WELCOME 50 street cp rail grade separation + road widening. public information session #1 June 26, pm to 8 pm

Similar documents
Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

Mill Woods Town Centre Proposed Rezoning LDA

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3

Burloak Drive Grade Separation

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Edmonton s LRT Setting the Stage for Heading Further South

2017 Canadian Consulting Engineering Awards

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015

WELCOME TO OPEN HOUSE TWO November 28, 2018

Strachan Ave. Overpass Community Design Update. October 26, 2010 Stephen Lipkus Executive Director Georgetown South Project GO Transit

The Project. In 2013, construction was completed between 100 Street and 102 Street.

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY

2018 Priority Regional Transportation Projects. Integrated Regional Transportation Master Plan

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON AUGUST 13, 2018

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

CAPITAL LINE SOUTH LRT EXTENSION INTRODUCTION

Capital Projects in and near Odenton Town Center

Fifth and Detroit Street Design May 2017 Capital Improvements Committee. DOWNTOWN Street Design

Rapid Transit Implementation Working Group September 14, 2017

City of London Adelaide Street North - Canadian Pacific Railway Grade Separation Class Environmental Assessment Study Report

Johnson Street Bridge Public Realm Update

Commissioners Road West Realignment Environmental Assessment

Gorman Neighbourhood Structure Plan LDA WELCOME RESIDENTS. edmonton.ca/gormanneighbourhoodplan. CITY OF EDMONTON Sustainable Development

Building Great Neighbourhoods. Strathcona

Emery Village Road 2A Municipal Class Environmental Assessment Study

2040 Long Range Transportation Plan

Southeast Extension to RidgeGate Parkway Scoping Booklet

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

City of Edmonton. Walterdale Bridge Replacement and Approach Roads Evaluation. Concept Planning Study. Final Report

City of Toronto. Emery Village Transportation Master Plan

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

Goals for Tonight s Meeting

Land Use & Planning Committee. Agenda

I-95 Girard Avenue Interchange Near Neighbors Meeting. Project Status

Shift Rapid Transit Public Participation Meeting May 3, 2017

Capital Projects impacting Odenton Town Center

Upcoming Projects and Emerging Issues

GOLD BAR WASTEWATER TREATMENT PLANT OPERATIONS CENTRE PROJECT AND REZONING NOTIFICATION

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1

Portage Parkway Environmental Assessment Public Information Centre No. 1

SOUTH UNIVERSITY Street Design Alternatives in Progress

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

US 95 Phase 2B/5 Open House

WELCOME CPT CORRIDOR AREA PROJECT BACKGROUND BROOKSIDE BLVD. The objectives of the CPT Functional Design Study included:

MURRAY CENTRAL STATION MASTER PLAN Central Station Area of Influence and Site Analysis

Potential Green Infrastructure Strategies May 6, 2015 Workshop

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Fort Edmonton Footbridge and Trails Project Design Phase

BURTON STATION STRATEGIC GROWTH AREA PLAN UPDATE JANUARY 25, 2018 PUBLIC MEETING

Kankakee River Bridge & Track Improvements Supplemental Environmental Assessment. May 5, 2016

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Waverley West B Secondary Planning Process. Open House South Pointe School April 25, 2018

edmonton.ca/ribbonofgreen #ribbonofgreen

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

West Dennis Center: Bass River to Old Main Street. West Dennis Business District: Old Main Street to Dennis Commons

ln the North Saskatchewan River Valley and Ravine System

Open Space Planning Capital Project Update

Valley Line LRT. Project Update & Citizen Working Groups Overview Public At Large Recruitment Meeting Citizen Working Group A Downtown

Project Overview. Get Involved. Public Information Meeting. Contact Information

Transportation Projects Quarterly Report. Morrisville Planning Department May 22, 2018

Update. What is the Osborne Bridge Rehabilitation project all about and how is it being planned? Neighbourhood Advisory Committee (NAC)

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

WELCOME TO OPEN HOUSE # 3

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

Welcome. Mill Creek Ravine Pedestrian Bridges Rehabilitation. Public Information Session #1. Thursday, October 27, :00 8:00 p.m.

SR-2 Freeway Terminus Improvement Project

Right-of-Way Acquisitions and Relocations Technical Memorandum

7.4 Maintenance and Storage Facility

Minto In Kensington Open House. Thursday March 23, pm Hillhurst Sunnyside Community Association Ave NW

Welcome to the. Open House

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

Northwest LRT Downtown to. Northwest Edmonton Study. Public Workshops

The purpose of tonight s PIC is to:

FDOT D4 Complete Streets

Infrastructure Engineering Planning Construction Suite 300 Minneapolis, MN Tel: Fax:

The transportation system in a community is an

Mavis Road Class Environmental Assessment

Ridgewood Precinct Plan

Port of Seattle Street Vacations Summary April, 2016

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

Guiding Principles for the SR 520 Replacement Project

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

SOUTHWEST TRANSITWAY (STAGE 2) PUBLIC OPEN HOUSE

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

New York Avenue Streetscape and Trail Project Public Meeting #1 Summary

Century Park to Ellerslie Road Preliminary Engineering

TONIGHT S PURPOSE INFORMATION SESSION CANORA & WEST JASPER PLACE SIDE STREETS CONCEPT PLANNING STUDY. Share draft side streets concept plan

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

MARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012

PIKE PINE RENAISSANCE: ACT ONE. October 19, 2017

Executive Summary. NY 7 / NY 2 Corridor

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table

TRANSPORTATION & STREET DESIGN

Holloway Green Street

Transcription:

WELCOME 50 street cp rail grade separation + road widening public information session #1 June 26, 2018 5 pm to 8 pm

session purpose To provide residents, businesses, and users of 50 Street with the opportunity to view the project information and discuss interests and concerns with project staff.

project purpose To provide efficient and safe movement of people, goods and services. The following will be included in the plan: A grade separation at the existing CP Railway crossing north of Sherwood Park Freeway Widening 50 Street to a six-lane divided roadway from 76 Avenue to 90 Avenue Replacement and widening of Sherwood Park Freeway bridge Addition of active modes infrastructure (such as a shared use pathway) Relocation of overhead and underground utilities

study area ottewell 90 avenue lambton industrial kenilworth cp lambton park yard 84 avenue 82 avenue morris road gainer industrial cp rail tracks 50 street morris industrial sherwood park freeway weir industrial 76 avenue davies industrial

public engagement to date The project team has begun gathering input through stakeholder meetings with: Directly adjacent residents Business owners Commercial property owners Community leagues CP Rail and utility companies

what we heard Stakeholders have shared local knowledge about how they currently use 50 Street and how they see 50 Street being used in the future, as well as their interests and concerns. The project team is examining these elements and will report back on how they have been addressed. Potential traffic calming in Kenilworth Addition of possible noise wall around Kenilworth homes Reduced waiting and travel time Inclusion of shared use path and sidewalk extension south of CP Rail tracks Closeness of road to private property Detours during construction Increased traffic Noise during construction Access closures

history of 50 street 1943 Two-lane gravel road 1965 Two-lane paved road 1978 Four-lane paved road Images courtesy of the City of Edmonton Archives As the City of Edmonton continues to grow, 50 Street will continue to play a key role for transportation in southeast Edmonton.

project timeline WE ARE HERE 2008 Rail grade crossing assessment and feasibility study is completed 2017 City of Edmonton submits final application to National Trade Corridors Fund SPRING 2018 Stakeholder engagement begins SUMMER 2018 Public Information Session #1 2019 Utility and detour work expected to begin 2023 Anticipated construction completion 2008 2010 2017 JAN 2018 SPRING 2018 MAY 2018 SUMMER 2018 FALL 2018 2019 2020 2023 2010 Functional planning study for 50 Street widening from Whitemud Drive to 90 Avenue is completed JAN 2018 City initiates planning and design study in anticipation of funding approval MAY 2018 Funding provided for CP Rail grade separation and 50 Street widening at Sherwood Park Freeway to 90 Avenue FALL 2018 City Council to consider funding the Sherwood Park Freeway bridge replacement and 50 Street widening to 76 Avenue 2020 Construction expected to begin

FUNDING Rail Grade Separation & Road Widening between Sherwood Park Freeway and 90 Avenue Funded by all orders of government: Government of Canada: $39.8 million Government of Alberta: up to $28.3 million City of Edmonton: $18.5 million Sherwood Park Freeway Bridge Replacement and Widening A funding request will be made as part of the 2019-2022 City of Edmonton Capital Budget for: Sherwood Park Freeway bridge replacement and widening 50 Street between 76 Avenue and Sherwood Park Freeway If funding is approved, construction would coincide with the railway grade separation work. (l-r) The Honourable Amarjeet Sohi, Minister of Infrastructure and Communities, The Right Honourable Justin Trudeau, Prime Minister of Canada, The Honourable Marc Garneau, Minister of Transport, and Councillor Ben Henderson, Councillor for Ward 8.

project scope Intersection reconfiguration Sidewalk (west side) Shared use pathway (east side) 84 Avenue proposed intersection closure 82 Avenue proposed intersection closure CP Rail grade separation Widening to six lanes Bridge replacement and widening Intersection reconfiguration Intersection reconfiguration Intersection reconfiguration Widening to six lanes FUNDED PENDING FUNDING

project scope: cp rail underpass option 63 Avenue and Gateway Boulevard 137 Avenue and 142 Street Shared use path feature 13 Avenue and Parsons Road

project scope: cp rail overpass option 23 Avenue and Gateway Boulevard 50 Street and Manning Drive Anthony Henday Drive and Parsons Road 156 Street and Yellowhead Trail

what factors are involved in this decision? stormwater management CONSTRUCTION COSTS NOISE IMPACTS visual impacts conditions for transit access conditions for goods movement (trucks) CONDITIONS FOR WALKING AND CYCLING construction detours RAILWAY IMPACTS OPERATIONAL AND COMMUNITY SAFETY utilities MAINTENANCE COSTS LAND IMPACTS GEOTECHNICAL CONDITIONS constructability

WHYTE (82) AVE 76 AVE 72A AVE 53 AVE 51 AVE 74 AVE 68 AVE 68 AVE 67 AVE 59 AVE 54 ST 54 ST 52 ST 8 84 AVE WHYTE (82) AVE 76 AVE 72A AVE 51 AVE DESIGN SP 50 km/h 53 AVE 90A AVE 49 ST 72 AVE 76 AVE WHYTE (82) AVE 76 AVE 72A 48 ST 55 AVE 52 AVE AVE 53 AVE 51 AVE 52 ST 74 AVE 72 AVE 68 AVE 68 AVE 67 AVE 59 AVE 44A ST WHITEMUD DR 74 AVE 68 AVE 68 AVE 67 AVE 59 AVE 84 AVE 54 ST 54 ST 52 ST 90A AVE 72 AVE 49 ST 54 ST 54 ST 76 AVE 55 AVE 52 AVE 48 ST 84 AVE DES 90A AVE 49 ST R1R11 76 AVE 48 ST 55 AVE 52 AVE CN SPUR LINE 44A ST WHITEMUD DR 44A ST WHITEMUD DR PAV R200 82 AVENUE 4.00 4.00 PAVEMENT REMOVAL R60 20m BAY 55m BAY REET REET 30m TAPER 4.00 3.50 P R200 30:1 TAPER 65m BAY 80m BAY 70m BAY 40m BAY 3.0m MULTI-USE TRAIL 3.0m MULTI-USE TRAIL REET 3.0m MULTI-USE TRAIL R 3.0m MULTI-USE TRAIL 4.00 400 3.0m MULTI-USE TRAIL 20m 20m BAY BAY PAVEMENT REMOVAL ECT 4.00 49 ST. project history: 2010 concept plan EX. GAS R15 82 AVE ROPER RD ROPER RD R2 R15 CP RAIL LINE LIMIT O R17 EXISTING BRIDGE TO BE WIDENED; DETAILS TO BE ADDRESSED DURING PRELMINARY DESIGN PROPOSED BUS STOP (NUMBER TO BE ASSIGNED BY ETS) EXISTING WEST PROPERTY LINE LIMIT OF PROJE VARIES 1.00 1.95 7.65 7.65 PROPOSED ROAD WIDENING BETWEEN SHERWOOD PARK FREEWAY AND 90TH AVENUE IS SUBJECT TO GRADE SEPARATION REQUIREMENTS FOR THE CPR LINE. REFER TO "REET RAILWAY GRADE SEPARATION CONCEPTUAL PLANNING REPORT, 2009" BY ISL FOR MORE INFORMATION. R80 R11 R11 R35 R5 R5 R5 R5 R5 3.9 3.30 5 84 AVE MORRIS ROAD RELOCATED BUS STOP 2331 SIGN STRUCTURE AND PANELS TO BE RELOCATED (PROTECTION IS REQUIRED) R2.8 60m TAPER 55m BAY 40m BAY SIGN LOCATIONS TO BE DETERMINED AT PRELIMINARY DESIGN 90 AVE 90 AVE 56 AVE 56 AVE WHITEMUD DR WHITEMUD DR ROPER RD 90 AVE 56 AVE WHITEMUD DR 11.50 CLOSE EXISTING ACCESS 46 STREET CP RAIL MORRIS ROAD 46 STREET CP RAIL MORRIS ROAD ELENIAK RD ELENIAK RD EX. EX. R18 R11 R5 SHERWOOD PK FWY SHERWOOD PK FWY 46 STREET CP RAIL MORRIS ROAD ELENIAK RD R11 SHERWOOD PK FWY N.T.S. 90 AVENUE N.T.S. PROPOSED RETAINING WALL (LT) CLOSE EXISTING ACCESS TO 82 AVENUE PROPERTY ACQUISITION REQUIRED 60m TAPER 40m TAPER RELOCATED ACCESS 40m TAPER 30:1 TAPER 40m TAPER R8.5 R25 PROPOSED RETAINING WALL (RT) PROPOSED BRIDGE LIMITS REFER TO "REET RAILWAY GRADE SEPARATION CONCEPTUAL PLANNING REPORT, 2009" FOR MORE INFORMATION PROPOSED RETAINING WALL (BRIDGE) 5.75 5.75 60m TAPER50m BAY R15 R15 PAVEMENT REMOVAL 5.0 MIN RELOCATE E SERVICE ROAD ACCESS (SEE E NOTE #3) PROP. BUS STOP (NUMBER TO BE ASSIGNED BY ETS) SIGN LOCATION TO BE DETERMINED AT PRELIMINARY DESIGN RELOCATED BUS STOP 2194 EXISTING ACCESSES TO REMAIN 3.75 3.75 A B 6.00 EX. CLOSE EX. ACCESS EX. 60m TAPER 30m TAPER 35m BAY 90m BAY R11 6.00 30:1 TAPER PROPOSED RETAINING WALL RELOCATED BUS STOP 2783 REMOVE EXISTING SIDEWALK R15 60m TAPER R25 3.50 2.00 8.00 SERVICE ROAD R3 R11 90A AVE R11 B REMOVE EX. SERVICE ROAD RELOCATE SERVICE ROAD ACCESS (SEE NOTE #3) REMOVE EXISTING SIDEWALK AND BUS STOP 2135 R100 90 AVENUE POSSIBLE CLOSE EXISTING ACCESS POSSIBLE RELOCATED ACCESS (DIRECTLY ACROSS FROM EX. ACCESS TO NORTH) R12 R14 PROPOSED RELOCATED SERVICE ROAD ACCESS (SEE NOTE #3) PROPOSED TURN-AROUND REMOVE EXISTING PAVEMENT 6.00 R60 C RELOCATED FENCE LINE R35 5.0 MIN. REMOVE EXISTING WALK RELOCATED BUS STOP 2362 40m BAY R25 R5 R5 40m TAPER R20 EX. TAPER EX. TAPER R5 R5 4.00 5.0 MIN. LIMIT OF PROJE CLOSE EXISTING ACCESSES & CONSTRUCT PROPOSED JOINT ACCESS (CROSS LOT AGREEMENT REQ'D; SEE NOTE #3) RELOCATED BUS STOP 2802 R100 CLOSE EXISTING ACCESS R100 R25 R100 5.0 MIN. 7.65 7.65 7.65 5.0 MIN. R25 60m TAPER EX. TAPER R35 35m BAY 50m TAPER 7.65 R25 R100 5.0 MIN. REMOVAL CLOSE EXISTING ACCESS RELOCATED BUS STOP 2239 Possible west N.T.S. sidewalk to be reviewed at next stage of design 30m BAY PAVEMENT R100 5.0 MIN. R25 C 84 Avenue access to be reviewed at next stage of design SHERWOOD PARK FREEWAY 76 AVENUE The 2010 concept plan shows at-grade road widening of 50 Street and the CP Rail underpass option. SUBJECT TO PRELIMINARY DESIGN TE PROPOSED TURN-AROUND 82 Avenue access to be reviewed at next stage of design

next steps We will continue stakeholder outreach We will continue to work with CP Rail and utility companies We will continue to evaluate design options that fit within the scope of the project Next public information session anticipated for: early 2019 Please fill out the event evaluation form.

thank you for attending stay informed on the project by visiting: edmonton.ca/50streetwidening if you have additional comments or questions about the project, please contact: Sidd Masand city of edmonton 780.442.1757 siddharth.masand@edmonton.ca