Comfortline Ceiling Heating Foils INSTALLATION INSTRUCTIONS. Rev Mar-2016

Similar documents
Installing Underfloor Heating Film. 1. Layout of electric underfloor heating systems

WATCH OUT! UNDERNEATH THE WOODEN FLOORING IS A 230 VOLT HEATING FOIL SYSTEM! NEVER DRILL OR SCREW INTO THE FLOOR!

Carbon Film Installation Instructions

Installation Manual Loose cable underfloor heating. A large print version can be downloaded from our website. www. underfloorheatinghq.co.

Always make sure to check the heating film before, during, and after installation of the floor covering.

Uponor Comfort E AL-Foil Mat

Installation And User Instructions GB/IRE. Devimat Warm Floor System Installation Instructions User Guide Trouble Shooter

Carbon Heating Film. Failure to follow these instructions may result in fire, electrical shock, property damage, personal injury, or death.

EasyWire Between Joists Installation Instructions

Installation Guide. Heating cables. Thin concrete (< 3 cm) Intelligent solutions with lasting effect. Visit DEVI.com

IdealFILM. Do-It-Yourself Installation Manual

Overview Frost Heave Prevention for Freezer floors on ground.

ELEKTRA HEATING MATS. Designed to be installed under laminate flooring and/or engineered wood UK PL RU. Installation manual

Underlaminate Foil Heater

UNDERWOOD HEATING SYSTEM

Intro. Intro. Table of Contents

amuheat Cable Mat floor heating systems Installation Manual CM02-12

Installation Instruction

LIFETIME. INSTALLATION MANUAL emat Pro 100w/150w/200w WARRANTY

LIFETIME. INSTALLATION MANUAL efoil WARRANTY

Underwood Heater Installation Manual

Foil Heaters. Installation Manual: TECHNICAL HELPLINE

Installation Guide Heating Elements

Model Dimensions Coverage 230v 230Vac. Pack Contents. Measuring Up

Installation And User Instructions. Devimat Warm Floor System Installation Instructions User Guide Trouble Shooter

Installation And User Instructions

Electric Warm-Stretch under floor heating

Introduction. Please read the following instructions carefully before commencing installation.

WARM WATER UNDERFLOOR HEATING SYSTEMS. Guidance Notes

Warm Feet For Uncoupling Membrane Pour membrane de désolidarisation. Installation Guide Floor Heating Cable

amuheat Laminate Panel 14 floor heating systems Installation Manual LP12-V1

Classic Mats Installation Manual

INSTRUCTION. Danfoss heating cable mats type 100/150 Danfoss heating cable mats for thin floors. Danfoss heating cable mat type 100/150

Installation Manual. Electric Underfloor Heating. heatingthroughinnovation.

Contact Details. Please note that some of the contact details on this PDF document may not be current.

Installation Guide - Heating Cables. Installation Guide. Heating cables. for In-Slab and In-Screed Applications BROCDEV135.1

Underfloor Heating Cable Installation Manual

Under Carpet Heater Kit Installation Guide

QuickNet System Installation Manual Manuel d installation du système QuickNet Manual de instalación del sistema QuickNet

emat Pro 100/150/200 Installation Manual

Installation Instruction Devidry - for installation with Devidry Pro Kit

I.D.L. Heaters Thermal Products Ltd. Roll n Warm Installation Manual

INSTALLATION GUIDE CEILING HEATING FOIL ECOFILM C FLOOR HEATING FOIL ECOFILM F F RESISTANCE OUTPUT OUTPUT

Installation Guide For your AHT Underfloor Heating System

Method Statement. General Site preparation by others: Preparation for screed system by others: Preparation for plate system by others:

INSTALLATION. For more information on this product or to order samples call or visit our website at builddirect.com.

HOTFOIL HB MODULE HEATING SYSTEM INSTALLATION, OPERATION & MAINTENANCE MANUAL HB.IOM.R3

IMPORTANT NOTES. Electric Underfloor Heating Mats For use with Touchsceen underfloor heating Thermostat

FloorHeat Installation Manual

Underfloor Heating Mat Installation Manual

Installation And User Instructions. devimat Warm Floor System Installation Instructions User Guide Trouble Shooter

F1202 TRACE HEATING. Road & Ramp

WARRANTY INSTALLATION MANUAL. Ideal for most wood/ laminate fl oors Easy to install. Fully compliant to latest regulations CE approved

Undertile Heating Mat. Instructions. CORGI Underfloor Heating - Quality, Flexibility, Safety 1

Underfloor Heating Inscreed Cable System

Click & Plug Floor Heating. Installation instruction Devidry Kit

WARRANTY INSTALLATION MANUAL. Ideal for most wood/ laminate fl oors Easy to install. Fully compliant to latest regulations CE approved

Documentation. Parallel Heating Cable. Type: ELP

CoziMat. 1. Introduction and Brief Description COZIMAT INSTALLATION INSTRUCTIONS & SAFETY REQUIREMENTS

Installation Guide Soil, Asphalt & Concrete De-icing Heating Ribbons

Electric Floor Warming Systems Installation and Operation Instructions. Mat Heating Systems and Cable Heating Systems. UL Listed for USA and Canada

FHHT 18 3 PHASE /32A / 400V ELECTRIC HEATER PRODUCT MANUAL P

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

INSTALL AN ELECTRIC SHOWER

Installation Guide. Heating cables. Pipe tracing. Intelligent solutions with lasting effect. Visit DEVI.com

AUS. Devireg TM 535 Installation and user manual

Installation Instructions

Installation Instructions

600mm Electric Cooktop with Solid Elements

Danfoss Self-limiting Heating Cables SLPG-10/26/33, SLPG-18, SLHW-55/70, SLPH-10

Electric Heater Technical Bulletin No. 19

Foil Heating System. Installation Manual. for Carpet and Laminate TECHNICAL HELPLINE 0800 WARMUP ( )

Royden. Look how easy it is to roll out the heat

OWNERS INSTRUCTION MANUAL

Floor Heat INSTRUCTIONS

ELECTRONIC SECURITY THEORY/REGULATIONS EXAMINATION 19 November 2011

Installation & Operation Manual for WarmlyYours Riviera Towel Warmers

INSTALLATION AND OPERATION MANUAL FOR HUUM DROP ELECTRIC SAUNA HEATER

Electrical Heating Solutions. Energy efficient building technology

Underlaminate Foil Heater

Installation Manual. Warmset. Warmset srl. Floor heating system

Simple. Smart. Solutions. ROOM PACK Z2105/239/0812. Step by Step Installation Guide

BACE cm ceramic electric cooktop GECE cm ceramic electric cooktop

I NDUCTION C OOKTOP INSTALLATION INSTRUCTIONS

floor heating system

CERAMIC COOKTOP MODELS CE901 AND CE901M

ELEKTRA RadiantFloor Heating

HEAT CABLE underfloor heating

2 PREPARE THE OPENING

Installation Instructions 30 French Door Built-in Wall Ovens

C08. S05. P02 P05 Decorative effects

INSTALLATION INSTRUCTIONS CARE AND USE MANUAL FOR: ISLAND RANGE HOODS Models covered by this instructions: SU900, SUT900, SUE900, SU901, SU902, SU903

INSTALLATION GUIDE Induction Cooktops

Raychem Heating System

Installation Instructions

Installation Manual. Warmset. Warmset srl. Floor heating system

Self Regulating Trace Heating Systems Installation and Maintenance. Non-Hazardous Area Installations

Radiant Heat Film for Floating Floors

4 1 Heating. wooden floors or renovated floors.

FLCH4R Garage and Utility Electric Heater

Transcription:

s INSTALLATION INSTRUCTIONS Rev 3.1 3-Mar-2016

ACCESSORIES and SPECIFICATION 1. Connecting cold tail conductor 1.5mm² SDI (Single core Double Insulated) supplied by others 2. Crimping tool (CFCT) C1J081 3. Polyester insulation tape (CMH) C1J093 or C1J096 (28 or 38mm wide) 4. Plastic covers for crimps (CFCC) C1J91 5. Crimp conectors (CFC) C1J092 Comfortline Ceiling Foil - Electrical Values C1J020 400mm wide foil: 230V, 60W/m, 0.26A/m, 882 ohm/m (2764 ohm/ 320mm panel) C1J030 600mm wide foil: 230V, 100W/m, 0.44A/m, 530 ohm/m (1630 ohm/ 320mm panel) Check that the correct parts have been received. Check the label printing on the Ceiling Foils. Read these INSTALLATION INSTRUCTIONS carefully before commencing any work.

LAYOUTPLAN Before installation, prepare a simple layout plan for the Ceiling Foil for each room to be heated. Show the positions of the heating foils, ceiling fittings (downlights, etc.) and the heating foil Cold Tails in the ceiling. Note that as installed documentation must be retained for future reference with a copy given to the customer. Other use of the heating foils or any other installation method, apart from these Installation Instructions, is not recommended, can be hazardous, and could cause damage. The warranty would also be void.

Important information WARNINGS Comfortline Ceiling Heating Foil must NEVER - cross or overlap itself. Foils must never be laid in layers or touch other areas that could heat up. The non-heated edges may overlap. FLAMMABLE MATERIAL be installed beneath flammable materials, especially any cellulose-based materials. be cut or sustain any damage to the black carbon heating element or copper conductor bus strips.

Important information GENERAL REQUIREMENTS (1) Ceiling height must not be lower than 2.3m where ceiling foils are to be installed. Ambient temperature must not be lower than 3 C or higher than 80 C for any significant period of time. High humidity must be avoided in the area of the foils. Materials that easily absorb moisture should not be used. The maximum acceptable thickness for the ceiling plasterboard is 16mm.Ceiling material must be a continuous flat surface. Irregular upper surfaces such as lathe and plaster are not suitable. The minimum bend radius of the foils is 35mm. They must not be creased. Covering under the foils must not have a Thermal Resistance higher than a R-value of 0.15 m² K/W (SI unit). Note that the foils must have thermal insulation over them to ensure that the heating is directed downwards through the ceiling. All furnishings and fixturesmust have a gapof at least 100mm between the heated ceiling and the top surface of any item below it. The foils are to be mounted in freely accessible locations. Radiant heat must not be obstructed by cupboards, partitions, etc. Aluminium foilor any metals must not be in close proximity to the black foil strips of copper bus strips. Separation must be ensured from walls, expansion joints and any areas that can cause movement.

Important information GENERAL REQUIREMENTS (2) The film should have a minimum space of 150 mm on both sides of noggings, electrical fittings and other obstructions. There must not be any air gaps between the foil and the thermal insulationwhen the job is complete and the ceiling surface must not be rough or have an irregular surface. We recommend theuse of fiberglass insulation (batts) or mineral wool which must notbe covered with a film,paperor foil. Back-blocking and taping is essential (refer to details page, below) Protectionagainst damage of the Heating foils with their connections and supply conductors must be ensured, such as against falling objects and sharp materials. Foil may be gently walked on with soft shoes provided the foil is on a flat, smooth clean surface. Anchorall Cold Tail wiring so that it cannot come into contact with any heated part of the element. Individual foil sections may be joined together by extending both copper bus with cold tails to make up a single run. The maximum current of any one run must not exceed 10 Amps. Runs may be connected together in parallel to a single electrical circuit. A qualified electricianis required to wire the Ceiling Heating Foils to the electricity supply. All electrical work must comply with the Australian/New Zealand Wiring Rules AS/NZS 3000. Strict quality standards are adhered to for the manufacture of Comfortline Ceiling Heating Foils.

INSTALLATION Check the distance between each ceiling joistand any obstructions or ceiling joins to ensure that the selected ceiling foil can be safely installed. Comfortline Ceiling Heating Foil can be retrofitted on top of existing ceilings or fitted prior to the ceiling plasterboard being fixed under the foils (plasterboard is also known as gib board or drywall in some countries). Please refer to the relevant section (in the following pages): INSTALLATION FROM BELOW(before ceiling fitted) INSTALLATION FROM ABOVE (existing ceiling)

INSTALLATIONFROM BELOW When installing the Comfortline Ceiling Heating Foil from below, it is necessary to install the thermal insulation before the Comfortline Ceiling Heating Foil. Unwind about 1 m of the length of the film. (before ceiling fitted) Pull it tautand flat, then fix to the battens using duct or other fixing tape from the edges, at 1mapart (approx.) to help retain the foil in place. Glue should not be used. Installation from below Metal joist example Ceiling Foils must be touching the ceiling plasterboard and kept in close contact with it. The foils must be on a flat clean surface and fixed in position so that they will not move or slip. It is best if the copper conductor bus strips on the foil are visible when the foils have been installed. There are no upper or lower surfaces of the heating foil.

INSTALLATIONFROMBELOW (before ceiling fitted) There must be NO AIR POCKETS between the ceiling heating foil and the thermal insulation which is on top of the ceiling foils. All spaces that do not have the ceiling heating foil must also have the thermal insulation installed.

INSTALLATIONFROM ABOVE (existing ceiling) Installation from above Wooden joist example Comfortline Lay the ComfortlineCeiling Heating Foil directly and flat on the clean plasterboard ceiling. In this case all ceiling insulation MUST be removed and the plasterboard cleaned of all debris and obstacles so that the foil will sit flat against the plasterboard. The ceiling insulation is then reinstalled over the foils.

INSTALLATION - STEP 1 Cutting and Insulating Cut the Ceiling Heating Foil to the required lengths as per your layout plan. The Foil should only be cut along the line of the carbon elements (from Copper bus to Copper bus). Only cut every 320mm of length along the cutting line (black dashes) in the clear section of the foil. This ensures a minimum of 11mm clearance to the black heating carbon strips. Insulate the uncovered edges of both copper buses with the supplied polyester insulating tape. However, the whole edge must be insulated if there is less than the 11mm clearance to the strips. The longitudinal edge (with the printed rating) may be cut if necessary, but no closer than 11mm from the copper bus strips. If ceiling foils are damaged (e.g. cut or pierced) then this section must be cut out. Also if the copper bus is damaged then that section must be cut out and replaced, preferably at a section break. The width of any black carbon strip must never be left with damage or be allowed to be reduced in width, even if insulated along the edge.

. INSTALLATION - STEP 2 Complete installing all foil runs. You must protect Cold Tail cables that pass through any metal construction with smooth, non-conductive material. Ensure that all the Comfortline Ceiling Heating Foil is at least150mm from lighting fixtures, junction boxesand other obstructions. Cold Tail cables and other electric circuits must be anchored down clear of the heated area of the foil.

INSTALLATION STEP 3 Fitting crimp connectors to the foil Refer also to the Comfortline Ceiling Foil Installation video at - http://www.devexsystems.com.au/videos.html Double over the Cold Tail if necessary to ensure a good electrical connection between the Cold Tail and the Crimp (below left). The connector is designed for a 3mm² cable. This mustbe done before crimping the connector to the foils. The Crimp connectoris placed in the centre of the copper busand closed by finger pressure. The Crimp connectors must be accurately placed on the copper bus. Complete the crimping using the Crimping Tool (C1J091). NOTE: It is essentialto use the supplied tool DO NOTUSE ANY OTHER METHOD. Apply on the angle (as shown) and crimp twice from bothsides of the Cold Tail. Crimp cable to the Crimp Connector Then Crimp to the ceiling foil (from both sides of the cable)

INSTALLATION STEP 4 -Insulating the crimpconnectors The Crimp connector must be covered with the Plastic Cover insulator (C1J091)

INSTALLATION- STEP 5 Back-blocking Cover over the ceiling foilwith the plasterboard (below) or insulation (above) only ifall electrical measurements are correct. Plasterboard mustbe fitted to Australian Standards AS/NZS 2589.1 (1997) and AS/NZS 2589.2 (1997) incorporating the backblockingtechnique and paper taped joints. Control joints must be used where required and installed to the plasterboard manufacturer s recommendation. We do not recommend use of plasterboard thicker than 16mm, nor materialsthat canabsorb moisture. Details ofthe thermal insulation and ceiling heating panels should be included in the project documentation. When painting, use plastic based paint (e.g. acrylic paint). The ceiling material must be fully dry before starting to paint. The ceiling heating system must be off before painting, and should not be turned on until the paint is dry. It is also recommended to protect thermostats when painting.

INSTALLATION - STEP 6 -Testing Following installation of the ComfortlineCeiling Heating Foil, test the heating system. Measure, with an accurate ohmmeter, the resistance of the heating circuit in each room. The resistance value must be within in the range from -5 % to +10 %to the calculated value. Comfortline Ceiling Foil -Electrical Values (refer to first page of this ) Record the measured resistance and retain with the layout plan as a record of the installation. WARNING: When the film isconnected in sub-circuits, the current for each film sub-circuit must not exceed 10 Amps. Max 10A total

WIRING Dealing with noggings Wiring is run through holes or over grooves in the noggins to continue the circuit. Any supply leads which pass over these joints must allow free movement of the cable without causing any damage to its insulation. Wiring is run in parallel to the thermostat. Maximum 10A per heating foil circuit.

INSULATION Cross Section Joists Plasterboard Incorrectly installed insulation Comfortline Ceiling Heating Foils Correctly installed insulation

TEMPERATURE and CONTROLS Ensure optimum performance and minimise running costs by installing an appropriate thermostat. The thermostat mustbe both floor (for ceiling sensing) and room / air sensing. The ceiling temperature must be regulated to no more than 42 C, or as per the plasterboard manufacturer s recommendations. The DEVIreg Touch timer thermostat (pictured) can be set for Room+Floor sensing and can also control when you want the heating to operate. Ref: http://www.devexsystems.com.au/shop/item/devireg-touch-thermostat The factory default setting/upper limit of this thermostat is 35 C, but it can be modified to extend beyond this, in accordance with the DEVIreg Touch Installation Instructions (page 21) The resistive end of the thermostat sensor probe should be positioned in the ceiling space in hard contact with the ceiling material (between one of the ceiling heating foils and the plasterboard), and notin direct contact with the heating section of the foil. That is, it should be located along the blank edge of the foil, thus measuring the surface temperature of the ceiling material, and not close to the heating strips. Supply must always be through a properly installed, approved and tested RCD (Residual Current Device) circuit breaker which will instantly isolate the electricity if an earth or overload fault is detected.

THERMOSTAT Electrical connection and control of Comfortline Ceiling Heating THERMOSTAT CONNECTIONS for a DEVIreg thermostat. L line or phase (from supply) N neutral (from supply) L LOAD line or phase(to Ceiling Foil) N LOAD neutral (to Ceiling Foil) NTC Ceiling sensor connection NOTE: The maximum total loadforthis thermostat when used for ceiling heating is 12 Amps (the thermostat is marked 16A). A contactor is needed if exceeding 12A load. The maximum for each Ceiling Heating Foil circuit is 10A.

On Completion of the Installation After testing the heating foil operation and electrical requirements, and after ensuring that the installation is in accordance with these instructions, then complete an information document describing the design. This document must be kept and a copy provided to the owner showing where the heating has been installed, power ratings and installer contact details. A label must be fixed marking the circuit(s) where ceiling heating foil has been installed and advising the key safety requirements. This label is available from DevexSystems (if not found in the kit of components).