JAMAICA BAY TASK FORCE MEETING

Similar documents
Restoring Water Ecosystems in NYC Parks

Improvement of the Atlantic Coast of New York City,

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

Ashbridges Bay Erosion and Sediment Control Project

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

New York City, 19 th c.

New York City, 17 th c.

Kevin M. Rampe, President -- Lower Manhattan Development Corporation

Hunts Point Landing, Bronx, New York

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

PRE-DESIGN CONCEPT REPORT GRAND CANAL RESTORATION

Lake and Stream Restoration Project

Lawrencetown Beach & Rainbow Haven Beach

Coastal Planning in Texas. Tony Williams Senior Director of Planning Coastal Resources Division Texas General Land Office

Monitoring and Maintenance Permit Process

PUBLIC SPACE/AMENITY PROJECTS

2013 Summer Recap. Rockaway Beach

Peoria Riverfront Development (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project (September 2011)

Goleta Community Plan Update

PURPOSE: The purpose is to provide commercial facilities in the Vancouver and Clark County vicinity.

Beneficial Use at Deer Island A Decade of Design and Implementation. Mississippi Water Resources Conference Jackson, Mississippi April 3, 2012

Green or Grey Solutions? Why not both? Lessons from the Mid-Atlantic on Hybrid Living Shorelines

Introduction. Integrating Ecological Restoration of Estuarine Shorelines with Urban Community Revitalization Efforts. Ed Morgereth Biohabitats, Inc.

North Carolina Coastal Federation

Scarborough Waterfront Project

STEWARDSHIP OF LONG ISLAND SOUND S ECOLOGICAL AND RECREATIONAL RESOURCES

Introducing Green Infrastructure for Coastal Resilience

Master Plan Objectives and Policies

NYC Green Infrastructure Program

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

CHAPTER 8 ISSUES, CONCERNS, CONSTRAINTS AND OPPORTUNITIES

ME DOT Route 3. File No.: City and State: Bar Harbor, ME

Welcome. Tannery and Waterworks Parks Shoreline Improvements Environmental Assessment. Public Information Centre #1 November 27, pm to 8 pm

Fulfilling the Promise of Parks to People in a Changing Environment: The Gateway National Recreation Area Experience

Sunshine Coast Council Coastal Management Overview. January 2016 edition

Turkey Creek Streamway Corridor

Port of San Diego Sea Level Rise Ad Hoc Committee Meeting 1 of 3.. September 18, 2018

Dauphin Island s East End Beach and Barrier Island Restoration Project. April 16, :00 PM Dauphin Island Sea Lab, Shelby Hall

Waterfront Revitalization Program

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

Appendix C Agency Correspondence

Caler Cove Lobster Company

Memorandum Planning. Thursday, January 8, 2015

Green Infrastructure. NYS Department of Environmental Conservation

Volunteer Guide to Freshkills Park

Storm Water Quality and Shoreline Restoration Improvements - Grant Funding Request City of Mound Carlson Park Bolton & Menk Project No.

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

U.S. Army Corps of Engineers, Los Angeles District Prado Basin Project Updates

Restoration of Richmond Beach Saltwater Park, Shoreline, WA

Olympics. Large areas of the Lower Lea Valley have now been taken for the Olympics and surrounded by tall blue fences.

The scope of the plan will focus on the Prospect Heights Slough and Hillcrest Lake as one entity.

Homeowner Rewards Program

Burrowing Owl Habitat Project at the Albany Plateau. (a component project of the Gilman Street Playing Fields Project City of Berkeley) March 10, 2006

July 22, 2013 REQUEST FOR PROPOSALS TO PROVIDE ENGINEERING DESIGN SERVICES FOR A PROJECT ALONG THE WESTERN SHORE OF MOBILE BAY

Discussion: ELSI comments re Colwood Draft Official Community Plan

The Napa River Flood Protection Project

Structural Measures at a Glance

Using a Citizen s Wetland Education Workshop As A Tool in Regulatory Compliance

Introduction to the Shoreline Master Program (SMP) Update. City of Bellingham Planning Department 2005

Design Guidelines for the Enhancement and Creation of Estuarine Habitats in the Middle Reaches of the Lower Columbia River

Daylighting Madrona Creek. It takes a neighborhood

Sconset Geotextile Tube Update Sconset Bluff, Nantucket. Maria Hartnett, Associate

Green Streets An Innovative Street Design Approach

Funding, Designing, and (eventually) Building Miles of Shoreline and Acres of Wetlands and Oyster Reefs on an Urbanized River!

TAPPING THE INGENUITY OF STUDENTS TO DESIGN A RESILIENT TEXAS COAST

the future of existing conditions A Multidisciplinary Approach to Resilient Coastal Design

RESPONSES TO PUBLIC CONCERNS AND QUESTIONS

Commercial Launch Site Addendum to Wetland Mitigation Plan. Revision 2. April 25, SpaceX Proprietary

Conservation in South Jersey Being Creative with Restoration

13 Maintenance and Operations Plan 223

Hudson Raritan Estuary (HRE) Ecosystem Restoration Feasibility Study Tentatively Selected Plan

Tale of Two Cities: Exploring How Two Communities are Using Green Infrastructure to Reduce Flood Risk

SBPO BOARD MEETING MARCH 20, 2018

CHAPTER Committee Substitute for Senate Bill No. 1472

Sierra Club Comments on ACOE Public Notice NAE Re: Proposed Town Neck Beach Project at Sandwich, Massachusetts

Baselands Trails Master Plan Public Meeting. April 28, 2015 Fire Academy, 895 Eastern Avenue, Toronto 6:30 p.m. to 9:00 p.m.

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

A CONCEPTUAL PROPOSAL BY THE UMDLOTI FORUM Representing the Umdloti Ratepayers and Residents Association and the emdloti UIP

30% Design Technical Report

STAFF SUMMARY FOR S17-02 SPECIAL USE PERMIT APPLICATION

Tips for Maintaining and Enhancing Stormwater Management Areas

Climate Smart Communities Green Infrastructure Case Studies

Working Group Meeting

Rain Gardens. A Welcome Addition to Your Landscape

ADDENDUM TO BIOLOGICAL SCOPING SURVEY REPORT, BOTANICAL SURVEY AND WETLAND DELINEATION

Highbridge Park Enhance the picturesque park: Provide more opportunities for healthy activity: Improve forest and ecology health:

Municipal Action Teams

Brooklyn Bridge Park: Storm Resilience through Design

MARINA MARKET & WATERFRONT DEVELOPMENT STUDY PORT ARANSAS, TEXAS

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

The Moors at Arne Project, Managing Coastal Change

BASS PONDS, MARSH, & WETLAND HABITAT RESTORATION PROJECT

CONSERVATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Coquitlam River Riparian Planting

Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary

Goals and Strategies. Goals. Strategies. Long-term Beach and Shoreline Management Program

Poisoned Park? How Exide s Lead Contamination Risks Frisco s Grand Park

COASTAL CONSERVANCY. Staff Recommendation June 5, 2008 SAN DIEGO RIVER TRIBUTARY CANYONS PROJECT. File No Project Manager: Megan Johnson

Louisiana Lawmakers Approve Historic Hurricane Protection Plan

Transcription:

JAMAICA BAY TASK FORCE MEETING Wednesday, February 16, 2005 6:00-8:30pm Floyd Bennett Field Ryan Visitors Center Flatbush Avenue Brooklyn, NY (718) 338-3876 Car: Belt Parkway to exit 11 south. Continue on Flatbush Avenue until the last traffic light before the Marine Parkway Gill Hodges Bridge. Turn left onto Floyd Bennett Blvd, the main entrance to the park. Make the first left (Aviation Road), the Visitors Center will be on your left. Train/Bus: 2/5 train to Flatbush Avenue then connect to Q35 Green line bus in front of Lord s Bakery. Ask the driver to let you off in front of the Ryan Center because it is no longer an official stop, or you can get off at the last stop before the toll and walk back towards the center. Minutes Eugenia Flatow (NYC Soil and Water Conservation District) called the meeting to order at 6:00 pm. Jamaica Bay Ecosystem Restoration Project Bobbi Jo McClain and Len Houston, US Army Corps of Engineers History of the JBERP At the beginning of the project, 50 sites were identified. The sites that have been planned for are a sampling of the original 50. Because of the common belief that the islands in the middle of the bay were not in need of restoration, the focus of the study was moved to the perimeter. The islands in the middle of the bay could be another central marsh island project. After preliminary evaluations, 8 sites were looked at for construction and planning. This presentation is the recommended planning for those 8 sites. The 8 sites are: Dead Horse Bay, Paerdegat Basin, Fresh Creek, Spring Creek, Hawtree Point, Bayswater State Park, Dubos Point, and Brant Point Dead Horse Bay The existing conditions of this area are characterized by lots of invasives, mostly Phragmities. Historically, this area was marsh and tidal creeks. Restoration efforts will remove the invasive species, and restructure the area to be tidal (2 acres) and marsh habitat (42 acres) in the north. In the southern section of the bay, the area will be stabilized, and restoration will create 41 acres dune and 49 acres maritime forest. This site is owned by the New York City Department of Parks and Recreation.

Paerdegat Basin The issue of most concern in Paerdegat Basin is its water quality including anoxic conditions for much of the year and a lack of benthic macroinvertebrates. A major contributor to the poor water quality is the combined sewer outfall (CSO) located in the Basin. To mitigate the runoff and problems associated with the CSO, New York City Department of Environmental Protection has plans to install a large holding tank where water would be held instead of being released into the basin. Another contributor to the poor water quality is the lack of tidal exchange in the basin. The basin was deepened in the past, and a sill of sediment left at the mouth, which decreases the movement of water in and out of the basin. Restoration efforts will remove invasives, creating coastal shrub habitat and marsh habitat. Restoration efforts may also include regrading this site, dredging and replacing with clean sand in order to encourage better tidal exchange in the basin. This site is owned by NYC DPR. The Department of City Planning is also considering the addition of an ecology park to the site, 2.5 acres are currently set aside for this project. Fresh Creek Historically this was a small tidal creek, but since the area was deeply dredged, the area is characterized by low tidal flush with a sediment mound. There is also a CSO at the head of the creek, contributing to poor water quality. Restoration efforts will replace the dredged area with a shrub habitat. A tidal marsh will help clean the water that is released from the CSO. Maritime forest in the --- will protect the area from erosion. This site is owned by NYC DPR. Spring Creek Historically this site was filled and is now dominated by invasive species. Restoration efforts will remove invasives by creating marsh and dune habitat. Maritime forest will also be created in this area. This area is owned by the National Parks Service (NPS). Hawtree Point This area has an existing park, which poses the problem of erosion and compaction due to motor vehicle use in the park and marsh area. In order to stop degradation due to vehicle use, a barrier will be installed so the area is accessible to pedestrian traffic, but traffic from ATVs and automobiles will be blocked. Bayswater State Park This site possesses a lot of existing good habitat, and the most pressing issue is the erosion occurring due to wave force. In order to mitigate the effect of the erosion, rock points will be put in to protect the habitat, tidal areas and tidal marsh. This site is owned by New York State. Dubos Point

This site currently has a great deal of marsh existent. Because of the wet marshy areas, and a number of deep tidal pools that only flush in very high tides, there is a mosquito problem at the site. Also, the current erosion control efforts are failing. Restoration efforts will remove invasives, put in tidal creeks, and replace what has eroded with something that will last in order, to protect the existing good habitat, and open up pre-existing tidal creeks. This site is owned by NYC DPR. Brant Point This site currently is characterized by invasives, with some existing good marsh habitat, which is currently being threatened by erosion. The beached barge off the site has protected the habitat. Proposed restoration includes rubble mounds to further protect the area and lesson erosion. On site, grassland, low marsh and maritime forest would be planted. This site is owned by NYC DPR. What Happens Next? A Draft Feasibility Report is currently in progress, and will hopefully be available this spring. Once available, the Army Corps will ask for public review and commentary. After public review the report is finalized and there is another public review. Following finalization, the report is then sent to chief s office. After all signatures are obtained, the report is submitted to Congress for authorization and funding. It is proposed that the projects outlined will cost $75-100 million. To submit commentary, or ask questions, please contact: Bobbi Jo McClain Project Biologist USACE, Environmental Analysis Branch Bobbi.j.mcclain@usace.army.mil (917) 790-8718 Question and Answer Session Community members inquired about Charles Park, where the east part is addressed, but not the west. Will the erosion of the west be addressed? B. McClain responded that the plan originally included a large area in the west end of the park, which was removed because of its proximity to JFK and security reasons. Community members also suggested that Shellbank Basin should be considered as a site for restoration. L. Houston stated that it would be looked into. B. McClain stated that this should be brought up during the open comment period because although it is not in this study, this is a continuing project and could be considered as a new site.

Community members also asked why sand from the mouth of the dredged areas was not being used to fill and regrade. L. Houston stated the sediments will be reused, and only clean sand will be used in addition to the sand currently residing in this area. Community members asked if this project based upon the WRDA. L. Houston stated that yes, they are hoping to get into the WRDA this year but no construction has been authorized for this project yet. If the project was funded by WRDA this year, which would appropriate money for 2006 and it is most likely that construction would occur in 2007. Review of the Jamaica Bay Guardian s Activities Don Riepe Jamaica Bay Clean Sweep The Guardian is working with the Jamaica Bay Ecowatchers for this project. In 2004, they removed 40 boats in Jamaica Bay. These boats go to Pete McCarthy who uses them for offshore moorings. Next month we will be doing needs assessment. Dan Mundy added that the program is very work intensive and requires a great deal of cooperation and hard work. The boat removal goes as follows; search parties go out and take survey of the boats to be removed. Then, before removal there is a workday that prepares the boats for removal. On the day of removal, a tugboat pulls the boat out and the boats are deposited at a mooring buoy, and tagged. Restoration Projects Dates for upcoming restoration projects: April 16 th and 22 nd These restoration projects are in cooperation with Partnerships for Parks, Ecowatchers, Jamaica Bay Watershed Alliance, and others at Four Sparrows Marsh in Mill Basin. The 7 acres of this marsh are heavily impacted by large debris and other trash. These projects will remove debris and do some planting. A floating scrap boat will remove the boats and the garbage. There will not be a skimmer. The groups are in need of boats to ferry volunteers to the site as well as additional volunteers. City parks are also involved and have done some Spartina restoration in another section of the marsh. NOAA will be providing additional funding. Port Authority has not been contacted about the Four Sparrows Marsh restoration. Raptor Surveys The Osprey banding program has shown that there is at least 8 pair of ospreys, and they are doing well. Sampling Sites This summer, George loaned us a grabber for bottom sampling at the restoration sites at Big Egg, Grassy Bay, and Norton basin. Mickey Cohen will ID the organisms that are found. There was no life found in some of these areas so Don would like to look at the sediment more intensely.

Jamaica Bay Watershed Alliance Mike Steffens Site Cleanups There are 37 sites schedule for cleanup in April/May. Please see him if you are interested in participating, or have any ideas. NYS DEC Restoration Update Leigh Vogel Planning is underway for a salt marsh restoration project at Bergen beach. The site will be located just north of the Riding Academy, and can be seen from the Belt Parkway. The restoration is on NYC DPR land. The goal of the project is to remove Phragmities, and regrade/revegetate the area mostly with Spartina. The design will be finalized within the next few months. E. Flatow asked if there was any money left in the Jamaica Bay damages fund. L. Vogel responded that there was and that bond act money is being used to do this project The community asked what DEC would do if a bird s nest was found during the restoration. L.Vogel responded that we the restoration team would try to avoid the area. Eugenia Flatow concluded the meeting with a few remarks. E. Flatow adjourned the meeting at 8:30.