SECTION XXXXX POSITIVE DISPLACEMENT BLOWER WITH SOUNDSEAL COMPACT ENCLOSURE

Similar documents
PhiloWilke Partnership Addendum No. 2 A/E Project No April 2016

SECTION COMPRESSED AIR SYSTEM. A. Pipe and pipe fittings, including valves, unions and couplings.

SECTION AIR COMPRESSORS AND ACCESSORIES

SECTION AIR COMPRESSORS AND ACCESSORIES

Direct Fired Heater Model AD Specification

SECTION STEAM CONDENSATE PUMPS

Internal ridged board 1" x 1.5 foil face installation shall be installed on roof, walls and base of casing.

SECTION STEAM CONDENSATE PUMPS

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

1.1 This section applies to air handling units for HVAC Systems.

A. Codes and Standards that are Standard at the University:

AIR HANDLING UNITS Vibration Isolation Air Filtration Equipment Ductwork.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

SECTION STEAM CONDENSATE PUMPS

Scirocco (tri-lobe) blowers Tri-lobe design for higher efficiency and reduced noise levels in the Water Industry

SECTION AIR HANDLING UNIT

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS

A. Section includes Factory Packaged, Modular units, providing cooling and heating for air distribution systems.

SECTION WATER-SOURCE UNITARY HEAT PUMPS

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

.2 Section Waste Management and Disposal..5 Section Motors, Drives and Guards for Mechanical Systems.

High Plume Blowers Suggested Specification Section (Master Format 1996) Suggested Specification Section (Master Format 2004)

University of Houston Master Construction Specifications Insert Project Name

SECTION AIR-COOLED SPLIT SYSTEM AIR CONDITIONING UNITS

SECTION AIR COOLED WATER CHILLERS

PRODUCT OVERVIEW. or other secondary operations using a high velocity, high impact air stream.

Construction Standards Page Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

A. Product Data: Include rated capacities, furnished specialties and accessories.

Enclosed Scroll Air Compressor System SES 3-5 HP

Submittal Data Performance Data Electrical Data

SECTION HEATING BOILER FEEDWATER EQUIPMENT

A. American National Standards Institute (ANSI): Establishes requirements applicable to certifying direct gas-fired heaters.

TURBO AND HIGH PRESSURE REGENERATIVE BLOWERS

Belt Driven Mixed Flow Fans

JM Aerofoil Fans Bulletin JMA60-05

dualarm Vertical In-Line Pumps

ENGINEERING LETTER 4

ENVIRO UNIT ENGINEERING MANUAL KES SERIES

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

B. Unit construction shall comply with ASHRAE 15 Safety Code, NEC, and ASME applicable codes (U.S.A. codes).

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION EXHAUST FANS

Laboratory Open Scroll Air Compressor System with Premium NFPA Controls

A. General: Refer to paragraph entitled "SUBMITTAL" in Section Include the following data:

University of Houston Master Construction Specifications Insert Project Name SECTION FIRE PROTECTION PUMPS PART 1 - GENERAL

SECTION PLUMBING EQUIPMENT

Schust Engineering, Inc. 701 North Street P.O. Box 128 Auburn, IN (260) Fax: (260)

Quality Components as a basis for Quality Equipment

Series 4302 & FILE NO: 43d.12 DATE: June 1, 2004 SUPERSEDES: 43d.12 DATE: July 15, dualarm Vertical In-Line Pumps

Construction Standards Page

UNIVERSITY OF ROCHESTER DESIGN STANDARDS NOVEMBER 1, 2013

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

MARLOW PUMPS RECIRCULATION

LC Series - Light Commercial Pump Station Installation and Operation Manual

Dry Bulk Truck Blowers

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

A. Operation and Maintenance Data: For pumps to include in emergency, operation, and maintenance manuals.

SECTION PLUMBING EQUIPMENT Piping (Plumbing). 2. Division 16 - Electrical Wiring and Connections.

TGIF-1. Indirect Fired Heating Systems. Technical Guide for: IF Indoor Installations. IFW Outdoor Installations. Applied Air. Keeps You.

SELF-PRIMING PUMPS CORNELL PUMP COMPANY STX & STL SERIES INDUSTRY LEADING EFFICIENCY WITH CYCLOSEAL SYSTEM EFFICIENT BY DESIGN FIVE-YEAR WARRANTY

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

HOFFMAN & LAMSON ENGINEERED VACUUM SYSTEMS

Wilo IL Vertical Split-Coupled Inline Pumps

3020/3120 Series DEMING PUMPS. Frame-mounted and close-coupled Enclosded and semi-enclosed impeller Capacities to 4,000 GPM Heads to 780 feet

J SERIES. Technical Specifications. Centrifugal Pumps for J Series Condensate & Boiler Feed Pumps. Features

D. NEMA Compliance: Provide electric motors and components which comply with NEMA standards.

INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

Models Series Series

UNIVERSITY OF MISSOURI Central Station Air-Handling Units March

Laboratory Open Scroll Air Compressor System with Premium NFPA Controls Rev. 06/27/14

AIR HANDLER SPECIFICATION

SECTION STEAM AND STEAM CONDENSATE SPECIALTIES

VSA SEWAGE PUMP. Capacities to 1600 gpm, Heads to 120, Horsepower range 3/4 thru 40, 3 thru 6 discharge, 1750 and 1150 operation.

Models Series Series

Fuji Electronic VFC 084P-5T

Engineering Specifications for HXV Closed Circuit Hybrid Cooling Tower

SECTION PLUMBING EQUIPMENT

Turning Air Into Solutions. TUBEAXIAL PAINT SPRAY BOOTH EXHAUST FANS. Model TCBS

TECHNICAL. Series 18. Pump Packages

PRODUCT REVIEW. Low Pressure Blowers. Medium Pressure Blowers. High Pressure Blowers. Side Channel Blowers. Conveying Blowers FD RD F

Vacuum Systems. A complete line of vacuum pumps and accessories for every dairy

Stainless Steel Condensate Return Units

HORIZONTAL FIRE TUBE BOILERS Piping (HVAC) Pumping Equipment (HVAC).

Roots TM Blowers, Compressors & Controls

RELIABLE SOLUTIONS FOR INDUSTRIAL APPLICATIONS ENGINEERED VACUUM SYSTEMS

University of Delaware

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise Modular Climate Changer Full Spec. Prepared by: Phone Number: Prepared for:

INSTALLATION MANUAL FOR ROTARY TWIN LOBE (ROOTS) BLOWERS / COMPRESSORS

B. HI Compliance: Design, manufacture, and install pumps in accordance with HI "Hydraulic Institute Standards."

/ Aquatower Fiberglass Cooling Tower /

ENGINEERING DATA AND SPECIFICATIONS. Marley Aquatower FIBERGLASS CROSSFLOW COOLING TOWER

VERTICAL STACK INNKEEPER GUIDE SPECIFICATION CGC Hybrid Heat Pump System

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

A. Section Common Motor Requirements for HVAC Equipment: Fan motors.

A. American National Standards Institute (ANSI) : Establishes requirements applicable to certifying direct gas-fired heaters.

GUIDE SPECIFICATIONS FOR AIR HANDLING UNITS VENTILATION UNITS & HEAT RECOVERY UNITS

Essex County College - West Essex Campus Addition And Renovations dib # / SECTION HYDRONIC PIPING SPECIALTIES PART 1- GENERAL

Copy Right By: Thomas T.S. Wan

Transcription:

SECTION XXXXX POSITIVE DISPLACEMENT BLOWER WITH SOUNDSEAL COMPACT ENCLOSURE PART 1 GENERAL 1.01 SECTION INCLUDES A.) Provide one (1) rotary positive displacement blower and all related appurtenances assembled as a complete system. 1.02 GENERAL BLOWER CONSTRUCTION A.) Provide blower, drive unit and accessories required for complete blower unit assembly. Installation of assembly by Contractor. B.) Blower shall be suitable for continuous operation at the conditions stated herein without excessive noise, vibration, heating or any damage to blower. 1.03 SUBMITTALS A.) Provide eight (8) sets of shop drawings and Operation and Maintenance Manuals. PART 2 - PRODUCTS 2.01 APPROVED EQUIPMENT A.) Sutorbilt 5MP-RHC with a SoundSeal Enclosure as supplied by C. Emery Nelson, Inc. B.) Equipment and training shall be provided by the local factory authorized distributor and warranty center. C.) Bid other Equipment as Substitute Items. 2.02 DESIGN CONDITIONS A.) The blower shall have a capacity of 180 SCFM at a discharge pressure of 7.5 psig. Calculate CFM based on local elevation and an ambient temp of 100 F. B.) Blower speed shall not exceed 1400 RPM. C.) Operation of blower at design conditions shall not exceed 15 HP. 2.03 BLOWER CONSTRUCTION A.) Casing: 1. One-piece close-grained cast iron with separate headplates 2. Horizontal arrangement of blower so that inlet and outlet are on opposite sides of blower and in the same vertical plane. B.) Impeller: 1. Straight, two lobe, involute type, balanced, carried by cylindrical roller bearing at drive shaft and ball bearings at headplate locations. 2. Timing gears shall be alloy steel or ductile iron, accurately machine and securely attached to impeller shaft with a taper pin. 3. Lubrication: Drive end grease, gear end oil splash.

4. The impeller side of the oil seals shall be vented to the atmosphere to relieve air pressure on the seals. 5. Seals shall be Viton. C.) Bearings: 1. Anti-friction bearings, ball or roller type. Designed for a minimum life of ten years per AFBMA B-10 Standards. D.) Base: 1. Silencer base combo for blower, motor, and drives. Fabricated steel, reinforced to withstand normal loading. E.) Inlet and Outlet Connections: 1. Factory supplied flexible connector for the outlet. 2.04 ACCESSORIES A.) Inlet Filter: Blower and Enclosure 1. Approved Manufacturers: Solberg or approved equal. 2. 4, reusable, dry type complete with weather hood. 3. Provide two (2) additional filter elements 4. Filter efficiency shall be 97 percent with particles of one (1) micron diameter and larger. 5. Pressure drop through filter shall not exceed three inches (6 ) water column when blower operates at full capacity. 6. Inlet filter restriction indicator for 0-20 water column. B.) Silencer Base Combo with Belt Guard: 1. Approved Manufacturers: Solberg or approved equal. 2. Discharge silencer: a. 4 connection. b. Multiple chambered design. C.) Pressure Relief Valve: 1. 2 weighted-type set at 8.5 psig, adjustable by selecting proper weights. D.) Valves: 1. Check Valve: a. Approved Manufacture: Flexi-Hinge, or approved equal. b. 4 Model 518 with epdm seats installed down stream of the discharge silencer. 2. Butterfly Valves: a. Approved Manufacturer: Bray, or approved equal. b. Isolation: 4 Series 30 with epdm seats and a manual handle lever. E.) Gauge: 1. Liquid filled with a 4 dial and indicating range from 0-15 psig flush mounted in the enclosure. F.) Thermometer: 1. Bi-metal with tree inch (3 ) dial and indicating range from 0 to 300 degrees F flush mounted in the enclosure. 1.05 MOTOR AND DRIVE A.) Motor:

1. Operate 460 volt, 3 phase, 60 cycle, 1800 rpm. 2. Horsepower: 15 HP Premium Efficiency, 92.4%, Rated at 50C 3. Type: Totally Enclosed Fan Cooled (TEFC). B.) Provide extra set of belts. 2.06 PAINT A.) The blower and motor shall be to the blower assembly manufacturer with their standard prime coat paint suitable for indoor application. B.) All other steel surfaces shall be prime painted. 2.07 SOURCE QUALITY CONTROL A.) The blower package supplier must be an Authorized Distributor and Factory Authorized warranty center for the geographical area in which the blower is being installed. 2.08 ENCLOSURE 1. The sound enclosure shall be suitable for Indoor/Outdoor application and shall enclose the entire machinery package. 2. The blower assembly with sound enclosure shall not exceed 80 dba measured at 3 feet from the enclosure with no reflective surfaces. 3. The exterior of the enclosure shall be fabricated of 12 gauge steel. The exterior must be designed to withstand potential impacts without substantial damage. The top of the enclosure shall have a positive pitch. 4. The enclosure is to be of a unitized welded construction. 5. A separate inlet filter shall be supplied on the inlet to the enclosure 6. Access Panels a. The top of the enclosure shall be removable without the use of any tools. This access shall allow removal of the blower and motor vertically upward b. Two full access side panels. c. Checking, changing and adding lubricant shall be capable of being performed through the two full access panels on either side of the enclosure. d. All access panels shall have a water tight seal. 7. Cooling and Insulation a. The enclosure shall be fabricated so that ambient process air flows through an internal sound plenum, built integral to the enclosure, directing air across the motor. b. The interior surface of the enclosure shall be 2" urethane foam with a protective film that is washable and free of

perforations and/or materials that would accumulate oil and dust. 8. Required Features: Power Coated Finish Pre-Assembled and Skid Mounted Integrated Forklift Pockets Flush Mount Gauges and Thermometers ½ Rubber Vibration Isolation N. ENCLOSURE THERMOMETER/TEMPERATURE SWITCH O. WIRING 1. The enclosure thermometer/temperature switch shall have a 5A SPDT snap action switch. The enclosure temperature switch shall be flush mounted in the enclosure by the blower package supplier and shall be wired in the field by the contractor to shut the blower off when the temperature setting is exceeded. Restarting the blower shall be done manually after troubleshooting is complete. Controls supplied by others. 1. The electrical contractor shall provide the wiring and controls for the drive motor and the enclosure temperature switch. It is recommended that the contractors wiring enter through the concrete base as indicated on the approved shop drawings. PART 3 EXECUTION 1.01 INSTALLATION A.) Piping and Blower System Installation: 1. Blower assembly shall be installed on a concrete pad and shall be leveled and anchored by Contractor as shown on the plans. 2. Contractor shall support piping to eliminate pipe strain on the blower system. 3. Blower shall be piped as shown on the plans. 4. Contractor shall supply all hardware necessary to anchor unit per manufacturer specifications. B.) Lubricants: 1. All initial blower lubricants to be supplied by the blower supplier and applied by Contractor. 1.02 START-UP AND TRAINING A.) Blower package supplier shall be factory authorized and shall provide training and start up services. Supplier to instruct the Owner in operation and maintenance procedures and to certify to the Engineer that the equipment is installed and operates correctly.