CxA to Answer this Section

Similar documents
Union County Vocational - Technical Schools Scotch Plains, New Jersey

City of Duluth Festival Center 04/25

Security CCTV System Construction Checklist

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

UNIVERSITY OF MISSOURI Central Station Air-Handling Units March

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

Series 9. Commissioning Checklist. MISSION CRITICAL Air Conditioning Systems. ClimateWorx International Inc.

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION

RAMAPO COLLEGE OF NEW JERSEY CCA0803 PHASE II HOUSING REHABILITATION 2012

TESTING, ADJUSTING AND BALANCING

SECTION AIR HANDLING UNITS WITH COILS. 1. Central Station Air Handling Units. 1. Section Basic Mechanical Requirements.

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

SECTION TESTING, ADJUSTING AND BALANCING

Service Step by Step Trouble-Shooting Check-List

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC

University of Houston Master Construction Specifications Insert Project Name

SECTION HEATING BOILER FEEDWATER EQUIPMENT

M2 Series Startup Form

SECTION PACKAGED COMPRESSOR AND CONDENSER UNITS

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

Construction Standards Page

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

SECTION STEAM CONDENSATE PUMPS

Field Start-Up Sheet Direct Fired Gas Equipment

1.1 This section applies to air handling units for HVAC Systems.

SECTION AUTOMATIC TRANSFER SWITCHES

Revitalize Building Mechanical Systems (4619)

SECTION AIR COILS

Modular Supply Make-Up Air Unit

M2 Series Startup Form

DUNHAM-BUSH. Request for start-up and commissioning of Dunham-Bush chillers (Water Cooled or Air Cooled) and Condensing Units.

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

Complete HVAC Capability. Central Station Air Handling Units. Publication No. WT-CSX-0616A

SA Series Startup Form

A. General: Refer to paragraph entitled "SUBMITTAL" in Section Include the following data:

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise T-Series AHU Full Spec. Prepared by: Phone Number: Prepared for: Acceptable Manufacturers

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

UNIVERSITY OF ROCHESTER DESIGN STANDARDS NOVEMBER 1, 2013

SECTION AIR HANDLING UNIT

SECTION AIR COILS

Test, Adjust, and Balance Services Submittal

AIR HANDLERS. Central Station (CS3) Roof Mounted (RT) (Modular AL Frame AHU)

THE ULTIMATE ROOFTOP SOLUTION

SECTION STEAM CONDENSATE PUMPS

62DA,DB,DC,DD,DE,DF07-38

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

Air Handler Unit (AHU) Equipment Purchase and Delivery Invitation to Bid

Installation, Operating & Maintenance Instructions. Horizontal Models: LH & HL

Indirect Gas-Fired Make-Up Air

3.0 Factory packaged or modular constructed AHUs, when approved for use, shall conform to the following criteria:

SECTION AIR COOLED WATER CHILLERS

AIR HANDLING UNITS Vibration Isolation Air Filtration Equipment Ductwork.

CS 2. Central Station Air Handlers Double Wall & Single Wall Installation, Operation & Maintenance Manual. Form No. 6120A

SECTION CUSTOM INDOOR CENTRAL-STATION AIR-HANDLING UNITS For large systems, 50,000 cfm or more.

CONTENTS AUTOMATIC TRANSFER SWITCHES

Chilled Water DOAS Fan Powered Terminal Units

Indholdsfortegnelse. Danvent Air Handling Units SERVICE MANUAL

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

DIVISION 15 MECHANICAL

.2 Section Waste Management and Disposal.

VERTICAL FAN COIL UNITS

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise Modular Climate Changer Full Spec. Prepared by: Phone Number: Prepared for:

Fire Smoke Damper Actuator Replacements SECTION COMMISSIONING OF HVAC

INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 21 Fire Suppression 3000 Fire Pumps

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

High Plume Blowers Suggested Specification Section (Master Format 1996) Suggested Specification Section (Master Format 2004)

SECTION PLUMBING EQUIPMENT

SECTION STEAM CONDENSATE PUMPS

SSL / SBS Sales Guide BLOWER-COILS REDUCED-FOOTPRINT, VERTICAL

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

Rooftop Ventilator. Models RV and RVE. with Packaged Cooling & Heating

Stanford University Facilities Design Guidelines SECTION DECENTRALIZED UNITARY HVAC EQUIPMENT

Centeral Station Air Handling Unit

Installation, Operating & Maintenance Instructions. Air Handler Models: AH & AV

Advance Release September 2009

AIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems

Evaporative Cooling Equipment Installer / Contractor Pre Start-Up Checklist

SECTION INTEGRATED AUTOMATION COMMISSIONING

SECTION PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING

Construction Standards Page Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

EXHAUST FAN SCHEDULE

SECTION ROTARY-SCREW WATER CHILLERS

AIR HANDLING. B. Section Building Automation and Control System Guidelines. C. Section Air Cleaning Devices and Filters

SECTION GAS-FIRED RADIANT HEATERS

SECTION AXIAL FANS

15900 HVAC INSTRUMENTATION AND CONTROLS

DTW Works Master Specification Version 2006 Issued 2006/08/01 Section15621 Packaged Reciprocating Water Chillers Page 1 of 5

Michigan State University Construction Standards COMMISSIONING OF FIRE ALARM SYSTEMS PAGE

SECTION AIR DUCT ACCESSORIES

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

Transcription:

EXHIBIT 01 91 13-3, SAMPLE Construction checklist items are to be completed as part of initial checkout and subsequent startup, preparatory to Functional testing. This checklist does not take the place of the manufacturer s recommended checkout, startup procedures or report. If this form is not used for documenting, one of similar rigor shall be used. Contractors assigned responsibility for sections of the Checklist shall be responsible to see that checklist items by their subcontractors are completed and validated. When completing these Forms electronically - enter all Text in the shaded boxes. PROJECT: UNIT NO: LOCATION: SERVICE: MANUFACTURER: MODEL: SERIAL NUMBER: CFM = SERVICE AREA: Cap MBH Show Signatures on this cover page of this Set. Submitting this Form signifies the equipment and systems integral to them are complete at this phase of construction. The completed checklist items have been checked off only by parties having direct knowledge of the event, as marked below, respective to each responsible contractor. This construction checklist is submitted for approval, subject to Noted items and/or an attached list of outstanding minor items yet to be completed and not already listed on this Form. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the outstanding items preclude safe and reliable functional tests being performed. List attached? (Yes or No) Mechanical Contractor Date BAS Contractor Date Electrical Contractor Date Sheet Metal Contractor Date TAB Contractor Date CM / General Contractor Date REQUIRED DOCUMENTATION Have the Following Contractor Submittals been provided to the CxA? Manufacturer s cut sheets Performance data (fan curves, coil data, etc.) Installation and startup manual and plan O&M manuals Flushing and cleaning plan Manufacturer Start-Up Sheets filled in & Submitted Sequences and control strategies Leak test reports Water treatment report Welder Certification Warranty Certificate CxA to Answer this Section The attached filled-out AHU Pre-Functional Checklist has been reviewed. [Each Group will receive an Evaluation of Approved, Approved as Noted, Resubmit [Resubmit = Retain this form and resubmit it with new data for new signatures]. Group 1 Group 2 Group 3 Group 4 Group 5 Group 6 Group 7 Group 8 Checklist as shown, is CxA Date AE Date PM Date Return to the CxA U OF I FACILITIES STANDARDS Page 1 of 5 EXHIBIT 01 91 13-3, SAMPLE

EXHIBIT 01 91 13-3, SAMPLE Installation Checks Note: TC, TAB(s), and Vent Contractors must all be present and working on unit while unit is running for this checklist work. Unit may be in manual mode for TC and Tab work for pre-startup work and but not left running. All Checklists associated with this Unit/System must be complete prior to Running for or during Construction and not violate LEED criteria! General Group 1. Cabinet and general installation all interior surfaces are clean (per Contract else SMACNA occupancy) Permanent labels affixed, including for fans Casing condition good: no dents, leaks, door gaskets installed Access doors close tightly - no leaks Connection between duct and unit tight and in good condition Vibration isolation equipment properly set blocks removed Maintenance access acceptable for unit and components Sound attenuation installed per Mfr's I&OM else Project Docs Thermal insulation properly installed and according to specs Instrumentation (gages, flow meters, etc.) installed per specs. Clean up of equipment completed per contract documents All coils are clean. Fins are in good condition Piping & Valves complete Protective Caps (or if allowed per Contract - Construction Filters) replaced with appropriate type(s) for Startup/Functional Testing Valves, Piping Group 2. Adequate maintenance clearance in provided and valve(s) accessible Balancing valves installed Isolation valves provided at all branches and main takeoffs to facilitate isolation (as required by contract) All valve installations per manufacturer's instructions Valve manufacturer labels permanently affixed Manual isolation valves checked for proper seal and found to travel freely No leaking apparent around fittings Valves that require a positive shut-off are verified to not be leaking when closed at normal operating pressure (Static test at Pre-Functional) Valves tagged and valve schedule submitted and displayed as required Valves installed in proper direction Proper fluid flow direction Valves properly & fully stroke Valves opened Piping system properly flushed (When used) 3 way Valves properly ported Unions installed to allow for easy removal of control valves Condensate drains clear Proper Trap Depth Humidifier section installation including piping completed Pipe fittings complete and pipes properly supported Pipes properly labeled Pipes properly Insulated Strainers in place and clean, blow-down installed Steam Traps do not leak through when Valves are open U OF I FACILITIES STANDARDS Page 2 of 5 EXHIBIT 01 91 13-3, SAMPLE

EXHIBIT 01 91 13-3, SAMPLE All condensate drain pans clean and slope to drain, per spec OSAT, MAT, SAT, RAT, chilled water supply sensors properly located and secure (related OSAT sensor shielded) Test plugs (P/T) and isolation valves installed per drawings FANS COILS DAMPERS Group 3. Supply Fan & Drive Set Supply VFD Return / Relief Fan Return / Relief Fan Drive Set Return / Relief VFD Exhaust Fan & Drive Set Exhaust Fan VFD Ready Pre-Heat Coil(s) & Valve(s) & all Piping New / Installed Pre-Filters & Bag / Cartridge Filters Mountings checked (shipping bolts removed) Equipment guards installed Pulleys aligned and belt tension correct Plenums clear and free of loose material Fans rotate freely Fans, motors and linkages lubricated Fire and balance dampers positioned start-up filters installed / Coordinate W/ Duct Cleaning Filter pressure Photohelic device installed and functional Code appropriate Smoke and fire dampers installed properly All dampers & actuators properly installed Energy Recovery Wheel & VFD Group 4. Installation per manufacturer's requirements and start up instructions completed Drive location is not subject to visual moisture or dirt Drive location not subject to temperatures exceeding Mfr s operating range. (i.e. not close to Steam apparatus or heat exchangers) Appropriate Volts vs. Hz curve is being used Drive size matches motor size Drive mounted on house keeping pad (if applicable) Cooling air flow path clean and unobstructed Permanent label affixed and UL stamp approved VFD interlocked to control system Unit is programmed with full written programming record on site Accel time set to and Decel time set to Operation checked in HAND OFF - AUTO. As applicable operation also checked in BYPASS Where applicable, ensure safeties are active in all modes Coordinated with BAS for all interface ranges and signal isolation Restart on Power Failure parameter set to auto U OF I FACILITIES STANDARDS Page 3 of 5 EXHIBIT 01 91 13-3, SAMPLE

EXHIBIT 01 91 13-3, SAMPLE VFD powered (wired to controlled equipment) Drive min and max speed set to Hz min and 60 Hz max Security settings set per Owner direction and Password documented for Owner Drive response to loss of signal set to Output pulse resolution set to MHz. (This is coordinated with the application to minimize audible noise and coordinated with driven bearing allowances.) Checked the input voltage with drive disconnected Input of motor FLA represents 100% to 105% of motor FLA rating Upper frequency limit set at 100%, unless explained otherwise Sound attenuators installed (if included in Project ) Duct joint sealant properly installed Ducts Group 5. No severe duct restrictions (Compliant w / SMACNA or better if Designed) Turning vanes in square elbows as per drawings (else SMACNA) OSA intakes located away from pollutant sources & exhaust outlets Static Pressure leakage tests completed Branch duct control dampers operable Balancing dampers installed as per drawings and TAB's site visit Duct cleaning completed / Coordinate w/ Project Requirements Electrical and Controls Group 6. NEMA Power disconnect is located within site of the unit it controls and labeled All electric connections tight Safeties and Smoke Detectors installed and operational Starter overload heaters / breakers installed and correct size All control devices and wiring complete Control system interlocks connected and functional Record drawings updated to reflect the actual installation Control system completed (end to end checks) VFDs (general) Group 7. Installation completed per manufacturer's requirements I&O/Ms Drive location not subject to excessive temperatures moisture or dirt Appropriate Volts vs. Hz curve is being used Drive size matches motor size Drive mounted on house keeping pad (if applicable) Cooling air flow path clean and unobstructed Permanent label affixed and UL stamp approved VFD interlocked to control system Unit is programmed with full written programming record on site U OF I FACILITIES STANDARDS Page 4 of 5 EXHIBIT 01 91 13-3, SAMPLE

EXHIBIT 01 91 13-3, SAMPLE Accel time set to and Decel time set to Operation checked in HAND, OFF, and AUTO. As applicable operation also checked if BYPASS Where applicable, ensure safeties are active in all modes Coordinated with BAS for all interface ranges and signal isolation Restart on Power Failure parameter set to auto VFD powered (wired to controlled equipment) Drive min and max speed set to Hz min and 60 Hz max Security settings set per Owner direction and Password documented for Owner Drive response to loss of signal set to Output pulse resolution set to MHz. (This is coordinated with the application to minimize audible noise and coordinated with driven bearing allowances.) Checked the input voltage with drive disconnected Input of motor FLA represents 100% to 105% of motor FLA rating Upper frequency limit set at 100%, unless explained otherwise Flow switches installed as required Sensors and Gages TC Group 8. Temperature, pressure and flow gages and sensors installed Piping gages, BAS and associated panel temperature and pressure readouts match. All Graphics real and virtual trend points match manual testing for calibration for all BAS and associated panel temperature and pressure and flow readouts. All Schedules programmed and sequences diagnostically tested. TAB Group 9. All BAS and associated temperature and pressure and flow readouts including real and virtual trend points match manual testing for calibration. All Schedules programmed and sequences diagnostically tested. Installation of system and balancing devices allow balancing to be completed following specified NEBB or AABC procedures and Contract documents. This concludes the Master Listing for the AHU Pre-Functional Checklist items relating to this unit for this Project. U OF I FACILITIES STANDARDS Page 5 of 5 EXHIBIT 01 91 13-3, SAMPLE