Appendix L: Quality Control

Similar documents
REGIONAL ROUTINE OPERATIONS AND MAINTENANCE REVIEW PLAN

CASS COUNTY MICHIGAN MASTER PLAN

CLARK CO.COMBINED HEALTH DIST COUNTY ONLY - MASTER PLUMBERS LIST

Long-Range Transportation Plan

Specialty: Framing Roofing Gutters Siding Decks

DEQ Dental Amalgam Separator Grants. MWEA Conference September 28, 2011

Chairman s Report for the TC on NEC CMP 2

Individual Team First Last Score

MASTERS BARR - Top 10 Category Place Points First Name Last Name Team

PRE-CONSTRUCTION CONFERENCE AGENDA 2:00 PM October 8, Type of Work: Grading, Concrete/Bituminous Paving, Storm Sewer, Watermain, Signal/Lighting

nmector's NOTE (continued on following page)

Results for: 6/22/18 - Beatrice Speedway - Beatrice, NE. Pos Start +/- Driver Hometown Car Jordan Grabouski Beatrice, NE 30

MINUTES BUILDING BOARD OF REVIEW 1:00 P.M., OCTOBER 1, 2012 Third Floor, Jesse Lowe Conference Room Omaha Civic Center Farnam Street

Sri Chinmoy Barwon River Run. 12km Run

VII. PREPARERS OF THE EIR AND PERSONS CONSULTED

Individual Team First Last Score Award

Berlin Pond Five Miler 2011 CVR/ORS Race Series #7 USATF #VT05001RF Berlin, VT August 11, 2011 ********** AGE GROUP RESULTS **************

i n S o u t h e r n M a i n e

Full Plan Document. Adopted October 4, 2011

Evesham Archery Club hosting the WMAS & CWAA Indoor Championships March 6th 2011 WRS Fita 18

Chief John C. Reese, EFO

Town of Amherst Fire Equipment Contractor List Suppression System Certfications...

2000 Western Ontario Regional

The South Carolina Stormwater Ponds Research and Management Collaborative

3605 S. Huron Rd Bay City, MI (989)

Greenfield & Behr Preferred Vendors

Correlating Committee on Automatic Sprinkler Systems

TECHNICAL COMMITTEE ON ELECTRONIC SAFETY EQUIPMENT. December 10-12, 2013 San Diego, CA AGENDA

Railroad Safety Trail. Recompiled August Project Description. Prepared For: City of San Luis Obispo

SECTION 8 RENTAL LISTINGS 3 BEDROOM LISTINGS

NHMPC. NHMPC Board of Directors. Storey County Emergency Management

Obispo Beautiful Association. Awards Program. A Working Association For A Rewarding Environment

APPROVED BACKFLOW TESTERS LIST : AUGUST 2018

The Road Runner* March 2013 Number 664. Official Publication of TEXAS HARDWARE BOOSTERS CLUB BOOSTING THE HARDWARE INDUSTRY SINCE 1935 HEADQUARTERS

Sustainable CT. Local Actions. Statewide Impact.

M E M O R A N D U M. SUBJECT: NFPA 855 First Draft Technical Committee FINAL Ballot Results (C2020)

Design and Sustainability for Winter Operations

Appendix B List of Preparers

Recommended Vendors MORTGAGE/FINANCIAL

GOOD HELP IS HARD TO FIND

M E M O R A N D U M. Technical Committee on Supervising Station Fire Alarm and Signaling Systems

2015 Shoreland Certified Contractors

Higher Education Energy Efficiency Partnership Program BEST PRACTICES AWARDS

Repair Station FAA Roster

October 10-12, 2012 Sheraton Madison Hotel Madison, Wisconsin

I. INTRODUCTION. identify long-term capital improvements and rehabilitation measures for the existing drainage system;

NATIONAL GREEN INFRASTRUCTURE LEARNING LAB MAKING GREEN INFRASTRUCTURE AN INTEGRAL PART OF YOUR COMMUNITY COLLEGE PARK, MARYLAND OCTOBER 27-28, 2015

MINUTES CHESAPEAKE BAY PRESERVATION AREA BOARD VIRGINIA BEACH, VIRGINIA APRIL 27, 2015

ANSI/CSAA CS-V Video Verification Procedures for Burglar Alarms

SECTION 8 RENTAL LISTINGS 3 BEDROOM LISTINGS

Gwinnett County Development Advisory Committee Wednesday April 19, 2017 at 12:00 p.m. 684 Winder Highway, Lawrenceville Training Room

Physical Map Revision Flood Insurance Study

App Date Auth. Solicitors

b. Z-15 of 2015: Steve Fishman

Mid-America Regional Council wishes to extend a special thank you to. each of the project participants. This document is the product of the

Commercial & Industrial Solutions Trade Ally List

ALEXANDRIA. Fire Department Impacting Lives, Empowering Future Leaders. Annual Report

MEMORANDUM. Technical Committee on Emergency Power Supplies. NFPA 111 First Draft Technical Committee FINAL Ballot Results (A2018)

MINUTES FRANKLIN TOWNSHIP LAND USE BOARD REGULAR MEETING. WEDNESDAY, June 27, 2012

Bakers Branch HOA Neighbor Recommended Contractors

NFPA Technical Committee on Deployment and Organization of Fire Prevention Activities

Kevin Decosta s Vendor List 2015/2016

Results for: 7/29/18 - Beatrice Speedway - Beatrice, NE. Pos Start +/- Driver Hometown Car Jordan Grabouski Beatrice, NE 30

CITY OF GARDEN CITY. Garden City Design Review Committee Staff Contact: Chris Samples STAFF REPORT: DSRFY Page 1

Chapter 13 Distribution List

Bio: Keith Mills, PE, GE

Template for Restoration in a Lake Superior Area of Concern. Template for Restoration in a Lake Superior Area of Concern

The Art of Submitting a Successful WRAPP. A City of Madison Perspective. Jojo O Brien City of Madison Engineering Division

CHAPTER 6 LIST OF PREPARERS

2017 Conference At-a-Glance

Strategic Planning Conference Attendees

Information for File # ARC

BOMA LADY SCORES

1.0 Background. 1.1 Study Process

APPENDIX F. List of Preparers

Chief Mark Crews gave a brief introduction regarding the Work Session and introduced Mr. Jack J. Krakeel to the Board.

VIRGINIA FIRE SERVICES BOARD Live Structure Committee Thursday, February 21, 2019

Johnson County I-69. Corridor Plan DRAFT DRAFT

STATUS OF REVIEW: ENGINEER WILL COMPLY

RISK, RESILIENCE, AND RESPONSE APRIL 23, 2019

State Highway 5 Corridor Context Sensitive Master Plan

HEOA Institutional Disclosure Requirements Emergency Response and Evacuation Procedures

Pikes Peak Regional Building Department 2880 International Circle Colorado Springs, Colorado 80910

Bijou Villa COA 105 East River Road Rumson, NJ Preferred Vendors List

COMPREHENSIVE PLAN VILLAGE OF BRIARCLIFF MANOR. September 2007

MINUTES OF THE PLAN COMMISSION June 26, 2017

7:30 9:00 AM Registration and Continental Breakfast in Exhibit Area

LAUNCH DESIGN TYPES Updated April river-management.org PREPARE TO LAUNCH!

FIELD RE-ASSEMBLY FOR FORM 3 AND FORM 7 SHIPMENT MODEL YD CHILLERS - MOD A AND B WITH GRAPHIC CONTROL CENTER AND ELECTRO-MECHANICAL STARTER

National Conference on Preservation, Repair, and Rehabilitation of Concrete Pavements

Town of Ontario Planning Board Minutes. October 9, 2018

Milford Fire Department 2016 Annual Report. Presented by: Chief Thomas M. Moore

Taholah Relocation Master Plan INTRODUCTIONS

The project manager Chris Darity was excellent throughout the entire process.

Evaluation of How O&M Costs Vary for Alternative Flood Control Strategies

Transportation Alternatives Program (TAP) Experience

Planning and Zoning Commission

HARVARD JOLLY, INC Dr. Martin Luther King, Jr. Street North

AGENDA ITEM: IOWA. west] that were not FISCAL IMPACT. the City of Clive. STAFF REVIEW. Resolution II. Amendment PREPARED BY: REVIEWED BY:

RESOURCE. Restore. Reveal. Renew.

Transcription:

Quality Control Fargo Moorhead Metropolitan Area Flood Risk Management Project Reach 2 ing and Design Phase P2# 370365 Doc Version: 97% Post-ATR 21 June 2013 DDR_FMM_R2_Appendix_L_Quality_Control.docx

This page is intentionally left blank DDR_FMM_R2_Appendix_L_Quality_Control.docx

Quality Control Table of Contents Attachments... 1 L.1 General... 1 L.2 Project Delivery Team... 1 L.2.1 Project Delivery Team... 1 L.2.2 Technical Leads and Functional POCs... 2 L.2.3 District Quality Control (DQC) Team... 3 L.2.4 Biddability Constructability Operability & Environmental (BCOE) Team... 4 L.2.5 Agency Technical Review (ATR) Team... 5 L.2.6 Sponsor Representatives... 6 L.2.7 State Agency Representatives... 7 L.3 Reviews to be Conducted Reach 2... 7 L.3.1 District Quality Control (DQC) Review of PER Submittal... 7 L.3.2 Agency Technical Review (ATR) of PER Submittal... 7 L.3.3 Independent External Peer Review (IEPR)... 7 L.3.4 Lessons Learned and After Action Reviews... 7 L.3.5 Final Product Quality Review Certifications... 7 L.4 Review Documentation... 7 None ATTACHMENTS DDR_FMM_R2_Appendix_L_Quality_Control.docx A-i

This page is intentionally left blank DDR_FMM_R2_Appendix_L_Quality_Control.docx

Quality Control L.1 GENERAL The Quality Management Plan (QMP) for Reach 2 can be found in Appendix E of the Reach Management Plan Reach 2. The Review Management Plan (RMP) can be found in Appendix F of the same document. The QMP and RMP define the types of reviews that will take place, the documents that will be reviewed, and specific points in the design process that the reviews will occur. The Review Plan for the overall Fargo Moorhead Metro (FMM) Flood Risk Management project was completed by the Project Management Team and approved by the Risk Management Center. L.2 PROJECT DELIVERY TEAM The Project Delivery Team (PDT) is an inclusive term that is meant to include all parties involved in the design, review, and approval of the products produced by a definable work effort; this includes USACE personnel, non-federal sponsor personnel, and in some instances key stakeholders. The members assigned have extensive professional and technical experience in their assigned areas of responsibility. L.2.1 Project Delivery Team Table 1: Project Delivery Team Project Delivery Team NAME DISTRICT / ORG DISCIPLINE/ROLE PHONE EMAIL Terry Williams CEMVP-PM PM-FMM 5517 terryl.l.williams@usace.army.mil Joseph Mose CEMVP-PM PM-R2 5567 Joseph.h.mose@usace.army.mil Thomas Heinold CEMVR-PM-M MVR Technical Manager 5203 thomas.d.heinold@usace.army.mil Chad Goche MVR Technical Lead 5435 Chad.M.Goche @usace.army.mil Jon Fleischman Civil Design 5322 Jon.P.Fleischman@usace.army.mil Alaena Ensey Civil Design / Scheduler 5507 Alaena.A.Ensey@usace.army.mil DDR_FMM_R2_Appendix_L_Quality_Control.docx Page L-1 of 7

Project Delivery Team Matthew Coffelt Civil Design 5735x6129 Matthew.Coffelt@usace.army.mil Nicholas Peschang Lead Civil CADD Technician 5539 Nicholas.P.Peschang@usace.army.mil Arturo Rodriguez Civil CADD Technician 5295 Arturo.E.Rodriguez@usace.army.mil Matthew Zager HH Hydraulic Design 5218 Matthew.S.Zager@usace.army.mil Randall Kinney G Geotechnical Design 5843 Randall.S.Kinney@usace.army.mil Laura St. Louis DN Environmental Design 5150 Laura.R.St.Louis@usace.army.mil Jody Schmitz TE Specification Writer 5300 Jody.S.Schmitz@usace.army.mil Jack McDaniel TE Cost Estimator 5452 Jack.McDaniel@usace.army.mil Ron Silver CEMVR-RE Real Estate Dawn Linder CEMVP-CT-C Contracts 5506 5407 ronald.silver@usace.army.mil dawn.m.linder@usace.army.mil L.2.2 Technical Leads and Functional POCs Table 2: Technical Leads and Functional POC's Technical Leads and Functional POCs NAME DISTRICT / DISCIPLINE/ROLE PHONE EMAIL ORG Gary Wolf CEMVP-EC-D Technical Lead 5288 gary.c.wolf@usace.army.mil Rick Femrite CEMVP- EC-D Technical Lead Aaron Buesing 5550 CEMVP-EC-H H&H Lead 5627 richard.h.femrite@usace.army.mil aaron.w.buesing@usace.army.mil DDR_FMM_R2_Appendix_L_Quality_Control.docx Page L-2 of 7

Technical Leads and Functional POCs Lisa Buchli CEMVP-EC-H Channels and Hydraulic Structures Kurt Heckendorf Grant Riddick 5416 CEMVP- EC-D Geotechnical 5411 CEMVP- EC-D Geology 5599 Kent Hokens CEMVP- EC-D Structural 5584 Jon Gustafson Christine Moss CEMVP- EC-D CEMVP- EC-D Geospatial and Surveys Civil-Site, NPDES/SWPPP Greg Fischer CEMVP- EC-D Utilities and Relocations Renee McGarvey CEMVP- EC-D Landscape and Recreation Jeff Hansen CEMVP- EC-D Specifications and Cost ing Chris Afdahl CEMVP- EC-D CAD and Drawing Standards 5596 5025 5464 5640 5649 5712 Jon Sobiech CEMVP- PD-E Environmental 5428 Ginny Gnabasik CEMVP- PD-E Cultural Resources 5262 lisa.a.buchli@usace.army.mil kurt.a.heckendorf@usace.army.mil grant.a.riddick@usace.army.mil kent.d.hokens@usace.army.mil jonathan.r.gustafson@usace.army.mil christine.r.moss@usace.army.mil russell.g.fischer@usace.army.mil renee.c.mcgarvey@usace.army.mil jeffrey.l.hansen@usace.army.mil christine.a.afdahl@usace.army.mil jonathan.j.sobiech@usace.army.mil virginia.r.gnabasik@usace.army.mil CEMVP- RE Real Estate @usace.army.mil L.2.3 District Quality Control (DQC) Team Table 3: DQC Team DQC Team NAME DISTRICT / ORG DISCIPLINE/ROLE PHONE EMAIL George Staley HH Channels and Hydraulic Structures 5318 George.C.Staley@usace.army.mil David Robison CEMVR-G Geology 7022 David.M.Robison@usace.army.mil Frederick Joers DS Structural 5248 Frederick.R.Joers@usace.army.mil DDR_FMM_R2_Appendix_L_Quality_Control.docx Page L-3 of 7

DQC Team Scott Kool TS Geospatial and Surveys 5268 Scott.D.Kool@usace.army.mil Kara Mitvalsky DN Civil-Site, NPDES/SWPPP 5623 Kara.N.Mitvalsky@usace.army.mil Richard Nickel D Utilities and Relocations 5210 Richard.T.Nickel@usace.army.mil Ronald Mott T Landscape and Recreation 5425 Ronald.L.Mott@usace.army.mil Steven Marruffo TE Specifications 5548 Steven.C.Marruffo@usace.army.mil Garrett Mattila TE Cost ing 5524 Garrett.P.Mattila@usace.army.mil Brian Dinnon CAD and Drawing Standards 5281 Brian.Dinnon@usace.army.mil Kara Mitvalsky DN Environmental 5623 Kara.N.Mitvalsky@usace.army.mil James Ross CEMVR-PD- C Cultural Resources 5540 James.S.Ross@usace.army.mil Ronald Silver CEMVR-RE-P Real Estate 5506 Ronald.Silver@usace.army.mil L.2.4 Biddability Constructability Operability & Environmental (BCOE) Team Table 4: BCOE Team BCOE Team NAME DISTRICT / ORG DISCIPLINE/ROLE PHONE EMAIL TBD CEMVP-EC-C TBD TBD CEMVP-EC-C TBD DDR_FMM_R2_Appendix_L_Quality_Control.docx Page L-4 of 7

L.2.5 Agency Technical Review (ATR) Team Table 5: ATR Team ATR Team NAME Mark Nelson Kevin Adams David Sobczyk Kathleen Englert Betty Peake Aaron Quinn DISTRICT / ORG PM-AA ED-HD ED-GB CD-S-CM PM-AB PM-AC Rick Noel RE-C Ron Beyer Dan Pridal Lyle Peterson Dan Otterby Michael Smith ED-HE ED-DF ED-DF ED-DC ED-DA DISCIPLINE/ROLE PHONE EMAIL ATR Leader 402-2703 Channels and Hydraulic Structures 402-2331 Geotechnical 402-2249 Civil-Site, Layout & Utilities 402-2038 Recreation Planning 402-2686 Environmental 402-2669 Real Estate 402-2832 Hydrologic 402-2339 Channel Stability 402-2336 Structures 402-2161 Electrical 402-2146 Mechanical 402-2133 Mark.E.Nelson@usace.army.mil Kevin.K.Adams@usace.army.mil David.F.Sobczyk@usace.army.mil Kathleen.J. Englert@usace.army.mil Elizabeth.B.Peake@usace.army.mil Aaron.T.Quinn@usace.army.mil Rick.L.Noel@usace.army.mil Ron.S.Beyer@usace.army.mil Daniel.B.Pridal@usace.army.mil Lyle.E.Peterson@usace.army.mil Daniel.Otterby@usace.army.mil Michael.T.Smith2@usace.army.mil DDR_FMM_R2_Appendix_L_Quality_Control.docx Page L-5 of 7

ATR Team Mike Jerina Jim Neubauer Steve Butler Stephen Graf Roger Kay ED-DJ CENWW- EC-X ED-GB CD-S-SM ED-HD Landscape/Architecture 402-2202 Cost/Value ing 509-527- 7332 Geotechnical 402-2244 Civil Site, Layout and Utilities Channels and Hydraulic Structures 402-2036 402-2342 Mike.Jerina@usace.army.mil James.G.Neubauer@usace.army.mil Steve.M.Butler@usace.army.mil Stephen.R.Graf@usace.army.mil Roger.L.Kay@usace.army.mil L.2.6 Sponsor Representatives Table 6: Sponsor Representatives Sponsor Representatives NAME ORGANIZATION DISCIPLINE/ROLE PHONE EMAIL Mark Bittner City of Fargo City 701-241- 1572 April Walker City of Fargo 701 241-1554 Bob Zimmerman Keith Berndt Tom Waters, P.E. John Glatzmaier, P.E. Rick Carson Leon Schieber City of Moorhead City 218-299- 5390 mbittner@cityoffargo.com awalker@cityoffargo.com bob.zimmerman@ci.moorhead.mn.us Cass County County berndtk@casscountynd.gov CH2MHill Program Manager 571-296- 5245 CH2MHill Project Manager 651-253- 5910 CH2MHill / KGS Group CH2MHill / Black & Veatch H&H and Geology 204-478- 3237 Structures 913-515- 8657 tom.waters@ch2mh.com john.glatzmaier@ch2m.com rcarson@kgsgroup.com schieberla@bv.com DDR_FMM_R2_Appendix_L_Quality_Control.docx Page L-6 of 7

L.2.7 State Agency Representatives Table 7: State Agency Representatives State Agency Representatives NAME ORGANIZATION DISCIPLINE/ROLE PHONE EMAIL Luther Aadland Minnesota DNR luther.aadland@state.mn.us David Friedl Minnesota DNR david.friedl@state.mn.us Tom Groshens Minnesota DNR tom.groshens@state.mn.us Bruce Kreft North Dakota GFP bkreft@nd.gov L.3 REVIEWS TO BE CONDUCTED REACH 2 L.3.1 District Quality Control (DQC) Review of PER Submittal District Quality Control Reviews will be performed on all engineering and design products as required by EC-1165-2-209 and the Review Plan. L.3.2 Agency Technical Review (ATR) of PER Submittal Agency Technical Reviews will be performed on all engineering and design products as required by EC- 1165-2-209 and the Review Plan. L.3.3 Independent External Peer Review (IEPR) Since Reach 2 is an initial product that will be designed to P&S level for the FMM Project, a Type II IEPR will be conducted on this Reach. L.3.4 Lessons Learned and After Action Reviews Prior to start of designs, Design s will review lessons learned from available databases and files that are pertinent and will assure they are considered for incorporation into the engineering and design products being prepared. L.3.5 Final Product Quality Review Certifications Upon completion of each design product or deliverable, the Project will perform a final product quality review and prepare a quality review certificate. L.4 REVIEW DOCUMENTATION The attachments at the end of this Appendix document the status of the reviews that have occurred and will be updated as reviews are completed and closed out. DDR_FMM_R2_Appendix_L_Quality_Control.docx Page L-7 of 7