210 PART 2 LANDSCAPE DESIGN GUIDELINES AND PRECINCT PLANS

Physical Structure. This historic image from 1882 emphasizes the dramatic topography that distinguishes Cornell s setting at the top of East Hill.

implementation r expression in landscape

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land.

6.1 University Projects

Staff Report and Recommendation

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

38 Queen s University Campus Master Plan Part 1

University of Denver Land Use Plan Update I. Executive Summary

UAA School of Engineering Parking Garage Master Plan Amendment. 1. Purpose

Academics Efficient use of space will be used to enhance investments in new pedagogies such as active learning classrooms.

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

Chapter 2: Vision, Goals and Strategies

NEIGHBORHOOD 7: FEE LANE AREA. Aerial View of Briscoe and McNutt Dormitories

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE

Introduction. Introduction

UTSC SECONDARY PLAN COMMUNITY OPEN HOUSE

Downtown Streetscape Manual & Built Form Standards

Edward R. Sajecki Commissioner of Planning and Building

Executive Summary. Parks and Recreation Plan. Executive Summary

WELCOME TO THE CHOUTEAU GREENWAY DESIGN, DEVELOPMENT AND CONSTRUCTION WORKING GROUP!

ANC 2A Presentation. November 9, 2006

Phase 1 : Understanding the Campus Context. Phase 2 : APPROACHES - Alternates & Preferred Plan

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

Official Plan Review: Draft Built Form Policies

RFP/RFQ. for Concept & Schematic Design Services. for Outdoor Garden Enhancements. to Cleveland Botanical Garden

1 Welcome! UBC Okanagan Master Plan Update - Open House

University of Saskatchewan CAMPUS MASTER PLAN. Senate Meeting Preliminary Presentation. April 21, 2018 DIALOG ECS DA WATT

UNIVERSITY TOWN NEIGHBOURHOODS 5.5 HOUSING MELBOURNE CAMPUS MASTER PLAN 2014

DOWNTOWN SAN JOSE STREET LIFE PLAN

Town of Oakville Streetscape Strategy

Long Branch Neighbourhood Character Guidelines Final Report

264 neighborhoods NEIGHBORHOOD 6: WOODLAWN AND TENTH STREET

ESTABLISH AN EFFICIENT TOWN CENTER

Cotswolds AONB Landscape Strategy and Guidelines. June 2016

18 May 2016 CAMPUS MASTER PLAN UPATE

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

The John Bartram Association Action Plan to advance the 10 year Strategic Plan

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

SECTION ONE: INTRODUCTION. introduction

1. Lenox Dale Community Character Strengths and Opportunities Identified by Residents: Strong neighborhood identity and sense of community.

IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK

CHAPTER 12 IMPLEMENTATION

6. RECREATION AND OPEN SPACE ELEMENT

A. Background Summary of Existing Challenges and Potential Possibilities. 1. Summary of Existing Assets and Potential Opportunities

Foreword to the Third + Edition

iii. Visioning framework

TO: CITY COUNCIL DATE: MARCH 23,2009

Sewanee Village + Request for Builder/Developer Proposals

11 February CAMPUS MASTER PLAN UPDATE Focus Group - Research Park

CAMPUS MASTER PLAN, AMENDMENTS

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

2.0 Strategic Context 4

Parks Master Plan Implementation: Phase I Waterfront Use and Design REPORT #: September 7, 2016 File #

Status Update (2006 vs. Now) Citizen s Advisory Committee February Plan for Prosperity

4.0 Future Land Use Element

Developer s Program. The Station at East 54

TEMPLE MEDICAL & EDUCATION DISTRICT

Plan Overview. Manhattan Area 2035 Reflections and Progress. Chapter 1: Introduction. Background

CONCLUSION AND IMPLEMENTATION

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

Chapter 1.0 Introduction

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

Technical Appendix L, University Community Plan Town Center

South fields. Community Architectural Design Guidelines. The Planning Partnership

Campus Sign Plan. Adopted by the Campus Planning Committee Adopted: June 26, 2006 Revised: April 14, 2016

THE CORPORATION OF THE TOWNSHIP OF KING REPORT TO COMMITTEE OF THE WHOLE. The Parks, Recreation & Culture Department respectfully submit the following

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Purpose of the Master Plan

Staff Report to the North Ogden City Planning Commission

WATERFORD Plan of Preservation, Conservation and Development Supplement Part 1 - Policy Element

PART 1. Background to the Study. Avenue Study. The Danforth

CAMPUS MASTER PLAN UPATE

The transportation system in a community is an

Local Growth Planning in North Central Green Line Communities

RENEWING THE MASTER PLAN

Bourne Downtown Site Planning

greenprint midtown SUSTAINABILITY ACTION PLAN 2012

RECREATION AND OPEN SPACE ELEMENT GOALS, OBJECTIVES, AND POLICIES

UBC Athletics + Recreation Facilities Strategy

8.0 Built Form Framework

Public Art Plan. We have elected to submit Public Art Plans before or concurrently with the CSP Submittal per the FDP Manual

NORTHEAST DISTRICT. Description. Opportunities

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

North Fair Oaks Community Plan Summary and Information

VICTORIA DOWNTOWN DEVELOPMENT PLANNING

Welcome. Walk Around. Talk to Us. Write Down Your Comments

MASTER PLAN KICK-OFF Open House #1A, April 28, 2015

Winston-Salem State University Campus Master Plan 2016 Update

1INTRODUCTION. Purpose of the Truckee Railyard Master Plan

10 Implementation. Implementation. Responsibility for Implementation. Blueprint for Bloomsburg. Town of Bloomsburg Comprehensive Plan 10-1

Part D. College Avenue Campus PAGE 121 UNIVERSITY OF REGINA / CAMPUS MASTER PLAN 2011

COBOURG Cobourg Heritage Advisory Committee. Alison Torrie Lapaire Planner I - Heritage

PUBLIC REALM STRATEGY

DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES Planning Division m e m o r a n d u m

Downtown Whitby Action Plan

Purpose of the Master Plan

Municipal Comprehensive and Open Space Plans

REQUEST FOR QUALIFICATIONS THURGOOD MARSHALL COLLEGE NEIGHBORHOOD PLANNING STUDY UNIVERSITY OF CALIFORNIA, SAN DIEGO

NORTH TORONTO COLLEGIATE INSTITUTE. the Journey to a New Urban School + the Partnerships which gave it Life

Transcription:

5 Implementation The campus master plan provides a holistic and integrated policy framework for future development decisions. This section describes how the campus master plan can be implemented over time. It identifies Development Opportunity Sites and Areas and a series of University Projects essential to completing the armature for campus development. Implementing Enabling and Concurrent Projects will set the stage for new buildings and open spaces in the future academic development areas, and adhering to the Precinct Plans will ensure each new investment helps achieve the objectives of the campus master plan. This section also makes recommendations regarding how to embed the campus master plan into Cornell s planning processes. 161

current project sites infill sites parking lot redevelopment sites redevelopment/replacement sites 5.1 Capitalize on strategic opportunities primary development opportunity areas D01 maximum building floor area 380,000 sq/f D02 maximum building floor area 970,000 sq/f D03 maximum building floor area 1,000,000 sq/f While it is not possible to know in what order development on campus will proceed over the long term, it is possible to classify sites in regard to the opportunity they provide and the ease with which they can be developed. There are many Current Project Sites under active consideration, primarily on the Core Campus. These projects represent most of Cornell s expected growth for the next many years. eyond these projects, there are a range of future development sites which can be categorized according to their comparative ease of development, as follows. There are several Infill Sites that do not require building or facility replacement since they either represent opportunities to add on to existing buildings or, in the case of the gap site on the Ag Quad, to build new free-standing buildings on vacant sites. The Parking Lot Redevelopment Sites are located at the eastern end of Core Campus and in North and South Campus, on existing surface parking lots. Development on these sites will likely require the replacement of some or all of the displaced parking in a structure above or below ground. The Redevelopment/Replacement Sites are on strategically located parcels currently occupied by outdated facilities or by buildings or land uses that do not make maximum use of their sites. Each will require that existing uses/facilities be replaced before development can take place. The remaining development sites are located within three Primary Development Opportunity Areas. Area D01 is located on the site of Hoy Field and D02 on the site of the Robert J. Kane Sports Complex. ecause of their strategic locations and the very significant development potential they support, these sites have been identified as primary areas for future development. While each requires the replacement of significant athletic facilities, it takes just one, albeit significant, set of moves to access them. In contrast, development in the third Primary Development Opportunity Area (D03) will require the temporary or permanent replacement of the functions currently located within several significant academic buildings before new development can occur. Additional information regarding the potential of each of these development sites is found in Part II of the campus master plan. 162 CORNELL MASTER PLAN FOR THE ITHACA CAMPUS PART 1: OVERALL PLAN

ALANY ST CAYUGA ST AURORA ST EAST AVE PLEASANT GROVE RD GAME FARM RD Development Opportunity Sites and Areas TRIPHAMMER RD WARREN RD LAKE ST THURSTON AVE LINCOLN ST CALDWELL RD UNIVERSITY AVE THIRD ST TOWER RD D02 D03 DRYDEN RD D01 GARDEN AVE CAMPUS RD JUDD FALLS RD PALM ROAD DRYDEN RD STEWART AVE MAPLE AVENUE ITHACA RD PINE TREE RD MITCHELL STREET STATE ST GILES ST ELLIS HOLLOW RD fig 44 The highlighted areas represent campus-building opportunities. IMPLEMENTATION 163

5.2 Implement a program of University Projects The University Projects identified as Early Priority Projects include the following: Creation of surge lab and office space located on Core Campus, Collegetown and/or East Hill Village. This will be required to realize the recommendations of the campus master plan, which calls for certain existing buildings to be demolished to make way for new uses that make maximal use of their sites. Transformation of Schoellkopf Stadium to a multi-sport/ multi-season facility, potentially including the relocated track. This initiative would free up Opportunity Area 02 for significant development and would enable the creation of Alumni Quad, which together provide a very significant opportunity to begin implementation of the campus master plan. While it is possible that the Robert J. Kane Track Complex and Alumni Fields will be relocated to the South Campus Precinct instead, it would be ideal if these facilities could remain on Core Campus. surge space (not mapped) generic lab surge space office surge space social/cultural/service/administrative infrastructure (not mapped) Cornell welcome center graduate student center university club Willard straight hall renovation/expansion day hall (redevelopment) athletics: A01 schoellkopf stadium (transformation to multi-sport/ multi-season facility, potentially including relocated track) A02 kite hill field and plaza, including underground parking and relocated utility easements (optional location) A03 ellis hollow athletics complex (optional location) A04 pine tree road athletics complex (optional location) landscape: L01 Cascadilla Meadows restoration L02 Founders Greenway landscape plan L03 Judd Falls Greenway landscape plan L04 Cornell Park L05 North Campus Greenway landscape plan The campus master plan identifies a number of elements that, because of their scale, complexity or lack of natural advocate, have been identified as projects that the university administration will be responsible for delivering. Many are landscape initiatives and elements of the campus s social infrastructure, but they also include surge facilities (lab and office), the campus circulator, structured parking and the relocation of significant athletic facilities that will be required to enable development within Primary Development Opportunity Areas D01 and D02, and to create Alumni Quad. Several of these initiatives have been identified as priority projects for early implementation. The remaining University Projects can be implemented over time as opportunities arise and in conjunction with adjacent development. In addition to these University Projects, academic building projects should be required to provide common social space appropriate for the building s location. Streetscaping of Tower Road and the implementation of the campus circulator will be important both symbolically and functionally as the primary initiatives that will unite the east and west sides of Core Campus and to support development as it continues to move east. Establishment of a funding source for structured parking will be need to be an early initiative given that many of the development sites on Core Campus will either displace existing surface parking or have been identified as important parcels on which to provide structured parking because of their location in relation to strategic infrastructure like the campus circulator. Other initiatives, including streetcaping of East Avenue, creation of a Cornell welcome center, provision of a larger Graduate Student Center, development of a University Club and the improvement of campus Gateways have long been priority projects for the university, and now have the benefit of added clarity and a supportive context provided * L06 Ag Quad L07 Alumni Quad L08 East Center Green L09 Vet Quad L10 Hoy Green L11 East Hill Park L12 Tower Road reconstruction L13 Campus Road streetscape L14 Rice Drive L15 Mid-Campus Walk L16 East Avenue streetscape L17 Garden Avenue streetscape campus gateways access and parking: P01 campus circulator P02 funding source for structured parking (above and below-ground) early priority project properties not owned by Cornell by the campus master plan. 164 CORNELL MASTER PLAN FOR THE ITHACA CAMPUS PART 1: OVERALL PLAN

AURORA ST University Projects TRIPHAMMER RD PLEASANT GROVE RD WARREN RD Athletics L05 North Campus Greenway Land ased Academic LAKE ST THURSTON AVE LINCOLN ST THIRD ST UNIVERSITY CALDWELL RD CAYUGA ST Founder s Greenway L02 * P01 AVE L16 L2.2 L10 EAST AVE L2.1 L06 L17 GARDEN AVE L13 L12 TOWER RD CAMPUS RD P01 L14 L07 L15 A02 L01 A01 DRYDEN RD L08 JUDD FALLS RD L3.1 L09 Orchards Land ased Academic L03 Judd Falls Greenway DRYDEN RD PALM ROAD Land ased Academic GAME FARM RD STEWART AVE MAPLE AVENUE ALANY ST ITHACA RD MITCHELL STREET * P01 PINE TREE RD A03 Athletics L11 STATE ST GILES ST fig 45 Pursuing the projects identified here as the campus grows and redevelops will be critical to fully realizing the campus master plan s vision. * A04 Athletics Cornell Park L04 Land ased Academic ELLIS HOLLOW RD IMPLEMENTATION 165

CAYUGA ST AURORA ST TOWN OF ITHACA CITY OF ITHACA Respect historic resources The Cornell campus has unique historic resources, including structures and landscapes. It contains one local historic district and abuts four others. uilt resources include both buildings and monuments designated as either national or local landmarks and in some cases, VILLAGE OF CAYUGA HEIGHTS CITY OF ITHACA both. Some buildings, while not designated landmarks, are reminders of the campus s own history and traditions, of notable events or academic discoveries, or have LINCOLN ST UNIVERSITY CALDWELL RD architectural merit. The natural historic resources include a variety of landscapes: the gorges and other natural areas, farming landscapes, including wooded areas that THIRD ST DRYDEN RD date back at least to the 19th century, an arboretum and botanical gardens, and several gardens that were created on campus both for teaching as well as recreation. All of these taken together contribute to the unique character of Cornell, and its campus environment. ALANY ST TRIPHAMMER RD PLEASANT GROVE RD WARREN RD LAKE ST THURSTON AVE AVE EAST AVE GARDEN AVE TOWER RD CAMPUS RD JUDD FALLS RD DRYDEN RD ITHACA RD TOWN OF DRYDEN TOWN OF ITHACA GAME FARM RD STEWART AVE MAPLE AVENUE MITCHELL STREET PINE TREE RD Cornell Heights (National Register) University Hill (Local Register) Dewitt Park and Clinton lock (National/Local Register) East Hill 5.3 historic buildings significant landscapes historic districts (national and/or local register) municipal boundary (National Register) Arts Quad (Local Register) Forest Home (National Register) Cornell Heights Arts Quad Forest Home University Hill PALM ROAD Dewitt Park and Clinton lock East Hill As the physical campus evolves in support of its academic mission, there will be changes to and around many of STATE ST these resources, such as infill, additions or adjacent new GILES ST ELLIS HOLLOW RD buildings. It is important that future development respect and conserve these resources as much as practicable, while allowing future development necessary to further fig 46 Historic Resources 166 CORNELL MASTER PLAN FOR THE ITHACA CAMPUS PART 1: OVERALL PLAN

CAYUGA ST AURORA ST historic buildings strategic replacement other campus buildings the academic mission. A museum-like campus is neither possible nor desirable. The campus itself is a brief history of architectural styles and their juxtaposition to each other. TRIPHAMMER RD PLEASANT GROVE RD WARREN RD It is desirable to continue and improve Cornell s use of contemporary architectural design, careful site selection, and integration of contemporary with historic architecture LAKE ST to create vibrant spaces for education that respond to THURSTON AVE modern needs, while maintaining the sense of place and character of the campus environment. LINCOLN ST CALDWELL RD The significant portfolio of historic and potentially UNIVERSITY historic buildings, landscapes and assets on the THIRD ST ALANY ST AVE TOWER RD CAMPUS RD DRYDEN RD GAME FARM RD Cornell campus requires a systematic and accountable approach to analysis, classification, and treatment. The approach should embrace opportunities for enhancing and enlivening the campus by integrating noteworthy DRYDEN RD contemporary architecture and landscape with existing STEWART AVE historic buildings and public open spaces. The approach should embrace opportunities for the stimulating and ITHACA RD appropriate integration within the campus, including its historic areas, of contemporary architecture that exhibits excellence of design and lasting stature. An institutional STATE ST policy and process will provide clear direction and facilitate GILES ST EAST AVE GARDEN AVE JUDD FALLS RD PALM ROAD MAPLE AVENUE MITCHELL STREET PINE TREE RD ELLIS HOLLOW RD sound, long-term decision-making by the university. Development and adoption of such a policy should be a top priority for the university. fig 47 Many of Cornell s buildings will become excellent candidates for adaptive reuse. Most of the sites identified for strategic replacement create significant new development or redevelopment opportunities. IMPLEMENTATION 167

5.4 Utilize precinct plans For each of the 23 zones identified here and in the Precinct Plans, the following information is provided. The Zone Overview outlines the role, program and formal ideas that pertain to each place and identifies the key defining characteristics and quality of area to be achieved. It is illustrated with perspectives and cross-sections and highlights priority actions. development parcels building footprint area height range lot coverage range of total gross square footage setbacks build-to lines and/or key frontages potential above grade pedestrian bridge locations corresponding landscape and streetscape initiatives The Precinct Plans provided in Part II are a significant component of the campus master plan. Their purpose is two-fold: to further describe the role, use and form of specific places on campus at a scale in which more detailed recommendations can be best illustrated and understood; and The General Guidelines illustrate the inter-relationship of proposed landscape and circulation initiatives to building development within a zone. They provide guidance on a number of basic but important matters, like the location of the front door and servicing areas. They address how a building should respond to its context: What are the key views? How should lobbies or interior public spaces reinforce important pedestrian routes? This component north campus west campus core campus orchards precinct south campus northeast/southeast campus East Shore Drive Triphammer Rd. Warren Rd. 22 HWY 13 to describe these places holistically, addressing building form, views, servicing, parking, circulation and landscape also includes recommendations regarding parking, servicing access, and strategic renewal. 13 14 19 HWY 366 design in an integrated manner. The Main Campus is comprised of eight precincts North Campus, West Campus, Core Campus, Orchards, South Campus, Northeast Campus, Southeast Campus and Collegetown. Four of the eight precincts are further broken down into zones. The Parcel Development and Key Landscape Initiatives section outlines recommendations regarding the location and form of buildings. It covers a range of development parameters, illustrating the following: Route 79 12 1 4 6 11 2 5 7 8 3 15 16 Route 79 9 10 20 17 21 18 23 Ellis Hollow Rd. 168 CORNELL MASTER PLAN FOR THE ITHACA CAMPUS PART 1: OVERALL PLAN Campus zones

Zone 08 East Center (example) HER GARDEN GREENHOUSE EEE FLORICULTURE UILDINGS PEONY GARDEN 22 FERNOW N 14 13 RUCKNER LA FIELD LL FEED HOUSE RICE TOWER ROAD 19 12 2 5 NEM STOCKING 11 6 7 8 STOCKING 9 JUDD FALLS ROAD 4 1 10 21 20 3 WING FOOD SCIENCE LA SIMON TRACK ROERT J. KANE SPORTS COMPLEX LIVESTOCK PAVILLION WING MORRISON ERMAN SOCCER FIELD 16 18 RILEY-RO WILSON SYNCHROTRON LA 23 precinct boundary DRYDEN ROAD Zone Overview General Guidelines Strategic Renewal GREENHOUSE EEE PEONY GARDEN DFIELD ALL 9A 6E P02 RICE CL P01 L03CL P L12C FERNOW L12 45 ON CL TOWER ROAD L08 8 STOCKING EQUAL 2 S02 L15 L15 420 P02 45 WING 9 S 812 SPACES S P 350 360 JUDD FALLS ROAD S02 L14 S03 EQUAL 2 420 8A 140 7A 140 S S S FRIEDMAN WRESTLING CENTER P02 8D P02 9C P P 140 140 8C RICE DRIVE 7 L13C 60 138 138 17 FRIEDMAN WRESTLING CENTER RICE DRIVE SURGE-3 FACILITY 15 S 45 140 P04 WILSON SYNCHROTRON LA L01 DRYDEN ROAD 3-Dimensional View Parcel Development L01 Parking, Servicing and Access IMPLEMENTATION 169

5.5 Adhere to development parameters A Development Parameters Matrix is included at the end of each zone in the Precinct Plans (Part II of the campus master plan). The Matrix collects the key information pertaining to development of all building sites identified in the plan in one place and: defines each building site as a distinct development Parcel; summarizes the scale and nature of potential development on the Parcel; articulates the projects or initiatives that must be undertaken before the Parcel can be developed (these are referred to as Enabling Projects) and the projects or initiatives that will need to be undertaken together with development of the Parcel (these are referred to as Concurrent Projects). An example of one of the Enabling Projects required to develop Parcel 8A in Zone 08 - East Center would be the need to relocate the Simon Track, erman Soccer Field and Robert J. Kane Sports Complex. Were these uses to be relocated to the Ellis Hollow Athletic Complex a further Enabling Project would be the need to relocate the current Farm Service uses currently in that area. An example of a Concurrent Project that would need to be undertaken or at minimum planned for with the Development of Parcel 8A would be streetscaping on Tower Road, given the Parcel s frontage on this very important street. Enabling and Concurrent Projects must both be considered during all phases of Parcel development; they have been identified separately in the campus master plan only because Enabling Projects must happen first. The portion of the Development Parameters Matrix pertaining to Zone 08 - East Center is included here as a sample. Parcel Parcel Footprint (sq/f) Max. uilding Footprint (sq/f) Height (range in stories) Potential GSF (range in sq/f) Zone 08 - East Center Parcel 8A 151,200 105,840 105,840 4 5 (56 70ft) 423,360 529,200 Parcel 8A set back minimum 25 ft 9,600 9,600 8 10 (112 140ft) 76,800 96,000 (Tower) from edge of base building above base building Parcel 8 150,100 105,070 105,070 4 5 (56 70ft) 420,280 525,350 Parcel 8 set back minimum 25 ft 9,600 9,600 8 10 (112 140ft) 76,800 96,000 (Tower) from edge of base building above base building Parcel 8C 54,400 54,400 54,400 4 5 (56 70ft) 217,600 272,000 Parcel 8C set back minimum 25 ft 9,600 9,600 8 10 (112 140ft) 76,800 96,000 (Tower) from edge of base building above base building Parcel 8D 58,800 58,800 58,800 4 5 (56 70ft) 235,200 294,000 Parcel 8D set back minimum 25 ft 9,600 9,600 8 10 (112 140ft) 76,800 96,000 (Tower) from edge of base building above base building Total 414,500 362,510 362,510 1,603,640 2,004,550 170 CORNELL MASTER PLAN FOR THE ITHACA CAMPUS PART 1: OVERALL PLAN

Potential Number Permitted Uses Enabling Concurrent units per acre (residential) of Units (residential) (required uses in bold) Projects Projects Academic Administration Active use/public space encouraged at grade fronting East Center Green and Mid- Campus Walk Remove and replace Simon Track, erman Soccer Field, and Robert J. Kane Sports Complex Remove and replace a portion of the Tower Road parking area Remove and replace a portion of the Wing Road on street parking Develop and implement Tower Road streetscape initiative Develop and implement Mid-Campus Walk initiative Develop and implement East Center Green initiative Develop campus circulator stop Construct the new Rice Drive Develop a shared below-grade service court with Parcel 8C 85 120 Residential Construct base building Provide residential amenities in base buildings (e.g. dining, fitness and recreation facilities) Academic Remove rear of Stocking Hall, rear of Wing Hall and Develop and implement Tower Road streetscape initiative Administration Food Science Lab and temporarily or permanently Develop and implement Mid-Campus Walk initiative relocate uses Active use/public space encouraged at Develop and implement East Center Green initiative grade fronting East Center Green and Mid- Relocate Livestock Pavilion or incorporate into new Campus Walk development Develop a shared below-grade service court with Parcel 8D 85 120 residential Construct base building Provide residential amenities in base buildings (e.g. dining, fitness and recreation facilities) Academic Remove and replace Simon Track, erman Soccer Construct the new Rice Drive Administration Field, and Robert J. Kane Sports Complex Develop and implement Campus Road streetscape initiative Active use/public space at grade encouraged Remove and replace Wing Road and RJK Sports and realignment fronting East Center Green and Mid- Complex parking areas Develop and implement Mid-Campus Walk initiative Campus Walk Develop a shared below-grade service court with Develop and implement East Center Green initiative elow-grade parking, loading and servicing Parcel 8A Develop campus circulator stop 85 120 Residential Construct base building Provide residential amenities in base buildings (e.g. dining, fitness and recreation facilities) Academic Remove Riley Robb Hall and temporarily or permanently Implement Campus Road realignment and streetscape initiative Administration relocate uses Develop and implement Mid-Campus Walk initiative Active use/public space at grade encouraged Remove Surge 3 and permanently relocate uses Develop and implement East Center Green initiative fronting East Center Green and Mid- Develop a shared below-grade service court with Develop and implement Campus Road streetscape initiative Campus Walk Parcel 8 and realignment elow-grade parking, loading and servicing 85 120 Residential Construct base building Provide residential amenities in base buildings (e.g. dining, fitness and rec center) IMPLEMENTATION 171

The following pages describe how the campus master plan should be used by the university to guide decisions about campus development. Following the principle of integrative planning and design, it stresses the need to embed the campus master plan into current and future planning processes, strengthen the planning function at the university, coordinate activities among colleges and units, and identify new development funding models. The consultation process undertaken while preparing the campus master plan built a strong base of support for the plan, and for planning generally. roadening and maintaining awareness of the plan and monitoring its effectiveness will ensure it remains an essential tool for shaping the future campus. The first step toward successful implementation of the campus master plan is its approval by the oard of Trustees, a watershed moment in the life of Cornell. In directing and shaping the evolution of the campus, the campus master plan should be viewed as one of 172 CORNELL MASTER PLAN FOR THE ITHACA CAMPUS PART 1: OVERALL PLAN 5.6 Embed the campus master plan in Cornell s planning processes three pillars of planning at Cornell. The other two are the academic plan, which the campus master plan will help the university to implement, and the capital plan, which will influence, and be influenced by, the campus master plan. To ensure ongoing coordination among the three pillars, the campus master plan should figure prominently in the university s planning processes. The campus master plan should be referred to at the outset of all development planning and design processes and returned to at each milestone so that it can effectively influence project formulation, site selection, design development and review, and project approval. In amending established processes to incorporate the campus master plan, policies should be adopted that make it easier to comply with the campus master plan than to vary from it. Project proponents should follow a transparent process that explains how their project conforms to the campus master plan or thoroughly justifies any variation from it. Significant variances from the campus master plan should require the approval of the uildings and Properties Committee. Project planning processes should both inform and seek input from stakeholders on and off campus at regular intervals. The Project Plan Process, the Project Approval Process (PAR), the Capital Project Delivery Process Guide and the Project Managers Guide should all be revised to ensure that these critical steps are incorporated. Where proposed building projects trigger an Enabling, University and/or Concurrent Project, corresponding planning processes for these, also informed by the campus master plan, will need to be initiated. University-led and endowed college projects on the Ithaca campus are subject to municipal planning regulations. Cornell should work with the municipalities to update applicable Comprehensive Plan and Zoning Ordinance provisions to reflect the recommendations of the campus master plan, as appropriate.

The campus master plan will become a fundamental part of Cornell s project planning processes. This proposed process diagram highlights the importance of greater planning involvement at the front end of major development projects. Define program priorities Complete project definition Make site selection Following Participate in Design egin project definition, need, justification and funding Identify potential sites based on campus master plan Establish expectations of the campus master plan and key issues for the development sites under consideration Set out recommended project refinements to achieve good fit with the campus master plan Identify site/site alternatives and the associated Enabling and Concurrent Projects Define site development guidelines, as established by the campus master plan and the Precinct Plans Finalize Enabling and Concurrent Project requirements Establish parallel planning process(es) for Enabling and Concurrent Projects Schematic Design, confirm compliance with campus master plan Development and review process so that project remains consistent with the campus master plan as it evolves Pre-consultation & Consultant Selection Project Formulation Planning Approval Schematic Design Design Development Milestone: Milestone: Milestone: Milestone: Milestone: Preliminary consultation Preliminary planning Site development Campus master plan Design sign-off meeting report guidelines report conformity sign-off PAR sign-off Planning Design IMPLEMENTATION 173

5.7 Strengthen the planning function Effective implementation of the campus master plan can only happen through a stronger, more integrated planning function at the university. This can be achieved by: Sizing the Planning Office to fully support its existing and new responsibilities that flow from the campus master plan; a reconstituted Campus Planning Committee (CPC); a model of integrated planning; and better coordination within and between administrative units. The campus planning function at Cornell will require the appropriate level of resources to manage existing and new responsibilities that flow from the campus master plan and to support the expanded mandate of the CPC, including involvement in shaping and monitoring the planning and approval of capital projects; spearheading and coordinating the implementation of University, Enabling and Concurrent Projects; stakeholder and community consultation; and maintaining, monitoring and updating the campus master plan. Cornell s current CPC is an Associate Committee of the University Assembly and is advisory to the President. Its primary mandate is to review and make recommendations regarding physical planning for the Ithaca campus. Given the significant investment Cornell has made in its campus master plan, it is recommended that the status, mandate and membership of the CPC be reviewed so that it can function effectively in overseeing the planning function at the university. It should continue to advise the university planner on site selection and site development guidelines, in addition to advocating for Enabling, Concurrent and University Projects as part of an incremental program, and periodic updating and revision of the campus master plan supported by the university planner s office. The CPC would have responsibility for interpreting the campus master plan as required during the formulation and implementation of planning and capital projects. The CPC would also have responsibility for working with the colleges and departments on their individual facilities/space plans, integrating them with the various precinct plans and ensuring the integrity of the campus master plan planning principles and guidelines. The CPC s leadership and membership should reflect the university s intention to actively integrate academic and physical planning streams. To fulfill its expanded mandate, the CPC would be well served by assistance from a group charged with reviewing, coordinating and integrating all of the various ongoing planning efforts related to facilities and physical development at the university, at a technical level. These would include but not be limited to initiatives in campus planning, capital planning, transportation planning, space planning, project planning, contract college s planning, maintenance planning and the like. While the university s Capital Funding and Priorities Committee (CF&PC) would continue to have final approval over all significant planning and development projects, the due diligence required to ensure that the process is informed from both the bottom up as well as the top down should be done by the CPC. The CPC would be responsible for ensuring integration of the various campus planning processes with the campus master plan and adherence to the broad principles and guidelines for the campus as a whole, as well as the more specific criteria for individual 174 CORNELL MASTER PLAN FOR THE ITHACA CAMPUS PART 1: OVERALL PLAN

precincts. The CPC would ensure that the Architectural Advisory Committee (AAC) is consulted as appropriate and their guidance and counsel incorporated into projects as applicable. All of this would be reported through the CF&PC to the appropriate committees of the oard of Trustees in a form and substance that permits them to carryout their fiduciary responsibility in an appropriate and efficient manner. Active integration of the campus master plan with the academic plans and the capital plan will require close coordination and cooperation between Facilities Services, The Office of udget and Planning and the Provost s Office. Another key to successfully implementing the campus master plan will be coordination of activities among colleges and units and linking plans and projects to ensure coordination, achieve economic efficiencies and maximize their impact on the campus. University officials associated with planning and development, including the university planner, university architect, university engineer, and directors of space planning, transportation, utilities, environmental compliance and sustainability, should function as an integrated team, meeting regularly to discuss active projects. The linking of building, infrastructure and landscape projects can help to overcome the lack of champions for universityfunded projects. 5.8 Update business and funding models There are many administrative and financial challenges that the university will need to overcome to successfully implement the campus master plan. These include financial models that rely upon individual capital projects to deliver broader campus facilities like social infrastructure, athletic facilities or open space. There are also fundamental differences in the level and timing of funding between state and endowed projects, for both maintenance and new construction, and the complications of using state funds to achieve shared objectives. The university and the state have already begun to address these challenges. Cornell has always achieved excellence from the strength of its individual units and their entrepreneurial nature. It may be necessary, however, to align the organizational structure and mandates of units to ensure they support the common overall objectives of the campus master plan. All enterprise units (shops, departments and colleges) should review their organization and business models to identify potential changes that would support the campus master plan. The campus master plan identifies a number of University Projects that, either because of their nature or their scale, do not have existing champions or funding sources. The campus master plan process highlighted the need to prepare a funded infrastructure master plan, covering a range of both conventional (hard) and unconventional (social, cultural, athletic, surge space, landscape) infrastructure needed to fully implement the campus master plan. One option would be to levy building projects to create funds not only for essential hard infrastructure but also soft infrastructure considered equally essential. Cornell already uses fees from the provision of resources like parking, heat and water to build reserves that fund future projects. These models too should be updated. IMPLEMENTATION 175

5.9 Monitor the success of the campus master plan The campus master plan is an integrated document that identifies the inter-related natural, built and social environments that will support Cornell s academic mission for the next 30 years, perhaps longer. ut times change, and so will academic and administrative goals. The campus master plan should be checked periodically with regard to such changes and against development that has occurred under the plan to ensure it remains a living document, responsive and relevant to Cornell s needs. new goals to the campus master plan as appropriate; and update plan elements as needed. More comprehensive reviews and updates of the campus master plan should occur every five to ten years to ensure that it continues to be an effective guide, fully responsive to changing circumstances. A reconstituted CPC should be charged with oversight of the campus master plan and work with the university planner s office to prepare annual or biennial reports to the oard that indicate the university s progress in meeting the plan s objectives; review recent projects in relation to the policies and guidelines of the plan; rank remaining next steps in the campus master plan for follow-up; add 176 CORNELL MASTER PLAN FOR THE ITHACA CAMPUS PART 1: OVERALL PLAN

177