A Blueprint for Reuse of Distressed Parcels

Similar documents
Blueprint Columbus GI Implementation & Design Guidelines One Water 2014 Technical Conference & Expo

Green Infrastructure Implementation Planning for Multiple Objectives

Moving from Pilots to a Program: Seattle s Green Infrastructure Program: September 20, 2012

FLEET AVENUE GREEN STREET USES VACANT LOT FOR CSO REDUCTION. Thomas M. Evans, AECOM Cleveland, Ohio

Sustainable Storm Water Management

Successful Green Infrastructure Planning: A Micro-Scale Modeling and Field Investigation Approach

DC Clean Rivers Project Green Infrastructure Program

The Benefits and Challenges Associated with Green Infrastructure Practices

CITY OF VALPARAISO STORMWATER MASTER PLAN

Third Ave CSO Integrated Green Infrastructure

A BLUEPRINT FOR BROCKTON A CITY-WIDE COMPREHENSIVE PLAN

Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016

Incorporating Sustainable Practices and Water Quality into Roadway Design. May 24, 2017

Village of Forest Park. July 27, Sewer Separation Evaluation

Physical Approaches to Flood Mitigation

Stormwater Retrofitting: The Art of Opportunity. Presented by the Center for Watershed Protection

Stormwater Management Plan (SWMP) Revision Date: 11/05

North Street Reconstruction & Integrated Stormwater Management System

Reducing New York City s CSOs Using Green Infrastructure

One County s Success in Linking Watershed Protection and Land Use Planning

CHAPTER 8 ISSUES, CONCERNS, CONSTRAINTS AND OPPORTUNITIES

Melissa Bernardo Hess, PE, CFM February 18, 2016

Retrofitting Low Impact Development (LID) for Stormwater at Sacramento State. City of Sacramento Sacramento State Facilities Management

Alternative Uses of Compost: Rain Gardens and Green Solutions for Stormwater Management

Camden s New Green Infrastructure Program- Protecting the Environment and the Public Health

DC Clean Rivers Project Green Infrastructure Program Potomac River Project A

Figure 1 SSIP Watersheds (Source: SFPUC) North Shore Watershed

water that enters our streams during storms. Any water the rain garden can t accept will continue into the storm sewer system.

Southeast Michigan Council of Governments

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012

The Flow. Green Infrastructure Taking Root in Cities 3/23/2015. Green Infrastructure Evolution City Plans/Projects Measureable and Holistic Benefits

Meeting Agenda. 1. Introductions (5 min)

Green Infrastructure: Implementation at the Community Level

Public Meeting May 20, 2014

Green Roofs and Stormwater Management Virginia Stovin

VACANT TO VIBRANT : GREEN INFRASTRUCTURE & URBAN REVITALIZATION

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

GREATER NEW HAVEN WPCA. GREEN REDEVELOPMENT REDUCES CSOs IN NEW HAVEN. Tom Sgroi, P.E. Director of Engineering, GNHWPCA

Roosevelt Corridor. R e i n v e s t m e n t P l a n. Public Meeting Gilbert Elementary School May 12, :00 pm

Peoria has a tremendous opportunity to get sewer overflows under control and fight stormwater runoff head-on

2012 Saginaw Bay Watershed Conference

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water?

MSD Project Clear s Rainscaping Program - Neighborhood Scale Rain Gardens

Detroit Stormwater Rules and Drainage Fee Updates

Sustainable Stormwater Management through Green Infrastructure. Jersey City Public School #5

4. UTILITIES ELEMENT.

Going Green with the NYS Stormwater Design Standards

Rezoning Petition Pre-Hearing Staff Analysis March 19, 2018

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

City of Elmhurst. City of Elmhurst. Storm Sewer System Workshop November 22, 2010

Two Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre

Flooding Hearing: Long and Short Term Strategies

Why a new Food & Farm Ordinance?

USF System Campus Master Plan Updates Goals, Objectives and Policies

Green Infrastructure Stormwater Management Options in an Ultra-Urban Redevelopment. Sandy Doyle-Ahern

Camden SMART Initiative Stormwater Management and Resource Training

Selecting Least Cost Green Infrastructure. James W. Ridgway, PE September 29, 2015

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Building Green: An Update on Atlanta's Green Infrastructure Approach

CITY COUNCIL AGENDA REPORT

Chapter 5: Natural Resources and Environment

E x E C U T I v E S U M M A R y / P L A N N I N G C O N T E x T 14 //

AGENDA 2015 Community Stormwater Event

Managing Stormwater Naturally. July 17, 2013

Neighborhood-Scale Water Quality Improvements The Broadway Neighborhood Stormwater Greenway Project

RETAINING RUNOFF AT ITS SOURCE

10,000 Rain Gardens Project

Municipal Action Teams

Highlights from WERF Stormwater Research and Future Opportunities

Green Infrastructure Recommendations For Parks and Public Spaces

March 14, Will Allen Director of Strategic Conservation Planning

GOING GREEN! NEWBURYPORT S PLAN FOR THE FUTURE

Tacoma Mall Neighborhood Subarea Plan & EIS. Planning Commission February15, 2017

FOUR MILE RUN VALLEY WORKING GROUP AND CHARGE

Figure 1 Cypress Street Study Area Location Map

7th Avenue Creek Master Plan Development Project. City of St. Charles, IL. IAFSM CONFERENCE March 14, 2018 MARKET

Separate Storm Sewer System Study Questions/Answers

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

Scorecard. WaterQuality. Appendix B USEPA WATER QUALITY SCORECARD APPENDIX B

Structural Measures at a Glance

THE CITY OF DELAWARE, OHIO ILLICIT DISCHARGE DETECTION AND ELIMINATION PLAN

Sustainable Stormwater Retrofit Best Practices

March 30, 2017

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

Rebecca Dohn October 13, 2017

Just The Basics: Illicit Discharge. What does it mean to me?

Submitted by: Phillip L. Harrington, Director, Department of Public Works. Framework for Green Infrastructure Plan Development

CHAPTER 5: GUIDING PRINCIPLES

Dyersville Downtown Plan. Open House October 24, 2017

NYC Green Infrastructure Program

Appendix E: Illustrative Green Infrastructure Examples

Green Infrastructure Modeling in Cincinnati Ohio. Small Scale Green Infrastructure Design Using Computer Modeling

Horsley Witten Group Sustainable Environmental Solutions. Rich Claytor, P.E. Janet Bernardo, P.E. horsleywitten.com

City of Elmhurst. Comprehensive Flood Plan. City of Elmhurst. City Council Meeting September 15, 2014

Portland International Airport Storm Water Master Plan June 5, Susan Aha Water Quality Manager

HAMLET OF KINGMAN AREA STRUCTURE PLAN

Green Infrastructure & Low Impact Development

Plan Policies. Introduction

Sustainability Through Comprehensive Water Management

5.6 Valverde. Basin Snapshot. Valverde Land Uses

Transcription:

Barthman Parsons Integrated Solutions A Blueprint for Reuse of Distressed Parcels Steven D. Thompson, P.E. (AECOM) C. Timothy Fallara, P.E. (City of Columbus, Sewerage & Drainage)

Presentation Agenda Introduction & Background Utilizing Distressed Parcels Generalized Application B/P I&I Project Area Specific Project Plan Elements

Background Why do I&I and GI? IF WE JUST BUILD BIGGER SEWERS Increased capacity here may make room for more I&I here

Blueprint Columbus Clean Streams Reduction of CSO and SSO volume Strong Neighborhoods Separate treatment for San and Storm Improved stream and river quality for recreational use Reduction of local flooding Removal of vacant and abandoned homes Construction of neighborhood amenities

Grounded in our I&I Program I&I in Columbus Blueprint Columbus Barthman Parsons IS B/P I&I Project Area

Blueprint Columbus Areas I&I in Columbus Blueprint Columbus Barthman Parsons IS

Introduction- Barthman Parsons I/I Study South Side Columbus Neighborhood Numerous Water-in- Basement (WIB) occurrences High I&I Reeb-Hosack Southern Orchards Significant Localized street and yard flooding

Introduction - Barthman Parsons IS Areas Reeb-Hosack Southern Orchards Separate sanitary and storm sewers Combined sewers with some separated areas

Reeb-Hosack Introduction Barthman/Parsons Integrated Solutions Areas Separate sewers Narrow Strip Coveted Land Reeb- Hosac k 8 DSRs Tributary A Focus for MANY A Good Place to Test

Introduction Barthman/Parsons Integrated Solutions Areas Southern Orchards Combined Sewer area Broad area No CSOs near Land Not Highly Sought A Good Test for us

Utilizing Distressed Parcels (Living w/landbank)

Re-Utilizing Parcels Origins of the Land Redevelopment Office (LRO) LRO s Re-utilization Process LRO s Programs

Integrating with Landbank The Design Process Coordinating with ALL the Stakeholders??? Civic Associations Recreation and Parks Department of Public Service

Project Coordination with Landbank Groundwater Monitoring Approval Process Parcel Acquisition

Generalized Application

Site Selection Process Evaluated all the parcels provided in the Land Bank datasets Removed all sites except those that are currently owned by the City or the Land Bank or are in the expedited foreclosure process (to be owned by the Land Bank within twelve months) Requested Land Bank guidance on parcel availability for DoSD use Removed additional sites based on directions from Land Bank

Site Selection Process Based on parcels removed, twenty-six sites across the two pilot areas were identified as potential GI installation locations including: Attempted to maximize overland gravity flow, street, and alley drainage to each of the sites Selected five top priority sites based on tributary area and potential stormwater benefit (two Reeb Hosack, three Southern Orchards)

Project Goals and Objectives Vacant land stormwater management Use GI/LID to create positive impact on CSO, DSR, WIB, and stormwater Template for future IS approaches Community beautification

Green Infrastructure Sizing Separate Area Sizing TSS Reduction Project target WQv, 77% reduction If possible 1.89, 83% reduction Benefits Combined Area Sizing CSO Reduction Sized for 1.89 inches of rain Goal is to manage CSO Benefit

Project Challenges Distressed Parcels City Stakeholders Community Stakeholders Land Issues

Specific Project Plan Elements

Reeb Hosack Area Example 1 2 3 1 5 2 3 4 4 5

Reeb Hosack Area Example $1.3M NPV, 4.0 MG Treated Annually, $0.35/G Treated

Reeb Hosack Area Example $1.3M NPV, 4.0 MG Treated Annually, $0.35/G Treated

Project Summary Installation Adjusted NPV Concept Cost (Concept Cost - TBL Benefit) Annual Benefit (runoff volume treated) $/gal treated annually Parsons Ave. 2 $732,450 4,190,000 0.17 SSSHP $1,304,171 4,000,000 0.35 Ohio/Sycamore 2 $254,699 2,800,000 0.09 E.Columbus 2 $211,140 2,270,000 0.09 Gilbert/Forest 2 $150,846 890,000 0.17 $2,653,306 14,150,000 0.17

Takeaways Location, location, location Communication Sharing is caring How many and how much $ O&M The (triple) Bottom Line

Questions?