing the Air: Ventilation. RESNET Building Performance Conference San Diego, CA February 17 th, 2015

Ventilation. ASHRAE 62.2 COMPLIANCE How do we get there? Bruce Hagen ND Dept. of Commerce.

CITY OF DANA POINT. COMMUNITY DEVELOPMENT, BUILDING AND SAFETY Golden Lantern, Suite 209 Dana Point, CA

The 2018 Ventilation Extravaganza. Rick Karg Residential Energy Dynamics 2018

EARTH ADVANTAGE HVAC REQUIREMENTS

Residential Air Leakage (Blower Door) Testing for Florida Code Compliance

WHAT S CHANGED WITH ANSI/RESNET/ICC STANDARD 380. Iain Walker, Residential Building Systems Group

BEST PRACTICE RECOMMENDATIONS

2015 MECHANICAL CODE REQUIREMENTS

Supplement A- Improving Forced Air Heating Systems

An Introduction to Energy Efficient and Effective Whole-House Ventilation

AUTOMATIC MAKE-UP AIR DAMPER WITH TRANSFORMER READ AND SAVE THESE INSTRUCTIONS

Green Building Practice Summary 3/10/2011

NEW HOME CERTIFICATION PROGRAM 2018 PROGRAM GUIDE

WHY IS BUILDING SCIENCE IMPORTANT?

101 S. George St 116 E Gas Ave York, PA York, PA (717) (717)

MultiFamily Ventilation Updates: ASHRAE 62.2, Best Practices and Practical Applications RESNET Conference Atlanta, GA

Ventilation BCBC 9.32 & Richard Kadulski Architect

ENERGY STAR Qualified Homes

IMC Significant Changes Summary Tier I

USEFUL RESOURCES: Applicability. Item o of section 150. Review-Definitions Section 101

WHOLE-HOUSE VENTILATION SYSTEMS

ENERGY STAR SUMMIT DECEMBER 6, 2006 ENERGY STAR INDOOR AIR PACKAGE

Fire and Life Safety GUIDE

Chapter Eight RESNET Standards

Indoor airplus. Better Environments Inside and Out

Rental Housing Inspection Guide

Section 8 Housing Choice Voucher Program. Housing Quality Standards (HQS) Inspection Checklist

Put the V back in HVAC

SnuggPro DATA COLLECTION FORM

BPI ANALYST ENVELOPE AUDIT FIELD EXAM CHECKLIST

Ventilation BCBC & Richard Kadulski Architect

RESNET HERS Rater Sample Test Questions 2

Building Codes, Ventilation Rates, and Certified Performance. Ventilation Track Comfortech 2007 St Louis, MO September 27, 2007

2006 Building Science Press All rights of reproduction in any form reserved.

HVAC Equipment Access Equipment Location

Habitability Guidelines

SUPPORTING DOCUMENT RESIDENTIAL ENERGY CODE WORKSHEET (2015) EFFECTIVE JANUARY 1, 2017

Equipment Specifications and Required Information Quantity Rebate

Address Account # Member # Equipment Specifications Quantity Rebate. ENERGY STAR Appliances

BPI 1200 and ASHRAE Standards

Air Change, Ventilation, and Dehumidification for Multi-family Buildings

Secondary Suites. Guidelines for the construction of Accessory Secondary Suites in the City of Abbotsford August

Why ventilate? Dilute contaminants Control or aggravate humidity Comfort or lack of cooling Odors Provide oxygen

Dwelling Ventilation Strategies, Including ASHRAE 62.2 ASHRAE Ventilation for Acceptable Indoor Air Quality

PLAN THE INSTALLATION Planning the installation first requires selecting the most appropriate installation approach. The chart below offers suggestion

CARBON MONOXIDE ALARM STANDARDS ACT - ENACTMENT Act of Dec. 18, 2013, P.L. 1229, No. 121 Cl. 35 An Act

Design Architect s/applicant s Certification Of Threshold Criteria

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL MECHANICAL CODE 2000 EDITION

ACCA Quality Homes ACCA 12 QH 2011 (Existing Home Evaluation and Performance Improvement) Developed in cooperation with RESNET

wattsmart New Homes Contractor-Certified HVAC Quality Assurance (HVAC-QI)

Gil Rossmiller. In the construction industry for over 30 years. ICC IRC Plumbing & Mechanical Code Development Committee

CHAPTER 7 ALTERATIONS LEVEL

Moisture, Ventilation & Global Weirding NEHERS Webinar Series

Home Performance Science

State of ALASKA, Weatherization Assistance Program. Technical Support Document. Combustion Safety

Building and Safety Division Civic Center Dr, Bellflower, CA, (562) x

2016 CALIFORNIA CODES KITCHEN, BATH & LAUNDRY REMODEL REQUIREMENTS

Introduction to Indoor Air Quality

MONTANA HOUSE 2 TECHNICAL SPECIFICATIONS June 28, 2011

Uniform Dwelling Code 2017 Updates SPS 323

FirstEnergy Program Overview

DUCT SYSTEMS CHAPTER 6

research highlight Assessment of Suite Compartmentalization and Depressurization in New High-Rise Residential Buildings

DUCT SYSTEMS CHAPTER 6

CHIMNEYS AND VENTS CHAPTER 8

2012 NC Building Code Chapter 2, 602.4, , , Chapter 35 Cross-Laminated Timber. ( Item B-1)

Notable Changes in the Mechanical Codes

SL-1 Passive Solar, Ventilation & Shading Design

Inspection Checklist Mechanical Final

Introductions HERS Industry HERS Ratings ACCA Standard 12 Resources

Installation Instructions

BALTIMORE CITY RENTAL LICENSE INSPECTION FORM RENTAL LICENSING INSPECTOR GUIDANCE

Home Set-up and Maintenance. Maintenance

2015 & 2012 International Mechanical Code Significant Changes and the PA Uniform Construction Code

SIGNIFICANT CHANGES TO MINOR WORK AND ORDINARY MAINTENANCE

18. Mechanical Ventilation

FAQ. (Frequently Asked Questions) What is required to convert my unfinished basement to finished space?

Combustion Safety. RESNET Conference San Antonio, TX February 27, Presented by Rich Moore Lightly Treading Energy & Design Denver, CO

Contents Chapters 4 & 5 of the 2012 Michigan Mechanical Code CHAPTER 4, MMC: VENTILATION CHAPTER 5, MMC: EXHAUST SYSTEMS

MECHANICAL VENTILATION STANDARDS V.1

MF Mechanical Systems. Doug McCleery, PE, CEM March 2, 2016

Agency for Health Care Administration

Building Science Basics

General Kitchen, Bath & Bedroom Remodeling Notes County of Marin, Building Inspection Division

IT S ABOUT TIME FOR FRESH AIR.

A Necessity for Preventing Unsafe Backdrafts and Unhealthy Air

IT'S BETTER. for EVERYONE.

RESNET National Conference New Orleans, LA. February 16, 2009 Presented by Rich Moore Invisible Energy Denver, CO

Land Use and Environmental Service Agency (Code Enforcement) NC Mechanical Code. Table of Contents

Home Performance Energy Audit Report

INDOOR RADON POLICY AND PROCEDURES LAWLER WOOD HOUSING, LLC

Are you Getting Your Fan Flows Right?

(House Bill 849) Public Safety Rental Dwelling Units Carbon Monoxide Alarms

WORKSHEET 2-1 THE MANITOBA RESIDENTIAL OCCUPANCY FIRE RISK INDEX FIRE SAFETY PARAMETER VALUES

SAFETY AND INSTALLATION MANUAL MODEL 8100

Installation Instructions Exhaust Fan With Light

Transcription:

The average person spends about 90% of their time indoor, a significant amount of time. Therefore, it is essential that houses provide a healthy and comfortable interior living environment. Conditions such as air quality, lighting, thermal comfort, and ergonomics affect a person s overall well being. A healthy indoor living environment has the potential to ensure a healthy lifestyle, protect the occupant s health, and reduce stress. Furthermore, a quality indoor environment increases property value and reduces liability for the homeowner. Indoor Environmental Quality Prerequisites Credits: Ventilation Enhanced Ventilation Combustion Venting Contaminant Control Garage Pollutant Protection Balancing of Heating and Cooling Distribution System Radon-Resistant Construction Air Filtering Environmental Tobacco Smoke Compartmentalization Enhanced Compartmentalization Enhanced Combustion Venting Enhanced Garage Pollutant Protection Low Emitting Products Finish

Prerequisite: Ventilation Case 2. Multifamily (Attached Housing) Design and install a whole-unit ventilation system for each individual dwelling unit that complies with the requirements of ASHRAE Standard 62.2 2010 (with errata) or local equivalent, whichever is more stringent, and all local exhaust requirements for Single Family section, above. Major components of the standard are summarized below. Provide outdoor air to each unit directly from the outdoors. Project teams using exhaust ventilation systems must specify how outside air is delivered at the flow rate required by ASHRAE 62.2 2010. Do not use systems that rely on transfer air from pressurized hallways or corridors, adjacent dwelling units, attics, etc. For continuous ventilation systems, meet the requirements of ASHRAE 62.2 2010 shown in Table 2, Continuous in-unit ventilation fans must be rated for sound at a maximum of 1.0 sone, per ASHRAE 62.2 2010, Section 7.2.1. Remote mounted fans need not meet these sound requirements. For intermittent ventilation systems, install fans to meet ASHRAE Standard 62.2 2010. The fan flow rate must be equal to the outdoor airflow requirements multiplied by the fan flow rate multiplier. The system must be designed such that it can operate automatically based on a timer. Fans must be rated for sound at a maximum of 1.0 sone. Remote mounted fans need not meet these sound requirements. As applicable, follow the restrictions on system types for hot, humid climates and very cold climates. In hot, humid climates, whole-house mechanical net exhaust flow must not exceed 7.5 cfm per 100 square feet (38 liters per second per 100 square meters) of conditioned floor area. In very cold climates, mechanical supply-only systems must not exceed 7.5 cfm per 100 square feet (38 liters per second per 100 square meters). See ASHRAE 62.2 2010, Sections 4.5 and 8, for more details and climate categories. Locate air inlets that are part of the ventilation design at least 10 feet (3 meters) from known sources of contamination, such as a stack, vent, exhaust hood, or vehicle exhaust. Place the intake such that entering air is not obstructed by snow, plantings, or other material. Forced air inlets must be covered by screens to exclude rodents and insects (mesh not larger than ½ inch or 13 millimeters). See ASHRAE 62.2 2010, Section 6.8, for more details and a list of exceptions. For all non-unit spaces, meet the minimum requirements of ASHRAE Standard 62.1 2010 or local equivalent, whichever is more stringent, Sections 4 7, Ventilation for Acceptable Indoor Air Quality (with errata). Mechanically ventilated spaces must be designed using the ventilation rate procedure or the applicable local code, whichever is more stringent. Ventilation fans that penetrate rated assemblies may require radiation and fire dampers to meet local building and fire codes. Naturally ventilated spaces must comply with ASHRAE Standard 62.1 2010, Section 6.4. Prerequisite: Combustion Venting Do not install any unvented combustion appliances (ovens and ranges excluded). Install a carbon monoxide (CO) monitor on each floor, hard-wired with a battery backup. In multifamily buildings, install a CO monitor on each floor of each unit.

For all fireplaces and woodstoves inside the building, provide doors that close or a solid glass enclosure. Interior fireplaces and woodstoves that are not closed-combustion or power-vented must pass BPI or RESNET combustion safety testing protocols to ensure that depressurization of the combustion appliance zone is less than 5 Pa. Space- and water-heating equipment that involves combustion must meet one of the following: It must be designed and installed with closed combustion (i.e., sealed supply air and exhaust ducting); It must be designed and installed with power-vented exhaust; or It must be located in a detached utility building or open-air facility. Projects that earn the EPA Indoor airplus label automatically meet the requirements of this prerequisite. Prerequisite: Garage Pollutant Protection Place all air-handling equipment and ductwork outside the fire-rated envelope of the garage. Tightly seal shared surfaces between the garage and conditioned spaces, including all of the following: In conditioned spaces above the garage, seal all penetrations and all connecting floor and ceiling joist bays. In conditioned spaces next to the garage, weather-strip all doors, install carbon monoxide detectors in rooms that share a door with the garage, seal all penetrations, and seal all cracks at the base of the walls. Projects that earn the EPA Indoor airplus label automatically meet the requirements of this prerequisite. Prerequisite: Radon-Resistant Construction Case 1. New Construction If the building is in EPA radon zone 1 (or local equivalent for projects outside the United States), design and build with radon-resistant construction techniques, as prescribed by American Association of Radon Scientist and Technologists (AARST), Reducing Radon in New Construction of 1 & 2 Family (RRNC 2.0); EPA Building Radon Out; NFPA 5000, Chapter 49; International Residential Code, Appendix F; CABO, Appendix F; ASTM E1465; or a local equivalent, whichever is more stringent. Follow all the requirements listed in Indoor airplus, 2.1: Provide a capillary break per the Indoor airplus specifications. Provide an electrical outlet near vent piping in the attic to facilitate future fan installation. Install a 3- or 4-inch (or approximately 80- or 100- millimeters) diameter gas-tight vertical vent pipe with no bends greater than 45 degrees, connected to an open T-fitting in the aggregate layer, extending up through the conditioned spaces and terminating at least 12 inches (300 millimeters) above the roof opening. The requirements for radon protection are automatically satisfied if the building is elevated by at least 2 feet (600 millimeters), with open air space between the building and ground. An enclosed vented crawlspace does not qualify. A garage under a building is an acceptable alternative.

Prerequisite: Air Filtering Install air filters with a minimum efficiency reporting value (MERV) of 8 or higher on all recirculating space conditioning systems, per ASHRAE 62.2 2010. Design ductwork and specify the central blower to account for the pressure drop across the filter. Air filter housings must be airtight to prevent bypass or leakage. Non-ducted systems are exempt from the minimum MERV 8 requirements but must have an internal air filter in the air-handling unit. Install air filters rated MERV 6 or higher for mechanically supplied outdoor air for systems with 10 feet (3 meters) of ductwork or more, per ASHRAE 62.2 2010, Section 6.7. Projects may use equivalent filtration media class of F5 or higher for MERV 8 and G4 or higher for MERV 6, as defined by CEN standard EN779 2002. Projects that earn the EPA Indoor airplus label automatically meet the requirements of this prerequisite. Prerequisite: Environmental Tobacco Smoke (Attached Housing) Multifamily projects only Prohibit smoking in all common areas of the building. The prohibition must be communicated in building rental or lease agreements or in condo or co-op association covenants and restrictions, and provisions for enforcement must be included. Locate any exterior designated smoking areas, including balconies where smoking is permitted, at least 25 feet (7.5 meters) from entries, outdoor air intakes, and operable windows opening to common areas. Prohibit on-property smoking within 25 feet (7.5 meters) of entries, outdoor air intakes, and operable windows. Provide signage to allow smoking in designated areas, prohibit smoking in designated areas, or prohibit smoking on the entire property. Prerequisite: Compartmentalization (Attached Housing) Multifamily and Attached Single-Family Projects Only Compartmentalize each residential unit to minimize leakage between units. Minimize uncontrolled pathways for environmental tobacco smoke and other indoor air pollutants between units by sealing penetrations in walls, ceilings, and floors and by sealing vertical chases (including utility chases, garbage chutes, mail drops, and elevator shafts) adjacent to the units. Weather-strip all doors in the residential units leading to common hallways to minimize air leakage into the hallway. Weather-strip all exterior doors and operable windows to minimize leakage from outdoors. Demonstrate acceptable sealing of residential units by a blower door test. Follow the procedure described by RESNET or the ENERGY STAR Multifamily High Rise Program Testing and Verification Protocols, Version 1.0, with an allowable maximum leakage of 0.23 cfm50 per square foot (0.07 cmm50 per square meter) of enclosure (i.e., all surfaces enclosing the apartment, including exterior and party walls, floors, and ceiling).

Enhanced Ventilation 3 points For each residential unit, place occupancy sensors, an automatic humidistat controller, and a continuously operated exhaust fan/ delay timer that operates the fan for at least 20 minutes in all bathrooms with a shower, tub or spa. For the rest of the living unit, a balanced whole house ventilation system is also recommended. Such ventilation system should meet with ASHRAE standard 62.2-2010 or local code whichever is stricter. Contaminant Control 1 point It is recommended that contaminant prevention design strategies be embedded at the main entries of each residential unit. Walk-off mats that are at least four (4) feet long and with cleaning access (grating with a catch basin) must be installed at each entryway. Rollout mats are also accepted if they are maintained on a weekly basis by a contracted service organization. Furthermore, a designated shoe storage area adjacent to primary entrances is recommended. Such space should be a permanent architectural design feature, with enough space to accommodate a bench and shoe storage of at least two (2) pairs of shoes per bedroom. The shoe storage area/room cannot contain any carpet. Balancing of Heating and Cooling Distribution Systems 2 points In each living unit, install a heating and cooling system with at least two independent thermostat controls. *Single-family houses with less than 800 square feet (74 square meters) of conditioned floor area and multifamily buildings whose average unit size is less than 1,200 square feet (110 square meters) automatically meet the requirements of this credit. It is also recommended that a qualified energy rater test the airflow in each room. Such testing method should be compliant with RESNET or ACCA Quality Installation Specifications. Results of supply airflow methods should be within 20% (+/-) of calculated values from the ACCA manual J. Enhanced Compartmentalization (Attached Housing) 1 point Shared walls between living units must be designed to prevent the transfer of air and pollutants between each unit. A blower door test must be performed according to RESNET and ENERGY STAR protocol. For attached housing, a maximum air leakage of 0.15 cfm per square foot of unit enclosure is allowed. Enhanced Combustion Venting 2 points It is recommended that no woodstove or fireplaces be installed in the house. Enhanced Garage Pollutant Protection 2 points Option 3: No Garage/ Detached Garage A garage is not recommended for the design of attached housing. If the owner desires a garage, design a detached garage structure (one that does not share a wall with the living units).

Low Emitting Products 3 points For the interior finishes of the house, it is recommended that paints, flooring tiles, insulation, and adhesives and sealants be compliant with the California Department of Public Health Standard Method V1.1-2010, section 01350, appendix B. Composite wood products must be compliant with the California Air Resources Board requirements. Products with no added formaldehyde based resin are highly recommended for this category. Total Points: 14 points