DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TURF AND GRASSES

SECTION SEEDING. C. Seed mix to be used will be as specified in the Bid Schedule.

SECTION TURF AND GRASSES

ITEM 164 SEEDING AND EROSION CONTROL BLANKET

Section 816. TURF ESTABLISHMENT

Section Seeding

SECTION 900 TURF ESTABLISHMENT

LANDSCAPE WORK

EXTERIOR IMPROVEMENTS PLANTING. .02 Lawns and Grasses. A. General. 1. Intent:

SECTION LANDSCAPING

Section 917. TURF AND LANDSCAPING MATERIALS

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

SECTION TOPSOIL AND SEEDING

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

Section 9 Landscaping and Street Trees

This section covers the planting of seed, sod, trees and vegetation.

SEEDING. .1 Submit product data in accordance with Section Submittals.

3.1 EROSION PREVENTION FACT SHEETS (EPP)

UNIFIED FACILITIES GUIDE SPECIFICATIONS

45.2. MATERIALS Shrubs, Trees and Other Plants Planting Pit Mulch and Cover Grass Materials

LAWNS Chapter 12. Topic Outline. Establishing a Lawn. Establishing a Lawn

SECTION LANDSCAPING

Retail Cost $ tax

EC Building a Bluegrass Lawn

Vegetation. Fe=0.90 (When fully established; lower while vegetation is first growing)

CALIFORNIA NATIVE GRASSES ON LEVEES

02 SITE 0252p LAWN SOLUTIONS in landscape natural grass surfaces

A. Finish Grade: Elevation of finished surface of planting soil.

CHARLES SOIL CONSERVATION DISTRICT PLAN SUBMITTAL GUIDELINES

A Section Subgrade Preparation. A Work shall be in conformance with MoDOT through

HVA C, Roofing, Interior & Exterior Renovations -Missouri Hills Youth Center SECTION TURF AND GRASSES


Addendum No. 2 for Drainage Improvements For Nueces River Fishing Area

LAWN RENOVATION & OVERSEEDING

Town of Essex Small Site Erosion Control Guide

CHAPTER 2. VEGETATION AND SOIL STABILIZATION CONTROL MEASURES

Turfgrass Sod General

All materials in this presentation are taken from materials produced by:

EROSION & SEDIMENT CONTROL

SECTION VEGETATIVE EROSION CONTROL. A. This section addresses permanent and temporary vegetation and cover crops.

Volume 2, Chapter 12 - Revegetation

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Erosion Prevention Practices (EPPs) Activity: Nets and Mats (N and M)

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2009

REQUIREMENTS FOR SUCCESSFUL ALFALFA ESTABLISHMENT

EnkaTech Note. Installation Guide for Enkamat Slopes and Channels. Site Preparation. Anchor Trench. Enkamat Installation

SECTION SOIL PREPARATION

Spring Turf Care. Pedro Perdomo Nisso America, Inc. HGS March

SECTION SEEDING

Product Catalogue. The Root to Your Success PROFESSIONAL TURF LANDSCAPE & RESIDENTIAL HYDROSEEDING FERTILIZER AND MORE VOLUME 2

Selecting the Right Turf Varieties. Charles Schuster Extension Educator University of Maryland Extension

Executive Sun Mix For the Executive look we all desire

SECTION SODDING

The proper use of erosion and sediment controls will allow the following objectives to be met:

Preparing Your Lawn for Spring and Summer. Pedro Perdomo Nisso America, Inc. HGS March

PERMANENT SEEDING. Overview of Sedimentation and Erosion Control Practices. Practice no. 6.11

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION SODDING

Appendix F Guidance on Selection of Temporary Slope Stabilization Techniques

Toronto District School Board Church Street Junior Public School

a. Section includes planting soils specified by composition of the mixes.

SOIL TEST NOTES. Applying Lime to Established Lawns

SECTION FINE GRADING AND SOIL PREPARATION

A. Surface parking areas shall be constructed of bituminous paving.

Winter work with multiple permit issues of missing perimeter control, exposed soils, missing energy dissipation, and stabilized conveyance.

DIVISION 32 EXTERIOR IMPROVEMENTS SECTION TURF AND GRASSES

B. Finish Grade: Elevation of finished surface of planting soil.

Content. 1. Particular Preambles for Standard Method of Measurement. 2. Particular Specification for Soil Fiber System. 3.

UPLAND EROSION CONTROL, REVEGETATION, AND MAINTENANCE PLAN

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

Erosion Control for Home Builders in the. City of Jacksonville

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

Minnesota Department of Transportation

ITEM V - GRASSING, PLANTING AND EROSION CONTROL

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

EROSION AND SEDIMENT CONTROL PLAN NARRATIVE

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 700 LANDSCAPING 703 CONSTRUCTION STANDARDS AND METHODS

Hollywood Management Guidelines

This is Gardening with Chuck on 1420 KJCK, I m Chuck Otte, Geary County, K-State Research

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2006

CMG GardenNotes #244 Cover Crops and Green Manure Crops

Tel

BMP-33. Stabilizing fine-graded disturbed areas by establishing permanent grass stands with sod.

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

Section Lawn & Grasses Pearl s Premium DRAFT. Pearl s Premium Lawn Grasses are the only acceptable seed / sod choice for this specification.

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

Why Control and Prevent Erosion?

Managing Pesky Weeds in Lawns

900 Roadside Improvement

EROSION & SEDIMENT CONTROL

Minnesota Department of Transportation

B. Finish Grade: Elevation of finished surface of planting soil.

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

SECTION SEEDING

Fertilizer 101. A guide to better sales. Know what you sell!

LANDSCAPE ORDINANCE 1. LANDSCAPE PLAN REVIEW REQUIREMENTS

317)

Table 4.7.1: Swales Potential Application and Storm Water Regulation

Lawn Problems and How to Fix Them. Pedro Perdomo Nisso America, Inc. HGS March

Transcription:

SECTION 32 9200 TURF AND NATIVE/ADAPTIVE PLANTINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections, apply to this section. B. Comply with most current edition of the Northwestern University Design Standards. 1.2 SUMMARY A. Provide all labor, materials and equipment as necessary to complete all work as indicated on the Drawings and specified herein. Review specific project requirements with NU during the design phase. B. This Section includes: 1. Topsoil. 2. Fertilizer. 3. Seed. 4. Mulch. 5. Sod. 1.3 SUBMITTALS A. Quality Assurance/Control Submittals: Supplier's certified analysis for each seed and fertilizer mixture required. 1.4 DELIVERY, STORAGE AND HANDLING A. Deliver materials in original, unbroken, brand marked containers or wrapping indicating weight, analysis and manufacturer's name. B. Handle and store materials in a manner which will prevent deterioration, damage, contamination with foreign matter, damage by weather or elements, and in accordance with manufacturer's directions. C. Reject damaged, deteriorated or contaminated material shall be immediately removed from the site. Replace rejected materials with new materials at no additional cost to NU. 1.5 PROJECT CONDITIONS A. A. Contractor shall obtain and submit copies to Northwestern University all necessary related city and environmental permits (e.g. irrigation water department permits; use of city hydrants - city hydrant permit, etc.). TURF AND NATIVE/ADAPTIVE PLANTINGS 32 9200-1

PART 2 - PRODUCTS 2.1 MATERIALS A. Topsoil: 1. Natural loam topsoil. 2. Uniform quality. 3. Free of undesirable material. 4. Organic content greater than 6% by weight. 5. Acidity between ph 5.0 and ph 8.0. B. Fertilizer: 1. Dry Fertilizer: Ready mixed granular material containing equal amounts by weight of available nitrogen (N), readily available phosphoric acid (P2O5) and total available potash (K2O), (12-12-12). 2. Liquid Fertilizer for Hydroseed: 16-32-4 containing no chlorine. 3. Minimum 40% filler by weight. C. Seed: 1. Uniform mixtures composed of seed of the following proportions by weight: a. Drain Side Slopes, Spoil Banks, and Other Disturbed Areas: 35% creeping red fescue, 10% Kentucky bluegrass, 2% red top, 35% tall fescue, 3% timothy, 15% birdsfoot trefoil. b. Lawns: 30% perennial rye grass, 30% Kentucky bluegrass, 40% creeping red fescue. 2. Legumes shall be inoculated with the proper nitrogen fixing bacteria within 24 hours prior to seeding. 3. Germination of seeds shall be 80% minimum. 4. Purity of seeds shall be 90% minimum. D. Mulch: 1. Anchoring Material for Small Grain Mulch: a. Netting: 2. Hydromulch: 1) Biodegradable. 2) Openings not to exceed 1-1/2 inches x 2 inches. 3) Minimum Roll Width: 35 inches. 4) Anchoring Staples or Pins: [Steel wire not permitted] [Wood pegs] [or No. 11 steel wire] at least 6 inches long. a. Slurry: Minimum 60% wood fiber mulch with remaining being recycled cellulose fibers. b. Tackifier: TURF AND NATIVE/ADAPTIVE PLANTINGS 32 9200-2

1) Synthetic fiber or gum. 2) Manufacturers: Finn Fiber Plus; Finn Fiber Gum; or equal. PART 3 - EXECUTION 3.1 TOPSOIL A. Lawns: 1. Comply with local requirements. 2. Minimum Thickness: 6 inches. B. Perennials: 1. Comply with local requirements. 2. Minimum Thickness: 12 inches of Garden Mix. C. Shrubs: 1. Comply with local requirements. 2. Minimum Thickness: 18 inches. D. Other Areas: Spread existing topsoil. 3.2 FERTILIZING A. Location: 1. Leveled spoil. 2. Other disturbed areas. 3. No fertilizer shall be used with native seeding. B. Dry Fertilizer: 1. Broadcast on surface as first step in seeding process. 2. Apply with seeding if drilled. 3. Apply uniformly. 4. Application Rate: Equivalent to [ 240 / 500 ] pounds per acre of 12-12-12. C. Hydroseeding: 1. Apply fertilizer with seeding. 2. Application Rate: Equivalent to 272 pounds per acre of 16-32-4. 3.3 LAYING SOD A. As specified by local requirements. TURF AND NATIVE/ADAPTIVE PLANTINGS 32 9200-3

3.4 SEEDING A. Scheduling: 1. Within [ 30 days ] [ 7 days ] [ 24 hours ] from the time the area was first disturbed. 2. Channel Banks: Within 24 hours from the time the area was first disturbed. 3. Seasonal Limitations: B. Sowing: a. [ April 20 ] [ May 1 ] through November 1. b. Soil temperatures shall be between 50ºF-65ºF. 1. Sow the seed following or in conjunction with the fertilizer and while the seed bed is in a friable condition. 2. Do not sow seed through mulch. 3. Application Rate: C. Method: a. Lawns: Sow seed at a minimum rate of 100 pounds per acre. b. Ditch Banks, Spoil Berms, and Other Areas: Sow seed a minimum rate of 56 pounds per acre. 1. Broadcast: Do not seed when wind velocity exceeds 5 miles per hour. 2. Mechanical drills. 3. Hydroseeder: D. Inspection: a. Use only equipment specifically designed for hydraulic seeding application. b. Mix seed, fertilizer and pulverized mulch in water until uniformly blended into homogeneous slurry. c. Continue mixing during application. d. [ Native seed must be applied with water only for direct seed-soil contact, not with pulverized mulch. ] e. [ Apply pulverized mulch after native seed is applied. ] 1. Visually inspect for uniform distribution. 2. Reseed areas as required to establish a uniform and stable stand of grass. E. Finishing: Incorporate seed into the upper 1/2-inch of soil. 3.5 MULCHING A. Small Grain Mulch: 1. Application: a. Immediately after seeding. b. Uniform distribution. c. Allow sunlight to penetrate mulch. TURF AND NATIVE/ADAPTIVE PLANTINGS 32 9200-4

2. Application Rate: a. Two tons per acre (2-1/2 bales per 1000 square feet). b. Three tons per acre for dormant seeding. c. One ton per acre (1-1/4 bales per 1,000 square feet) for native seeding. 3. Anchoring: B. Hydromulch: a. Level Areas and Slopes Flatter Than 3:1 (H:V): Mulch anchoring tool. b. Slopes 3:1 (H:V) or Steeper for Netting: Install in accordance with manufacturer's instructions. 1. Apply with hydroseed. 2. Application Rate: 1,250 pounds per acre. 3. Apply after native seed has been applied without mulch in slurry. 3.6 MAINTENANCE A. Reseed, resod, refertilize, remulch, or regrade as necessary to establish a uniform and stable grassed area. END OF SECTION 32 9200 TURF AND NATIVE/ADAPTIVE PLANTINGS 32 9200-5