South Bismarck Watershed Model Update and Stormwater Improvement Project

Similar documents
Figure 1 Cypress Street Study Area Location Map

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

City of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014

STAFFORD TRACT NORTH OF US90A 1.0 INTRODUCTION 1.1 OBJECTIVE

Appendix K. Stormwater Management Plan

NAPA COUNTY PUBLIC WORKS Standards & Specifications

4. Contractor (and subcontractors if applicable) certification statement(s)

CHECKLIST FOR PHASE II DRAINAGE REPORT

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

Chapter 4 - Preparation of Stormwater Site Plans

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

Table of Contents G.1.a Water Resources - Surface Water - Drainage

City of Dade City AMEC Project No Dade City Stormwater Master Plan September 2012 Page 32

Village of Forest Park. July 27, Sewer Separation Evaluation

City of Waco Stormwater Management Regulations

PRELIMINARY DRAINAGE REPORT LATHAM 200 MMSCFD GAS PROCESSING PLANT

Level 1 Downstream Analysis

APPENDIX B. Hydrologic and Hydraulic Analysis

Draft Rhode Island Stormwater Design and Installation Standards Manual

MASTER DEVELOPMENT DRAINAGE PLAN FOR MONUMENT HEIGHTS

Leduc Industrial Outline Plan SE W4

BRISBANE BAYLANDS INFRASTRUCTURE PLAN FEBRUARY 2011 APPENDIX O DRAFT

continues in the watershed, additional flood control and water quality / natural system improvements may be required in the future.

When planning stormwater management facilities, the following principles shall be applied where possible.

Why a new Food & Farm Ordinance?

POLE BRIDGE ROAD NEAR FIVE LOT FARM

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities


6.5 Lakewood Gulch. Basin Snapshot

Intercept, Detain and Release. Custer Avenue CSO Relief GRESHAM, SMITH AND PARTNERS

City of Norfolk Coastal Flood Mitigation Program. March 13, 2013

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

New Development Stormwater Guidelines

HAZARD MITIGATION GOALS AND OBJECTIVES

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

Huntington Stormwater Utility

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water

Marion Street Green Infrastructure Project. Whittier Neighborhood Community Meeting April 18, 2018

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi

CITY OF VALPARAISO STORMWATER MASTER PLAN

Lincoln 270. City of Lincoln. Stormwater Management Plan. April 2, 2013

Swatara Township Stormwater Program. 1. There are no storm sewers on or near my property. Why should I pay a fee?

Portland International Airport Storm Water Master Plan April 6, 2016

Case Study Presentation of the Downtown Brampton Flood Protection Class EA

Village of New Maryland. Storm Water Management Master Plan

September 7, Mr. Brant Gary Director of Public Works City of Bellaire 7008 S. Rice Avenue Bellaire, Texas 77401

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

APPENDIX APPENDIX 6 STORMWATER MANAGEMENT REPORT

Checklists. Project Name: Location: File Number: Date of Submittal: Reviewer: Date: Applicant: Contact Name: Phone Number:

South Campus Stormwater Master Plan. University of Illinois. June Clark Dietz, Inc S. Neil Street, Suite 100 Champaign, Illinois 61820

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Washington County, Maryland Division of Public Works Policy Manual

DESIGN CRITERIA PACKAGE

Technical note. Option 3a (cyan route) Project: To: A428 Bus Enhancement Scheme. Rid Hollands, Colin Young

USF System Campus Master Plan Updates Goals, Objectives and Policies

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

Brigitte A. Berger, Director of Engineering

October 7, City of Thornton 9500 Civic Center Drive Thornton, CO (303) RE: Maverik Thornton, CO - Drainage Report

EXCERPTS. Sep City and County of Denver (CCD) Storm Drainage Master Plan

13. PRELIMINARY PLAT NO MILLS FARM - Vicinity of the southeast corner of 159 th Street and Quivira Road

I. INTRODUCTION. identify long-term capital improvements and rehabilitation measures for the existing drainage system;

The Art and Science of Stormwater Retrofitting

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

Patrick E. Lindemann INGHAM COUNTY DRAIN COMMISSIONER. Towar Rain Garden Drains A Low-Impact Urban Retrofit

Blake C. Kronkosky, PE, Ph.D.

Do you know there your MS4 is?

CRYSTAL LAKE FLOODING STUDY

Tale of Two Cities: Exploring How Two Communities are Using Green Infrastructure to Reduce Flood Risk

GREATER NEW HAVEN WPCA. GREEN REDEVELOPMENT REDUCES CSOs IN NEW HAVEN. Tom Sgroi, P.E. Director of Engineering, GNHWPCA

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

East Montpelier SWMP Preliminary BMP Summary Sheet BMP ID #: 1 Site name: U-32 High School. Current site type

Sewer & Storm Drain Systems

2012 Saginaw Bay Watershed Conference

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

ORDINANCE NUMBER DRAFT. An ordinance amending Title 12 Environmental Protection of the Los Angeles County

Adopting the Manual of Best Management Practices for Stormwater Quality. Facts for Communities

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012

Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project

Existing Conditions and Environmental Consequences Floodplains

Arlington County Watershed Retrofits. Greg Hoffmann Center for Watershed Protection

Green Infrastructure Modeling in Cincinnati Ohio. Small Scale Green Infrastructure Design Using Computer Modeling

COMMISSION ACTION FORM

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

Sustainable Stormwater Retrofit Best Practices

Executive Committee Meeting Addendum. #7/15 July 3, :30 A.M. HEAD OFFICE, 101 EXCHANGE AVENUE, VAUGHAN Members:

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

STORMWATER MASTER PLAN

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

Play areas overlooking climbing hill. School & playgrounds overlooking pond bottom ballfields. Project experience while at Loris and Associates, Inc.

Attachment 2: Permeable Pavement Design Guidelines

Win 3! Basic Guidelines for Successful Roadside Ditch Management

NATIONAL WESTERN CENTER

FLAGSTAFF FAMILY FOOD BANK Erik Henricksen, Elena Smith, Garrett Ribas, and Meshal Alotaibi Client: Joshua Spears TA: Dr.

Information for File # MVP MMJ; Elim Care

Severn River Sub-Watershed: BMP 09-Retrofit

4.1 Build Alternative 1 Construction Phasing

MEMORANDUM. September 10, 2018

Fixer Upper. MS4 Post-Construction and Redevelopment. Anthony Betters, CSI City of Waco Environmental Storm Water Compliance

Separate Storm Sewer System Study Questions/Answers

Transcription:

Preliminary Engineering Report Bismarck Tribune South Bismarck Watershed Model Update and Stormwater Improvement Project City of Bismarck, ND January 2017 14.105.0046

1.0 Executive Summary The focus of this study was to verify and update the existing south Bismarck watershed model assumptions, methodology, hydrologic and hydraulic computations, design flows and recommended improvements generated by the 2013 South Bismarck Stormwater Management Plan Update. The project needs focused on frequent flooding problems on South 12 th Street/Bismarck Expressway and was expanded to include additional areas in South Bismarck from Bowen Avenue to Bismarck Expressway. See Figure 1 for a map of the South Bismarck watershed. Figure 1. South Bismarck Watershed Page 1 of 114

1.1 South 12 th Street / Bismarck Expressway Alternatives 1.1.1 Preferred South 12 th Street Alternatives The 2013 South Bismarck Stormwater Management Plan recommended the construction of two piped bypass systems along the South 12 th Street corridor to convey runoff to the South Bismarck Stormwater Channel. Apex was tasked with the investigation of and recommendations for infrastructure improvements that could potentially be more economical and effective than the proposed improvements from the 2013 plan. The existing conditions, 2-year storm inundation map is shown in Figure 2. Approximately 18.8 acres is inundated on a 2-year event within the area of interest as shown on the map. This map illustrates the effects from the least intense storm that was studied. Larger and more intense rain events result in expanded areas of inundation and increased flood depths. Figure 2. South 12 th Street Existing Conditions, 2-Year Inundation Map Page 2 of 114

Alternatives were investigated in the South 12 th Street corridor for three separate local areas. Each alternative is benefitting the area local to the improvement. 6 th Avenue Improvements This improvement includes a new storm sewer system along South 12 th Street and 6 th Avenue to relieve flooding on Bismarck Expressway and South 12 th Street from Bismarck Expressway to 8th Avenue. The proposed route is shown in Figure 3. This improvement reduces the flooding stages on the 2, 5, and 10-year events in areas near the improvement by providing additional conveyance to the storm water channel. Stages are not reduced on events larger than a 10- year event, however the duration of flooding is reduced in all scenarios. On a 2- year event, the area flooded in the vicinity of South 12 th Street is reduced from 18.8 acres to 8.2 acres. The benefiting area is local to the improvements. Estimated cost of improvements is between $3,400,000 and $4,200,000. Figure 3. South 12 th Street and 6 th Avenue Proposed Storm Sewer Improvements Page 3 of 114

American Avenue Improvements This improvement includes a new storm sewer system along American Avenue which intercepts runoff in low areas on South 12 th Street and directs the flows to the south Bismarck stormwater channel. The proposed route is shown in Figure 4. This improvement reduces the flooding stages on the 2, 5, and 10-year events in areas near the improvement by providing additional conveyance to the stormwater channel. Stages are not reduced on events larger than a 10- year, however the duration of flooding is reduced in all scenarios. On a 2-year event, the area flooded in the vicinity of South 12 th Street is reduced from 18.8 acres to 8.3 acres. The benefiting area is local to the improvement. Estimated cost of improvements is between $1,900,000 and $2,100,000. Figure 4. American Avenue Proposed Storm Sewer Improvements Northwest Drive Improvements This improvement includes a new storm sewer system which intercepts runoff on South 12 th Street near University Drive and Basin Avenue and directs flows to the south Bismarck stormwater channel via a more direct and efficient route along Northwest Drive. The proposed route is shown in Figure 5. This improvement reduces the flooding stages on the 2, 5, and 10-year events in areas near the improvement by providing additional conveyance to the stormwater channel. Stages are not reduced on events larger than a 10-year, Page 4 of 114

however the duration of flooding is reduced in all scenarios. On a 2-year event, the area flooded in the vicinity of South 12 th Street is reduced from 18.8 acres to 10.6 acres. The benefiting area is local to the improvements. Estimated costs of improvements is between $1,600,000 and $2,000,000. Figure 5. Northwest Drive Proposed Storm Sewer Improvements If all three storm sewer systems are built, the combined improvements will reduce the inundated area from 18.8 acres to 2.0 acres for the 2-year, 6-hour storm. The result of this improvement is shown in Figure 6. Estimated cost of this improvement scenario is between $6.9 and $8.3 million. Page 5 of 114

Figure 6. South 12 th Street Proposed Conditions, 2-Year Inundation Map 1.1.2 South Bismarck Bypass Due to the proposed improvements near 12 th Street only having benefits on the more frequent events, a more comprehensive solution was sought. The South Bismarck Bypass alternative was developed to reduce flooding along South 12 th Street and Bismarck Expressway and at the same time alleviate localized Page 6 of 114

flooding at other locations in South Bismarck. The South Bismarck Bypass accomplishes this by reducing stages in the south Bismarck stormwater channel, which allows local systems that discharge to the channel to function more efficiently. This alternative has a much larger scope than the local improvements between 12 th Street and the stormwater channel. A map of the preferred route investigated for this bypass is shown in Figure 7. The South Bismarck bypass would divert runoff from approximately 56% of the area contributing to the south Bismarck stormwater channel at Denver Avenue. This system would establish a new storm sewer route to the Missouri River, thereby reducing a major portion of runoff that eventually contributes to capacity problems of the south Bismarck stormwater channel. This major storm sewer system provides flood stage improvements for South 12 th Street during larger, less frequent storm events. However local improvements along South 12 th Street are still required for smaller, more frequent events because the existing storm sewer is too small to convey the runoff to the ditch. A map of water surface improvements watershed-wide for the 2-year event is shown in Figure 8 with only the bypass. This alternative, in combination with the local improvements on South 12 th Street, provides flood stage reduction in modeled storm event scenarios to the area of Bismarck Expressway and South 12 th Street. A secondary benefit to this alternative is the flood stage reduction it provides to the 5th Street and Bowen Avenue intersection, Kirkwood Mall parking lot, 3 rd Street, 2 nd Street and surrounding areas. Estimated cost of the South Bismarck Bypass improvement is between $15,800,000 and $19,300,000. Page 7 of 114

Figure 7. Preferred Route Investigated for the South Bismarck Bypass Page 8 of 114

Figure 8. Water Surface Improvement for South Bismarck Bypass on 2-Year Event Page 9 of 114

1.2 5 th Street & Bowen Avenue During the evaluation of the stormwater improvement alternatives for the South 12 th Street corridor, a rain event caused flooding watershed-wide in South Bismarck. The storm produced 0.87 inches of rain in one hour at the Bismarck Municipal Airport, but the severity of street flooding elsewhere in the watershed indicates that higher rainfall totals occurred locally. Several rain events have caused street flooding at the intersection of 5 th Street and Bowen Avenue. Due to the localized flooding, the focus of the stormwater modeling was expanded to include investigation of local flooding at 5 th Street from Sweet Avenue to the Bowen Avenue intersection. There are significant plans for redevelopment in this area, including improvements to public utilities and infrastructure, thus providing an opportunity to correct these existing problems. 1.2.1 Kiwanis Park Bypass Understanding that the South Bismarck Bypass alternative is a large and expensive project, a smaller, more local solution was developed to reduce flooding along 5 th Street from Sweet Avenue to the Kirkwood Mall. This alternative consists of a new storm sewer system which intercepts stormwater flows coming from the downtown area and redirects it in a westerly direction to an existing storm sewer system that has available excess capacity. The proposed route is shown in Figure 9. The existing and proposed 2-year hydraulic grade lines at the Bismarck Event Center are shown in Figure 10 and Figure 11. Similar results can be observed on larger events. This system will provide reduced flooding for the intersection of 5 th Street and Bowen Avenue for modeled events. The Kiwanis Park Bypass does not provide benefit to the South 12 th Street area. Estimated cost of improvements is between $3,500,000 and $4,300,000. Page 10 of 114

Figure 9. Kiwanis Park Bypass Proposed Storm Sewer Improvements Figure 10. Existing Conditions, 2-Year Hydraulic Grade Line on 5th Street Page 11 of 114

Figure 11. Proposed conditions, 2-Year Hydraulic Grade line on 5th Street 1.3 Other Alternatives Investigated Several other potential alternatives were examined and abandoned due to their ineffectiveness: Concrete lining of the existing south Bismarck stormwater channel. Potential detention ponds were evaluated in the Tatley-Eagles Park and Sons of Norway Park. Dual storm sewer in 8 th Street A reliever storm sewer system from 5 th Street and Bowen Avenue to the outfall system on 8 th Street was found to be ineffective due to the fact that the receiving system is currently at capacity for all but very small rain events. None of the above alternatives provide a significant reduction in the stage of the flood surface nor to the duration of flooding, and were therefore rejected. Widening and concrete lining the south Bismarck stormwater channel and replacing the box culverts with bridges was effective at reducing stages in the channel, however, these stage reductions did not expand beyond the channel. The local improvements along the South 12 th Street corridor recommended in Section 1.1.1 would still be necessary to convey the water to the stormwater channel because the existing pipes are undersized. This alternative was not investigated further because the South Bismarck Bypass provided more benefit to the watershed as a whole. Page 12 of 114